| File | Type | Posted |
|---|---|---|
| 20R0025 Amendment 2.pdf | ||
| B.08.01_20R0025 amendment 1.pdf | ||
| PW North Build Final Jun 25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Base Year | |||||
| CLIN # | Section 1-Campsite Maintenance | U/M | Unit Price | Quantity | Price |
| A001 | IMPACT PAD MATERIAL | SF | 1 | ||
| A002 | CONCRETE WHEEL STOPS | EA | 1 | ||
| A003 | TIMBER DELINIATORS, ONE TIER | LF | 1 | ||
| A004 | TIMBER DELINIATORS,TWO TIER | LF | 1 | ||
| A005 | TIMBER DELINIATORS, THREE TIER | LF | 1 | ||
| A006 | TIMBER DELINIATORS, FOUR TIER | LF | 1 | ||
| A007 | TIMBER DELINIATORS, FIVE TIER | LF | 1 | ||
| A008 | UPRIGHT AND PEDASTAL GRILL INSTALLATION | EA | 1 | ||
| A009 | FIRE RING AND GROUND MOUNTED COOKER INSTALLATION | EA | 1 | ||
| A010 | LANTER HANGER POST INSTALLION | EA | 1 | ||
| A011 | REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC TABLES | EA | 1 | ||
| A012 | REPLACE/INSTALL PARK BENCHES | EA | 1 | ||
| A013 | RETAINER WALL BLOCK INSTALLATION ONE | LF | 1 | ||
| A014 | RETAINER WALL BLOCK INSTALLATION TWO | LF | 1 | ||
| A015 | RETAINER WALL BLOCK INSTALLATION THREE | LF | 1 | ||
| A016 | RETAINER WALL BLOCK INSTALLATION FOUR | LF | 1 | ||
| A017 | RETAINER WALL BLOCK INSTALLATION FIVE | LF | 1 | ||
| A018 | RIP RAP BAG INSTALLATION ONE | LF | 1 | ||
| A019 | RIP RAP BAG INSTALLATION TWO | LF | 1 | ||
| A020 | RIP RAP BAG INSTALLATION THREE | LF | 1 | ||
| A021 | RIP RAP BAG INSTALLATION FOUR | LF | 1 | ||
| A022 | RIP RAP BAG INSTALLATION FIVE | LF | 1 | ||
| A023 | RIP RAP BAG INSTALLATION SIX | LF | 1 | ||
| A024 | RIP RAP BAG INSTALLATION SEVEN | LF | 1 | ||
| A025 | RIP RAP BAG INSTALLATION EIGHT | LF | 1 | ||
| A026 | OTHER CAMPSITE MAINTENANCE |
| Total Section 1 Base Year | |||||
| CLIN # | Section 2-Carpentry and Painting | U/M | Unit Price | Quantity | Price |
| A027 | METAL PICNIC SHELTER INSTALLATION | EA | 1 |
| A028 | ROOFING REMOVAL (COMPOSITION AND R-PANEL) | SF | 1 |
| A029 | ROOF SHEATHING | SF | 1 |
| A030 | TONGUE AND GROVE DECKING | SF | 1 |
| A031 | FASCIA BOARD | LF | 1 |
| A032 | COMPOSITION SHINGLE REPAIR/INSTALLATION | SF | 1 |
| A033 | R-PANEL REPAIR/INSTALLATION | SF | 1 |
| A034 | WALL SHEATING | SF | 1 |
| A035 | SOFFIT SHEATHING | SF | 1 |
| A036 | WALL SIDING | SF | 1 |
| A037 | PLASTIC LAMINATE PANELS | SF | 1 |
| A038 | LAP OR "V" GROOVED SIDING | SF | 1 |
| A039 | BRICK AND SLUMP STONE MASONRY-REPAIR/INSTALLATION | SF | 1 |
| A040 | NATURAL STONE MASONRY-REPAIR/INSTALLATION | SF | 1 |
| A041 | TOILET PARTITION-SINGLE | EA | 1 |
| A042 | TOILET PARTITION-DOUBLE | EA | 1 |
| A043 | TOILET PARTITION-TRIPLE | EA | 1 |
| A044 | SHOWER PARTITION | EA | 1 |
| A045 | SHOWER/TOILET DOOR WITH PILASTER | EA | 1 |
| A046 | URINAL PARTITION | EA | 1 |
| A047 | PAINTING METAL PICNIC SHELTERS | SF | 1 |
| A048 | PAINTING WOOD-OIL BASED PAINT | SF | 1 |
| A049 | PAINTING WOOD-EXTERIOR LATEX PAINT | SF | 1 |
| A050 | PAINTING WOOD-SEALER/STAIN | SF | 1 |
| A051 | PAINTING WOOD-WATERPROOFING | SF | 1 |
| A052 | PAINTING MASONRY-BLOCK SEALER/FILLER | SF | 1 |
| A053 | PAINTING MASONRY-OIL BASED | SF | 1 |
| A054 | PAINTING MASONRY-EXTERIOR LATEX PAINT | SF | 1 |
| A055 | PAINTING METAL-OIL BASED PAINT | SF | 1 |
| A056 | PAINTING METAL-EXTERIOR BASED PAINT | SF | 1 |
| A057 | LOG VENEER SIDING | SF | 1 |
| A058 | LOG SIDING | SF | 1 |
| A059 | OTHER CARPENTRY AND PAINTING |
| Total Section 2 Base Year | |||||
| CLIN # | Section 3-Paving, Road Maintenance and Site Work | U/M | Unit Price | Quantity | Price |
| A060 | TOP SOIL | TN | 1 | ||
| A061 | FILL MATERIAL | TN | 1 | ||
| A062 | SAND MATERIAL | TN | 1 | ||
| A063 | AGGREGATE ROAD BASE MATERIAL | TN | 1 | ||
| A064 | AGGREGATE ROAD BASE MATERIAL | TN | 1 | ||
| A065 | RIP RAP STONE 3"-5" | TN | 1 | ||
| A066 | RIP RAP STONE 6"-12" | TN | 1 | ||
| A067 | RIP RAP STONE 12"-18" | TN | 1 | ||
| A068 | POLYETHYLENE CULVERT REPLACEMENT 12" | LF | 1 | ||
| A069 | POLYETHYLENE CULVERT REPLACEMENT 18" | LF | 1 | ||
| A070 | POLYETHYLENE CULVERT REPLACEMENT 24" | LF | 1 | ||
| A071 | POLYETHYLENE CULVERT REPLACEMENT 36" | LF | 1 | ||
| A072 | POLYETHYLENE CULVERT REPLACEMENT 48" | LF | 1 | ||
| A073 | ROAD BORING-2" CASING | LF | 1 | ||
| A074 | ROAD BORING-4" CASING | LF | 1 | ||
| A075 | ROAD BORING-6" CASING | LF | 1 | ||
| A076 | ASPHALT PAVING AND PATCHING | SY | 1 | ||
| A077 | SCARFYING AND RESHAPING BASE COURSE | SY | 1 | ||
| A078 | BITUMINOUS TACK COAT | SY | 1 | ||
| A079 | BITUMINOUS PRIME COAT | SY | 1 | ||
| A080 | ASPHALT SEALING COATING | SY | 1 | ||
| A081 | SEALING JOINTS AND CRACKS | LF | 1 | ||
| A082 | PAINTING/MARKING TRAFFIC CONTROL | LF | 1 | ||
| A083 | 4" CONCRETE SLAB | SF | 1 | ||
| A084 | 4" CONTRETE SLAB WITH FOOTINGS | SF | 1 | ||
| A085 | 6" CONCRETE SLAB | SF | 1 | ||
| A086 | 6" CONCRETE SLAB WITH FOOTINGS | SF | 1 | ||
| A087 | CONCRETE CURB | LF | 1 | ||
| A088 | CONCRETE CURB, 24" CURB AND GUTTER | LF | 1 | ||
| A089 | ROAD SHOULDER MAINTENANCE | LF | 1 | ||
| A090 | PLAYGROUND MULCH REMOVAL AND DISPOSAL | CY | 1 | ||
| A091 | BARK CHIP SUPPLY/DELIVERY | CY | 1 | ||
| A092 | RUBBER MULCH SUPPLY/DELIVERY | CY | 1 | ||
| A093 | LIMESTONE ROAD BASE | SF | 1 | ||
| A094 | LAUNCH TYPE CONCRETE | SF | 1 | ||
| A095 | OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK |
| Total Section 3 Base Year | |||||
| CLIN # | Section 4-Plumbing | U/M | Unit Price | Quantity | Price |
| A096 | WATER VALVE INSTALLATION 3/4"-2" | EA | 1 | ||
| A097 | WATER VALVE INSTALLATION 2 1/2"-4" | EA | 1 | ||
| A098 | WATER LINE INSTALLATION 3/4"-2" | LF | 1 | ||
| A099 | WATER LINE INSTALLATION 2 1/2"-4" | LF | 1 | ||
| A100 | GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP | LF | 1 | ||
| A101 | GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP | LF | 1 | ||
| A102 | GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP | LF | 1 | ||
| A103 | GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP | LF | 1 | ||
| A104 | GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP | LF | 1 | ||
| A105 | GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP | LF | 1 | ||
| A106 | GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP | LF | 1 | ||
| A107 | GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP | LF | 1 | ||
| A108 | GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP | LF | 1 | ||
| A109 | COMMODE REPLACEMENT, CHINA /WALL MOUNTED | EA | 1 | ||
| A110 | COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED | EA | 1 | ||
| A111 | COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED | EA | 1 | ||
| A112 | COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED | EA | 1 | ||
| A113 | URINAL REPLACEMENT, CHINA /WALL MOUNTED | EA | 1 | ||
| A114 | URINAL REPLACEMENT, STAINLESS / WALL MOUNTED | EA | 1 | ||
| A115 | LAVATORY REPLACEMENT, CHINA /WALL HUNG | EA | 1 | ||
| A116 | LAVATORY REPLACEMENT, STAINLESS /WALL HUNG | EA | 1 | ||
| A117 | WATER HEATER REPLACEMENT-50 GALLON | EA | 1 | ||
| A118 | WATER HEATER REPLACEMENT-80 GALLON | EA | 1 | ||
| A119 | SELINOID VALVE REPLACEMENT | EA | 1 | ||
| A120 | PNEUMATIC VALVE REPLACEMENT | EA | 1 | ||
