AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The solicitation is amended to:
1. Add Questions and Answ ers from the site visit and other inquiry.
2. To increase the quantities on the seed task order. This increase does not adjust the quantities on the base SATOC.
3. To make clear that the $10,000 minimum amount w ill be for each year of the contract. Therefore, if the contract is fully exercised then the minimum amount w ill be for $50,000. This is for the base year plus the four option periods.
4. To request that, on the base SATOC bid table w ith any quantities listed as “zero” to be price w ith the quantity of one (1) for fair evaluation proposes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G20R0024
X 9B. DATED (SEE ITEM 11)
26-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2020
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G20R0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION SF30 - CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE
The following have been modified:
ADDENDUM
1) The Period of Performance will be determined on a task order basis.
2) The requirement for Payment and Performance Bonds will be determined on a Task Order basis.
3) The Seed Project Price Breakout Schedule to be issued with base SATOC is for evaluation purposes and will result in a task order award.
4) The SATOC bid table requires a price for all actions for evaluation. For any zero quantity items, please use a quantity of one (1) for price evaluation.
AWARDING TASK ORDERS
This is an Indefinite Delivery, Indefinite Quantity type Contract (IDIQ) contract utilizing Firm-Fixed-Price task orders in accordance with FAR Subpart 16.5 for Design-Bid-Build, Construction, and Incidental Service Projects associated with the Piney Woods North Region. This is a Single Award Task Order Contract (SATOC) Umbrella contract. The prices will be fixed based on quantities and unit prices set in the Bid Table. This contract is set aside Small Business Contractors.
The total combined contract capacity under the umbrella contract is valued at $10,000,000 over a one year base period from the date of award to include four option years. Exercising the option years will not increase the available capacity. Awards will be made as Firm-Fixed-Price Task Orders during the period of performance.
The minimum guarantee is $10,000 in services per contract for the base period. The $10,000 minimum amount will be for each year of the contract. If the contract is fully exercised then the minimum amount will be for $50,000.
This is for the base year plus the four option periods.
For the base period only, the Government hereby obligates itself to obtain no less than Ten Thousand and No/100 Dollars ($10,000.00) in services, chargeable to the following appropriation:
096 NA X 3123 0000 3123-20/XX-2455 M2270601 20B8C5
PERFORMANCE AND PAYMENT BONDS ARE ONLY APPLICABLE TO THE EXTENT INDICATED ON
INDIVIDUAL TASK ORDERS.
In general, Task Orders will typically be awarded on a Firm-Fixed-Price basis, using the Bid Table set at the SATOC Umbrella contract. The designs for the requirement will come from the Government on the Task Order, in which the Contractor will be able to make recommendations and adjustments through value engineering.
SCOPE
This work consists of construction design-bid-build as well as items incidental to the completion of the construction.
The scope includes new building construction, building or building systems renovation, structural repairs, site work, paving, and civil works (flood damage reduction, such as channel improvements, bank stabilization, levees and floodwalls). Activities incidental to the construction such as building/facilities demolition and debris removal, utility installation/replacement, equipment upgrades, landscaping, geotechnical work, security systems, and abatement of materials of environmental concern (e.g. materials containing lead, asbestos, PCBs or HTRW).
SECTION SF30 - CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWER
Sit Visit Questions Maintenance IDIQ South
14 JULY 2020
1. Where is the work?
A – The work will be located in the southern part of the Piney Woods region, which will include government managed property at Sam Rayburn Reservoir, Town Bluff Reservoir, and their associated powerhouse locations.
2. How do wage rates work for equipment rental?
A – Wage rates depict the hourly wage that a worker should receive in a given location for doing a certain job or operating a certain piece of equipment. It does not include the price of the equipment, upkeep, mobilization, etc.
3. “Emergency” focus can be established for work locations?
A – If a certain area (a park location for example at Town Bluff reservoir) happened to receive a major storm, work may be focused at that location for a given task order.
4. How does COVID-19 affect task orders or task order payment?
A – It is understood that some supplies may be in short supply due to Covid-19. Clauses exist for payment timeframes related to completed work after invoicing is received.
5. When is the anticipated start work?
A – The seed task order is anticipated to be awarded prior to the end on SEP 2020.
