W9126G20R1598_Santa Fe ACP Exit Widening_AMD01.pdf
PDF 1 MB Posted
- Attached to
- Santa Fe ACP Exit Widening
- Solicitation number
- W9126G20R1598
About this file
This document amends a solicitation for the construction portion of a design-build-bid contract to repair the Fort Hood Santa Fe ACP Exit Road. The amendment provides updated information on the site visit, including a new date and location, as well as attendance procedures. It also adds an attachment with a map of parking areas. Offerors are required to inspect the site and may not use failure to do so as grounds to withdraw a proposal or claim after award. The U.S. Army Corps of Engineers Engineering District Fort Worth will evaluate proposals due by September 10, 2020 at 2:00 pm Central Time for this project to repair the exit road at Fort Hood, Texas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for HOOD SANTA FE ACP EXIT ROAD; Fort Hood, Texas is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is 10 September 2020; at 2:00 p.m.,CT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G20R1598
X 9B. DATED (SEE ITEM 11)
25-Aug-2020
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25 -Aug-2020
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G20R1598
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G20R1598
CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
1. Section 00 21 30 SITE VISITS: Section 00 21 30 has been updated and replaced, bearing the notation W9126G20R1598-0001.
ADDED ATTACHMENTS
2. Added Attachment: The following attachment will be added after section 00 21 30 SITE VISIT, bearing the notation W9126G20R1598-0001.
VCCtoCRDAMC_Parking.pdf
End of Summary of Changes
Santa Fe ACP Exit Road FH20SFAER
SECTION 00 21 30
SITE VISITS
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SITE VISITS
(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors or quoters are urged and expected to inspect the site where the work will be performed. Site visits will be arranged during normal duty hours.
(b) Site visit information: The site visit will be:
Date: <AM#0001>August 7, 2020August 31, 2020 Time: 0930 Location: Bldg. 4617 72nd St and Sante Fe Ave.In the parking lot of building 36000 </AM#0001> POC: Brad Butts EMAIL: brad.d.butts@usace.army.mil Office Phone: (254) 285-3189 Cell Phone: (254) 220-2126
Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email, to the referenced Base Access POC, a minimum of two (2) calendar days prior to the preproposal site visit. Site visit appointments are limited to 2 hours each. Each site visit is limited to three (3) contractor personnel total. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF (POC), and this individual will be responsible for all other personnel:
Offeror's and offeror's subcontractor personnel full names Driver's License, including the State Issued Firm
Personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.
NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.
Persons with questionable criminal records or outstanding warrants will be denied access to the installation.
(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a proposal after receipt of proposal or for a claim after award
DOCUMENT 00 21 30 Page 1
W9126G20R1598-0001
Santa Fe ACP Exit Road FH20SFAER of the contract.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
DOCUMENT 00 21 30 Page 2
VISITORS
CONTROL CTR
FISHER HOUSE
SANTA FE AVE
W
RA
TTEN DR
SP
UR
FI
SH
ER LN
TRO
O
P
ER LP
VOYAGER WAY
OLD RAI L HEAD DR
SA
N
TA
FE
RA
MP W
MEDICAL CENTER RD
SANTA FE RAMP N
WI LDFLOWER CT
SANTA
FE
R A
M P
S
S T
J M
I L L
S R
D
S
TJ
MILLS
BLVD
W VETERANS MEMORIAL BLVD
W CENTRAL TEXAS EXPY
IH 14
6900336062 µ
SANTA FE
GATE
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| SUMMARY OF CHANGES |
| 00 21 30 - SITE VISITS |
| VCCtoCRDAMC_Parking.pdf |
File details come from the government source that posted it. Updated .