1A_Drawings_WSMR_B1622_for11x17 printing_Updated Solicitation.pdf

PDF 14 MB Posted

Attached to
HVAC Renovation of Bldg 1622
Solicitation number
W9126G20B0030
Issued by

About this file

This solicitation is for an Invitation for Bid (IFB) for a design-bid-build HVAC renovation project at Building 1622 at White Sands Missile Range in New Mexico. The project scope includes replacing the HVAC system, ductwork, chillers, boilers and controls, as well as renovating suspended ceilings, light fixtures, and abating asbestos and lead-based materials associated with demolition and construction work. The construction cost is estimated between $1 million to $5 million. The solicitation is a 100% small business set-aside. Bids are due by responding to the solicitation number W9126G20B0030 on the SAM.gov website, where any amendments to the solicitation will also be posted. The Army Corps of Engineers Fort Worth District is the contracting agency overseeing the project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

D

C

B

A

US Army Corps of Engineers ®

ARCHITECTURE

M.E.P. & FP

SEVEN GENERATIONS AE

CSG, INC

600 E. Michigan Ave., Suite B Kalamazoo, MI 49007

Ph: 269.927.0144

5202 County Rd 7350 Suite A Lubbock, TX 79424 Ph: 806.748.0040

FORT WORTH DISTRICT

FORT WORTH, TX.

BLDG 1622 BUILDING REPAIR

S O

L

IC

IT

A

T

IO

N D

A T

A

JUNE 26, 2019

WHITE SANDS MISSILE RANGE

SOLICITATION NUMBER :

WHITE SANDS, NM 88002

L I CEN

DES

61431P R

O

FESS ION A L ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

L ICE DESN

56111

P R

O

FESS ION A L ENGIN

EE

R

STATE OF TEX AS

JOHN L. SUTTER

W9126G20B0030

DRAWING ABBREVIATIONS GENERAL LEGEND

LEGEND

NUMBERING SYSTEM:

A - 210-A

DISCIPLINE w/ LEVEL 2 DESINATOR:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

F - FIRE PROTECTION

SERIES NUMBER

SHEET NUMBER WITHIN

SERIES

BUILDING DESIGNATOR

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT,

OR CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS SEMI RIGID

INSULATION

FIBERGLASS BATT

INSULATION

MINERAL WOOL SEMI

RIGID INSULATION

EXPANDED

POLYSTYRENE RIGID

INSULATION

EXTRUDED

POLYSTYRENE RIGID

INSULATION

POLYISOCYANURATE

RIGID INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT

GYP BD

PLYWOOD

COVER BOARD

MATERIALS

ANNOTATION CALLOUTS/DRAWING SYMBOLS

CEILING SYMBOLS

DRAWING INDEX

A ---------------------

A LABELCLASS A DOOR

A/C AIR CONDITION

A/C UNITAIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNLACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABELCLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABELCLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABELCLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

1i

GRID / COLUMN

LINE

DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

EXIT LIGHT

1i

WALL TYPE

WINDOW TYPE

Room name

101 ROOM NAME/NUMBER

REVISION TAG

PLAN NORTH

NORTH ARROW w/

TRUE NORTH

INDICATION

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

2' x 2' ACT CEILING

4' x 4' ACT CEILING

EGRESS ROUTE ID

AND SECTION

LENGTH

S

1 HR FIRE

S

S

S

1 HR FIRE/SMOKE WALL

4 HR FIRE

4 HR FIRE/SMOKE WALL

2 HR FIRE

2 HR FIRE/SMOKE WALL

3 HR FIRE

3 HR FIRE/SMOKE WALL

FIRE RATED WALL SYMBOLS:

GYP. BD. CEILING

1' x 1' ACT CEILING

2 X 4 LIGHT FIXTURE

2 x 2 LIGHT FIXTURE

SUSP. FLUORESCENT

LIGHT

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXHAUST AIR GRILLE

Room

Rm_Occupancy

150 SF

EGRESS :Egress_ID

Egress_Length

ROOM OCCUPANCY

& AREA

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name

Elevation

FLOOR LEVEL & NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

SHEET KEYNOTE

A-101

Ref

R e f

Ref

R e f

INTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

A-101

A-101

100000.A

HORIZONTAL JOINT

REINFORCING

FLOOR LINE

BASE MATERIAL; MATCH

EXISTING

TYPE WYTHE SIZE

PARTITION

WIDTH

FIRE RATING

SOUND

ATTENUATION

4" 3-5/8" - -

CONCRETE MASONRY UNITS

PLAN

VERTICAL

REINFORCING

A4

UNDERSIDE OF

DECK

NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

G-001

D R

A W

IN

G

I N

D E

X

G E

N E

R A

L N

O T

E S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

SHEET NUMBER

SHEET

ORDER SHEET TITLE

GENERAL

G-000 001 COVER SHEET

G-001 002 DRAWING INDEX & GENERAL NOTES

HAZARDOUS MATERIALS

HA100 003 ASBESTOS LOCATION PLANS

HA101 004 ASBESTOS LOCATION PLANS

HA102 005 ASBESTOS LOCATION PLANS

HL100 006 LEAD LOCATION PLANS

HL101 007 LEAD LOCATION PLANS

ARCHITECTURAL - DEMOLITION

AD100 008 ARCHITECTURAL DEMOLITION BASEMENT FLOOR PLAN

AD101 009 ARCHITECTURAL DEMOLITION FIRST FLOOR PLAN

AD102 010 ARCHITECTURAL DEMOLITION SECOND FLOOR PLAN

ARCHITECTURAL

A-100 011 ARCHITECTURAL OVERALL FLOOR PLANS

A-101 012 ARCHITECTURAL OVERALL FLOOR PLANS

A-110 013 ARCHITECTURAL BASEMENT FLOOR PLAN

A-111 014 ARCHITECTURL FIRST FLOOR PLAN

A-112 015 ARCHITECTURAL SECOND FLOOR PLAN

A-120 016 ARCHITECTURAL REFLECTED CEILING BASEMENT PLAN

A-121 017 ARCHITECTURAL REFLECTED CEILING FIRST FLOOR PLAN

A-122 018 ARCHITECTURAL REFLECTED CEILING SECOND FLOOR PLAN

A-140 019 ARCHITECTURAL ROOF PLAN

A-201 020 ARCHITECTURAL EXTERIOR ELEVATIONS

A-202 021 ARCHITECTURAL EXTERIOR ELEVATIONS

A-301 022 ARCHITECTURAL BUILDING SECTIONS

A-340 023 ENLARGED DETAILS

A-341 024 ENLARGED DETAILS

A-602 025 ROOM FINISH SCHEDULE

MECHANICAL - DEMOLITION

MD100 026 MECHANICAL DEMOLITION SITE PLAN

MD101 027 HVAC DEMOLITION PLAN - BASEMENT

MD102 028 HVAC DEMOLITION PLAN - FIRST FLOOR

MD103 029 HVAC DEMOLITION PLAN - SECOND FLOOR

MECHANICAL - SITE

MS100 030 MECHANICAL SITE PLAN

MECHANICAL

M-000 031 MECHANICAL LEGENDS

M-100 032 HVAC DUCTWORK PLAN - BASEMENT

M-101 033 HVAC DUCTWORK PLAN - FIRST FLOOR

M-102 034 HVAC DUCTWORK PLAN - SECOND FLOOR

M-110 035 HVAC PIPING PLAN - BASEMENT

M-111 036 HVAC PIPING PLAN - FIRST FLOOR

M-112 037 HVAC PIPING PLAN - SECOND FLOOR

M-120 038 HVAC CONTROLS PLAN - BASEMENT

M-121 039 HVAC CONTROLS PLAN - FIRST FLOOR

M-122 040 HVAC CONTROLS PLAN - SECOND FLOOR

M-400 041 MECHANICAL YARD ENLARGED PLAN

M-401 042 MECHANICAL BOILER ROOM ENLARGED PLAN

M-402 043 MECHANICAL AHU ROOM ENLARGED PLAN

M-500 044 MECHANICAL DETAILS

M-501 045 MECHANICAL DETAILS

M-600 046 MECHANICAL SCHEDULES

M-601 047 MECHANICAL SCHEDULES

M-621 048 MECHANICAL SCHEDULES

M-622 049 HVAC CONTROLS DIAGRAMS

M-623 050 HVAC CONTROLS DIAGRAMS

M-624 051 HVAC CONTROLS DIAGRAMS

ELECTRICAL - DEMOLITION

ED100 052 LIGHTING DEMOLITION PLAN - BASEMENT

ED101 053 LIGHTING DEMOLITION PLAN - FIRST FLOOR

ED102 054 LIGHTING DEMOLITION PLAN - SECOND FLOOR

ED110 055 POWER DEMOLITION PLAN - BASEMENT

ED111 056 POWER DEMOLITION PLAN - FIRST FLOOR

ED112 057 POWER DEMOLITION PLAN - SECOND FLOOR

ELECTRICAL - SITE

ES100 058 ELECTRICAL SITE PLAN

ELECTRICAL

E-000 059 ELECTRICAL LEGENDS

E-100 060 LIGHTING PLAN - BASEMENT

E-101 061 LIGHTING PLAN - FIRST FLOOR

E-102 062 LIGHTING PLAN - SECOND FLOOR

E-110 063 POWER PLAN - BASEMENT

E-111 064 POWER PLAN - FIRST FLOOR

E-112 065 POWER PLAN - SECOND FLOOR

E-500 066 ELECTRICAL DETAILS

E-600 067 ELECTRICAL SCHEDULES

E-601 068 ELECTRICAL SCHEDULES

E-602 069 ELECTRICAL SCHEDULES

E-603 070 ELECTRICAL RISER DIAGRAMS

E-604 071 ELECTRICAL ONE-LINE DIAGRAMS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

ASBESTOS LOCATION LEGEND

DUCT INSULATION & MASTIC

CMU SEALANT

DOOR CAULKING

VINYL SHEET FLOORING AND MASTIC

9X9 FLOOR TILE AND MASTIC

1. THIS DRAWING IS REPRODUCED FROM AN EXISTING ASBESTOS

SURVEY CONDUCTED BY CHAMPION ENVIRONMENTAL CONSULTING

IN JANUARY, 2019. THE ENTIRE REPORT SHALL BE CONSULTED AND

COMPLIED WITH.

2. CONTRACTOR SHALL ABATE ALL ASBESTOS CONTAINING

MATERIALS THAT ARE DISTURBED DURING CONSTRUCTION PER

SPECIFICATIONS.

SHEET ROCK AND JOINT COMPOUND CEILING

TEXTURE

GENERAL NOTES - ASBESTOS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

HA100

A S

B E

S T

O S

L O

C A

T

IO

N P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

1/16" = 1'-0"HA100

01 ASBESTOS LOCATION PLAN - BASEMENT

1/16" = 1'-0"HA100

02 ASBESTOS LOCATION PLAN - FIRST FLOOR

1/16" = 1'-0"HA100

03 ASBESTOS LOCATION PLAN - SECOND FLOOR

08 16 3241216

GRAPHIC SCALE 1/16"=1'-0"

NORTH

W

G

B0

CMU SEALANT

DOOR CAULKING

VINYL SHEET FLOORING AND MASTIC

9X9 FLOOR TILE AND MASTIC

1. THIS DRAWING IS REPRODUCED FROM AN EXISTING ASBESTOS

SURVEY CONDUCTED BY CHAMPION ENVIRONMENTAL CONSULTING

IN JANUARY, 2019. THE ENTIRE REPORT SHALL BE CONSULTED AND

COMPLIED WITH.

2. CONTRACTOR SHALL ABATE ALL ASBESTOS CONTAINING

MATERIALS THAT ARE DISTURBED DURING CONSTRUCTION PER

SPECIFICATIONS.

SHEET ROCK AND JOINT COMPOUND CEILING

TEXTURE

GENERAL NOTES - ASBESTOS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

HA101

A S

B E

S T

O S

L O

C A

T

IO

N P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

1/16" = 1'-0"HA101

01 ASBESTOS LOCATION PLAN - BASEMENT

1/16" = 1'-0"HA101

02 ASBESTOS LOCATION PLAN - FIRST FLOOR

1/16" = 1'-0"HA101

03 ASBESTOS LOCATION PLAN - SECOND FLOOR

08 16 3241216

GRAPHIC SCALE 1/16"=1'-0"

NORTH

W

G

B0

CMU SEALANT

DOOR CAULKING

VINYL SHEET FLOORING AND MASTIC

9X9 FLOOR TILE AND MASTIC

1. THIS DRAWING IS REPRODUCED FROM AN EXISTING ASBESTOS

SURVEY CONDUCTED BY CHAMPION ENVIRONMENTAL CONSULTING

IN JANUARY, 2019. THE ENTIRE REPORT SHALL BE CONSULTED AND

COMPLIED WITH.

2. CONTRACTOR SHALL ABATE ALL ASBESTOS CONTAINING

MATERIALS THAT ARE DISTURBED DURING CONSTRUCTION PER

SPECIFICATIONS.

SHEET ROCK AND JOINT COMPOUND CEILING

TEXTURE

GENERAL NOTES - ASBESTOS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

HA102

A S

B E

S T

O S

L O

C A

T

IO

N P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

1/16" = 1'-0"HA102

01 ASBESTOS LOCATION PLAN - BASEMENT

1/16" = 1'-0"HA102

02 ASBESTOS LOCATION PLAN - FIRST FLOOR

1/16" = 1'-0"HA102

03 ASBESTOS LOCATION PLAN - SECOND FLOOR

08 16 3241216

GRAPHIC SCALE 1/16"=1'-0"

NORTH

W

G

B0

LEAD LOCATION LEGEND

GRAY METAL FREIGHT ELEVATOR DOORS/FRAMES

METAL DOORS/FRAMES

METAL HANDRIALS

1. THIS DRAWING IS REPRODUCED FROM AN EXISTING LEAD SURVEY

CONDUCTED BY CHAMPION ENVIRONMENTAL CONSULTING IN

JANUARY, 2019. THE ENTIRE REPORT SHALL BE CONSULTED AND

COMPLIED WITH.

2. CONTRACTOR SHALL TREAT ALL LEAD CONTAINING MATERIALS

THAT ARE DISTURBED DURING CONSTRUCTION PER

SPECIFICATIONS.