6. What is the minimum and maximum task order amounts?
A – The minimum task order amount is $10,000. A maximum is not assigned. If the government intends to award a task order below the3 $10,000 minimum the contractor does not have to honor it.
7. Is there enough work to “make it interesting”?
A – Work for this contract will include projects from multiple business lines, including Flood risk Management, Recreation Management, Environmental Stewardship, and Hydropower.
8. Is there is a risk involved with a contractor being spread too thin if they intend to bid on both this action, and the Northern Piney Woods Maintenance IDIQ?
A – It will depend on the size of the selected bidder. The government is advertising two separate contract actions, this Maintenance IDIQ for the southern portion of the Piney Woods region and one for the northern portion to negate the risk.
9. Is the intent to award the contract to one company or to multiple companies?
A – The government will award this action to one company as a prime contractor. The prime contractor will be responsible for any dealings with their own subcontractors.
10. Additional question send in via email.
“1-According to our understanding the unit price includes labor, material and equipment with contractor’s OH & Profit for the installed item
2-If the above statement is correct, where will these items (but not limited to) be added:
General condition-As site supervision, storage, barrier, temporary fencing, daily cleaning, dumpster, testing etc.
Office OH- As submittals, shop drawings, documentation, coordination with site, correspondence, bill submittals, cost value, construction schedule, procurement etc.”
A – Costs will need to be factored into the bidder’s line item costs as operating costs. There is no separate line item to include the items mentioned above.
SEED TASK ORDER
Base Year
CLIN
Section 1-Campsite Maintenance U/M Unit Price Estimated Quantity
Estimated Price
A001 CONCRETE WHEEL STOPS EA 0
A002 TIMBER DELINIATORS, ONE TIER LF 0
A003 TIMBER DELINIATORS,TWO TIER LF 0
A004 TIMBER DELINIATORS, THREE TIER LF 0
A005 TIMBER DELINIATORS, FOUR TIER LF 0
A006 TIMBER DELINIATORS, TIER FIVE LF 0
A007 UPRIGHT AND PEDASTAL GRILL INSTALLATION LF 0
A008 FIRE RING AND GROUND MOUNTED COOKER INSTALLATION EA 0
A009 LANTER HANGER POST INSTALLION EA 0
A010 REPLACE/INSTALL VINYL COATED OR ALUMINIUM PICNIC
TABLES
EA 0
A011 REPLACE/INSTALL PARK BENCHES EA 0
A012 RETAINER WALL BLOCK INSTALLATION ONE LF 0
A013 RETAINER WALL BLOCK INSTALLATION TWO LF 0
A014 RETAINER WALL BLOCK INSTALLATION THREE LF 0
A015 RETAINER WALL BLOCK INSTALLATION FOUR LF 0
A016 RETAINER WALL BLOCK INSTALLATION FIVE LF 200
A017 RIP RAP BAG INSTALLATION ONE LF 0