| A121 | FROST FREE WATER HYDRANT ON 4" X 6" POST | EA | 1 | ||
| A122 | OTHER PLUMBING |
| Total Section 4 Base Year | |||||
| CLIN # | Section 5-Civil Engineering Services | U/M | Unit Price | Quantity | Price |
| A123 | HAND OPERATED TOOLS | HR | 1 | ||
| A124 | DUMP TRUCK, TWENTY TON | HR | 1 | ||
| A125 | DUMP TRUCK, TWO AND ONE HALF TON | HR | 1 | ||
| A126 | MOTOR GRADER, TWELVE FOOT MOLDBOARD | HR | 1 | ||
| A127 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT FOOT BLADE | HR | 1 | ||
| A128 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT BLADE | HR | 1 | ||
| A129 | WATER TANK TRUCK | HR | 1 | ||
| A130 | SHEEP FOOT ROLLER/COMPACTOR | HR | 1 | ||
| A131 | ROLLER/COMPACTOR, PNEUMATIC-TIRED | HR | 1 | ||
| A132 | ROLLER/COMPACTOR, STEEL WHEELED | HR | 1 | ||
| A133 | FRONT END LOADER, RUBBER TIRED TYPE | HR | 1 | ||
| A134 | TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY MOWER | HR | 1 | ||
| A135 | BACKHOE, RUBBER TIRED TYPE | HR | 1 | ||
| A136 | BACKHOE (TRACKHOE) TRACK TYPE | HR | 1 | ||
| A137 | TRACTOR, "SKID STEERING" TYPE LOADER | HR | 1 | ||
| A138 | TRENCHER, ROCK SAW, WHEEL TYPE | HR | 1 | ||
| A139 | ROAD BROOM | HR | 1 | ||
| A140 | ASPHALT MILLING MACHINE (COLD PLANER) | HR | 1 | ||
| A141 | AIR COMPRESSOR | HR | 1 | ||
| A142 | WELDER, TRUCK OR TRAILER, MOUNTED | HR | 1 | ||
| A143 | VIBRATORY PLATE COMPACTOR | HR | 1 | ||
| A144 | WATER PUMP, TWO INCH | HR | 1 | ||
| A145 | WATER PUMP, FOUR INCH | HR | 1 | ||
| A146 | WATER PUMP, SIX INCH | HR | 1 | ||
| A147 | WASHER HIGH PRESSURE | HR | 1 | ||
| A148 | CHIPPER, BRUSH/LIMB | HR | 1 | ||
| A149 | CONCRETE/ASPHALT SAW | HR | 1 | ||
| A150 | CHAIN SAW | HR | 1 | ||
| A151 | OTHER ENGINEER SERVICES |
| Total Section 5 Base Year | |||||
| CLIN # | Section 6-Fencing | U/M | Unit Price | Quantity | Price |
| A152 | PIPE RAIL FENCING | LF | 1 |
| A153 | PIPE RAIL FENCE GATE | EA | 1 |
| A154 | STEEL POST AND CABLE | LF | 1 |
| A155 | REPAIR/REPLACE GUARDRAIL FENCING | LF | 1 |
| A156 | BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE | LF | 1 |
| A157 | INSTALLATION OF SWINGING GATE-4' | EA | 1 |
| A158 | INSTALLATION OF SWINGING GATE-12' | EA | 1 |
| A159 | INSTALLATION OF SWINGING GATE-14' | EA | 1 |
| A160 | INSTALLATION OF SWINGING GATE-16' | EA | 1 |
| A161 | INSTALLATION OF BOUNDRY DELINEATION POST | EA | 1 |
| A162 | OTHER FENCING |
| Total Section 6 Base Year | |||||
| CLIN # | Section 7-Sign and Buoy Maintenance | U/M | Unit Price | Quantity | Price |
| A163 | PARK SIGN INSTALLATION-SINGLE POST | EA | 1 |
| A164 | PARK SIGN INSTALLATION-DOUBLE POST | EA | 1 |
| A165 | PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST | EA | 1 |
| A166 | PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST | EA | 1 |
| A167 | BOUY INSTALLATION | EA | 1 |
| A168 | REPAIR/REPLACE PIPELINE FLOATING BARRIER | LF | 1 |
| A169 | PIPELINE FLOATING BARRIER ANCHORS | EA | 1 |
| A170 | OTHER SIGN AND BOUY MAINTENANCE |
| Total Section 7 Base Year | |||||
| CLIN | Section 8 -Electrical | U/M | Unit Price | Quantity | Price |
| A171 | ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL | LF | 1 | ||
| A172 | ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT | LF | 1 | ||
| A173 | RV PEDESTAL INSTALLATION, SINGLE UNIT | EA | 1 | ||
| A174 | METER BASE INSTALLATION | EA | 1 | ||
| A175 | MAIN DISCONNECT PANEL INSTALLATION | EA | 1 | ||
| A176 | LOAD CENTER PANEL | EA | 1 | ||
| A177 | OTHER ELECTRICAL |
| Total Section 8 Base Year |
| Total Option Base Year Sections 1-8 (CLINs A001-A177) |
Option 1
| Option 1 | |||||||
| CLIN # | Section 1-Campsite Maintenance | U/M | Unit Price | Unit Price | Quantity | Price | 1.21275 |
| B001 | IMPACT PAD MATERIAL | SF | $1.75 | 1 |
| B002 | CONCRETE WHEEL STOPS | EA | $60.00 | 1 |
| B003 | TIMBER DELINIATORS, ONE TIER | LF | $8.00 | 1 |
| B004 | TIMBER DELINIATORS,TWO TIER | LF | $8.00 | 1 |
| B005 | TIMBER DELINIATORS, THREE TIER | LF | $8.00 | 1 |
| B006 | TIMBER DELINIATORS, FOUR TIER | LF | $8.00 | 1 |
| B007 | TIMBER DELINIATORS, FIVE TIER | LF | $8.00 | 1 |
| B008 | UPRIGHT AND PEDASTAL GRILL INSTALLATION | EA | $30.00 | 1 |
| B009 | FIRE RING AND GROUND MOUNTED COOKER INSTALLATION | EA | $25.00 | 1 |
| B010 | LANTER HANGER POST INSTALLION | EA | $30.00 | 1 |
| B011 | REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC TABLES | EA | $35.00 | 1 |
| B012 | REPLACE/INSTALL PARK BENCHES | EA | $40.00 | 1 |
| B013 | RETAINER WALL BLOCK INSTALLATION ONE | LF | $1.05 | 1 |
| B014 | RETAINER WALL BLOCK INSTALLATION TWO | LF | $1.05 | 1 |
| B015 | RETAINER WALL BLOCK INSTALLATION THREE | LF | $1.05 | 1 |
| B016 | RETAINER WALL BLOCK INSTALLATION FOUR | LF | $1.05 | 1 |
| B017 | RETAINER WALL BLOCK INSTALLATION FIVE | LF | $1.05 | 1 |
| B018 | RIP RAP BAG INSTALLATION ONE | LF | $0.80 | 1 |
| B019 | RIP RAP BAG INSTALLATION TWO | LF | $0.80 | 1 |
| B020 | RIP RAP BAG INSTALLATION THREE | LF | $0.80 | 1 |
| B021 | RIP RAP BAG INSTALLATION FOUR | LF | $0.80 | 1 |
| B022 | RIP RAP BAG INSTALLATION FIVE | LF | $0.80 | 1 |
| B023 | RIP RAP BAG INSTALLATION SIX | LF | $0.80 | 1 |
| B024 | RIP RAP BAG INSTALLATION SEVEN | LF | $0.80 | 1 |
| B025 | RIP RAP BAG INSTALLATION EIGHT | LF | $0.80 | 1 |
| B026 | OTHER CAMPSITE MAINTENANCE |
Total Section 1 Option Year 1
CLIN # Section 2-Carpentry and Painting U/M Unit Price Unit Price Quantity Price
| B027 | METAL PICNIC SHELTER INSTALLATION | EA | $605.00 | 1 |
| B028 | ROOFING REMOVAL (COMPOSITION AND R-PANEL) | SF | $0.75 | 1 |
| B029 | ROOF SHEATHING | SF | $1.45 | 1 |
| B030 | TONGUE AND GROVE DECKING | SF | $1.81 | 1 |
| B031 | FASCIA BOARD | LF | $10.45 | 1 |
| B032 | COMPOSITION SHINGLE REPAIR/INSTALLATION | SF | $1.19 | 1 |
| B033 | R-PANEL REPAIR/INSTALLATION | SF | $2.42 | 1 |
| B034 | WALL SHEATING | SF | $1.34 | 1 |
| B035 | SOFFIT SHEATHING | SF | $3.01 | 1 |
| B036 | WALL SIDING | SF | $1.34 | 1 |
| B037 | PLASTIC LAMINATE PANELS | SF | $2.51 | 1 |
| B038 | LAP OR "V" GROOVED SIDING | SF | $2.34 | 1 |
| B039 | BRICK AND SLUMP STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| B040 | NATURAL STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| B041 | TOILET PARTITION-SINGLE | EA | $181.00 | 1 |
| B042 | TOILET PARTITION-DOUBLE | EA | $261.00 | 1 |
| B043 | TOILET PARTITION-TRIPLE | EA | $341.00 | 1 |
| B044 | SHOWER PARTITION | EA | $221.00 | 1 |
| B045 | SHOWER/TOILET DOOR WITH PILASTER | EA | $161.00 | 1 |
| B046 | URINAL PARTITION | EA | $141.00 | 1 |
| B047 | PAINTING METAL PICNIC SHELTERS | SF | $0.97 | 1 |
| B048 | PAINTING WOOD-OIL BASED PAINT | SF | $0.75 | 1 |
| B049 | PAINTING WOOD-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| B050 | PAINTING WOOD-SEALER/STAIN | SF | $0.75 | 1 |
| B051 | PAINTING WOOD-WATERPROOFING | SF | $0.75 | 1 |
| B052 | PAINTING MASONRY-BLOCK SEALER/FILLER | SF | $0.75 | 1 |
| B053 | PAINTING MASONRY-OIL BASED | SF | $0.75 | 1 |
| B054 | PAINTING MASONRY-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| B055 | PAINTING METAL-OIL BASED PAINT | SF | $0.75 | 1 |
| B056 | PAINTING METAL-EXTERIOR BASED PAINT | SF | $0.75 | 1 |
| B057 | LOG VENEER SIDING | SF | $2.34 | 1 |
| B058 | LOG SIDING | SF | $2.55 | 1 |