GENERAL NOTES - LEAD

METAL HANDRAILS IN STAIRWELLS & YELLOW PAINT

ON STEPS

GREEN BRICK (GLAZED BLOCK) BEHIND BASEBOARD

LIGHT BROWN METAL ROOF PERIMETER RAIL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

HL100

L E

A D

L O

C A

T

IO

N P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

1/16" = 1'-0"HL100

01 LEAD LOCATION PLAN - BASEMENT

1/16" = 1'-0"HL100

02 LEAD LOCATION PLAN - FIRST FLOOR

1/16" = 1'-0"HL100

03 LEAD LOCATION PLAN - SECOND FLOOR

08 16 3241216

GRAPHIC SCALE 1/16"=1'-0"

NORTH

W

G

B0

LEAD LOCATION LEGEND

GRAY METAL FREIGHT ELEVATOR DOORS/FRAMES

METAL DOORS/FRAMES

METAL HANDRIALS

1. THIS DRAWING IS REPRODUCED FROM AN EXISTING LEAD SURVEY

CONDUCTED BY CHAMPION ENVIRONMENTAL CONSULTING IN

JANUARY, 2019. THE ENTIRE REPORT SHALL BE CONSULTED AND

COMPLIED WITH.

2. CONTRACTOR SHALL TREAT ALL LEAD CONTAINING MATERIALS

THAT ARE DISTURBED DURING CONSTRUCTION PER

SPECIFICATIONS.

GENERAL NOTES - LEAD

METAL HANDRAILS IN STAIRWELLS & YELLOW PAINT

ON STEPS

GREEN BRICK (GLAZED BLOCK) BEHIND BASEBOARD

LIGHT BROWN METAL ROOF PERIMETER RAIL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

HL101

L E

A D

L O

C A

T

IO

N P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

08 16 3241216

GRAPHIC SCALE 1/16"=1'-0"

NORTH1/16" = 1'-0"HL101

01 LEAD LOCATION ROOF PLAN

W

G

B0

UP

UP

UP

UP

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE

DEMOLITION WITH NEW CONSTRUCTION FOR EACH DISCIPLINE.

2. CONTRACTOR TO NOTIFY THE CONTRACTING OFFICER REP. (COR) AS SOON

AS POSSIBLE IN THE EVENT THAT EXISTING CONDITIONS DIFFER

SUBSTANTIALLY FROM THOSE INDICATED IN THE DOCUMENTS.

3. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT

IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL

MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

4. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT

VERIFYING AND COORDINATING WITH ALL TRADES AS TO HOW THEY

RELATE TO THE OVERALL PROJECT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY

DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY

AND DISPOSE OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OF

REMOVED ITEMS IS PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE

THE SAFETY OF THE PUBLIC AND/OR WORK PERSONS ON THE SITE TO

PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT, OR

ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL

LAWS, ORDINANCES, CODES, AND REGULATIONS PERTAINING TO SAFETY

AND THE PREVENTION OF ACCIDENTS.

7. WSMR DPW RESERVES THE RIGHTS TO ANY REMOVED MATERIAL OR ITEMS.

CONTRACTOR TO COORDINATE WITH THE COR.

8. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AS REQUIRED.

9. CMU SEALANT, DUCT MASTIC & INSULATION, 9X9 FLOOR TILE & MASTIC,

VINYL SHEET FLOORING & MASTIC, AND DOOR CAULKING CONTAINS

ASBESTOS, TYP. HANDRAIL & DOOR PAINT CONTAINS LEAD, TYP. EXISTING

GLAZED MASONRY CONTAINS LEAD IN COATING, TYP. REMOVE 3 MERCURY

THERMOSTATS. IF ANY OF THESE MATERIALS ARE DISTURBED DURING

DEMOLITION, THE CONTRACTOR SHALL HANDLE ACCORDING TO

SPECIFICATIONS. REFER TO HAZARDOUS MATERIALS REPORT.

10. IF ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED DURING

DEMOLITION, CONTRACTOR SHALL COORDINATE THE ABATEMENT OF THE

MATERIALS. REFER TO HAZARDOUS MATERIALS REPORT FOR ADDITIONAL

AREAS OF KNOWN HAZARDOUS MATERIALS. REFER TO SPECIFICATIONS

FOR HAZARDOUS MATERIALS ABATEMENT.

11. CONTRACTOR SHALL PATCH, REPAIR, AND IN-FILL ALL APPLIED

FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO REMOVAL

OF EXISTING ELEMENTS OR AREAS DAMAGED DURING DEMOLITION AND

NEW WORK. MATCH EXISTING FIREPROOFING MATERIAL TYPE AND

THICKNESS TO MAINTAIN REQUIRED LEVEL OR PROTECTION.

12. REFER MEP FOR DEMOLITION OF EQUIPMENT, UTILITIES AND

CONNECTIONS.

GENERAL NOTES - DEMOLITION

STORAGE

B05

ADMIN

STORAGE

B06

VENTILATION RM

B07

BOILER RM

B08

STORAGE

B10

JAN

B09

R&D COMPUTER

LAB

B11

1.1

1 1.1

VACANT

B12

A D

A D

EXISTING AREAWAY & RAIL

HALL

B18

6 6

6 6

1.1

OFFICE

B04

1 5

1.21.21

1.2 1

10 10 10 1010

WORKROOM

B01

PROTOTYPE

SHOP

B02

OFFICE

B14

WOMENS RM

B15A

MENS RM

B16

JAN

B17

ELEV LOBBY

B19

ELEV

E-1

ELEV EQUIP RM

B01A

HALL

B18

OFFICE

B02C

VACANT

B03

VACANT

B13

1.1

A D

A D

1.1

EXISTING AREAWAY & RAIL

WORKROOM

S-C

PROTECT EXISTING TELECOM

NETWORK CABINET

PROTECT HELIOSTAT TO REMAIN

1.1

1.2

1.2

1 1.2

LOUNGE

B15

CONTRACTOR TO REMOVE ALL EXISTING CEILING CONSTRUCTION UNLESS

SPECIFICALLY NOTED OTHERWISE. THE DETAILED NOTES BELOW ARE ONLY A

GENERAL GUIDE, CONTRACTOR SHALL PROVIDE COMPLETE REMOVAL OF ALL

CEILINGS. PATCH & REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE

NEW CONSTRUCTION AND/OR NEW FINISHES.

EXISTING CEILING TO BE REMOVED CONTAINS SHEET ROCK & JOINT

COMPOUND KNOWN TO CONTAIN ASBESTOS. REFER TO HAZARDOUS

MATERIALS REPORT. REFER TO SPECIFICATIONS FOR HAZARDOUS MATERIAL

ABATEMENT.

ROOM HAS 2 EXISTING CEILINGS. REMOVE BOTH CEILINGS TO ALLOW FOR

NEW CONSTRUCTION.

CONTRACTOR TO REMOVE WINDOW HVAC UNIT & SECURITY BARS. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW SECURITY

BARS.

CONTRACTOR TO REMOVE EXISTING RADIANT HEAT RADIATOR. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW FINISHES.

REFER TO MECHANICAL DEMOLITION FOR ADDITIONAL INFORMATION.

LOCATIONS AND EXTENTS TO BE VERIFIED IN FIELD.

CONTRACTOR TO REMOVE EXISTING WINDOW AIR CONDITIONER.

REPAIR GLASS PANE W/ NEW TO MATCH EXISTING; TYPICAL.

ROOM SECURED, INTERIOR CONDITIONS UNKNOWN (SHEET AD100 ONLY).

REMOVE LOUVER. SEE SHEETS A340 FOR INFILL DETAILS.

EXISTING CMU WALL TO BE REMOVED; PATCH & REPAIR ADJACENT SURFACES

AS REQUIRED.