A018 RIP RAP BAG INSTALLATION TWO LF 0
A019 RIP RAP BAG INSTALLATION THREE LF 0
A020 RIP RAP BAG INSTALLATION FOUR LF 0
A021 RIP RAP BAG INSTALLATION FIVE LF 0
A022 RIP RAP BAG INSTALLATION SIX LF 0
A023 RIP RAP BAG INSTALLATION SEVEN LF 0
A024 RIP RAP BAG INSTALLATION EIGHT LF 0
A025 OTHER CAMPSITE MAINTENANCE
Total Section 1 Base Year
CLIN
Section 2-Carpentry and Painting U/M Unit Price Estimated Quantity
Unit Price
A026 METAL PICNIC SHELTER INSTALLATION EA 0
A027 ROOFING REMOVAL (COMPOSITION AND R-PANEL) SF 782
A028 ROOF SHEATHING SF 0
A029 TONGUE AND GROVE DECKING SF 0
A030 FASCIA BOARD LF 120
A031 COMPOSITION SHINGLE REPAIR/INSTALLATION SF 0
A032 R-PANEL REPAIR/INSTALLATION SF 782
A033 WALL SHEATING SF 0
A034 SOFFIT SHEATHING SF 120
A035 WALL SIDING SF 0
A036 PLASTIC LAMINATE PANELS SF 0
A037 LAP OR "V" GROOVED SIDING SF 0
A038 TOILET PARTITION-SINGLE EA 0
A039 TOILET PARTITION-DOUBLE EA 0
A040 TOILET PARTITION-TRIPLE EA 0
A041 SHOWER PARTITION EA 0
A042 SHOWER/TOILET DOOR WITH PILASTER EA 0
A043 URINAL PARTITION EA 0
A044 PAINTING METAL PICNIC SHELTERS SF 0
A045 PAINTING WOOD-OIL BASED PAINT SF 0
A046 PAINTING WOOD-EXTERIOR LATEX PAINT SF 0
A047 PAINTING WOOD-SEALER/STAIN SF 0
A048 PAINTING WOOD-WATERPROOFING SF 0
A049 PAINTING MASONRY-BLOCK SEALER/FILLER SF 0
A050 PAINTING MASONRY-OIL BASED SF 0
A051 PAINTING MASONRY-EXTERIOR LATEX PAINT SF 0
A052 PAINTING METAL-OIL BASED PAINT SF 0
A053 PAINTING METAL-EXTERIOR BASED PAINT SF 0
A054 LOG VENEER SIDING SF 0
A055 LOG SIDING SF 0
A056 OTHER CARPENTRY AND PAINTING
Total Section 2 Base Year
Section 3-Paving, Road Maintenance and Site Work U/M Unit Price Estimated
A057 TOP SOIL TN 0
A058 FILL MATERIAL TN 0
A059 SAND MATERIAL TN 0
A060 Intentionally Left Blank
A061 AGGREGATE ROAD BASE MATERIAL TN 25
A062 RIP RAP STONE 3"-5" TN 0
A063 RIP RAP STONE 6"-12" TN 0
A064 RIP RAP STONE 12"-18" TN 0
A065 GALVANIZED CULVERT REPLACEMENT 15" LF 84
A066 GALVANIZED CULVERT END SECTION 15", PAIR EA 1
A067 GALVANIZED CULVERT REPLACEMENT 18" LF 0
A068 GALVANIZED CULVERT END SECTION 18", PAIR EA 0
A069 GALVANIZED CULVERT REPLACEMENT 24" LF 0
A070 GALVANIZED CULVERT END SECTION 24", PAIR EA 0
A071 GALVANIZED CULVERT REPLACEMENT 30" LF 0
A072 GALVANIZED CULVERT END SECTION 30", PAIR EA 0
A073 GALVANIZED CULVERT REPLACEMENT 36" LF 0
A074 GALVANIZED CULVERT END SECTION 36", PAIR EA 0
A075 POLYETHYLENE CULVERT REPLACEMENT 12" LF 0
A076 POLYETHYLENE CULVERT REPLACEMENT 18" LF 0
A077 POLYETHYLENE CULVERT REPLACEMENT 24" LF 0
A078 POLYETHYLENE CULVERT REPLACEMENT 36" LF 0
A079 POLYETHYLENE CULVERT REPLACEMENT 48" LF 0
A080 ROAD BORING-2" CASING LF 0
A081 ROAD BORING-4" CASING LF 200
A082 ROAD BORING-6" CASING LF 0