| B059 | OTHER CARPENTRY AND PAINTING |
Total Section 2 Option Year 1
CLIN # Section 3-Paving, Road Maintenance and Site Work U/M Unit Price Unit Price Quantity Price
| B060 | TOP SOIL | TN | $64.00 | 1 |
| B061 | FILL MATERIAL | TN | $56.00 | 1 |
| B062 | SAND MATERIAL | TN | $56.00 | 1 |
| B063 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| B064 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| B065 | RIP RAP STONE 3"-5" | TN | $76.00 | 1 |
| B066 | RIP RAP STONE 6"-12" | TN | $89.00 | 1 |
| B067 | RIP RAP STONE 12"-18" | TN | $116.00 | 1 |
| B068 | POLYETHYLENE CULVERT REPLACEMENT 12" | LF | $58.50 | 1 |
| B069 | POLYETHYLENE CULVERT REPLACEMENT 18" | LF | $65.00 | 1 |
| B070 | POLYETHYLENE CULVERT REPLACEMENT 24" | LF | $73.25 | 1 |
| B071 | POLYETHYLENE CULVERT REPLACEMENT 36" | LF | $92.75 | 1 |
| B072 | POLYETHYLENE CULVERT REPLACEMENT 48" | LF | $113.75 | 1 |
| B073 | ROAD BORING-2" CASING | LF | $15.00 | 1 |
| B074 | ROAD BORING-4" CASING | LF | $26.00 | 1 |
| B075 | ROAD BORING-6" CASING | LF | $37.00 | 1 |
| B076 | ASPHALT PAVING AND PATCHING | SY | $18.00 | 1 |
| B077 | SCARFYING AND RESHAPING BASE COURSE | SY | $5.75 | 1 |
| B078 | BITUMINOUS TACK COAT | SY | $5.50 | 1 |
| B079 | BITUMINOUS PRIME COAT | SY | $5.30 | 1 |
| B080 | ASPHALT SEALING COATING | SY | $2.00 | 1 |
| B081 | SEALING JOINTS AND CRACKS | LF | $9.00 | 1 |
| B082 | PAINTING/MARKING TRAFFIC CONTROL | LF | $1.75 | 1 |
| B083 | 4" CONCRETE SLAB | SF | $4.00 | 1 |
| B084 | 4" CONTRETE SLAB WITH FOOTINGS | SF | $6.50 | 1 |
| B085 | 6" CONCRETE SLAB | SF | $6.50 | 1 |
| B086 | 6" CONCRETE SLAB WITH FOOTINGS | SF | $7.50 | 1 |
| B087 | CONCRETE CURB | LF | $11.00 | 1 |
| B088 | CONCRETE CURB, 24" CURB AND GUTTER | LF | $21.00 | 1 |
| B089 | ROAD SHOULDER MAINTENANCE | LF | $1.57 | 1 |
| B090 | PLAYGROUND MULCH REMOVAL AND DISPOSAL | CY | $52.81 | 1 |
| B091 | BARK CHIP SUPPLY/DELIVERY | CY | $208.00 | 1 |
| B092 | RUBBER MULCH SUPPLY/DELIVERY | CY | $331.00 | 1 |
| B093 | LIMESTONE ROAD BASE | SF | $0.59 | 1 |
| B094 | LAUNCH TYPE CONCRETE | SF | $8.75 | 1 |
| B095 | OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK |
Total Section 3 Base Year
CLIN # Section-4 Plumbing U/M Unit Price Unit Price Quantity Price
| B096 | WATER VALVE INSTALLATION 3/4"-2" | EA | $16.00 | 1 |
| B097 | WATER VALVE INSTALLATION 2 1/2"-4" | EA | $24.00 | 1 |
| B098 | WATER LINE INSTALLATION 3/4"-2" | LF | $16.00 | 1 |
| B099 | WATER LINE INSTALLATION 2 1/2"-4" | LF | $18.50 | 1 |
| B100 | GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP | LF | $75.65 | 1 |
| B101 | GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP | LF | $177.50 | 1 |
| B102 | GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP | LF | $202.50 | 1 |
| B103 | GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP | LF | $75.90 | 1 |
| B104 | GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP | LF | $187.50 | 1 |
| B105 | GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP | LF | $205.75 | 1 |
| B106 | GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP | LF | $79.50 | 1 |
| B107 | GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP | LF | $192.75 | 1 |
| B108 | GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP | LF | $209.50 | 1 |
| B109 | COMMODE REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| B110 | COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED | EA | $24.00 | 1 |
| B111 | COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED | EA | $24.00 | 1 |
| B112 | COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED | EA | $24.00 | 1 |
| B113 | URINAL REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| B114 | URINAL REPLACEMENT, STAINLESS / WALL MOUNTED | EA | $24.00 | 1 |
| B115 | LAVATORY REPLACEMENT, CHINA /WALL HUNG | EA | $24.00 | 1 |
| B116 | LAVATORY REPLACEMENT, STAINLESS /WALL HUNG | EA | $24.00 | 1 |
| B117 | WATER HEATER REPLACEMENT-50 GALLON | EA | $400.00 | 1 |
| B118 | WATER HEATER REPLACEMENT-80 GALLON | EA | $550.00 | 1 |
| B119 | SELINOID VALVE REPLACEMENT | EA | $24.00 | 1 |
| B120 | PNEUMATIC VALVE REPLACEMENT | EA | $21.00 | 1 |
| B121 | FROST FREE WATER HYDRANT ON 4" X 6" POST | EA | $19.00 | 1 |
| B122 | OTHER PLUMBING |
Total Section 4 Option Year 1
CLIN # Section 5-Civil Engineering Services U/M Unit Price Unit Price Quantity Price
| B123 | HAND OPERATED TOOLS | HR | $21.50 | 1 |
| B124 | DUMP TRUCK, TWENTY TON | HR | $56.75 | 1 |
| B125 | DUMP TRUCK, TWO AND ONE HALF TON | HR | $38.88 | 1 |
| B126 | MOTOR GRADER, TWELVE FOOT MOLDBOARD | HR | $79.28 | 1 |
| B127 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT FOOT BLADE | HR | $113.63 | 1 |
| B128 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT BLADE | HR | $99.25 | 1 |
| B129 | WATER TANK TRUCK | HR | $88.50 | 1 |
| B130 | SHEEP FOOT ROLLER/COMPACTOR | HR | $80.00 | 1 |
| B131 | ROLLER/COMPACTOR, PNEUMATIC-TIRED | HR | $71.38 | 1 |
| B132 | ROLLER/COMPACTOR, STEEL WHEELED | HR | $80.00 | 1 |
| B133 | FRONT END LOADER, RUBBER TIRED TYPE | HR | $117.38 | 1 |
| B134 | TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY MOWER | HR | $29.00 | 1 |
| B135 | BACKHOE, RUBBER TIRED TYPE | HR | $67.81 | 1 |
| B136 | BACKHOE (TRACKHOE) TRACK TYPE | HR | $157.91 | 1 |
| B137 | TRACTOR, "SKID STEERING" TYPE LOADER | HR | $50.68 | 1 |
| B138 | TRENCHER, ROCK SAW, WHEEL TYPE | HR | $46.08 | 1 |
| B139 | ROAD BROOM | HR | $54.13 | 1 |
| B140 | ASPHALT MILLING MACHINE (COLD PLANER) | HR | $77.69 | 1 |
| B141 | AIR COMPRESSOR | HR | $76.53 | 1 |
| B142 | WELDER, TRUCK OR TRAILER, MOUNTED | HR | $41.15 | 1 |
| B143 | VIBRATORY PLATE COMPACTOR | HR | $35.15 | 1 |
| B144 | WATER PUMP, TWO INCH | HR | $22.65 | 1 |
| B145 | WATER PUMP, FOUR INCH | HR | $26.10 | 1 |
| B146 | WATER PUMP, SIX INCH | HR | $31.56 | 1 |
| B147 | WASHER HIGH PRESSURE | HR | $20.93 | 1 |
| B148 | CHIPPER, BRUSH/LIMB | HR | $42.34 | 1 |
| B149 | CONCRETE/ASPHALT SAW | HR | $19.34 | 1 |
| B150 | CHAIN SAW | HR | $21.33 | 1 |
| B151 | OTHER ENGINEER SERVICES |
Total Section 5 Option Year 1
CLIN # Section 6-Fencing U/M Unit Price Unit Price Quantity Price
| B152 | PIPE RAIL FENCING | LF | $15.35 | 1 |
| B153 | PIPE RAIL FENCE GATE | EA | $296.00 | 1 |
| B154 | STEEL POST AND CABLE | LF | $28.00 | 1 |
| B155 | REPAIR/REPLACE GUARDRAIL FENCING | LF | $67.00 | 1 |
| B156 | BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE | LF | $3.50 | 1 |
| B157 | INSTALLATION OF SWINGING GATE-4' | EA | $325.00 | 1 |
| B158 | INSTALLATION OF SWINGING GATE-12' | EA | $350.00 | 1 |
| B159 | INSTALLATION OF SWINGING GATE-14' | EA | $390.00 | 1 |
| B160 | INSTALLATION OF SWINGING GATE-16' | LF | $420.00 | 1 |
| B161 | INSTALLATION OF BOUNDRY DELINEATION POST | EA | $218.00 | 1 |
| B162 | OTHER FENCING |
Total Section 6 Option Year 1
CLIN # Section 7-Sign and Buoy Maintenance U/M Unit Price Unit Price Quantity Price
| B163 | PARK SIGN INSTALLATION-SINGLE POST | EA | $21.00 | 1 |
| B164 | PARK SIGN INSTALLATION-DOUBLE POST | EA | $32.00 | 1 |
| B165 | PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST | EA | $11.00 | 1 |
| B166 | PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST | EA | $16.00 | 1 |