REMOVE EXISTING SECURITY BARS.

REMOVE ALL ASBESTOS HVAC UNIT & DUCT INSULATION IN VENTILATION

ROOM B07 AND BOILER ROOM B08 AND ABOVE CEILINGS THROUGHOUT THE

BUILDING, COMPLY WITH HAZARDOUS MATERIALS REPORT AND

SPECIFICATIONS.

REMOVE EXISTING STATIONARY 11'-4" X 5'-6" LOUVER.

NOTE: ALL KEY NOTES ARE LISTED BUT DO NOT NECESSARILY APPLY TO

EVERY PLAN OR ELEVATIONS; REFER TO DRAWINGS FOR APPLICABILITY

DEMOLITION KEY NOTES

1.1

1.2

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

AD100

A R

C H

IT

E

C T

U R

A L

D E

M O

L

IT

IO

N

B A

S E

M E

N T

F L O

O R

P L A

N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"AD100

02 DEMOLITION BASEMENT FLOOR PLAN - NORTH

1/8" = 1'-0"AD100

01 DEMOLITION BASEMENT FLOOR PLAN - SOUTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

DN

UP

DN

DN

UP

DN

1 1 1

111.11

A D

A D

SIPRNET RM

OFFICE

MECH CLOSET

OFFICE

OFFICE

OFFICE

WOMENS RM

115A

MENS RM

OFFICE

112A

STAIRS

S-B

OFFICE

111A

OFFICE

BREAKROOM

MAIN

CONFERENCE

ROOM

HALL

CORRIDOR

ENTRANCE

KITCHEN

EXISTING AREAWAY & RAIL

4 4

4 4

OFFICE SUITE

333333333

33333333 3

6 6

COPY RM

MAIL RM

107A

1.1

1.2

1.2

1.21.2

1.2

1.2

1.2

1.21.2 1.2

1.2

1.2

1.2

1.2

1.2

1.2 1

LOUNGE

1 1 1 1 1

1 2

A D

A D

OFFICE

101A

OFFICE SUITE

CONFERENCE

ROOM

101B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MAIL RM

107A

COPY RM

ELEV

E-1

MEN'S ROOM

OFFICE

OFFICE

OFFICE

WOMEN'S ROOM

126A

STAIRS

S-A

CORRIDOR

ELEV LOBBY

EXISTING AREAWAY & RAIL

4 4 4 4

333333333

3 3 3 3 3 3 3

1.1

1.2

1.2

1.2 1.2 1.2 1.21.21.2

1.21.21.2 1.21.2

1.21

1 1.2

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE

DEMOLITION WITH NEW CONSTRUCTION FOR EACH DISCIPLINE.

2. CONTRACTOR TO NOTIFY THE CONTRACTING OFFICER REP. (COR) AS SOON

AS POSSIBLE IN THE EVENT THAT EXISTING CONDITIONS DIFFER

SUBSTANTIALLY FROM THOSE INDICATED IN THE DOCUMENTS.

3. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT

IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL

MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

4. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT

VERIFYING AND COORDINATING WITH ALL TRADES AS TO HOW THEY

RELATE TO THE OVERALL PROJECT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY

DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY

AND DISPOSE OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OF

REMOVED ITEMS IS PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE

THE SAFETY OF THE PUBLIC AND/OR WORK PERSONS ON THE SITE TO

PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT, OR

ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL

LAWS, ORDINANCES, CODES, AND REGULATIONS PERTAINING TO SAFETY

AND THE PREVENTION OF ACCIDENTS.

7. WSMR DPW RESERVES THE RIGHTS TO ANY REMOVED MATERIAL OR ITEMS.

CONTRACTOR TO COORDINATE WITH THE COR.

8. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AS REQUIRED.

9. CMU SEALANT, DUCT MASTIC & INSULATION, 9X9 FLOOR TILE & MASTIC,

VINYL SHEET FLOORING & MASTIC, AND DOOR CAULKING CONTAINS

ASBESTOS, TYP. HANDRAIL & DOOR PAINT CONTAINS LEAD, TYP. EXISTING

GLAZED MASONRY CONTAINS LEAD IN COATING, TYP. REMOVE 3 MERCURY

THERMOSTATS. IF ANY OF THESE MATERIALS ARE DISTURBED DURING

DEMOLITION, THE CONTRACTOR SHALL HANDLE ACCORDING TO

SPECIFICATIONS. REFER TO HAZARDOUS MATERIALS REPORT.

10. IF ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED DURING

DEMOLITION, CONTRACTOR SHALL COORDINATE THE ABATEMENT OF THE

MATERIALS. REFER TO HAZARDOUS MATERIALS REPORT FOR ADDITIONAL

AREAS OF KNOWN HAZARDOUS MATERIALS. REFER TO SPECIFICATIONS

FOR HAZARDOUS MATERIALS ABATEMENT.

11. CONTRACTOR SHALL PATCH, REPAIR, AND IN-FILL ALL APPLIED

FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO REMOVAL

OF EXISTING ELEMENTS OR AREAS DAMAGED DURING DEMOLITION AND

NEW WORK. MATCH EXISTING FIREPROOFING MATERIAL TYPE AND

THICKNESS TO MAINTAIN REQUIRED LEVEL OR PROTECTION.

12. REFER MEP FOR DEMOLITION OF EQUIPMENT, UTILITIES AND

CONNECTIONS.

GENERAL NOTES - DEMOLITION

CONTRACTOR TO REMOVE ALL EXISTING CEILING CONSTRUCTION UNLESS

SPECIFICALLY NOTED OTHERWISE. THE DETAILED NOTES BELOW ARE ONLY A

GENERAL GUIDE, CONTRACTOR SHALL PROVIDE COMPLETE REMOVAL OF ALL

CEILINGS. PATCH & REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE

NEW CONSTRUCTION AND/OR NEW FINISHES.

EXISTING CEILING TO BE REMOVED CONTAINS SHEET ROCK & JOINT

COMPOUND KNOWN TO CONTAIN ASBESTOS. REFER TO HAZARDOUS

MATERIALS REPORT. REFER TO SPECIFICATIONS FOR HAZARDOUS MATERIAL

ABATEMENT.

ROOM HAS 2 EXISTING CEILINGS. REMOVE BOTH CEILINGS TO ALLOW FOR

NEW CONSTRUCTION.

CONTRACTOR TO REMOVE WINDOW HVAC UNIT & SECURITY BARS. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW SECURITY

BARS.

CONTRACTOR TO REMOVE EXISTING RADIANT HEAT RADIATOR. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW FINISHES.

REFER TO MECHANICAL DEMOLITION FOR ADDITIONAL INFORMATION.

LOCATIONS AND EXTENTS TO BE VERIFIED IN FIELD.

CONTRACTOR TO REMOVE EXISTING WINDOW AIR CONDITIONER.

REPAIR GLASS PANE W/ NEW TO MATCH EXISTING; TYPICAL.

ROOM SECURED, INTERIOR CONDITIONS UNKNOWN (SHEET AD100 ONLY).

REMOVE LOUVER. SEE SHEETS A340 FOR INFILL DETAILS.

EXISTING CMU WALL TO BE REMOVED; PATCH & REPAIR ADJACENT SURFACES

AS REQUIRED.

REMOVE EXISTING SECURITY BARS.