A083 ASPHALT PAVING AND PATCHING SY 0
A084 SCARFYING AND RESHAPING BASE COURSE SY 0
A085 BITUMINOUS TACK COAT SY 0
A086 BITUMINOUS PRIME COAT SY 0
A087 ASPHALT SECLING COATING SY 0
A088 SECLING JOINTS AND CRACKS LF 0
A089 PAINTING/MARKING TRAFFIC CONTROL LF 0
A090 4" CONCRETE SLAB SF 0
A091 4" CONTRETE SLAB WITH FOOTINGS SF 0
A092 6" CONCRETE SLAB SF 0
A093 6" CONCRETE SLAB WITH FOOTINGS SF 19980
A094 CONCRETE CURB LF 0
A095 CONCRETE CURB, 24" CURB AND GUTTER LF 0
A096 ROAD SHOULDER MAINTENANCE LF 0
A097 PLAYGROUND MULCH REMOVAL AND DISPOSAL CY 0
A098 BARK CHIP SUPPLY/DELIVERY CY 0
A099 RUBBER MULCH SUPPLY/DELIVERY CY 0
A100 LIMESTONE ROAD BASE SF 480
A101 LAUNCH TYPE CONCRETE SF 0
A102 OTHER PAVING, ROAD MAINTENANCE, AND SITE WORK
Total Section 3 Base Year
Section 4-Plumbing U/M Unit Price Estimated
A103 WATER VALVE INSTALLATION 3/4"-2" EA 9
A104 WATER VALVE INSTALLATION 2 1/2"-4" EA 0
A105 WATER LINE INSTALTATION 3/4"-2" LF 5500
A106 WATER LINE INSTALTATION 2 1/2"-4" LF 0
A107 GRAVITY SEWER LINE INSTALLATION 4", LESS THAN 4' DEEP LF 125
A108 GRAVITY SEWER LINE INSTALLATION 4", 4.1' TO 10' DEEP LF 0
A109 GRAVITY SEWER LINE INSTALLATION 4", 10.1' TO 15' DEEP LF 0
A110 GRAVITY SEWER LINE INSTALLATION 6", LESS THAN 4' DEEP LF 0
A111 GRAVITY SEWER LINE INSTALLATION 6", 4.1' TO 10' DEEP LF 0
A112 GRAVITY SEWER LINE INSTALLATION 6", 10.1' TO 15' DEEP LF 0
A113 GRAVITY SEWER LINE INSTALLATION 8", LESS THAN 4' DEEP LF 0
A114 GRAVITY SEWER LINE INSTALLATION 8", 4.1' TO 10' DEEP LF 0
A115 GRAVITY SEWER LINE INSTALLATION 8", 10.1' TO 15' DEEP LF 0
A116 COMMODE REPLACEMENT, CHINA /WALL MOUNTED EA 0
A117 COMMODE REPLACEMENT, STAINLESS /WALL MOUNTED EA 0
A118 COMMODE REPLACEMENT, CHINA /FLOOR MOUNTED EA 0
A119 COMMODE REPLACEMENT, STAINLESS /FLOOR MOUNTED EA 0
A120 URINAL REPLACEMENT, CHINA /WALL MOUNTED EA 0
A121 URINAL REPLACEMENT, STAINLESS / WALL MOUNTED EA 0
A122 LAVATORY REPLACEMENT, CHINA /WALL HUNG EA 0
A123 LAVATORY REPLACEMENT, STAINLESS /WALL HUNG EA 0
A124 WATER HEATER REPLACEMENT-50 GALLON EA 0
A125 WATER HEATER REPLACEMENT-80 GALLON EA 0
A126 SELINOID VALVE REPLACEMENT EA 0
A127 PNEUMATIC VALVE REPLACEMENT EA 0
A128 WATER HYDRANT ON 4" X 6" POST EA 0
A129 OTHER PLUMBING
Total Section 4 Base Year
Section 5-Civil Engineering Services U/M Unit Price Estimated
A130 HAND OPERATED TOOLS HR 0
A131 DUMP TRUCK, TWENTY TON HR 0
A132 DUMP TRUCK, TWO AND ONE HALF TON HR 0
A133 MOTOR GRADER, TWELVE FOOT MOLDBOARD HR 40
A134 BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM EIGHT
FOOT BLADE
HR 0
A135 BULLDOZER, CRAWLER/TRACTOR TYPE, MINIMUM SIX FOOT
BLADE
HR 0
A136 WATER TANK TRUCK HR 0
A137 CRANE, TRUCK MOUNTED, 35 TON W/112' BOOM HR 0
A138 SHEEP FOOT ROLLER/COMPACTOR HR 0