| B167 | BOUY INSTALLATION | EA | $203.00 | 1 |
| B168 | REPAIR/REPLACE PIPELINE FLOATING BARRIER | LF | $12.00 | 1 |
| B169 | PIPELINE FLOATING BARRIER ANCHORS | EA | $203.00 | 1 |
| B170 | OTHER SIGN AND BOUY MAINTENANCE |
Total Section 7 Option Year 1
CLIN Section 8-Electrical U/M Unit Price Unit Price Quantity Price
| B171 | ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL | LF | $8.00 | 1 |
| B172 | ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT | LF | $8.20 | 1 |
| B173 | RV PEDESTAL INSTALLATION, SINGLE UNIT | EA | $120.00 | 1 |
| B174 | METER BASE INSTALLATION | EA | $320.00 | 1 |
| B175 | MAIN DISCONNECT PANEL INSTALLATION | EA | $350.00 | 1 |
| B176 | LOAD CENTER PANEL | EA | $850.00 | 1 |
| B177 | OTHER ELECTRICAL |
| Total Section 8 Option Year 1 |
| Total Option Year 1 Sections 1-8 (CLINs B001-B177) |
Option 2
| Option 2 | |||||||
| CLIN # | Section 1-Campsite Maintenance | U/M | Unit Price | Unit Price | Quantity | Price | 1.2705 |
| C001 | IMPACT PAD MATERIAL | SF | $1.75 | 1 |
| C002 | CONCRETE WHEEL STOPS | EA | $60.00 | 1 |
| C003 | TIMBER DELINIATORS, ONE TIER | LF | $8.00 | 1 |
| C004 | TIMBER DELINIATORS,TWO TIER | LF | $8.00 | 1 |
| C005 | TIMBER DELINIATORS, THREE TIER | LF | $8.00 | 1 |
| C006 | TIMBER DELINIATORS, FOUR TIER | LF | $8.00 | 1 |
| C007 | TIMBER DELINIATORS, FIVE TIER | LF | $8.00 | 1 |
| C008 | UPRIGHT AND PEDASTAL GRILL INSTALLATION | EA | $30.00 | 1 |
| C009 | FIRE RING AND GROUND MOUNTED COOKER INSTALLATION | EA | $25.00 | 1 |
| C010 | LANTER HANGER POST INSTALLION | EA | $30.00 | 1 |
| C011 | REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC TABLES | EA | $35.00 | 1 |
| C012 | REPLACE/INSTALL PARK BENCHES | EA | $40.00 | 1 |
| C013 | RETAINER WALL BLOCK INSTALLATION ONE | LF | $1.05 | 1 |
| C014 | RETAINER WALL BLOCK INSTALLATION TWO | LF | $1.05 | 1 |
| C015 | RETAINER WALL BLOCK INSTALLATION THREE | LF | $1.05 | 1 |
| C016 | RETAINER WALL BLOCK INSTALLATION FOUR | LF | $1.05 | 1 |
| C017 | RETAINER WALL BLOCK INSTALLATION FIVE | LF | $1.05 | 1 |
| C018 | RIP RAP BAG INSTALLATION ONE | LF | $0.80 | 1 |
| C019 | RIP RAP BAG INSTALLATION TWO | LF | $0.80 | 1 |
| C020 | RIP RAP BAG INSTALLATION THREE | LF | $0.80 | 1 |
| C021 | RIP RAP BAG INSTALLATION FOUR | LF | $0.80 | 1 |
| C022 | RIP RAP BAG INSTALLATION FIVE | LF | $0.80 | 1 |
| C023 | RIP RAP BAG INSTALLATION SIX | LF | $0.80 | 1 |
| C024 | RIP RAP BAG INSTALLATION SEVEN | LF | $0.80 | 1 |
| C025 | RIP RAP BAG INSTALLATION EIGHT | LF | $0.80 | 1 |
| C026 | OTHER CAMPSITE MAINTENANCE |
Total Section 1 Option Year 2
CLIN # Section 2-Carpentry and Painting U/M Unit Price Unit Price Quantity Price
| C027 | METAL PICNIC SHELTER INSTALLATION | EA | $605.00 | 1 |
| C028 | ROOFING REMOVAL (COMPOSITION AND R-PANEL) | SF | $0.75 | 1 |
| C029 | ROOF SHEATHING | SF | $1.45 | 1 |
| C030 | TONGUE AND GROVE DECKING | SF | $1.81 | 1 |
| C031 | FASCIA BOARD | LF | $10.45 | 1 |
| C032 | COMPOSITION SHINGLE REPAIR/INSTALLATION | SF | $1.19 | 1 |
| C033 | R-PANEL REPAIR/INSTALLATION | SF | $2.42 | 1 |
| C034 | WALL SHEATING | SF | $1.34 | 1 |
| C035 | SOFFIT SHEATHING | SF | $3.01 | 1 |
| C036 | WALL SIDING | SF | $1.34 | 1 |
| C037 | PLASTIC LAMINATE PANELS | SF | $2.51 | 1 |
| C038 | LAP OR "V" GROOVED SIDING | SF | $2.34 | 1 |
| C039 | BRICK AND SLUMP STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| C040 | NATURAL STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| C041 | TOILET PARTITION-SINGLE | EA | $181.00 | 1 |
| C042 | TOILET PARTITION-DOUBLE | EA | $261.00 | 1 |
| C043 | TOILET PARTITION-TRIPLE | EA | $341.00 | 1 |
| C044 | SHOWER PARTITION | EA | $221.00 | 1 |
| C045 | SHOWER/TOILET DOOR WITH PILASTER | EA | $161.00 | 1 |
| C046 | URINAL PARTITION | EA | $141.00 | 1 |
| C047 | PAINTING METAL PICNIC SHELTERS | SF | $0.97 | 1 |
| C048 | PAINTING WOOD-OIL BASED PAINT | SF | $0.75 | 1 |
| C049 | PAINTING WOOD-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| C050 | PAINTING WOOD-SEALER/STAIN | SF | $0.75 | 1 |
| C051 | PAINTING WOOD-WATERPROOFING | SF | $0.75 | 1 |
| C052 | PAINTING MASONRY-BLOCK SEALER/FILLER | SF | $0.75 | 1 |
| C053 | PAINTING MASONRY-OIL BASED | SF | $0.75 | 1 |
| C054 | PAINTING MASONRY-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| C055 | PAINTING METAL-OIL BASED PAINT | SF | $0.75 | 1 |
| C056 | PAINTING METAL-EXTERIOR BASED PAINT | SF | $0.75 | 1 |
| C057 | LOG VENEER SIDING | SF | $2.34 | 1 |
| C058 | LOG SIDING | SF | $2.55 | 1 |
| C059 | OTHER CARPENTRY AND PAINTING |
Total Section 2 Option Year 2
CLIN # Section 3-Paving, Road Maintenance and Site Work U/M Unit Price Unit Price Quantity Price
| C060 | TOP SOIL | TN | $64.00 | 1 |
| C061 | FILL MATERIAL | TN | $56.00 | 1 |
| C062 | SAND MATERIAL | TN | $56.00 | 1 |
| C063 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| C064 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| C065 | RIP RAP STONE 3"-5" | TN | $76.00 | 1 |
| C066 | RIP RAP STONE 6"-12" | TN | $89.00 | 1 |
| C067 | RIP RAP STONE 12"-18" | TN | $116.00 | 1 |
| C068 | POLYETHYLENE CULVERT REPLACEMENT 12" | LF | $58.50 | 1 |
| C069 | POLYETHYLENE CULVERT REPLACEMENT 18" | LF | $65.00 | 1 |
| C070 | POLYETHYLENE CULVERT REPLACEMENT 24" | LF | $73.25 | 1 |
| C071 | POLYETHYLENE CULVERT REPLACEMENT 36" | LF | $92.75 | 1 |
| C072 | POLYETHYLENE CULVERT REPLACEMENT 48" | LF | $113.75 | 1 |
| C073 | ROAD BORING-2" CASING | LF | $15.00 | 1 |
| C074 | ROAD BORING-4" CASING | LF | $26.00 | 1 |
| C075 | ROAD BORING-6" CASING | LF | $37.00 | 1 |
| C076 | ASPHALT PAVING AND PATCHING | SY | $18.00 | 1 |
| C077 | SCARFYING AND RESHAPING BASE COURSE | SY | $5.75 | 1 |
| C078 | BITUMINOUS TACK COAT | SY | $5.50 | 1 |
| C079 | BITUMINOUS PRIME COAT | SY | $5.30 | 1 |
| C080 | ASPHALT SEALING COATING | SY | $2.00 | 1 |
| C081 | SEALING JOINTS AND CRACKS | LF | $9.00 | 1 |
| C082 | PAINTING/MARKING TRAFFIC CONTROL | LF | $1.75 | 1 |
| C083 | 4" CONCRETE SLAB | SF | $4.00 | 1 |
| C084 | 4" CONTRETE SLAB WITH FOOTINGS | SF | $6.50 | 1 |
| C085 | 6" CONCRETE SLAB | SF | $6.50 | 1 |
| C086 | 6" CONCRETE SLAB WITH FOOTINGS | SF | $7.50 | 1 |
| C087 | CONCRETE CURB | LF | $11.00 | 1 |
| C088 | CONCRETE CURB, 24" CURB AND GUTTER | LF | $21.00 | 1 |
| C089 | ROAD SHOULDER MAINTENANCE | LF | $1.57 | 1 |
| C090 | PLAYGROUND MULCH REMOVAL AND DISPOSAL | CY | $52.81 | 1 |
| C091 | BARK CHIP SUPPLY/DELIVERY | CY | $208.00 | 1 |
| C092 | RUBBER MULCH SUPPLY/DELIVERY | CY | $331.00 | 1 |
| C093 | LIMESTONE ROAD BASE | SF | $0.59 | 1 |
| C094 | LAUNCH TYPE CONCRETE | SF | $8.75 | 1 |
| C095 | OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK |
Total Section 3 Option Year 2
CLIN # Section 4-Plumbing U/M Unit Price Unit Price Quantity Price
| C096 | WATER VALVE INSTALLATION 3/4"-2" | EA | $16.00 | 1 |
| C097 | WATER VALVE INSTALLATION 2 1/2"-4" | EA | $24.00 | 1 |
| C098 | WATER LINE INSTALLATION 3/4"-2" | LF | $16.00 | 1 |
| C099 | WATER LINE INSTALLATION 2 1/2"-4" | LF | $18.50 | 1 |
| C100 | GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP | LF | $75.65 | 1 |
| C101 | GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP | LF | $177.50 | 1 |