REMOVE ALL ASBESTOS HVAC UNIT & DUCT INSULATION IN VENTILATION

ROOM B07 AND BOILER ROOM B08 AND ABOVE CEILINGS THROUGHOUT THE

BUILDING, COMPLY WITH HAZARDOUS MATERIALS REPORT AND

SPECIFICATIONS.

REMOVE EXISTING STATIONARY 11'-4" X 5'-6" LOUVER.

NOTE: ALL KEY NOTES ARE LISTED BUT DO NOT NECESSARILY APPLY TO

EVERY PLAN OR ELEVATIONS; REFER TO DRAWINGS FOR APPLICABILITY

DEMOLITION KEY NOTES

1.1

1.2

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

AD101

A R

C H

IT

E

C T

U R

A L

D E

M O

L

IT

IO

N

F

IR

S T

F L

O O

R P

L A

N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"AD101

02 DEMOLITION FIRST FLOOR PLAN - NORTH

1/8" = 1'-0"AD101

01 DEMOLITION FIRST FLOOR PLAN - SOUTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE

DEMOLITION WITH NEW CONSTRUCTION FOR EACH DISCIPLINE.

2. CONTRACTOR TO NOTIFY THE CONTRACTING OFFICER REP. (COR) AS SOON

AS POSSIBLE IN THE EVENT THAT EXISTING CONDITIONS DIFFER

SUBSTANTIALLY FROM THOSE INDICATED IN THE DOCUMENTS.

3. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT

IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL

MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

4. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT

VERIFYING AND COORDINATING WITH ALL TRADES AS TO HOW THEY

RELATE TO THE OVERALL PROJECT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY

DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY

AND DISPOSE OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OF

REMOVED ITEMS IS PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE

THE SAFETY OF THE PUBLIC AND/OR WORK PERSONS ON THE SITE TO

PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT, OR

ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL

LAWS, ORDINANCES, CODES, AND REGULATIONS PERTAINING TO SAFETY

AND THE PREVENTION OF ACCIDENTS.

7. WSMR DPW RESERVES THE RIGHTS TO ANY REMOVED MATERIAL OR ITEMS.

CONTRACTOR TO COORDINATE WITH THE COR.

8. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AS REQUIRED.

9. CMU SEALANT, DUCT MASTIC & INSULATION, 9X9 FLOOR TILE & MASTIC,

VINYL SHEET FLOORING & MASTIC, AND DOOR CAULKING CONTAINS

ASBESTOS, TYP. HANDRAIL & DOOR PAINT CONTAINS LEAD, TYP. EXISTING

GLAZED MASONRY CONTAINS LEAD IN COATING, TYP. REMOVE 3 MERCURY

THERMOSTATS. IF ANY OF THESE MATERIALS ARE DISTURBED DURING

DEMOLITION, THE CONTRACTOR SHALL HANDLE ACCORDING TO

SPECIFICATIONS. REFER TO HAZARDOUS MATERIALS REPORT.

10. IF ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED DURING

DEMOLITION, CONTRACTOR SHALL COORDINATE THE ABATEMENT OF THE

MATERIALS. REFER TO HAZARDOUS MATERIALS REPORT FOR ADDITIONAL

AREAS OF KNOWN HAZARDOUS MATERIALS. REFER TO SPECIFICATIONS

FOR HAZARDOUS MATERIALS ABATEMENT.

11. CONTRACTOR SHALL PATCH, REPAIR, AND IN-FILL ALL APPLIED

FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO REMOVAL

OF EXISTING ELEMENTS OR AREAS DAMAGED DURING DEMOLITION AND

NEW WORK. MATCH EXISTING FIREPROOFING MATERIAL TYPE AND

THICKNESS TO MAINTAIN REQUIRED LEVEL OR PROTECTION.

12. REFER MEP FOR DEMOLITION OF EQUIPMENT, UTILITIES AND

CONNECTIONS.

GENERAL NOTES - DEMOLITION

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

209A

OFFICE

STAIRS

S-B

MENS TOILET

WOMENS TOILET

OFFICE

SUPPLY

L-REAC DEMO

ROOM

IT

OFFICE

OFFICE

OFFICE

HALL

CORRIDOR

1 1 1 1 1

1.1

A D

A D

OFFICE

33333333 3

3 3 3 3 3 3 3 3 3

6 6 6 6 6 6 66

1.2 1.2

1.2

1.21.21.2

1.2

1.2

1.2

1.2 7

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

207A

WOMENS TOILET

MENS TOILET

STAIRS

S-AELEVATOR

E-1

OFFICE

CONFERENCE

ROOM

PROFILE & GEN II

SERVER ROOM

CORRIDOR

1 1 1 1 1 1

A D

A D

333333333

3 3 3 3 3 33

1.1

1.2

1.2 1.2

CONTRACTOR TO REMOVE ALL EXISTING CEILING CONSTRUCTION UNLESS

SPECIFICALLY NOTED OTHERWISE. THE DETAILED NOTES BELOW ARE ONLY A

GENERAL GUIDE, CONTRACTOR SHALL PROVIDE COMPLETE REMOVAL OF ALL

CEILINGS. PATCH & REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE

NEW CONSTRUCTION AND/OR NEW FINISHES.

EXISTING CEILING TO BE REMOVED CONTAINS SHEET ROCK & JOINT

COMPOUND KNOWN TO CONTAIN ASBESTOS. REFER TO HAZARDOUS

MATERIALS REPORT. REFER TO SPECIFICATIONS FOR HAZARDOUS MATERIAL

ABATEMENT.

ROOM HAS 2 EXISTING CEILINGS. REMOVE BOTH CEILINGS TO ALLOW FOR

NEW CONSTRUCTION.

CONTRACTOR TO REMOVE WINDOW HVAC UNIT & SECURITY BARS. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW SECURITY

BARS.

CONTRACTOR TO REMOVE EXISTING RADIANT HEAT RADIATOR. PATCH &

REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW FINISHES.

REFER TO MECHANICAL DEMOLITION FOR ADDITIONAL INFORMATION.

LOCATIONS AND EXTENTS TO BE VERIFIED IN FIELD.

CONTRACTOR TO REMOVE EXISTING WINDOW AIR CONDITIONER.

REPAIR GLASS PANE W/ NEW TO MATCH EXISTING; TYPICAL.

ROOM SECURED, INTERIOR CONDITIONS UNKNOWN (SHEET AD100 ONLY).

REMOVE LOUVER. SEE SHEETS A340 FOR INFILL DETAILS.

EXISTING CMU WALL TO BE REMOVED; PATCH & REPAIR ADJACENT SURFACES

AS REQUIRED.

REMOVE EXISTING SECURITY BARS.

REMOVE ALL ASBESTOS HVAC UNIT & DUCT INSULATION IN VENTILATION

ROOM B07 AND BOILER ROOM B08 AND ABOVE CEILINGS THROUGHOUT THE

BUILDING, COMPLY WITH HAZARDOUS MATERIALS REPORT AND

SPECIFICATIONS.

REMOVE EXISTING STATIONARY 11'-4" X 5'-6" LOUVER.

