B08_20Q0071_AMD_0003._.pdf
PDF 231 KB Posted
- Attached to
- Town Bluff Area Mowing Federal contract opportunity
- Solicitation number
- W9126G20Q0071
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08_20Q0071_AMD_0002.pdf | ||
| B.08_20Q0071_AMD_0001.pdf | ||
| B.01_CSS_W9126G-20-Q-0071_.pdf | ||
| B3_TB Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
22-Jun-2020
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE W9126G 7. ADMINISTERED BY (If other than item 6) CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
See Item 6
8. NAME AND ADDRESS OF CONTRACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G20Q0071
X 9B. DATED (SEE ITEM 11)
05-Jun-2020
10A. MOD. OF CONTRACT /ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICIT ATIONS
X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt ofOffer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIATION DATA (If required)
13. THISITEM APPLIESONLY TO MODIFICATIONSOF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
B.A. Steinhagen/ Tow n Bluff Lake, Landscaping Services, Solicitation No. W9126G20Q0071, ADM 0003
The purpose of this amendment is to extend the due date:
1. From : 24 June 2020 @ 4:00pm To: 01 July 2020 @ 4:00pm
2. Update Bid Schedule period of performance.
3. CT POC: Rochelle Ross at (817)886-1050 Email:rochelle.ross@usace.army.mil
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATESOF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA mailto:rochelle.ross@usace.army.mil mailto:rochelle.ross@usace.army.mil
F A R C F R
W9126G20Q0071
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
BID SCHEDULE
BID SCHEDULE – AREA MOWING SOLICITATION W9126G20Q0071
B.A. STEINHAGEN LAKE, TOWN BLUFF PROJECT, WOODVILLE, TEXAS
0001 BASE YEAR: 21 JULY 2020 TO 20 JULY 2021
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO PERFORM AREA MOWING AT B.A. STEINHAGEN LAKE, TOWN BLUFF PROJECT, WOODVILLE, TX IN
ACCORDANCE WITH CONTRACT SPECIFICATIONS AND ATTACHMENTS
Item No. Description Units Estimated Quantity Unit Price ($) Total Price ($)
0001AA Project Office Compound each 8
0001AB Bluff View Park each 8
0001AC Structure Slope each 8
0001AD Camper’s Cove North each 8
0001AE Camper’s Cove South each 4
0001AF Magnolia Ridge Park each 8
0001AG Sandy Creek Park each 8
0001AH East End Park each 8
0001AJ Spillway each 4
YEAR 1 TOTAL
1001 OPTION YEAR 1: 21 JULY 2021 TO 20 JULY 2022
1001AA Project Office
1001AB Bluff View Park each 8
1001AC
1001AD
1001AE
Structure Slope
Camper’s Cove North
Camper’s Cove South each each each
1001AF
1001AG
1001AH
Magnolia Ridge Park
Sandy Creek Park
East End Park each each each
1001AJ Spillway each 4
YEAR 2 TOTAL
2001 OPTION YEAR 2: 21 JULY 2022 TO 20 JULY 2023
2001AA Project Office
2001AB Bluff View Park each 8
2001AC Structure Slope each 8
2001AD Camper’s Cove North each 8
2001AE Camper’s Cove South each 4
2001AF Magnolia Ridge Park each 8
2001AG Sandy Creek Park each 8
2001AH East End Park each 8
2001AJ Spillway each 4
YEAR 3 TOTAL
3001 OPTION YEAR 3: 21 JULY 2023 TO 20 JULY 2024
3001AA Project Office
3001AB Bluff View Park each 8
3001AC Structure Slope each 8
3001AD Camper’s Cove North each 8
3001AE Camper’s Cove South each 4
3001AF Magnolia Ridge Park each 8
3001AG Sandy Creek Park each 8
3001AH East End Park each 8
3001AJ Spillway each 4
YEAR 4 TOTAL
4001 OPTION YEAR 4: 21 JULY 2024 TO 20 JULY 2025
4001AA Project Office
4001AB Bluff View Park each 8
4001AC Structure Slope each 8
4001AD Camper’s Cove North each 8
4001AE Camper’s Cove South each 4
4001AF Magnolia Ridge Park each 8
4001AG Sandy Creek Park each 8
4001AH East End Park each 8
4001AJ Spillway each 4
YEAR 5 TOTAL
SECTION SF 1449 - CONTINUATION SHEET
The following have been deleted:
BID SCHEDULE
(End of Summary of Changes)
GRAND TOTAL
| SECTION SF 30 BLOCK 14 CONTINUATION PAGE |
| SECTION SF 1449 - CONTINUATION SHEET |
File details come from the government source that posted it. Updated .