| C102 | GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP | LF | $202.50 | 1 |
| C103 | GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP | LF | $75.90 | 1 |
| C104 | GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP | LF | $187.50 | 1 |
| C105 | GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP | LF | $205.75 | 1 |
| C106 | GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP | LF | $79.50 | 1 |
| C107 | GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP | LF | $192.75 | 1 |
| C108 | GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP | LF | $209.50 | 1 |
| C109 | COMMODE REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| C110 | COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED | EA | $24.00 | 1 |
| C111 | COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED | EA | $24.00 | 1 |
| C112 | COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED | EA | $24.00 | 1 |
| C113 | URINAL REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| C114 | URINAL REPLACEMENT, STAINLESS / WALL MOUNTED | EA | $24.00 | 1 |
| C115 | LAVATORY REPLACEMENT, CHINA /WALL HUNG | EA | $24.00 | 1 |
| C116 | LAVATORY REPLACEMENT, STAINLESS /WALL HUNG | EA | $24.00 | 1 |
| C117 | WATER HEATER REPLACEMENT-50 GALLON | EA | $400.00 | 1 |
| C118 | WATER HEATER REPLACEMENT-80 GALLON | EA | $550.00 | 1 |
| C119 | SELINOID VALVE REPLACEMENT | EA | $24.00 | 1 |
| C120 | PNEUMATIC VALVE REPLACEMENT | EA | $21.00 | 1 |
| C121 | FROST FREE WATER HYDRANT ON 4" X 6" POST | EA | $19.00 | 1 |
| C122 | OTHER PLUMBING |
Total Section 4 Option Year 2
CLIN # Section 5-Civil Engineering Services U/M Unit Price Unit Price Quantity Price
| C123 | HAND OPERATED TOOLS | HR | $21.50 | 1 |
| C124 | DUMP TRUCK, TWENTY TON | HR | $56.75 | 1 |
| C125 | DUMP TRUCK, TWO AND ONE HALF TON | HR | $38.88 | 1 |
| C126 | MOTOR GRADER, TWELVE FOOT MOLDBOARD | HR | $79.28 | 1 |
| C127 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT FOOT BLADE | HR | $113.63 | 1 |
| C128 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT BLADE | HR | $99.25 | 1 |
| C129 | WATER TANK TRUCK | HR | $88.50 | 1 |
| C130 | SHEEP FOOT ROLLER/COMPACTOR | HR | $80.00 | 1 |
| C131 | ROLLER/COMPACTOR, PNEUMATIC-TIRED | HR | $71.38 | 1 |
| C132 | ROLLER/COMPACTOR, STEEL WHEELED | HR | $80.00 | 1 |
| C133 | FRONT END LOADER, RUBBER TIRED TYPE | HR | $117.38 | 1 |
| C134 | TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY MOWER | HR | $29.00 | 1 |
| C135 | BACKHOE, RUBBER TIRED TYPE | HR | $67.81 | 1 |
| C136 | BACKHOE (TRACKHOE) TRACK TYPE | HR | $157.91 | 1 |
| C137 | TRACTOR, "SKID STEERING" TYPE LOADER | HR | $50.68 | 1 |
| C138 | TRENCHER, ROCK SAW, WHEEL TYPE | HR | $46.08 | 1 |
| C139 | ROAD BROOM | HR | $54.13 | 1 |
| C140 | ASPHALT MILLING MACHINE (COLD PLANER) | HR | $77.69 | 1 |
| C141 | AIR COMPRESSOR | HR | $76.53 | 1 |
| C142 | WELDER, TRUCK OR TRAILER, MOUNTED | HR | $41.15 | 1 |
| C143 | VIBRATORY PLATE COMPACTOR | HR | $35.15 | 1 |
| C144 | WATER PUMP, TWO INCH | HR | $22.65 | 1 |
| C145 | WATER PUMP, FOUR INCH | HR | $26.10 | 1 |
| C146 | WATER PUMP, SIX INCH | HR | $31.56 | 1 |
| C147 | WASHER HIGH PRESSURE | HR | $20.93 | 1 |
| C148 | CHIPPER, BRUSH/LIMB | HR | $42.34 | 1 |
| C149 | CONCRETE/ASPHALT SAW | HR | $19.34 | 1 |
| C150 | CHAIN SAW | HR | $21.33 | 1 |
| C151 | OTHER ENGINEER SERVICES |
Total Section 5 Option Year 2
CLIN # Section 6-Fencing U/M Unit Price Unit Price Quantity Price
| C152 | PIPE RAIL FENCING | LF | $15.35 | 1 |
| C153 | PIPE RAIL FENCE GATE | EA | $296.00 | 1 |
| C154 | STEEL POST AND CABLE | LF | $28.00 | 1 |
| C155 | REPAIR/REPLACE GUARDRAIL FENCING | LF | $67.00 | 1 |
| C156 | BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE | LF | $3.50 | 1 |
| C157 | INSTALLATION OF SWINGING GATE-4' | EA | $325.00 | 1 |
| C158 | INSTALLATION OF SWINGING GATE-12' | EA | $340.00 | 1 |
| C159 | INSTALLATION OF SWINGING GATE-14' | EA | $350.00 | 1 |
| C160 | INSTALLATION OF SWINGING GATE-16' | EA | $390.00 | 1 |
| C161 | INSTALLATION OF BOUNDRY DELINEATION POST | EA | $420.00 | 1 |
| C162 | OTHER FENCING |
Total Section 6 Option Year 2
CLIN # Section 7-Sign and Buoy Maintenance U/M Unit Price Unit Price Quantity Price
| C163 | PARK SIGN INSTALLATION-SINGLE POST | EA | $21.00 | 1 |
| C164 | PARK SIGN INSTALLATION-DOUBLE POST | EA | $32.00 | 1 |
| C165 | PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST | EA | $11.00 | 1 |
| C166 | PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST | EA | $16.00 | 1 |
| C167 | BOUY INSTALLATION | EA | $203.00 | 1 |
| C168 | REPAIR/REPLACE PIPELINE FLOATING BARRIER | LF | $12.00 | 1 |
| C169 | PIPELINE FLOATING BARRIER ANCHORS | EA | $203.00 | 1 |
| C170 | OTHER SIGN AND BOUY MAINTENANCE |
Total Section 7 Option Year 2
CLIN Section 8-Electrical U/M Unit Price Unit Price Quantity Price
| C171 | ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL | LF | $8.00 | 1 |
| C172 | ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT | LF | $8.20 | 1 |
| C173 | RV PEDESTAL INSTALLATION, SINGLE UNIT | EA | $120.00 | 1 |
| C174 | METER BASE INSTALLATION | EA | $320.00 | 1 |
| C175 | MAIN DISCONNECT PANEL INSTALLATION | EA | $350.00 | 1 |
| C176 | LOAD CENTER PANEL | EA | $850.00 | 1 |
| C177 | OTHER ELECTRICAL |
| Total Section 8 Option Year 2 |
| Total Option Year 2 Sections 1-8 (CLINs C001-C177) |
Option 3
| Option 3 | |||||||
| CLIN # | Section 1-Campsite Maintenance | U/M | Unit Price | Unit Price | Quantity | Price | 1.32825 |
| D001 | IMPACT PAD MATERIAL | SF | $1.75 | 1 |
| D002 | CONCRETE WHEEL STOPS | EA | $60.00 | 1 |
| D003 | TIMBER DELINIATORS, ONE TIER | LF | $8.00 | 1 |
| D004 | TIMBER DELINIATORS,TWO TIER | LF | $8.00 | 1 |
| D005 | TIMBER DELINIATORS, THREE TIER | LF | $8.00 | 1 |
| D006 | TIMBER DELINIATORS, FOUR TIER | LF | $8.00 | 1 |
| D007 | TIMBER DELINIATORS, FIVE TIER | LF | $8.00 | 1 |
| D008 | UPRIGHT AND PEDASTAL GRILL INSTALLATION | EA | $30.00 | 1 |
| D009 | FIRE RING AND GROUND MOUNTED COOKER INSTALLATION | EA | $25.00 | 1 |
| D010 | LANTER HANGER POST INSTALLION | EA | $30.00 | 1 |
| D011 | REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC TABLES | EA | $35.00 | 1 |
| D012 | REPLACE/INSTALL PARK BENCHES | EA | $40.00 | 1 |
| D013 | RETAINER WALL BLOCK INSTALLATION ONE | LF | $1.05 | 1 |
| D014 | RETAINER WALL BLOCK INSTALLATION TWO | LF | $1.05 | 1 |
| D015 | RETAINER WALL BLOCK INSTALLATION THREE | LF | $1.05 | 1 |
| D016 | RETAINER WALL BLOCK INSTALLATION FOUR | LF | $1.05 | 1 |
| D017 | RETAINER WALL BLOCK INSTALLATION FIVE | LF | $1.05 | 1 |
| D018 | RIP RAP BAG INSTALLATION ONE | LF | $0.80 | 1 |
| D019 | RIP RAP BAG INSTALLATION TWO | LF | $0.80 | 1 |
| D020 | RIP RAP BAG INSTALLATION THREE | LF | $0.80 | 1 |
| D021 | RIP RAP BAG INSTALLATION FOUR | LF | $0.80 | 1 |
| D022 | RIP RAP BAG INSTALLATION FIVE | LF | $0.80 | 1 |
| D023 | RIP RAP BAG INSTALLATION SIX | LF | $0.80 | 1 |
| D024 | RIP RAP BAG INSTALLATION SEVEN | LF | $0.80 | 1 |
| D025 | RIP RAP BAG INSTALLATION EIGHT | LF | $0.80 | 1 |
| D026 | OTHER CAMPSITE MAINTENANCE |
Total Section 1 Option Year 3
CLIN # Section 2-Carpentry and Painting U/M Unit Price Unit Price Quantity Price