NOTE: ALL KEY NOTES ARE LISTED BUT DO NOT NECESSARILY APPLY TO

EVERY PLAN OR ELEVATIONS; REFER TO DRAWINGS FOR APPLICABILITY

DEMOLITION KEY NOTES

1.1

1.2

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

AD102

A R

C H

IT

E

C T

U R

A L

D E

M O

L

IT

IO

N

S E

C O

N D

F L

O O

R P

L A

N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"AD102

02 DEMOLITION SECOND FLOOR PLAN - NORTH

1/8" = 1'-0"AD102

01 DEMOLITION SECOND FLOOR PLAN - SOUTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

DN

DN

UP UP

A-202

A-201

02A-201

01 BOILER RM

B08

VENTILATION RM

B07

JAN

B09

STORAGE

B10

R&D COMPUTER

LAB

B11

VACANT

B12

ADMIN STORAGE

B06

STORAGE

B05

OFFICE

B04

OFFICE

B02C

VACANT

B03

PROTOTYPE

SHOP

B02

WORKROOM

B01

WORKROOM

E-2

ELEV EQUIP

ROOM

B01A

ELEV.

E-1

ELEV LOBBY

B19

STORAGE

B17

MENS RM

B16

WOMEN'S RM

B15A

LOUNGE

B15

HALL

B18

OFFICE

B13

OFFICE

B14

A -1

A -1

A -1

A -1

A-202

A-201

A-202

A-201

OFFICE SUITE

OFFICE

111A

OFFICE

BREAKROOM

MAIN

CONFERENCE

ROOM

109A

WOMENS RM

115A

MENS RM

STAIRS

S-B

OFFICE

112A

OFFICE

OFFICE

OFFICE

KITCHEN

COMM RM

HALL

116OFFICE

OFFICE

OFFICE

OFFICE

WOMEN'S ROOM

126A

MEN'S ROOM

STAIRS

S-A

ELEV.

E-1

ELEV LOBBY

OFFICE

101A

OFFICE SUITE

CONFERENCE

ROOM

101B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPY RM

MAIL RM

107A

ENTRANCE

CORRIDOR

CORRIDOR

SIPRNET RM

A -1

A -1

A -1

A -1

DN

EXISTING CHILLER;

REFER TO MEP

NEW CHILLER;

REFER TO MEP

NEW 6" STL. PIPE BOLLARDS @ 4'-0" O.C.;

4'-0" ABOVE GRADE PLUS 4'-0" CONCRETE

EMBEDMENT, TYP. AROUND NEW PAD

NEW CONC. CHILLER PAD; REFER TO MEP

18' - 0" 27' - 0"

EXISTING CHILLER

PAD

EXISTING

TRANSFORMER

PAD

A-340

Sim

A-340

Sim

EXISTING BOLLARD

TO REMAIN, TYP. LEGEND

ALL NEW PENETRATIONS OF INDICATED WALLS SHALL BE

FIRESTOPPED. SEE GENERAL NOTES ON SHEET A-120.

1. INFILL EXISTING OPENINGS WITH CMU OR CONCRETE WHERE DUCTS OR

OTHER ITEMS ARE REMOVED. SEE MECHANICAL DEMO PLANS. ALLOWANCE

FOR ADDITIONAL OPENINGS: 30 OPENINGS AVERAGE 8"X16" PLUS 30 HOLES

UP TO 4" DIA. FOR EACH FLOOR.

2. FLOOR PENETRATIONS SHALL HAVE ANNULAR SPACES FILL WITH NON-

COMBUSTIBLE MATERIAL TO RESIST FREE PASSAGE OF FLAME OR

PARTICLES OF COMBUSTION.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-100

A R

C H

IT

E

C T

U R

A L

O V

E R

A L L

F L

O O

R P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

3/32" = 1'-0"A-100

01 OVERALL BASEMENT FLOOR PLAN

3/32" = 1'-0"A-100

02 OVERALL FIRST FLOOR PLAN

08 244

GRAPHIC SCALE 3/32"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

DNUP

A-202

A-201

A-202

A-201

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

209A

OFFICE

OFFICE

OFFICE

OFFICE

207A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEV.

E-1

CORRIDOR

CORRIDOR

MENS TOILET

WOMENS TOILET

STAIRS

S-A

CONFERENCE

ROOM

PROFILE & GEN II

SERVER ROOM

L-REAC DEMO

ROOM

HALL

IT

SUPPLY

OFFICE

OFFICE

OFFICE

WOMENS TOILET

MENS TOILET

STAIRS

S-B

OFFICE

A -1

A -1

A -1

A -1

ELEV.

E-1

STAIRS

S-A

PENTHOUSE

A -1

A -1

A -1

A -1

REMOVE EXISTING HVAC UNITS. PATCH

ROOF STRUCTURE & MEMBRANE FOR

WATERTIGHT CONDITION

REMOVE EXISTING VENT; PATCH

ROOF STRUCTURE & MEMBRANE

FOR WATERTIGHT CONDITION

LEGEND

ALL NEW PENETRATIONS OF INDICATED WALLS SHALL BE

FIRESTOPPED. SEE GENERAL NOTES ON SHEET A-120.

1. INFILL EXISTING OPENINGS WITH CMU OR CONCRETE WHERE DUCTS OR

OTHER ITEMS ARE REMOVED. SEE MECHANICAL DEMO PLANS. ALLOWANCE

FOR ADDITIONAL OPENINGS: 30 OPENINGS AVERAGE 8"X16" PLUS 30 HOLES

UP TO 4" DIA. FOR EACH FLOOR.

2. FLOOR PENETRATIONS SHALL HAVE ANNULAR SPACES FILL WITH NON-

COMBUSTIBLE MATERIAL TO RESIST FREE PASSAGE OF FLAME OR

PARTICLES OF COMBUSTION.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-101

A R

C H

IT

E

C T

U R

A L

O V

E R

A L L

F L

O O

R P

L A

N S

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

3/32" = 1'-0"A-101

01 OVERALL SECOND FLOOR PLAN

3/32" = 1'-0"A-101

02 OVERALL ROOF PLAN

08 244

GRAPHIC SCALE 3/32"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

UP

DN

UP

UP

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE ALL

WORK FOR EACH DISCIPLINE.

2. THESE DRAWINGS WERE DEVELOPED FROM EXISTING AS-BUILT DRAWINGS

PROVIDED BY THE GOVERNMENT. CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER REP. (COR) AS SOON AS POSSIBLE IN THE EVENT

THAT EXISTING CONDITIONS DIFFER SUBSTANTIALLY FROM THOSE

INDICATED IN THE DOCUMENTS.

3. DIMENSION ARE TO THE FACE OF FINISH, FACE OF STEEL, FACE OF

CONCRETE OR CENTERLINE OF COLUMN UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL COORDINATE WITH APPROVED CONSTRUCTION

DOCUMENTS PRIOR TO DEMOLITION AND DURING CONSTRUCTION FOR

EACH TRADE.

5. REFER TO KEYNOTES FOR ADDITIONAL REQUIREMENTS.

6. REFER A6-SERIES DRAWING FOR ROOM FINISH SCHEDULE, DOOR AND

WINDOW SCHEDULE AND PARTITION TYPES SCHEDULE

GENERAL NOTES

A-301

A-301

A -1

A -1

WORKROOM

B01

PROTOTYPE

SHOP

B02

OFFICE

B14

LOUNGE

B15

MENS RM

B16

STORAGE

B17

ELEV LOBBY

B19

ELEV.

E-1

ELEV EQUIP

ROOM

B01A

OFFICE

B02C

VACANT

B03

OFFICE

B13

WOMEN'S RM

B15A

HALL

B18

VERIFY WALLS, ROOMS, AND

DOORS IN THIS AREA

WORKROOM

E-2

BLANK OFF EXISTING

DOOR LOUVER WITH

METAL FINISHED TO

MATCH DOOR.