A139 ROLLER/COMPACTOR, PNEUMATIC-TIRED HR 0
A140 ROLLER/COMPACTOR, STEEL WHEELED HR 0
A141 FRONT END LOADER, RUBBER TIRED TYPE HR 0
A142 TRACTOR, RUBBER TIRED WITH BOX BLADE, AUGER, BUSH
HOG ROTARTY MOWER, SIDE BOOM BRUSH HOG ROTARY
MOWER
HR 0
A143 BACKHOE, RUBBER TIRED TYPE HR 0
A144 BACKHOE (TRACKHOE) TRACK TYPE HR 0
A145 TRACTOR, "SKID STEERING" TYPE LOADER HR 0
A146 DITCHING MACHINE, CHAIN TYPE HR 0
A147 TRENCHER, ROCK SAW, WHEEL TYPE HR 0
A148 ROAD BROOM HR 0
A149 ASPHALT MILLING MACHINE (COLD PLANER) HR 0
A150 AIR COMPRESSOR HR 0
A151 WELDER, TRUCK OR TRAILER, MOUNTED HR 0
A152 VIBRATORY PLATE COMPACTOR HR 0
A153 WATER PUMP, TWO INCH HR 0
A154 WATER PUMP, FOUR INCH HR 0
A155 WATER PUMP, SIX INCH HR 0
A156 WASHER HIGH PRESSURE HR 0
A157 CHIPPER, BRUSH/LIMB HR 0
A158 CONCRETE/ASPHALT SAW HR 0
A159 CHAIN SAW HR 0
A160 LATTICE BOOM CRAWLER CRANE WITH TRACKS, 30-80 TON HR 0
A161 RUBBER-TIRED HYDRALIC BOOM (TELESCOPIC) CRANE, 30-90
TON
HR 0
A162 RUBBER-TIRED TRUCK MOUNTER CRANE (BOOM TRUCK OR
PICKER TRUCK), 25-50 TON
HR 0
A163 RUBBER TIRED ROUGH TERRAIN CRANE, 30-90 TON HR 0
A164 ARTICULATING RUBBER-TIRED HYDRAULIC BOOM
(TELESCOPIC) CRANE, 100-250 TON
HR 0
A165 OTHER ENGINEER SERVICES
Total Section 5 Base Year
Section 6-Fencing U/M Unit Price Estimated
A166 PIPE RAIL FENCING LF 200
A167 PIPE RAIL FENCE GATE EA 0
A168 GUARD POST AND CABLE LF 0
A169 STEEL POST AND CABLE LF 0
A170 TIMBER VEHICLE BARRIES EA 0
A171 REPAIR/REPLACE GUARDRAIL FENCING LF 0
A172 BARBED WIRE FENCING, STEEL POST, SIX (6) WIRE LF 0
A173 INSTALLATION OF SWINGING GATE-4' EA 0
A174 INSTALLATION OF SWINGING GATE-12' EA 0
A175 INSTALLATION OF SWINGING GATE-14' EA 4
A176 INSTALLATION OF SWINGING GATE-16' EA 0
A177 OTHER FENCING
Total Section 6 Base Year
Section 7-Sign and Buoy Maintenance U/M Unit Price Estimated
A178 PARK SIGN INSTALLATION-SINGLE POST EA 0
A179 PARK SIGN INSTALLATION-DOUBLE POST EA 0
A180 PARK SIGN REPLACEMENT-SIGN ONLY-SINGLE POST EA 0
A181 PARK SIGN REPLACEMENT-SIGN ONLY-DOUBLE POST EA 0
A182 BOUY INSTALLATION EA 0
A183 REPAIR/REPLACE PIPELINE FLOATING BARRIER LF 0
A184 PIPELINE FLOATING BARRIER ANCHORS EA 0
A185 OTHER SIGN AND BOUY MAINTENANCE
Total Section 7 Base Year
CLIN Section 8-Electrical U/M Unit Price Estimated
A186 ELECTRIC LINE REPAIR/INSTALLATION, DIRECT BURIAL LF 450
A187 ELECTRIC LINE REPAIR/INSTALLATION, IN CONDUIT LF 0
A188 RV PEDESTAL INSTALLATION, SINGLE UNIT EA 3
A189 RV PEDESTAL INSTALLATION, DOUBLE UNIT EA 0
A190 METER BASE INSTALLATION EA 0
A191 MAIN DISCONNECT PANEL INSTALLATION EA 0
A192 LOAD CENTER PANEL EA 1
A193 OTHER ELECTRICAL
Total Section 8 Base Year Total Option Base Year Sections 1-8 (CLINs A001-A193)
(End of Summary of Changes)