| D027 | METAL PICNIC SHELTER INSTALLATION | EA | $605.00 | 1 |
| D028 | ROOFING REMOVAL (COMPOSITION AND R-PANEL) | SF | $0.75 | 1 |
| D029 | ROOF SHEATHING | SF | $1.45 | 1 |
| D030 | TONGUE AND GROVE DECKING | SF | $1.81 | 1 |
| D031 | FASCIA BOARD | LF | $10.45 | 1 |
| D032 | COMPOSITION SHINGLE REPAIR/INSTALLATION | SF | $1.19 | 1 |
| D033 | R-PANEL REPAIR/INSTALLATION | SF | $2.42 | 1 |
| D034 | WALL SHEATING | SF | $1.34 | 1 |
| D035 | SOFFIT SHEATHING | SF | $3.01 | 1 |
| D036 | WALL SIDING | SF | $1.34 | 1 |
| D037 | PLASTIC LAMINATE PANELS | SF | $2.51 | 1 |
| D038 | LAP OR "V" GROOVED SIDING | SF | $2.34 | 1 |
| D039 | BRICK AND SLUMP STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| D040 | NATURAL STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| D041 | TOILET PARTITION-SINGLE | EA | $181.00 | 1 |
| D042 | TOILET PARTITION-DOUBLE | EA | $261.00 | 1 |
| D043 | TOILET PARTITION-TRIPLE | EA | $341.00 | 1 |
| D044 | SHOWER PARTITION | EA | $221.00 | 1 |
| D045 | SHOWER/TOILET DOOR WITH PILASTER | EA | $161.00 | 1 |
| D046 | URINAL PARTITION | EA | $141.00 | 1 |
| D047 | PAINTING METAL PICNIC SHELTERS | SF | $0.97 | 1 |
| D048 | PAINTING WOOD-OIL BASED PAINT | SF | $0.75 | 1 |
| D049 | PAINTING WOOD-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| D050 | PAINTING WOOD-SEALER/STAIN | SF | $0.75 | 1 |
| D051 | PAINTING WOOD-WATERPROOFING | SF | $0.75 | 1 |
| D052 | PAINTING MASONRY-BLOCK SEALER/FILLER | SF | $0.75 | 1 |
| D053 | PAINTING MASONRY-OIL BASED | SF | $0.75 | 1 |
| D054 | PAINTING MASONRY-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| D055 | PAINTING METAL-OIL BASED PAINT | SF | $0.75 | 1 |
| D056 | PAINTING METAL-EXTERIOR BASED PAINT | SF | $0.75 | 1 |
| D057 | LOG VENEER SIDING | SF | $2.34 | 1 |
| D058 | LOG SIDING | SF | $2.55 | 1 |
| D059 | OTHER CARPENTRY AND PAINTING |
Total Section 2 Option Year 3
CLIN # Section 3-Paving, Road Maintenance and Site Work U/M Unit Price Unit Price Quantity Price
| D060 | TOP SOIL | TN | $64.00 | 1 |
| D061 | FILL MATERIAL | TN | $56.00 | 1 |
| D062 | SAND MATERIAL | TN | $56.00 | 1 |
| D063 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| D064 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| D065 | RIP RAP STONE 3"-5" | TN | $76.00 | 1 |
| D066 | RIP RAP STONE 6"-12" | TN | $89.00 | 1 |
| D067 | RIP RAP STONE 12"-18" | TN | $116.00 | 1 |
| D068 | POLYETHYLENE CULVERT REPLACEMENT 12" | LF | $58.50 | 1 |
| D069 | POLYETHYLENE CULVERT REPLACEMENT 18" | LF | $65.00 | 1 |
| D070 | POLYETHYLENE CULVERT REPLACEMENT 24" | LF | $73.25 | 1 |
| D071 | POLYETHYLENE CULVERT REPLACEMENT 36" | LF | $92.75 | 1 |
| D072 | POLYETHYLENE CULVERT REPLACEMENT 48" | LF | $113.75 | 1 |
| D073 | ROAD BORING-2" CASING | LF | $15.00 | 1 |
| D074 | ROAD BORING-4" CASING | LF | $26.00 | 1 |
| D075 | ROAD BORING-6" CASING | LF | $37.00 | 1 |
| D076 | ASPHALT PAVING AND PATCHING | SY | $18.00 | 1 |
| D077 | SCARFYING AND RESHAPING BASE COURSE | SY | $5.75 | 1 |
| D078 | BITUMINOUS TACK COAT | SY | $5.50 | 1 |
| D079 | BITUMINOUS PRIME COAT | SY | $5.30 | 1 |
| D080 | ASPHALT SEALING COATING | SY | $2.00 | 1 |
| D081 | SEALING JOINTS AND CRACKS | LF | $9.00 | 1 |
| D082 | PAINTING/MARKING TRAFFIC CONTROL | LF | $1.75 | 1 |
| D083 | 4" CONCRETE SLAB | SF | $4.00 | 1 |
| D084 | 4" CONTRETE SLAB WITH FOOTINGS | SF | $6.50 | 1 |
| D085 | 6" CONCRETE SLAB | SF | $6.50 | 1 |
| D086 | 6" CONCRETE SLAB WITH FOOTINGS | SF | $7.50 | 1 |
| D087 | CONCRETE CURB | LF | $11.00 | 1 |
| D088 | CONCRETE CURB, 24" CURB AND GUTTER | LF | $21.00 | 1 |
| D089 | ROAD SHOULDER MAINTENANCE | LF | $1.57 | 1 |
| D090 | PLAYGROUND MULCH REMOVAL AND DISPOSAL | CY | $52.81 | 1 |
| D091 | BARK CHIP SUPPLY/DELIVERY | CY | $208.00 | 1 |
| D092 | RUBBER MULCH SUPPLY/DELIVERY | CY | $331.00 | 1 |
| D093 | LIMESTONE ROAD BASE | SF | $0.59 | 1 |
| D094 | LAUNCH TYPE CONCRETE | SF | $8.75 | 1 |
| D095 | OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK |
Total Section 3 Option Year 3
CLIN # Section 4-Plumbing U/M Unit Price Unit Price Quantity Price
| D096 | WATER VALVE INSTALLATION 3/4"-2" | EA | $16.00 | 1 |
| D097 | WATER VALVE INSTALLATION 2 1/2"-4" | EA | $24.00 | 1 |
| D098 | WATER LINE INSTALLATION 3/4"-2" | LF | $16.00 | 1 |
| D099 | WATER LINE INSTALLATION 2 1/2"-4" | LF | $18.50 | 1 |
| D100 | GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP | LF | $75.65 | 1 |
| D101 | GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP | LF | $177.50 | 1 |
| D102 | GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP | LF | $202.50 | 1 |
| D103 | GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP | LF | $75.90 | 1 |
| D104 | GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP | LF | $187.50 | 1 |
| D105 | GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP | LF | $205.75 | 1 |
| D106 | GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP | LF | $79.50 | 1 |
| D107 | GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP | LF | $192.75 | 1 |
| D108 | GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP | LF | $209.50 | 1 |
| D109 | COMMODE REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| D110 | COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED | EA | $24.00 | 1 |
| D111 | COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED | EA | $24.00 | 1 |
| D112 | COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED | EA | $24.00 | 1 |
| D113 | URINAL REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| D114 | URINAL REPLACEMENT, STAINLESS / WALL MOUNTED | EA | $24.00 | 1 |
| D115 | LAVATORY REPLACEMENT, CHINA /WALL HUNG | EA | $24.00 | 1 |
| D116 | LAVATORY REPLACEMENT, STAINLESS /WALL HUNG | EA | $24.00 | 1 |
| D117 | WATER HEATER REPLACEMENT-50 GALLON | EA | $400.00 | 1 |
| D118 | WATER HEATER REPLACEMENT-80 GALLON | EA | $550.00 | 1 |
| D119 | SELINOID VALVE REPLACEMENT | EA | $24.00 | 1 |
| D120 | PNEUMATIC VALVE REPLACEMENT | EA | $21.00 | 1 |
| D121 | FROST FREE WATER HYDRANT ON 4" X 6" POST | EA | $19.00 | 1 |
| D122 | OTHER PLUMBING |
Total Section 4 Option Year 3
CLIN # Section 5-Civil Engineering Services U/M Unit Price Unit Price Quantity Price
| D123 | HAND OPERATED TOOLS | HR | $21.50 | 1 |
| D124 | DUMP TRUCK, TWENTY TON | HR | $56.75 | 1 |
| D125 | DUMP TRUCK, TWO AND ONE HALF TON | HR | $38.88 | 1 |
| D126 | MOTOR GRADER, TWELVE FOOT MOLDBOARD | HR | $79.28 | 1 |
| D127 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT FOOT BLADE | HR | $113.63 | 1 |
| D128 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT BLADE | HR | $99.25 | 1 |
| D129 | WATER TANK TRUCK | HR | $88.50 | 1 |
| D130 | SHEEP FOOT ROLLER/COMPACTOR | HR | $80.00 | 1 |
| D131 | ROLLER/COMPACTOR, PNEUMATIC-TIRED | HR | $71.38 | 1 |
| D132 | ROLLER/COMPACTOR, STEEL WHEELED | HR | $80.00 | 1 |
| D133 | FRONT END LOADER, RUBBER TIRED TYPE | HR | $117.38 | 1 |
| D134 | TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY MOWER | HR | $29.00 | 1 |
| D135 | BACKHOE, RUBBER TIRED TYPE | HR | $67.81 | 1 |
| D136 | BACKHOE (TRACKHOE) TRACK TYPE | HR | $157.91 | 1 |
| D137 | TRACTOR, "SKID STEERING" TYPE LOADER | HR | $50.68 | 1 |
| D138 | TRENCHER, ROCK SAW, WHEEL TYPE | HR | $46.08 | 1 |
| D139 | ROAD BROOM | HR | $54.13 | 1 |
| D140 | ASPHALT MILLING MACHINE (COLD PLANER) | HR | $77.69 | 1 |
| D141 | AIR COMPRESSOR | HR | $76.53 | 1 |
| D142 | WELDER, TRUCK OR TRAILER, MOUNTED | HR | $41.15 | 1 |
| D143 | VIBRATORY PLATE COMPACTOR | HR | $35.15 | 1 |
| D144 | WATER PUMP, TWO INCH | HR | $22.65 | 1 |
| D145 | WATER PUMP, FOUR INCH | HR | $26.10 | 1 |
| D146 | WATER PUMP, SIX INCH | HR | $31.56 | 1 |
| D147 | WASHER HIGH PRESSURE | HR | $20.93 | 1 |
| D148 | CHIPPER, BRUSH/LIMB | HR | $42.34 | 1 |
| D149 | CONCRETE/ASPHALT SAW | HR | $19.34 | 1 |
| D150 | CHAIN SAW | HR | $21.33 | 1 |
| D151 | OTHER ENGINEER SERVICES |
Total Section 5 Option Year 3
CLIN # Section 6-Fencing U/M Unit Price Unit Price Quantity Price
| D152 | PIPE RAIL FENCING | LF | $15.35 | 1 |
| D153 | PIPE RAIL FENCE GATE | EA | $296.00 | 1 |
| D154 | STEEL POST AND CABLE | LF | $28.00 | 1 |
| D155 | REPAIR/REPLACE GUARDRAIL FENCING | LF | $67.00 | 1 |
| D156 | BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE | LF | $3.50 | 1 |
| D157 | INSTALLATION OF SWINGING GATE-4' | EA | $325.00 | 1 |
| D158 | INSTALLATION OF SWINGING GATE-12' | EA | $340.00 | 1 |
| D159 | INSTALLATION OF SWINGING GATE-14' | EA | $350.00 | 1 |
| D160 | INSTALLATION OF SWINGING GATE-16' | EA | $390.00 | 1 |
| D161 | INSTALLATION OF BOUNDRY DELINEATION POST | EA | $420.00 | 1 |
| D162 | OTHER FENCING |
Total Section 6 Option Year 3
CLIN # Section 7-Sign and Buoy Maintenance U/M Unit Price Unit Price Quantity Price
| D163 | PARK SIGN INSTALLATION-SINGLE POST | EA | $21.00 | 1 |
| D164 | PARK SIGN INSTALLATION-DOUBLE POST | EA | $32.00 | 1 |
| D165 | PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST | EA | $11.00 | 1 |
| D166 | PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST | EA | $16.00 | 1 |
| D167 | BOUY INSTALLATION | EA | $203.00 | 1 |
| D168 | REPAIR/REPLACE PIPELINE FLOATING BARRIER | LF | $12.00 | 1 |
| D169 | PIPELINE FLOATING BARRIER ANCHORS | EA | $203.00 | 1 |
| D170 | OTHER SIGN AND BOUY MAINTENANCE |
Total Section 7 Option Year 3
CLIN Section 8-Electrical U/M Unit Price Unit Price Quantity Price
| D171 | ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL | LF | $8.00 | 1 |
| D172 | ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT | LF | $8.20 | 1 |
| D173 | RV PEDESTAL INSTALLATION, SINGLE UNIT | EA | $120.00 | 1 |
| D174 | METER BASE INSTALLATION | EA | $320.00 | 1 |
| D175 | MAIN DISCONNECT PANEL INSTALLATION | EA | $350.00 | 1 |
| D176 | LOAD CENTER PANEL | EA | $850.00 | 1 |
| D177 | OTHER ELECTRICAL |
| Total Section 8 Option Year 3 |
| Total Option Year 3 Sections 1-8 (CLINs D001-D177) |
Option 4
| Option 4 | |||||||
| CLIN # | Section 1-Campsite Maintenance | U/M | Unit Price | Unit Price | Quantity | Price | 1.386 |
| E001 | IMPACT PAD MATERIAL | SF | $1.75 | 1 |
| E002 | CONCRETE WHEEL STOPS | EA | $60.00 | 1 |
| E003 | TIMBER DELINIATORS, ONE TIER | LF | $8.00 | 1 |
| E004 | TIMBER DELINIATORS,TWO TIER | LF | $8.00 | 1 |
| E005 | TIMBER DELINIATORS, THREE TIER | LF | $8.00 | 1 |
| E006 | TIMBER DELINIATORS, FOUR TIER | LF | $8.00 | 1 |
| E007 | TIMBER DELINIATORS, FIVE TIER | LF | $8.00 | 1 |
| E008 | UPRIGHT AND PEDESTAL GRILL INSTALLATION | RA | $30.00 | 1 |
| E009 | FIRE RING AND GROUND MOUNTED COOKER INSTALLATION | EA | $25.00 | 1 |
| E010 | LANTER HANGER POST INSTALLION | EA | $30.00 | 1 |
| E011 | REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC TABLES | EA | $35.00 | 1 |
| E012 | REPLACE/INSTALL PARK BENCHES | EA | $40.00 | 1 |
| E013 | RETAINER WALL BLOCK INSTALLATION ONE | LF | $1.05 | 1 |
| E014 | RETAINER WALL BLOCK INSTALLATION TWO | LF | $1.05 | 1 |
| E015 | RETAINER WALL BLOCK INSTALLATION THREE | LF | $1.05 | 1 |
| E016 | RETAINER WALL BLOCK INSTALLATION FOUR | LF | $1.05 | 1 |
| E017 | RETAINER WALL BLOCK INSTALLATION FIVE | LF | $1.05 | 1 |
| E018 | RIP RAP BAG INSTALLATION ONE | LF | $0.80 | 1 |
| E019 | RIP RAP BAG INSTALLATION TWO | LF | $0.80 | 1 |
| E020 | RIP RAP BAG INSTALLATION THREE | LF | $0.80 | 1 |
| E021 | RIP RAP BAG INSTALLATION FOUR | LF | $0.80 | 1 |
| E022 | RIP RAP BAG INSTALLATION FIVE | LF | $0.80 | 1 |
| E023 | RIP RAP BAG INSTALLATION SIX | LF | $0.80 | 1 |
| E024 | RIP RAP BAG INSTALLATION SEVEN | LF | $0.80 | 1 |
| E025 | RIP RAP BAG INSTALLATION EIGHT | LF | $0.80 | 1 |
| E026 | OTHER CAMPSITE MAINTENANCE |
Total Section 1 Option Year 4
CLIN # Section 2-Carpentry and Painting U/M Unit Price Unit Price Quantity Price
| E027 | METAL PICNIC SHELTER INSTALLATION | EA | $605.00 | 1 |
| E028 | ROOFING REMOVAL (COMPOSITION AND R-PANEL) | SF | $0.75 | 1 |
| E029 | ROOF SHEATHING | SF | $1.45 | 1 |
| E030 | TONGUE AND GROVE DECKING | SF | $1.81 | 1 |
| E031 | FASCIA BOARD | LF | $10.45 | 1 |
| E032 | COMPOSITION SHINGLE REPAIR/INSTALLATION | SF | $1.19 | 1 |
| E033 | R-PANEL REPAIR/INSTALLATION | SF | $2.42 | 1 |
| E034 | WALL SHEATING | SF | $1.34 | 1 |
| E035 | SOFFIT SHEATHING | SF | $3.01 | 1 |
| E036 | WALL SIDING | SF | $1.34 | 1 |
| E037 | PLASTIC LAMINATE PANELS | SF | $2.51 | 1 |
| E038 | LAP OR "V" GROOVED SIDING | SF | $2.34 | 1 |
| E039 | BRICK AND SLUMP STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| E040 | NATURAL STONE MASONRY-REPAIR/INSTALLATION | SF | $4.00 | 1 |
| E041 | TOILET PARTITION-SINGLE | EA | $181.00 | 1 |
| E042 | TOILET PARTITION-DOUBLE | EA | $261.00 | 1 |
| E043 | TOILET PARTITION-TRIPLE | EA | $341.00 | 1 |
| E044 | SHOWER PARTITION | EA | $221.00 | 1 |
| E045 | SHOWER/TOILET DOOR WITH PILASTER | EA | $161.00 | 1 |
| E046 | URINAL PARTITION | EA | $141.00 | 1 |
| E047 | PAINTING METAL PICNIC SHELTERS | SF | $0.97 | 1 |
| E048 | PAINTING WOOD-OIL BASED PAINT | SF | $0.75 | 1 |
| E049 | PAINTING WOOD-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| E050 | PAINTING WOOD-SEALER/STAIN | SF | $0.75 | 1 |
| E051 | PAINTING WOOD-WATERPROOFING | SF | $0.75 | 1 |
| E052 | PAINTING MASONRY-BLOCK SEALER/FILLER | SF | $0.75 | 1 |
| E053 | PAINTING MASONRY-OIL BASED | SF | $0.75 | 1 |
| E054 | PAINTING MASONRY-EXTERIOR LATEX PAINT | SF | $0.75 | 1 |
| E055 | PAINTING METAL-OIL BASED PAINT | SF | $0.75 | 1 |
| E056 | PAINTING METAL-EXTERIOR BASED PAINT | SF | $0.75 | 1 |
| E057 | LOG VENEER SIDING | SF | $2.34 | 1 |
| E058 | LOG SIDING | SF | $2.55 | 1 |
| E059 | OTHER CARPENTRY AND PAINTING |
Total Section 2 Option Year 4
CLIN # Section 3-Paving, Road Maintenance and Site Work U/M Unit Price Unit Price Quantity Price
| E060 | TOP SOIL | TN | $64.00 | 1 |
| E061 | FILL MATERIAL | TN | $56.00 | 1 |
| E062 | SAND MATERIAL | TN | $56.00 | 1 |
| E063 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| E064 | AGGREGATE ROAD BASE MATERIAL | TN | $80.00 | 1 |
| E065 | RIP RAP STONE 3"-5" | TN | $76.00 | 1 |
| E066 | RIP RAP STONE 6"-12" | TN | $89.00 | 1 |
| E067 | RIP RAP STONE 12"-18" | TN | $116.00 | 1 |
| E068 | POLYETHYLENE CULVERT REPLACEMENT 12" | LF | $58.50 | 1 |
| E069 | POLYETHYLENE CULVERT REPLACEMENT 18" | LF | $65.00 | 1 |
| E070 | POLYETHYLENE CULVERT REPLACEMENT 24" | LF | $73.25 | 1 |
| E071 | POLYETHYLENE CULVERT REPLACEMENT 36" | LF | $92.75 | 1 |
| E072 | POLYETHYLENE CULVERT REPLACEMENT 48" | LF | $113.75 | 1 |
| E073 | ROAD BORING-2" CASING | LF | $15.00 | 1 |
| E074 | ROAD BORING-4" CASING | LF | $26.00 | 1 |
| E075 | ROAD BORING-6" CASING | LF | $37.00 | 1 |
| E076 | ASPHALT PAVING AND PATCHING | SY | $18.00 | 1 |
| E077 | SCARFYING AND RESHAPING BASE COURSE | SY | $5.75 | 1 |
| E078 | BITUMINOUS TACK COAT | SY | $5.50 | 1 |
| E079 | BITUMINOUS PRIME COAT | SY | $5.30 | 1 |
| E080 | ASPHALT SEALING COATING | SY | $2.00 | 1 |
| E081 | SEALING JOINTS AND CRACKS | LF | $9.00 | 1 |
| E082 | PAINTING/MARKING TRAFFIC CONTROL | LF | $1.75 | 1 |
| E083 | 4" CONCRETE SLAB | SF | $4.00 | 1 |
| E084 | 4" CONTRETE SLAB WITH FOOTINGS | SF | $6.50 | 1 |
| E085 | 6" CONCRETE SLAB | SF | $6.50 | 1 |
| E086 | 6" CONCRETE SLAB WITH FOOTINGS | SF | $7.50 | 1 |
| E087 | CONCRETE CURB | LF | $11.00 | 1 |
| E088 | CONCRETE CURB, 24" CURB AND GUTTER | LF | $21.00 | 1 |
| E089 | ROAD SHOULDER MAINTENANCE | LF | $1.57 | 1 |
| E090 | PLAYGROUND MULCH REMOVAL AND DISPOSAL | CY | $52.81 | 1 |
| E091 | BARK CHIP SUPPLY/DELIVERY | CY | $208.00 | 1 |
| E092 | RUBBER MULCH SUPPLY/DELIVERY | CY | $331.00 | 1 |
| E093 | LIMESTONE ROAD BASE | SF | $0.59 | 1 |
| E094 | LAUNCH TYPE CONCRETE | SF | $8.75 | 1 |
| E095 | OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK |
Total Section 3 Option Year 4
CLIN # Section 4-Plumbing U/M Unit Price Unit Price Quantity Price
| E096 | WATER VALVE INSTALLATION 3/4"-2" | EA | $16.00 | 1 |
| E097 | WATER VALVE INSTALLATION 2 1/2"-4" | EA | $24.00 | 1 |
| E098 | WATER LINE INSTALLATION 3/4"-2" | LF | $16.00 | 1 |
| E099 | WATER LINE INSTALLATION 2 1/2"-4" | LF | $18.50 | 1 |
| E100 | GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP | LF | $75.65 | 1 |
| E101 | GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP | LF | $177.50 | 1 |
| E102 | GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP | LF | $202.50 | 1 |
| E103 | GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP | LF | $75.90 | 1 |
| E104 | GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP | LF | $187.50 | 1 |
| E105 | GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP | LF | $205.75 | 1 |
| E106 | GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP | LF | $79.50 | 1 |
| E107 | GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP | LF | $192.75 | 1 |
| E108 | GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP | LF | $209.50 | 1 |
| E109 | COMMODE REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| E110 | COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED | EA | $24.00 | 1 |
| E111 | COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED | EA | $24.00 | 1 |
| E112 | COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED | EA | $24.00 | 1 |
| E113 | URINAL REPLACEMENT, CHINA /WALL MOUNTED | EA | $24.00 | 1 |
| E114 | URINAL REPLACEMENT, STAINLESS / WALL MOUNTED | EA | $24.00 | 1 |
| E115 | LAVATORY REPLACEMENT, CHINA /WALL HUNG | EA | $24.00 | 1 |
| E116 | LAVATORY REPLACEMENT, STAINLESS /WALL HUNG | EA | $24.00 | 1 |
| E117 | WATER HEATER REPLACEMENT-50 GALLON | EA | $400.00 | 1 |
| E118 | WATER HEATER REPLACEMENT-80 GALLON | EA | $550.00 | 1 |
| E119 | SELINOID VALVE REPLACEMENT | EA | $24.00 | 1 |
| E120 | PNEUMATIC VALVE REPLACEMENT | EA | $21.00 | 1 |
| E121 | FROST FREE WATER HYDRANT ON 4" X 6" POST | EA | $19.00 | 1 |
| E122 | OTHER PLUMBING |
Total Section 4 Option Year 4
CLIN # Section 5-Civil Engineering Services U/M Unit Price Unit Price Quantity Price
| E123 | HAND OPERATED TOOLS | HR | $21.50 | 1 |
| E124 | DUMP TRUCK, TWENTY TON | HR | $56.75 | 1 |
| E125 | DUMP TRUCK, TWO AND ONE HALF TON | HR | $38.88 | 1 |
| E126 | MOTOR GRADER, TWELVE FOOT MOLDBOARD | HR | $79.28 | 1 |
| E127 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT FOOT BLADE | HR | $113.63 | 1 |
| E128 | BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT BLADE | HR | $99.25 | 1 |
| E129 | WATER TANK TRUCK | HR | $88.50 | 1 |
| E130 | SHEEP FOOT ROLLER/COMPACTOR | HR | $80.00 | 1 |
| E131 | ROLLER/COMPACTOR, PNEUMATIC-TIRED | HR | $71.38 | 1 |
| E132 | ROLLER/COMPACTOR, STEEL WHEELED | HR | $80.00 | 1 |
| E133 | FRONT END LOADER, RUBBER TIRED TYPE | HR | $117.38 | 1 |
| E134 | TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY MOWER | HR | $29.00 | 1 |
| E135 | BACKHOE, RUBBER TIRED TYPE | HR | $67.81 | 1 |
| E136 | BACKHOE (TRACKHOE) TRACK TYPE | HR | $157.91 | 1 |
| E137 | TRACTOR, "SKID STEERING" TYPE LOADER | HR | $50.68 | 1 |
| E138 | TRENCHER, ROCK SAW, WHEEL TYPE | HR | $46.08 | 1 |
| E139 | ROAD BROOM | HR | $54.13 | 1 |
| E140 | ASPHALT MILLING MACHINE (COLD PLANER) | HR | $77.69 | 1 |
| E141 | AIR COMPRESSOR | HR | $76.53 | 1 |
| E142 | WELDER, TRUCK OR TRAILER, MOUNTED | HR | $41.15 | 1 |
| E143 | VIBRATORY PLATE COMPACTOR | HR | $35.15 | 1 |
| E144 | WATER PUMP, TWO INCH | HR | $22.65 | 1 |
| E145 | WATER PUMP, FOUR INCH | HR | $26.10 | 1 |
| E146 | WATER PUMP, SIX INCH | HR | $31.56 | 1 |
| E147 | WASHER HIGH PRESSURE | HR | $20.93 | 1 |
| E148 | CHIPPER, BRUSH/LIMB | HR | $42.34 | 1 |
| E149 | CONCRETE/ASPHALT SAW | HR | $19.34 | 1 |
| E150 | CHAIN SAW | HR | $21.33 | 1 |
| E151 | OTHER ENGINEER SERVICES |
Total Section 5 Option Year 4
CLIN # Section 6-Fencing U/M Unit Price Unit Price Quantity Price
| E152 | PIPE RAIL FENCING | LF | $15.35 | 1 |
| E153 | PIPE RAIL FENCE GATE | EA | $296.00 | 1 |
| E154 | STEEL POST AND CABLE | LF | $28.00 | 1 |
| E155 | REPAIR/REPLACE GUARDRAIL FENCING | LF | $67.00 | 1 |
| E156 | BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE | LF | $3.50 | 1 |
| E157 | INSTALLATION OF SWINGING GATE-4' | EA | $325.00 | 1 |
| E158 | INSTALLATION OF SWINGING GATE-12' | EA | $340.00 | 1 |
| E159 | INSTALLATION OF SWINGING GATE-14' | EA | $350.00 | 1 |
| E160 | INSTALLATION OF SWINGING GATE-16' | EA | $390.00 | 1 |
| E161 | INSTALLATION OF BOUNDRY DELINEATION POST | EA | $420.00 | 1 |
| E162 | OTHER FENCING |
Total Section 6 Option Year 4
CLIN # Section 7-Sign and Buoy Maintenance U/M Unit Price Unit Price Quantity Price
| E163 | PARK SIGN INSTALLATION-SINGLE POST | EA | $21.00 | 1 |
| E164 | PARK SIGN INSTALLATION-DOUBLE POST | EA | $32.00 | 1 |
| E165 | PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST | EA | $11.00 | 1 |
| E166 | PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST | EA | $16.00 | 1 |
| E167 | BOUY INSTALLATION | EA | $203.00 | 1 |
| E168 | REPAIR/REPLACE PIPELINE FLOATING BARRIER | LF | $12.00 | 1 |
| E169 | PIPELINE FLOATING BARRIER ANCHORS | EA | $203.00 | 1 |
| E170 | OTHER SIGN AND BOUY MAINTENANCE |
Total Section 7 Option Year 4
CLIN Section 8-Electrical U/M Unit Price Unit Price Quantity Price
| E171 | ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL | LF | $8.00 | 1 |
| E172 | ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT | LF | $8.20 | 1 |
| E173 | RV PEDESTAL INSTALLATION, SINGLE UNIT | EA | $120.00 | 1 |
| E174 | METER BASE INSTALLATION | EA | $320.00 | 1 |
| E175 | MAIN DISCONNECT PANEL INSTALLATION | EA | $350.00 | 1 |
| E176 | LOAD CENTER PANEL | EA | $850.00 | 1 |
| E177 | OTHER ELECTRICAL |
| Total Section 8 Option Year 4 |
| Total Option Year 4 Sections 1-8(CLINs E001-E177) |
| Total IGE |