A-301

A -1

A -1

HALL

B18

OFFICE

B04

STORAGE

B05

ADMIN STORAGE

B06

VENTILATION RM

B07

BOILER RM

B08

STORAGE

B10

JAN

B09

R&D COMPUTER

LAB

B11

VACANT

B12

EXIST. AREAWAY DRAIN

A-341

Sim

TYP.

6 6666

A-341

TYP.

REPAIR WINDOW PANE WHERE WINDOW AIR CONDITIONER WAS

REMOVED. MATCH EXISTING GLASS.

REPAIR WALL AND PAINT AT LOCATIONS WHERE RADIATORS WERE

REMOVED.

INFILL LOUVER OPENING WITH CMU TO MATCH ADJACENT WALL

CONSTRUCTION. PAINT WALL TO CEILING AND NEAREST CORNERS.

REPAIR WALL AND ADD METAL STUDS & DRYWALL TO FLUSH OUT WALL AT

LOCATIONS WHERE RADIATORS WERE REMOVED.

INFILL LOUVER OPENING WITH CONC TO BE FLUSH WITH EXISTING WALL.

SEE DETAIL 03/A340.

INFILL LOUVER OPENING WITH INSULATED METAL PANEL. SEE DETAIL

01/A-341.

KEY NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-110

A R

C H

IT

E

C T

U R

A L

B A

S E

M E

N T

F L

O O

R P

L A

N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"A-110

02 BASEMENT FLOOR PLAN - SOUTH

1/8" = 1'-0"A-110

01 BASEMENT FLOOR PLAN - NORTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

DN

UP

DN

DN

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE ALL

WORK FOR EACH DISCIPLINE.

2. THESE DRAWINGS WERE DEVELOPED FROM EXISTING AS-BUILT DRAWINGS

PROVIDED BY THE GOVERNMENT. CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER REP. (COR) AS SOON AS POSSIBLE IN THE EVENT

THAT EXISTING CONDITIONS DIFFER SUBSTANTIALLY FROM THOSE

INDICATED IN THE DOCUMENTS.

3. DIMENSION ARE TO THE FACE OF FINISH, FACE OF STEEL, FACE OF

CONCRETE OR CENTERLINE OF COLUMN UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL COORDINATE WITH APPROVED CONSTRUCTION

DOCUMENTS PRIOR TO DEMOLITION AND DURING CONSTRUCTION FOR

EACH TRADE.

5. REFER TO KEYNOTES FOR ADDITIONAL REQUIREMENTS.

6. REFER A6-SERIES DRAWING FOR ROOM FINISH SCHEDULE, DOOR AND

WINDOW SCHEDULE AND PARTITION TYPES SCHEDULE

GENERAL NOTES

A-301

A -1

A -1

SIPRNET RM

OFFICE

COMM RM

OFFICE

OFFICE

OFFICE

WOMENS RM

115A

MENS RM

OFFICE

112A

STAIRS

S-B

OFFICE SUITE

OFFICE

111A

OFFICE

BREAKROOM

MAIN

CONFERENCE

ROOM

109A

HALL

CORRIDOR

ENTRANCE

KITCHEN

EXIST. AREAWAY DRAIN

1 1

1 1

222222222

2 2 2 2 2 2 2

A-340

A-301

A-301

A -1

A -1

OFFICE

101A

OFFICE SUITE

CONFERENCE

ROOM

101B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MAIL RM

107A

COPY RM

ELEV.

E-1

MEN'S ROOM

OFFICE

OFFICE

OFFICE

WOMEN'S ROOM

126A

STAIRS

S-A

CORRIDOR

ELEV LOBBY

1 1 1 1

2 22222222

2 2 2 2 2 2 2

A-340

REPAIR WINDOW PANE WHERE WINDOW AIR CONDITIONER WAS

REMOVED. MATCH EXISTING GLASS.

REPAIR WALL AND PAINT AT LOCATIONS WHERE RADIATORS WERE

REMOVED.

INFILL LOUVER OPENING WITH CMU TO MATCH ADJACENT WALL

CONSTRUCTION. PAINT WALL TO CEILING AND NEAREST CORNERS.

REPAIR WALL AND ADD METAL STUDS & DRYWALL TO FLUSH OUT WALL AT

LOCATIONS WHERE RADIATORS WERE REMOVED.

INFILL LOUVER OPENING WITH CONC TO BE FLUSH WITH EXISTING WALL.

SEE DETAIL 03/A340.

INFILL LOUVER OPENING WITH INSULATED METAL PANEL. SEE DETAIL

01/A-341.

KEY NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-111

A R

C H

IT

E

C T

U R

L F

IR

S

T F

L O

O R

P L

A N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"A-111

01 FIRST FLOOR PLAN - NORTH

1/8" = 1'-0"A-111

02 FIRST FLOOR PLAN - SOUTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE ALL

WORK FOR EACH DISCIPLINE.

2. THESE DRAWINGS WERE DEVELOPED FROM EXISTING AS-BUILT DRAWINGS

PROVIDED BY THE GOVERNMENT. CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER REP. (COR) AS SOON AS POSSIBLE IN THE EVENT

THAT EXISTING CONDITIONS DIFFER SUBSTANTIALLY FROM THOSE

INDICATED IN THE DOCUMENTS.

3. DIMENSION ARE TO THE FACE OF FINISH, FACE OF STEEL, FACE OF

CONCRETE OR CENTERLINE OF COLUMN UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL COORDINATE WITH APPROVED CONSTRUCTION

DOCUMENTS PRIOR TO DEMOLITION AND DURING CONSTRUCTION FOR

EACH TRADE.

5. REFER TO KEYNOTES FOR ADDITIONAL REQUIREMENTS.

6. REFER A6-SERIES DRAWING FOR ROOM FINISH SCHEDULE, DOOR AND

WINDOW SCHEDULE AND PARTITION TYPES SCHEDULE

GENERAL NOTES

A-340

A-301

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

209A

OFFICE

STAIRS

S-B

MENS TOILET

WOMENS TOILET

OFFICE

SUPPLY

L-REAC DEMO

ROOM

IT

OFFICE

OFFICE

OFFICE

HALL

CORRIDOR

A -1

A -1

222244222

2222222

OFFICE

5 555

A4

A4

TYP.

/8

3' - 11 5/8"

G001

G001

A-301

A-301

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

207A

WOMENS TOILET

MENS TOILET

STAIRS

S-A

ELEV.

E-1

OFFICE

CONFERENCE

ROOM

PROFILE & GEN II

SERVER ROOM

CORRIDOR

A -1

A -1

1 222222

2 2 2 2 2 2 2 2 2

555555

5 5 5

REPAIR WINDOW PANE WHERE WINDOW AIR CONDITIONER WAS

REMOVED. MATCH EXISTING GLASS.

REPAIR WALL AND PAINT AT LOCATIONS WHERE RADIATORS WERE

REMOVED.

INFILL LOUVER OPENING WITH CMU TO MATCH ADJACENT WALL

CONSTRUCTION. PAINT WALL TO CEILING AND NEAREST CORNERS.

REPAIR WALL AND ADD METAL STUDS & DRYWALL TO FLUSH OUT WALL AT

LOCATIONS WHERE RADIATORS WERE REMOVED.

INFILL LOUVER OPENING WITH CONC TO BE FLUSH WITH EXISTING WALL.

