W9126G20R1598_Santa Fe ACP Exit Widening_Solicitation.pdf

PDF 4 MB Posted

Attached to
Santa Fe ACP Exit Widening Federal contract opportunity
Solicitation number
W9126G20R1598
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

This solicitation requests proposals for the construction portion of a design-bid-build renovation project at the Fort Hood Santa Fe ACP Exit Road. The contractor will provide all labor, management, investigations, studies, travel, facilities, supplies, equipment, and materials to perform the required repair services. This is a 100% total small business set-aside solicitation using the best value tradeoff process, with a construction value between $1,000,000 to $5,000,000. Proposals are due by the specified date. The Department of the Army Corps of Engineers Engineering District Fort Worth will evaluate proposals and make award to the best value offer based on past performance, schedule, and price factors.

View the file

Other files for this federal contract opportunity

Other files attached to Santa Fe ACP Exit Widening, newest first.
File Type Posted
W9126G20R1598_Santa Fe ACP Exit Widening_AMD01.pdf PDF
Drawings - Santa Fe ACP Exit Roadway Widening - Solicitation Data - Signed and Sealed - 07202020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build Request For Proposal

Total Small Business Set Aside

HOOD SANTA FE ACP EXIT ROAD

Fort Hood, TX

W9126G20R1598 August 2020

US Army Corps of Engineers Fort Worth District

Santa Fe ACP Exit Road FH20SFAER

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442

00 11 00.02 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 21 30 SITE VISITS

00 22 11 LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL

PREPARATION

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 19.00 44 PROJECT MEETINGS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)

01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM

01 58 00 PROJECT IDENTIFICATION

01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 10 - SPECIALTIES

10 14 53 TRAFFIC SIGNAGE

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISION 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 1

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 11 30 LIME TREATED SUBGRADE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 34 - TRANSPORTATION

34 71 13.16 VEHICLE CRASH BARRIERS

34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SOLICITATION, OFFER, 1. SOLICITATION NO.

W9126G20R1598

2. TYPE OF SOLICITATION

SEALED BID (IFB)

X NEGOTIATED (RFP)

3. DATE ISSUED

11-Aug-2020

PAGE OF PAGES

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE W9126G 8. ADDRESS OFFER TO (If Other Than Item 7) CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAY LOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

See Item 7

TEL: FAX: (817) 886-6403 TEL: FAX:

9. FOR INFORMATION

CALL:

A. NAME

EMMANUEL D HARDRICK

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(817) 886-1088

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Project Title: Santa Fe ACP Exit Roadw ay Widening

NAICS Code: 236220 Size Standard: $39.5 Million

THIS IS A 100% TOTAL SMALL BUSINESS SET-ASIDE solicitation using the Best Value Trade-off Process.

Magnitute of Construction: $1,000,000 - $5,000,000.

If the contractor fails to provide adequate and acceptable bond documents and insurance certificate w ithin ten days after contract aw ard, such failure shall constitute grounds for termination for default w ithout the requirement of the Contracting Officer to first issue a "show cause" letter. The Government w ill not allow the contractor to w ork on the project unless the bond documents and insurance certificate have been accepted by the Contracting Officer and a signed Notice to Proceed has been issued to the contractor.

*Block 11. See Section 01 00 00.00 44 for the Period of Performance

Point of Contact for solicitation: Mr. Emmanuel D. Hardrick; emmanuel.d.hardrick@usace.army.mil; (817) 886-1088

11. The Contractor shall begin performance w ithin 10 calendar days and complete it w ithin 180 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See 01 00 00.00 44 .)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

copies to perform the w ork required are due at the place specified in Item 8 by 1_0_:_0_0_A_M (hour) A. Sealed offers in original and local time 10 Sept 20 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section: 00 11 00 W9126G20R1598

Item Unit Line Item No. Description Quantity Unit Price Amount

0001 Construction of the Santa Fe ACP Exit Road.. 1 JOB $ *** $

DAYS

HOOD SANTA FE ACP EXIT ROAD

FY 20

TOTAL BASE OFFER

Contract Duration in Calendar Days After the Notice to Proceed is received.*

*Note: Contract duration for all work shall NOT exceed the duration specified in Section 01 00 00.00 44 CONSTRUCTION SCHEDULE. See Note No. 4.

Fort Hood, TX

CONTRACT LINE ITEM SCHEDULE

Section: 00 11 00 W9126G20R1598

HOOD SANTA FE ACP EXIT ROAD

FY 20

Fort Hood, TX

CONTRACT LINE ITEM SCHEDULE

NOTES:

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable

NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

NOTE NO. 4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for design and construction through completion, ready for turnover shall not exceed the number of calendar days specified in Section 01 00 00.00 44 Construction Schedule. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See also Sections 00 73 00 Special Contract Requirements, clause Commencement, Prosecution And Completion Of Work.

NOTE NO. 5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

NOTE NO. 6. The Army will procure this facility through a cost competition in accordance with the provisions set forth in this Request for Proposals (RFP). When awarded, it will be a "Firm Fixed Price Contract."

NOTE NO. 7. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

NOTE NO. 8. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. JOB

END OF CLIN SCHEDULE

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

PROJECT INFORMATION

INSTRUCTIONS, CONDITIONS AND NOTICES TO

OFFERORS

1.1 GENERAL DESCRIPTION OF WORK

1.2 GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR’S QUESTION AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARDS/ NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 SITE VISIT

1.8 ACCURACY IN PROPOSALS

1.9 PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL

INSTRUCTIONS

1.10 PROPOSAL FORMAT

1.11 JOINT VENTURE PROPOSAL REQUIREMENTS

1.12 BID GUARANTEE

1.13 CONTRACT PRICES-BIDDING SCHEDULE

1.1. GENERAL DESCRIPTION OF WORK

General Description of Work: This is the construction portion of a D-B-B contract. This project shall provide repair of the Fort Hood Santa Fe ACP Exit Road. The contractor shall furnish all labor, management, investigations, studies, travel, facilities, supplies, equipment, and materials to perform the required services.

The contractor is responsible for determining what disciplines and skill sets are required for accomplishing the work under this SOW and form a team accordingly. The contractor shall accomplish the required services and furnish to the Government reports and other data together with supporting material developed during the period of service as set forth herein. During the execution of work, the contractor shall provide adequate supervision and quality, timeliness, and completeness of the work.

1.2. GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES

The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):

U.S. Army Engineer District, Fort Worth

ATTN: CESWF-CT-C, Contract Specialist, Emmanuel

Hardrick

819 Taylor Street (Room 2A17)

Fort Worth, TX, 76102-0300

All Federal Express/UPS/etc. packages are required to have Offeror’s physical address and the above contracting office address including room number, contract specialist’s name and telephone number for proper delivery.

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY. All solicitation documents and amendments will be posted on Contract Opportunities website at https://beta.SAM.gov and Offeror can access solicitation documents by the solicitation number, W9126G20R1598.

It is solely the Contractor’s responsibility to check beta.SAM.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. The Offeror must be registered with the System for Award Management

Database (SAM) to receive a Government contract award.

Additional information regarding this solicitation and potential Offerors (i.e., interested vendors list) and/or subcontractors will be available beta.SAM.gov website under the solicitation number.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail to:

Contract Specialist – Primary POC

U.S. Army Corps of Engineers, Fort Worth

District ATTN: CECT-SWF (Emmanuel

Hardrick)

Phone: (817) 886-1088

Email: emmanuel.d.hardrick@usace.army.mil

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via:

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter

Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

mailto:emmanuel.d.hardrick@usace.army.mil http://www.projnet.org/projnet

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9126G20R1598

The Bidder Inquiry Key is: P5PX9Q-IXZJW5

The Bidder Inquiry System will be unavailable for new inquires seven (7) days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions.

1.7. SITE VISIT

See section 00 21 30 for detailed site visit information.

1.8. ACCURACY IN PROPOSALS

Proposals must set forth with full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

1.9. PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL INSTRUCTIONS

Submit the Price and Technical proposals electronically via the DoD SAFE website at https://safe.apps.mil/.

In order for an outside user (the contractor) to submit a proposal for the solicitation, they must receive a drop-off request from an inside user (the government). When the inside user generates a drop-off request for you, you will receive an email with a link to submit your drop-off. Optionally, the Government may provide you with a request code. In that case, click the Drop-off button on the SAFE home page and enter the Request code.

To request and receive a drop-off request for this solicitation, email the Contract Specialist and Contracting

Officer two (2) working days before the proposal due date. The Contracting Officer for this project is: Mr.

John H. Rodgers. Email address is john.h.rodgers@usace.army.mil. The Contract Specialist for this project is:

Mr. Emmanuel Hardrick. Email address is emmanuel.d.hardrick@usace.army.mil. Include the solicitation number in your Email Subject Line: W9126G20R1598.

1.10. PROPOSAL FORMAT

Submit only the electronic documents. All files submitted shall be in PDF format. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.

https://safe.apps.mil/ mailto:john.h.rodgers@usace.army.mil

PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company. PDF drawings and summary schedule diagrams shall be sized to print on 11x17 inch paper.

Hard copies shall not be submitted, with the exception of the bid guarantee. Refer to this section, 1.12 Bid

Guarantee, for bid guarantee submission requirements.

“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.

Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

For submissions with page limitations, the corresponding PDF pages will be counted.

Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.

1.11 JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or Hub Zone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.12 BID GUARANTEE

Submit the Bid Guarantee in accordance Provision 52.228-1, Bid Guarantee. One (1) copy of the bid guarantee shall be submitted electronically as part of Volume 2 and one (1) hard copy submission of the bid guarantee is due by the date and time for proposal submission. The bid guarantee shall be sent to the address in this section, 1.9 Proposal Submittals and Proposal Format & General Instructions, on or before the date indicated in Box 13 of the SF1442.

1.13 CONTRACT PRICES - BIDDING SCHEDULE

Payment for the items listed in the Bidding Schedule shall constitute full compensation for furnishing all plant, labor, equipment, appliances, materials and bonds (performance and payment), and for performing all operations required to complete the work in conformity with the drawings and specifications. All costs for work not specifically mentioned in the Bidding Schedule shall be included in the contract prices for the items listed.

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Unique Entity Identifier OCT 2016

52.204-7 System for Award Management OCT 2018

52.204-22 Alternative Line Item Proposal JAN 2017

52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

DEC 2019

52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and

Standardization Information System (ASSIST)

APR 2014

52.211-14 Notice Of Priority Rating For National Defense, Emergency

Preparedness, and Energy Program Use

APR 2008

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017

52.217-5 Evaluation Of Options JUL 1990

52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.232-13 Notice Of Progress Payments APR 1984

52.232-18 Availability Of Funds APR 1984

52.236-28 Preparation of Proposals--Construction OCT 1997

252.236-7006 Cost Limitation JAN 1997

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price (FFP) contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers

Fort Worth District

819 Taylor Street, Rm 2A17 (Attn: Mr. John Rodgers, CESWF-CT)

Fort Worth, Texas 76102-0300

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

See section 00 21 30 for detailed site visit information

(c) Participants will meet at—

See section 00 21 30 for detailed site visit information

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR):

https://www.acquisition.gov/browse/index/far

Department of Defense FAR Supplement (DFARS):

https://www.acquisition.gov/dfars https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

SECTION 00 21 30

SITE VISITS

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors or quoters are urged and expected to inspect the site where the work will be performed. Site visits will be arranged during normal duty hours.

(b) Site visit information: The site visit will be:

Date: August 7, 2020 Location: Bldg. 4617 72nd St and Sante Fe Ave.

POC: Brad Butts EMAIL: brad.d.butts@usace.army.mil Office Phone: (254) 285-3189 Cell Phone: (254) 220-2126

Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email, to the referenced Base Access POC, a minimum of two (2) calendar days prior to the preproposal site visit. Site visit appointments are limited to 2 hours each. Each site visit is limited to three (3) contractor personnel total. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF (POC), and this individual will be responsible for all other personnel:

Offeror's and offeror's subcontractor personnel full names Driver's License, including the State Issued Firm

Personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.

Persons with questionable criminal records or outstanding warrants will be denied access to the installation.

(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a proposal after receipt of proposal or for a claim after award of the contract.

DOCUMENT 00 21 30 Page 1

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DOCUMENT 00 21 30 Page 2

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award One Step - Best

Value, Design-Build (Single Award)

EVALUATION CRITERIA

APPENDIX C

SECTION 00 22

SELECTION PROCEDURES

1. OVERVIEW

2. BASIS OF AWARD

3. GENERALINSTRUCTION

3.1. GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES

3.2. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

3.3. OFFERORS QUESTIONS AND COMMENTS

3.4. DIRECTIONS FOR SUBMITTING PROPOSALS

3.5. PROPOSAL FORMAT

3.6. MAGNITUDE OF CONSTRUCTION

4. EVALUATION FACTORS AND WEIGHTING, VOLUME 1, TECHNICAL

4.1. GENERAL

4.2. PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

5. TAB A– FACTOR 1–PASTPERFORMANCE

5.1. SUBMISSIONREQUIREMENTS

5.2. RELEVANCYDETERMINATION

5.3. CONFIDENCE EVALUATIONCRITERIA

6. TAB B –FACTOR 2 – SUMMARY SCHEDULE

6.1. SUBMISSIONREQUIREMENTS

6.2. EVALUATIONCRITERIA

7. PRICE AND OTHER REQUIRED INFORMATION, VOLUME 2, PRICE

7.1 TABLE 2 - Volume 2 – PRICE AND OTHERREQUIREDINFORMATION

7.2 GENERAL

7.3 TAB A – FACTOR 3 – PRICE

7.4 TAB B – BID GUARANTEE

7.5 TAB C – REQUIRED PRE-AWARD INFORMATION

7.5.2 EVALUATION CRITERIA

8.1. GENERAL

8.2. DISCUSSIONS (IFNECESSARY)

9. EVALUATION AND RATING SYSTEM

9.1. GENERAL

9.2. REVIEW WRITE-UP

9.3. RATING SYSTEM

10. DEFINITIONS

11. PAST PERFORMANCE RATINGS

12. PRICE AND OTHER REQUIRED INFORMATION RATINGS

13. ATTACHMENTS

ATTACHMENT 1- PROPOSAL DATA SHEETS

ATTACHMENT 2- CONSTRUCTION PAST PERFORMANCE ASSESSMENT WORKSHEET

ATTACHMENT 3- CONSTRUCTION PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT 4- FAR PROVISION 52.209-5, CERTIFICATION REGARDING RESPONSIBILITY

MATTERS (APR 2010)

1.0 OVERVIEW

This Request for Proposal (RFP) solicits for the design-bid build renovation of the Santa Fe ACP, Fort Hood, Texas.

The work shall be in accordance with the Request for Proposal documents. The proposed project will be a Total

Small Business set-aside using the “Tradeoff Process”.

The award of this Total Small Business set-aside task order will be for a Design-Bid Build, Firm-Fixed Price (FFP) contract at Fort Hood, Texas. This will be awarded competitively through a fair opportunity process using FAR

Subpart 19.5.

The Tradeoff Process permits the tradeoffs among cost, price and/or non-cost factors and allows the Government to accept other than the lowest priced proposal. Offerors submit their performance and capability information for review and consideration by the Government. Relative weights among technical factors are provided in Section 4: Evaluation

Factors & Weighting. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical

Offerors will be established prior to discussions (if held). Concurrently, the Government analyzes price proposals of

Offerors utilizing the project cost proposal. Price will not be rated, but will be a factor in making the final best value determination for award. The Source Selection Authority (SSA) compares proposals and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.

2.0 BASIS OF AWARD

The Contracting Officer (KO) will award a firm fixed-price task order to that responsible Offeror whose proposal the Source Selection Authority (SSA) determines offers the best overall value to the Government. Best

Value means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. This process may result in an award being made to a firm with a higher- priced offer where the decision is consistent with the evaluation criteria/factors and the SSA determines that the superior past performance, summary schedule, and/or construction approach of the higher-priced offer outweighs the cost difference.

The SSA, using sound business judgment, bases the award decision on an integrated assessment of the evaluation criteria in the factors described below. While the entire evaluation team strives for maximum objectivity, the selection process is subjective by nature and professional judgment is implicit throughout the best value process. Ultimately, the contract shall be awarded to the Offeror whose proposal, based upon the evaluation criteria, represents the best value to the Government.

Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, technical acceptability and responsibility.

In order to determine which proposal(s) represent the best value, the Government will be determined by a comparative assessment of proposals against all source selection criteria in this RFP.

As technical ratings and relative advantages and disadvantages become less distinct, differences in price between proposals are of increased importance in determining the most advantageous proposal.

Conversely, as differences in price become less distinct, differences in technical ratings and relative advantages and disadvantages between proposals are of increased importance to the determination. All evaluation factors when combined are significantly more important than price.

The Government reserves the right to accept other than the lowest priced offer(s). The right is also reserved to reject any and all offers.

Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.

3.0 GENERAL INSTRUCTIONS

Offerors shall submit their proposal per the instructions provided. Proposals are due no later than the time and date specified in the RFP letter.

3.1 GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES

The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of

Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):

U.S. Army Corps of Engineers, Fort Worth District

ATTN: Emmanuel Hardrick, Contract Specialist 819

Taylor Street (Room 2A17)

Fort Worth, TX, 76102-0300

3.2 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and all amendments are available by EMAIL and FILE EXCHANGE ONLY. All solicitation documents and amendments will be sent via email and/or file exchange to the bidders.

The Offeror shall submit in its proposal all requested information as specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. The Offeror must be registered with the

System for Award Management Database (SAM) to receive a Government contract award.

3.3 OFFERORS QUESTIONS AND COMMENTS

a. Bidder Inquiry

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in

ProjNet at http://www.projnet.org/projnet .

The RFP Number is: W9126G20R1598

The Bidder Inquiry Key is: P5PX9Q-IXZJW5

b. To submit and review bidder inquiries, bidders will need to be a current registered user or self-register into the

ProjNet system. To self-register go to web page at http://www.projnet.org/projnet, click the BID tab, select Bidder

Inquiry, select agency USACE, enter the Key for this RFP (listed above) and your email address, and click login.

Fill in all required information and click create user. Verify that the information on the next screen is correct and click to continue.

c. From this page you may view all bidder inquiries or addan inquiry. Offerors are to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. Only one question will be allowed per inquiry. If multiple questions are included in a single inquiry, only the first question will be answered. All others will remain unanswered until entered in as a single inquiry.

d. Bidders will receive an acknowledgement of their question via email, followed byan answer to their question after it has been processed by our technical team.

e. The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.

f. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

3.4 DIRECTIONS FOR SUBMITTING PROPOSALS

To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award.

The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W9126G20R1598_COMPANY NAME_PRICE

W9126G20R1598_COMPANY NAME_TECHNICAL

All proposals shall be submitted electronically using the DOD SAFE website located at https://safe.apps.mil.

Offers, modifications thereto, or cancellations of offers received by telegraph, facsimile or by e mail will not be accepted.

At the DOD SAFE website, select the Non-CAC Users. The website will require offeror to enter Personal

Information, upload files (PDF format required), and include a brief description with the RFQ number. ADD the Contract Specialist for the recipient information. Users cannot send packages to recipients who do not have

.mil or .gov email addresses. Upload your files and Agree to any SAFE Usage Policy. Once uploading is complete, please verify your file uploads. In order to complete the proposal submission you will need to check your email for further instructions, unless instructed otherwise. Complete sent instructions and verify your email address so the Government will be able to download the files.

NOTE: Please save all emails received from https://safe.apps.mil for your records.

DOD SAFE WEBSITE IS NOT DESIGNED FOR LAST MINUTE SUMISSIONS OF PROPOSALS.

YOU ARE ADVISED TO NOT WAIT UNTIL THE LAST MINUTE. Proposals received after the date and time will be handled in accordance with FAR 52.215-1(c)(3)(ii).

When completing the information for transmittal at the DOD SAFE website and verifying your email address, send a separate email notification to the Contract Specialist stating that you have successfully submitted (and uploaded) a proposal at the DOD SAFE website. Include the solicitation number, W9126G20R1598 in the subject line of your email.

3.5 PROPOSAL FORMAT:

3.5.1 Submit only the electronic documents. Submit only the electronic files specifically requested. All files submitted shall be in PDF format. Do not submit excess information, to include audio-visual materials, electronic media, etc.

All pages shall be numbered.

3.5.2 Searchable PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company. PDF drawings and summary schedule diagrams shall be sized to print on 11x17 inch paper.

3.5.3 Hard copies shall not be submitted, with the exception of the bid guarantee. Refer to Section 00 21 00, 1.12 Bid

Guarantee for bid guarantee submissionrequirements.

3.5.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.

Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

3.5.5 In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

3.5.6 For submissions with page limitations, the corresponding PDF pages will be counted.

3.5.7 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked

“REVISED”, with the date ofrevision.

3.5.8 Within three (3) days of contract award, the contractor receiving the award shall electronically submit their conformed proposal.

3.6 MAGNITUDE OF CONSTRUCTION:

Magnitude of Construction is $1,000,000 to $5,000,000.

4.0 EVALUATION FACTORS AND WEIGHTING, VOLUME 1, TECHNICAL

4.1 GENERAL:

https://safe.apps.mil/

Offerors are invited to submit a proposal, as indicated below. The Government will evaluate the proposals in accordance with the evaluation criteria described herein, using the evaluation rating systems outlined in the selection procedures. Price information will be evaluated for fairness, reasonableness, and for material unbalancing, as described herein. The evaluation will be conducted in accordance with FAR Part 15.

4.2. PROPOSAL CONTENTS AND RELATED EVALUATIONFACTORS

VOLUME 1 – Technical

Table 1 - Volume 1 – PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

5.0 TAB A – FACTOR 1 - PAST PERFORMANCE

5.1 SUBMISSIONREQUIREMENTS:

5.1.1. The Offeror shall demonstrate past performance through the submission of similar projects, using the

Construction – Past Performance Assessment Worksheet (Attachment 2). If the Offeror is a Joint Venture, Partnership, Teaming Arrangement, or Parent company/subsidiary/affiliate as identified in the offeror’s proposal, provide past performance information for construction projects relevant to each of the proposed roles on this project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Offerors shall submit at least three (3) and no more than five (5) projects (one Past Performance Assessment Worksheet per project) completed or substantially completed within 6 years from the date of this solicitation that best represent their experience similar to the scope of workfor this solicitation. One (1) of the projects submitted for construction past performance may be a current construction project with at least 50% construction progress completed. If offeror is proposing as a Joint Venture (JV), Partnership and/or Teaming

Arrangement and past performance cannot be provided as such, each partner shall submit past performance information, with no more than three (3) projectseach.

5.1.2. The Past Performance Questionnaire (PPQ) included in the solicitation (Attachment 3) is provided for the

Offeror to submit to the client for each project the Offeror included for Factor 1, Past Performance that does not have an interim or final CPARS evaluation or is a non-Federal Government project. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQ should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If any negative past performance information is received to which the Offeror has not an opportunity to respond, the contractor will be given an opportunity to provide rebuttal. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Emmanuel Hardrick, via e-mail at emmanuel.d.hardrick@usace.army.mil prior to proposal closing date.

5.1.2.1. Offerors shall not incorporate by reference into their proposals PPQ’s previously submitted for other

RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Location Factor Number

Description Relative Importance

TAB A Factor 1 PAST PERFORMANCE More important than Factor 2

TAB B Factor 2 SUMMARY SCHEDULE Less important than Factor 1

5.1.2.2. Do not request PPQ on projects that have interim or final CPARS evaluations. If an interim or final

CPARS evaluation exists and a PPQ is provided for the same project, the CPARS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the

Source Selection Board or the Source Selection Authority.

5.1.2.3. For USACE or other DoD projects which are underway but do not yet have an interim or final CPARS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the

Administrative Contracting Officer (ACO) for the contract.

5.1.3. Offerors are not required to submit any additional past performance information. The Government will utilize CPARS and any other information deemed relevant to assess confidence in the Offeror’s ability to perform.

5.1.3.1. Offerors may submit information on past performance issues and corrective actions taken to prevent these issues from reoccurring. Discuss whether these corrective actions have been implemented on contracts awarded subsequent to the performance issues, the effectiveness of the corrective actions, and POC information for the subsequentcontracts.

5.1.4. In addition to the above, the Government may review any other sources of information for evaluation of past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor

Performance Assessment Reporting System (CPARS), using all CAGE/DUNS number of team members

(Partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquires of owner representative(s), Federal Awardees Performance and Integrity

Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

5.1.5. The Projects will be considered relevant to this procurement if they are similar in type, scope, complexity or magnitude. Relevancy is defined as:

(a) Roadway renovation project that included at least 15,000 square feet of asphalt removal/replacement in accordance with TxDOT requirements

(b) Construction value of at least $1,000,000

(c) Installation of pavement markings and signage conforming to MUTCD requirements

(d) Installation of an active vehicle barrier system and associated controls

5.1.6. The Offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate past performance that is not directly related to the specific projects above is applicable to this project and how the Government will benefit.

5.2…