SEE DETAIL 03/A340.

INFILL LOUVER OPENING WITH INSULATED METAL PANEL. SEE DETAIL

01/A-341.

KEY NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-112

A R

C H

IT

E

C T

U R

A L S

E C

O N

D F

L O

O R

P L

A N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"A-112

01 SECOND FLOOR PLAN - NORTH

1/8" = 1'-0"A-112

02 SECOND FLOOR PLAN - SOUTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

SUSPENDED CEILING GRID SYSTEM

W/ 2' x 2' LAY-IN CEILING TILES;

MATCH EXISTING HEIGHT

GYPSUM BOARD CEILING ON MTL.

FRAMING (T.B.T. & P.)

EXPOSED STRUCTURE (NO CEILING)EXP

GWB

LEGEND

NOTE: REFER E-SERIES DRAWINGS FOR LIGHT FIXTURE

SCHEDULE. COORDINATE LOCATIONS OF CEILING

MOUNTED MECHANICAL / ELECTRICAL DEVICES WITH MEP

DRAWINGS.

2X2 LIGHT FIXTURE

REFER E-SERIES DRAWINGS

HVAC SUPPLY REGISTER

REFER M-SERIES DRAWINGS

HVAC RETURN REGISTER

REFER M-SERIES DRAWINGS

EMERGENCY EXIT LIGHT

A-301

A-301

A -1

A -1

WORKROOM

B01

PROTOTYPE

SHOP

B02

OFFICE

B14

LOUNGE

B15

MENS RM

B16

STORAGE

B17

ELEV LOBBY

B19

ELEV.

E-1

ELEV EQUIP

ROOM

B01A

OFFICE

B02C

VACANT

B03

OFFICE

B13

WOMEN'S RM

B15A

HALL

B18

WORKROOM

E-2

EXP.

EXP.

EXP.

EXP.

A-301

A -1

A -1

HALL

B18

OFFICE

B04

STORAGE

B05

ADMIN STORAGE

B06

VENTILATION RM

B07

BOILER RM

B08

STORAGE

B10

JAN

B09

R&D COMPUTER

LAB

B11

VACANT

B12

EXP.

EXP.

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE ALL

WORK FOR EACH DISCIPLINE.

2. THESE DRAWINGS WERE DEVELOPED FROM EXISTING AS-BUILT DRAWINGS

PROVIDED BY THE GOVERNMENT. CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER REP. (COR) AS SOON AS POSSIBLE IN THE EVENT

THAT EXISTING CONDITIONS DIFFER SUBSTANTIALLY FROM THOSE

INDICATED IN THE DOCUMENTS.

3. DIMENSION ARE TO THE FACE OF FINISH, FACE OF STEEL, FACE OF

CONCRETE OR CENTERLINE OF COLUMN UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL COORDINATE WITH APPROVED CONSTRUCTION

DOCUMENTS PRIOR TO DEMOLITION AND DURING CONSTRUCTION FOR

EACH TRADE.

5. REFER TO KEYNOTES FOR ADDITIONAL REQUIREMENTS.

6. NEW CEILINGS ARE TO BE INSTALLED AT THE SAME HEIGHT AS EXISTING.

CONTRACTOR TO FIELD VERIFY EXISTING HEIGHTS PRIOR TO DEMOLITION.

7. ENCLOSE ALL OPENINGS IN WALLS ABOVE CEILING RESULTING FROM

REMOVAL OF DUCTS, PIPES, AND OTHER MEP ITEMS. SEE MD100.

8. USE CMU, POURED CONCRETE, OR FIRESTOPPING TO MEET 1 HR. FIRE

RATING

9. IN ADDITION, ENCLOSE EXISTING OPENINGS UP TO 8" x 16"; UP TO 30 PER

FLOOR

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SOLICITATION DATA

A-120

A R

C H

IT

E

C T

U R

A L

R E

F L

E C

T E

D C

E

IL

IN

G

B A

S E

M E

N T

P L

A N

W H

IT

E

S A

N D

S M

IS

S

L E

R A

N G

E

N M

B L

D G

B

U

IL

D

IN

G R

E P

A

IR

F O

R T

W O

R T

H D

IS

T

R

IC

T T

A Y

L O

R S

T R

E E

T F

O R

T W

O R

T H

T

X

S E

V E

N G

E N

E R

A T

IO

N

S a rc h it e c tu re e n g in e e ri n g

E a s t M ic h ig a n A v e n u e S u it e B

K a la m a z o o M

I

G

A E

N T

F

D R

H

D R

H

J U

N E

1/8" = 1'-0"A-120

02 REFLECTED CEILING BASEMENT PLAN - SOUTH

1/8" = 1'-0"A-120

01 REFLECTED CEILING BASEMENT PLAN - NORTH

04 8 16268

GRAPHIC SCALE 1/8"=1'-0"

NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B0

MATCH EXISTING HEIGHT

GYPSUM BOARD CEILING ON MTL.

FRAMING (T.B.T. & P.)

EXPOSED STRUCTURE (NO CEILING)EXP

GWB

LEGEND

NOTE: REFER E-SERIES DRAWINGS FOR LIGHT FIXTURE

SCHEDULE. COORDINATE LOCATIONS OF CEILING

MOUNTED MECHANICAL / ELECTRICAL DEVICES WITH MEP

DRAWINGS.

2X2 LIGHT FIXTURE

REFER E-SERIES DRAWINGS

HVAC SUPPLY REGISTER

REFER M-SERIES DRAWINGS

HVAC RETURN REGISTER

REFER M-SERIES DRAWINGS

EMERGENCY EXIT LIGHT

A-301

A-301

A -1

A -1

OFFICE

101A

OFFICE SUITE

CONFERENCE

ROOM

101B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEV.

E-1

MEN'S ROOM

OFFICE

OFFICE

OFFICE

OFFICE

WOMEN'S ROOM

126A

STAIRS

S-A

CORRIDOR

ELEV LOBBY

A-340

A-301

A -1

A -1

MAIL RM

107A

COPY RM

107 SIPRNET RM

OFFICE

COMM RM

OFFICE

OFFICE

OFFICE

WOMENS RM

115A

MENS RM

OFFICE

112A

STAIRS

S-B

OFFICE SUITE

OFFICE

111A

OFFICE

111BREAKROOM

MAIN

CONFERENCE

ROOM

109A

HALL

CORRIDOR

ENTRANCE

KITCHEN

OFFICE SUITE

EXP.

1. CONTRACTOR TO VERIFY EXISTING CONSTRUCTION AND COORDINATE ALL

WORK FOR EACH DISCIPLINE.

2. THESE DRAWINGS WERE DEVELOPED FROM EXISTING AS-BUILT DRAWINGS

PROVIDED BY THE GOVERNMENT. CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER REP. (COR) AS SOON AS POSSIBLE IN THE EVENT

THAT EXISTING CONDITIONS DIFFER SUBSTANTIALLY FROM THOSE

INDICATED IN THE DOCUMENTS.

3. DIMENSION ARE TO THE FACE OF FINISH, FACE OF STEEL, FACE OF

CONCRETE OR CENTERLINE OF COLUMN UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL COORDINATE WITH APPROVED CONSTRUCTION

DOCUMENTS PRIOR TO DEMOLITION AND DURING CONSTRUCTION FOR

EACH TRADE.

5. REFER TO KEYNOTES FOR ADDITIONAL REQUIREMENTS.

6. NEW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .