B3_Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Hords Creek Lake Janitorial Services
- Solicitation number
- W9126G18Q0053
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_Sol_Amendment_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G18Q0053 16-Aug-2018
b. TELEPHONE NUMBER
817-886-1082
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 31 Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GLORIA GONZALES
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 967427 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
HORDS CREEK PROJECT OFC
USAED, FORT WORTH
GLEN COVE ROUTE
230 FRIENDSHIP PARK ROAD
COLEMAN TX 76834
TEL: 325-625-2322 FAX: 325-625-5079
(817) 886-6403FAX:
TEL: (817) 886-1077 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$18,000,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF81
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Funded Amt:
Hords Creek Lake Janitorial Services BASE YEAR - Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards.
Period of Performance: 1 Oct 2018 - 30 Sep 2019
NAICS CD: 561720
, FSC CD: S201
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1001 1 Job
OPTION Funded Amt:
Hords Creek Lake Janitorial Services OPTION YEAR 1 - Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards.
Period of Performance: 1 Oct 2019 - 30 Sep 2020
NAICS CD: 561720
, FSC CD: S201
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1002 1 Job
OPTION Funded Amt:
Hords Creek Lake Janitorial Services OPTION YEAR 2 - Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards.
Period of Performance: 1 Oct 2020 - 30 Sep 2021
NAICS CD: 561720
, FSC CD: S201
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1003 1 Job
OPTION Funded Amt:
Hords Creek Lake Janitorial Services OPTION YEAR 3 - Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards.
Period of Performance: 1 Oct 2021 - 30 Sep 2022
NAICS CD: 561720
, FSC CD: S201
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1004 1 Job
OPTION Funded Amt:
Hords Creek Lake Janitorial Services OPTION YEAR 4 - Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards.
Period of Performance: 1 Oct 2022- 30 Sep 2023
NAICS CD: 561720
, FSC CD: S201
KO STATEMENT
“Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”
BID SHEET
HORDS CREEK LAKE OFFICE
JANITORIAL SERVICES
BASE YEAR PLUS FOUR OPTION YEARS
Furnish all labor, equipment and materials to provide janitorial services at the above locations in accordance with the Performance Work Statement and Performance Requirements Standards. The quantities included on this IGE have been fomulated using the anticipated cleaning frequency/schedule for 100% of these services throughout the entire contract life, base year plus four options.
BASE YEAR (1 October 2018 - 30 September 2019)
CLIN Description Qty U/M Unit Price Price
0001AA Foyers, reception area, hallways, offices and common area(s) (PRS # 1 , #2, #6)
52 EA
0001AB Restroom cleanings (PRS # 4) 52 EA
0001AC Kitchen cleaning (PRS # 3) 52 EA
0001AD Conference Room Cleaning (PRS # 5) 52 EA
0001AE Building Exterior and Grounds Cleaning (PRS # 7) 52 EA
0001AF Window Cleaning (PRS # 8) 12 EA
0001AG Steam Cleaning and Scotch Guarding of Carpet (PRS # 9) 2 EA
0001AH Wax Rejuvenator (PRS # 10) 2 EA
Base Year- Subtotal
OPTION YEAR ONE (1 October 2019 - 30 September 2020)
CLIN Description Qty U/M Unit Price Price
1001AA Foyers, reception area, hallways, offices and common area(s) (PRS # 1 , #2, #6)
52 EA
1001AB Restroom cleanings (PRS # 4) 52 EA
1001AC Kitchen cleaning (PRS # 3) 52 EA
1001AD Conference Room Cleaning (PRS # 5) 52 EA
1001AE Building Exterior and Grounds Cleaning (PRS # 7) 52 EA
1001AF Window Cleaning (PRS # 8) 12 EA
1001AG Steam Cleaning and Scotch Guarding of Carpet (PRS # 9) 2 EA
1001AH Wax Rejuvenator (PRS # 10) 2 EA
Option Year One Subtotal
OPTION YEAR TWO (1 October 2020 - 30 September 2021)
CLIN Description Qty U/M Unit Price Price
2001AA Foyers, reception area, hallways, offices and common area(s) (PRS # 1 , #2, #6)
52 EA
2001AB Restroom cleanings (PRS # 4) 52 EA
2001AC Kitchen cleaning (PRS # 3) 52 EA
2001AD Conference Room Cleaning (PRS # 5) 52 EA
2001AE Building Exterior and Grounds Cleaning (PRS # 7) 52 EA
2001AF Window Cleaning (PRS # 8) 12 EA
2001AG Steam Cleaning and Scotch Guarding of Carpet (PRS # 9) 2 EA
2001AH Wax Rejuvenator (PRS # 10) 2 EA
Option Year Two - Subtotal
OPTION YEAR THREE (1 October 2021 - 30 September 2022)
CLIN Description Qty U/M Unit Price Price
3001AA Foyers, reception area, hallways, offices and common area(s) (PRS # 1 , #2, #6)
52 EA
3001AB Restroom cleanings (PRS # 4) 52 EA
3001AC Kitchen cleaning (PRS # 3) 52 EA
3001AD Conference Room Cleaning (PRS # 5) 52 EA
3001AE Building Exterior and Grounds Cleaning (PRS # 7) 52 EA
3001AF Window Cleaning (PRS # 8) 12 EA
3001AG Steam Cleaning and Scotch Guarding of Carpet (PRS # 9) 2 EA
3001AH Wax Rejuvenator (PRS # 10) 2 EA
Option Year Three - Subtotal
OPTION YEAR FOUR (1 October 2022 - 30 September 2023)
CLIN Description Qty U/M Unit Price Price
4001AA Foyers, reception area, hallways, offices and common area(s) (PRS # 1 , #2, #6)
52 EA
4001AB Restroom cleanings (PRS # 4) 52 EA
4001AC Kitchen cleaning (PRS # 3) 52 EA
4001AD Conference Room Cleaning (PRS # 5) 52 EA
4001AE Building Exterior and Grounds Cleaning (PRS # 7) 52 EA
4001AF Window Cleaning (PRS # 8) 12 EA
4001AG Steam Cleaning and Scotch Guarding of Carpet (PRS # 9) 2 EA
4001AH Wax Rejuvenator (PRS # 10) 2 EA
Option Year Four - Subtotal
PERFORMANCE WORK STATEMENT (PWS)
JANITORIAL SERVICES
At
HORDS CREEK LAKE OFFICE
1. GENERAL: This is a non-personal services contract to provide all management, tools, equipment, materials, and labor necessary to ensure that office janitorial services are performed at Hords Creek Lake, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract.
The following resources are available to assist USACE contractors in their outreach efforts: Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/Department of Veterans Affairs–VOW to Hire Heroes Act http://benefits.va.gov/vow/Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heroes http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
1.1 Description of Services/Introduction: The Contractor shall provide all labor, tools, equipment, materials and management necessary to accomplish janitorial services at the Hords Creek Lake as defined in this Performance Work Statement except for those items specified as government furnished property and services.
The Contractor shall perform to the standards in this contract.
1.2. Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform office cleaning, conference room cleaning, reception room cleaning, restroom cleaning, and kitchen/break room cleaning at Hords Creek Lake’s Office. Services include dusting, vacuuming, stripping and waxing floors, cleaning toilets, urinals and sinks, cleaning kitchen counters and sinks, trash removal, cleaning windows, mopping and scrubbing floors, buffing waxed floors, steam cleaning carpets, scotch guarding carpets, replacing light bulbs, cleaning light fixture lenses, washing/drying dishes, placing dishes in cabinets, providing and replenishing toilet paper, paper towels, liquid hand soap and its dispensers and liquid dish washing detergent. The Contractor shall accomplish all operations in accordance with procedures and practices described in IAW EM 385-1-1.
1.3 Period of Performance: One Year Base Period, plus four one year Options.
1.4 General Information
1.4.1 Award of Other Contracts - The services provided under this contract shall be independent of all services provided under other contracts, at this work site or any other work site, at which the Contractor may receive award. The Contractor shall be responsible for meeting any and all deadlines for services specified under this contract.
1.4.2 Cooperation with Other Contractors - The Government may undertake or award other contracts for additional work not related to the contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit, direct, lead or permit any acts that will interfere with the performance of work by another Contractor, or by Government employees.
1.4.3 Work Schedule : Work shall begin no earlier than 4:30 p.m. and be finished by no later than 7:00 a.m.
on any workday except during the summer season when Lake personnel work late shifts and then work shall begin no earlier than 8:00 p.m. and be finished by no later than 7:00 a.m. The Contractor shall be required to submit a work schedule to the Designated Individual (DI) for approval within (10) days after the beginning date of the contract. Refer to the frequency sheet in the attachments. Floor wax rejuvenation and fabric cleaning steam cleaning/Scotch Guarding shall be scheduled as per the Contract. The schedule shall include the approximate time and the date of performance for all scheduled services. Any unforeseen change or variation from an approved schedule must be reported to the DI before work begins or as soon as possible on the affected day. If a permanent deviation from an approved work schedule is desired, the Contractor shall submit a new schedule in writing to the DI for approval a minimum of 10 business days before implementation
1.4.4 Payment: Payment for completed and accepted work will be done by contract on a monthly basis.
The Contractor shall only invoice at the end of month.
1.4.5 Performance Evaluation Meetings: The Contractor, Contractor’s superintendent, and quality control inspectors shall meet with the Quality Assurance Representative (QAR) and Designated Individual (DI) once a quarter in order to discuss performance. However, a meeting shall not be held later than 1 working day after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve any and all problems identified. Written minutes of these meetings shall be prepared and signed by the QAR or DI, Contractor and their respective employees.
1.4.6 Performance of Work Outside of Scope of this Contract: If the Contractor performs work above and beyond the scope of the contract (e.g. cleans more than required/ordered under the contract) the Government shall not be liable for additional cost.
1.4.7 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirements of the contract. The QCP is to be delivered within 30 calendar days after contract award. 2 copies of a comprehensive written QCP shall be submitted for approval by the Contracting Officer (KO). Any proposed changes to an approved QCP, shall be submitted, in writing, to the KO for review and approval.
1.4.8 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.9 Government Holidays: The Contractor shall not perform services on Federal holidays. A minimum of 24 hours notification will be given to the Contractor via telephone or in writing. For information purposes only observed federal holidays are as follows:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.10 Hours of Operation: Hords Creek Lake Office’s normal office hours are 08:00am to 4:30 pm (CST).
Both buildings shall be closed on Federal holidays. The Contractor shall be required to submit a work schedule for review and approval by the KO or DI. This schedule shall meet the requirements of this PWS, Technical Exhibit 3 “Deliverables” and Technical Exhibit 3 - Item a, “Frequency of Service”.
1.4.11 Place of Performance: The work to be performed under this contract will be performed at:
1.4.11.1 Hords Creek Lake Office located at 230 Friendship Park Rd., Coleman, TX 76834
1.4.12 Type of Contract: The government will award a Firm Fixed Price contract. The Contractor shall perform all services specified herein on an as-ordered basis.
1.4.13 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards and security codes issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. All Government keys and or key cards will be issued and controlled in accordance with AR190-51. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the KO or the DI.
1.4.13.1 The Contractor shall prohibit the use of Government issued keys/key cards and security codes by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO or the DI.
1.4.14 Safety: The Contractor shall develop and execute an effective safety program to ensure all required services are performed safely. The Contractor shall develop and implement procedures to identify, minimize and prevent safety risks in the form of a Safety Plan. The Contractor’s Safety Plan is the means by which he assures safety of personnel in the work place. The Safety Plan is to be delivered with the Contractor’s proposal. 2 copies of a comprehensive written Safety Plan shall be submitted for approval by the KO. Any proposed changes to an approved plan shall be submitted, in writing, to the KO for review and approval. The Contractor shall exercise all applicable safety rules in accordance with the OSHA and all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, 15 September 2008 or most recent version. OSHA standards are subject to change and such changes may affect the Contractor in their performance during the contract period and shall be at no additional cost to the Government.
1.4.15 Special Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses, permits, and letters of certification. All current federal, state and county rules and regulations shall be met and maintained throughout the performance of the work specified under this contract.
1.4.16 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO or DI, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO or DI will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.4.17 Designated Individual (DI): A Designated Individual will be identified to monitor and act as liaison with the Contractor for any Contract under $150,000. This will be by separate letter by the Operations Project Manager. The DI monitors all technical aspects of the contract and assists in contract administration. The DI is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation shall be issued to the DI by the Project Operations Manager, a copy of which is sent to the Contractor, states the responsibilities and limitations of the DI, especially with regard to changes in cost or price, estimates or changes in delivery dates. The DI is not authorized to change any of the terms and conditions of the contract or signed contract.
1.4.18 Contractor Key Personnel: The following personnel are considered key personnel by the Government: The Contractor, Contractor’s Superintendent/Manager, or Quality Control Inspectors. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work.
The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
1.4.19 Contractor’s Employees: The Contractor shall be responsible for insuring employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity shall result in the removal of the employee/employees and or may result in the termination of the contract. The KO or the DI may require the Contractor to immediately remove from work site any employee of the Contractor or Subcontractor, who, in the opinion of the KO or the DI, endangers persons or property, or whose physical or mental conditions are such that it would impair the employee’s ability to satisfactorily perform work.
Notification to the Contractor shall be promptly made in writing if time and circumstances permit.
Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the obligation to perform all work required under the contract, and immediate replacement shall be made as required. This removal shall not be made the basis of any claim for compensation or damages against the United States or any of its employees, officers, or agents. All personnel shall maintain a clean, neat and well groomed appearance while performing work on the job site. Employee attire shall meet the requirements of the EM 385-1-1, “Safety and Health Requirements Manual” or most recent version.
1.4.20 Security Requirements: All Contractor and all associated sub- contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractor and all associated Contractor’s employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.20.1 The Contractor must pre‐screen Candidates using the E‐verify Program website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the DI no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file. All employees, at the time of award or hired during the life of this contract, must remain eligible with the Department of Homeland Security. Current I-9 forms and E-Verify Program can be accessed at http://www.uscis.gov at no charge.
1.4.20.2 Photo Identification Badges: Contractor shall provide photo identification cards to all contract employees working at Hords Creek Lake and the THREE RIVERS PROJECT OFFICE.
Contractors will wear photo badges on their person as they perform duties to execute work items under this contract.
1.4.20.3 Screening for Criminal History: Contractor and Contractor’s employees will be screened for criminal history by government personnel using Southeastern Security Consultants, Inc before any work under this contract is started.
1.4.20.4 I-WATCH, Corps Watch, or See Something, Say Something program. The Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the DI NLT 5 calendar days after the completion of the training. The I-Watch/CORPS watch training video and literature can be found at the following web site. http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx.
1.4.20.5 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the DI or to the contracting officer, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx
1.4.20.6 Operations Security: All new contractor employees will complete Level I OPSEC training within 30 calendar days of their reporting for duty. Additionally, all contract employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the DI, or Contracting Officer, within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx .
1.4.21 Identification of Contractor Employees: The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with a uniform shirt clearly displaying the company’s name and logo screen printed on the left breast area or on the back. The DI shall approve the uniform shirt before the commencement of contract performance. It is the Contractor’s responsibility to ensure that all Contractor personnel wear the uniform shirt at all times when performing work under this contract at a Government facility. Contractor shall allow only persons directly involved with accomplishment of the Contractor's operations in facilities serviced by this contract (i.e., no friends, guests, children, or pets). Unless otherwise specified in the contract, each Contractor employee shall wear the uniform shirt except when safety or health reasons prohibit such usage.
1.4.22 Contractor Travel: Any travel requirement associated with this contract is at the Contractor’s own expense and shall be at no additional cost to the Government.
1.4.23 Data Rights: Not applicable under this contract.
1.4.24 Organizational Conflict of Interest: The only conflict of interest would be if a contractor or subcontractor would have business or family association with a USACE employee. If this is found to be true, the contract will immediately be terminated or subcontractor removed.
1.5. GOVERNMENT FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: The Government will provide a storage closet at each location to store equipment and cleaning supplies.
1.5.2 Equipment: The Government will provide no equipment under this contract.
1.5.3 Materials: The Government will provide potable water and electricity and replacement fluorescent light bulbs. Government will provide required forms for preparation of Activity Hazard Analysis and reporting of maintenance problems.
1.6 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: The Contractor shall furnish all management, labor, supplies, equipment, facilities and services required to perform work under this contract.
1.6.2 Materials: All equipment and materials used for cleaning shall be provided by the Contractor.
Materials include, but are not limited to, cleaning solvents, germicidal disinfectants, scouring powders, bowl cleaners, deodorizers, detergents, window cleaning supplies, floor cleaning agents clean and dry, white premium grade two-ply toilet tissue paper, paper towels (“C” Fold Dispenser), trash receptacle liners, aerosol deodorizer and disinfectant spray, liquid dish washing detergent in squeeze bottle, liquid germicide hand soap (deb Dispenser) and urinal cakes in protective holders, perfumed and 100% free of paradichlorobenzene necessary to meet the requirements under this PWS. A proposed material list must be submitted for the DI approval ten days prior to the commencement of this contract, including Safety Data Sheets for all products of a chemical nature. All products must be non-toxic and biodegradable and used as per the manufacturer’s recommendations. All equipment must be inspected and approved by the QAR prior to use, to insure safety compliance IAW EM 385-1-1.
1.6.2.1 In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired;
(1) Competitively within a timeframe providing for compliance with the contract performance schedule;
(2) Meeting contract performance requirements; or
(3) At a reasonable price.
Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program . The list of EPA-designated items is also available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products, items may include, but are not limited to the following products used on-site in execution of this contract.
• Two ply toilet tissue
• Trash can liners
• Bio based content cleaners, solvents, detergents and disinfectants.
1.6.2.2 As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C.
6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.
1.6.2.3 References
• FAR Provision 52.223-1 – Biobased Product Certification (should be included in solicitations)
• FAR Clause 52.223-2 – Affirmative Procurement of Biobased Products Under Service and Construction Contracts
• FAR Provision 52.223-4 – Recovered Material Certification (should be included in solicitations)
• FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA- Designated Items
• FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): Not applicable under this contract
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS): The Contractor must abide by all applicable regulations, publications, manuals, State, local and Texas Commission on Environmental Quality policies and procedures. Regarding safety and health standards, the Contractor shall follow the guidelines of OSHA and the Engineer Manual (EM) 385-1-1, entitled "Safety and Health Requirements Manual", most recent edition.
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
1.9.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
1.9.3 Attachment 3/Technical Exhibit 3 - Appendices
TECHNICAL EXHIBIT 1
Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. The Government expects the Contractor to perform at a minimum, the identified acceptable levels throughout the life of the contract, and the Contractor’s performance shall be given significant consideration when exercising contract option years and evaluating recommendations for future government contracts and or awards.
Performance Objective: Describes the work that is to take place.
Standard: Describes the desired results that are to be achieved.
Performance Threshold: The Contractor shall be rated acceptable or unacceptable based upon the scores of all inspections for a month. Deficiencies will be noted for each month for each Performance Objective item. This number is identified as the Performance Threshold.
Acceptable Performance: Acceptable Performance is achieved if inspections scores are above 85%. That level is 100% for Refuse Removal and Beach Water Testing.
Unacceptable Performance: QAR’s inspection scores fall below 85% or work specified by the contract is incomplete.
Method of Surveillance: The Government will monitor the Contractor’s service performance using the Periodic Inspections method and or 100% inspection method as detailed in “Quality Assurance Surveillance Plans
(QASP).
Performance Objective Standard Performance Threshold
Method of Surveillance
PRS # 1.
OFFICE CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces in an office, empty trash and multiple recyclable paper containers and clean floor covering.
The Contractor's cleaning shall result in all surfaces of the office including desk surface, chairs, credenzas, book shelves, ceiling fans, picture frames, light switches, phones, computers, filing cabinets, printers, monitors, HVAC vents, chair rails, displays, fire extinguishers and window sills and window blinds shall be free of dust. All light fixtures shall be in working order (burnt out bulbs replaced), and shall be free of insects, insect nest and dust. Trash receptacles shall be empty of all trash with a new liner. Ceiling and walls shall be free of dust and cob webs/insect nest. Multiple recyclable paper containers shall be emptied. Floors shall be free of dirt and insects.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 2
COMMON AREA
CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces a common area, empty trash and multiple recyclable paper containers and clean floor covering.
The Contractor's cleaning shall result in all surfaces of the common area including chairs, credenzas, book shelves, ceiling fans, picture frames, light switches, filing cabinets, chair rails, stuffed animal displays, fire extinguishers and map cabinets shall be free of dust. Light fixtures shall be free of insects, insect nest and dust. Trash receptacles shall be empty of all trash with a fresh liner. Ceiling and walls shall be free of dust and cob webs/insect nest. Recyclable paper containers shall be emptied. Floor shall be free of dirt and insects.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS#3
KITCHEN CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces in kitchen, including tables, chairs, cabinet top and stove top, wash and store dishes, empty trash container, replenish hands towels, hand soaps dish washing detergent dispensers and clean floors.
The Contractor’s work shall result all walls, ceilings, baseboards, cabinets, counter tops, coffee maker, refrigerator (inside and out), microwaves (inside and out), stove/oven (inside and out), sink, plumbing fixtures, light fixtures, paper towel dispenser, pictures, recesses, tables (top and bottom), chairs, soap dish/dispenser, dirty dishes being cleaned and free of grease, food particles, dirt and grime. Floors shall be free of grease, dirt, food particles and insects. Cleaned dishes shall be placed in the proper storage area. Chairs shall be neatly arranged around tables. Contractor shall replenish soap dispenser, dish washing detergent and paper towel dispenser to insure a sufficient supply until the next schedule service.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 4
RESTROOM CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces in restroom including sinks, commodes and floors and replenish hand towel and hand soap dispenser. Replace toilet deodorizer and air freshener as needed.
Contractor’s cleaning shall result in surfaces, receptacles and drains shall be free of deposits, dirt, debris, streaks and odors.
All surfaces of sinks, toilet bowls and adjacent walls shall be cleaned and disinfected. All lights fixtures shall be free of dirt, dust, insects and insect nest. All toilet paper dispensers shall be stocked with an adequate supply of rolls of toilet paper (white, two-ply unglazed, clean and dry) to assure supply will not become depleted between cleanings. Rolls with less than ¾ of inch of tissue and rolls that have become wet shall be removed and replaced with new rolls. All toilet paper rolls shall be secured in designated dispensers. All toilets shall contain a fully functional deodorant cake. Deodorant cake shall be 100% paradichlorobenzene free, perfumed, and firmly pressured into a hard cake with hanger. After de-scaling, surfaces should be free from streaks, stains, scale, scum, urine deposits, hair and rust stains. All bright work shall be free of streaks. Floor surfaces shall be free from litter, dirt, dust, and debris. Floors shall be uniform in appearance free from streaks, swirl marks detergent residue, or any evidence of soil, stain, film or standing water. Interior walls shall be free of streaks, dirt scum, mildew, residue, insects and insect nest etc. All light fixtures shall be in working order (burnt out bulbs replaced), clean and free of insects, insect nest and debris. Trash receptacles shall be emptied with a new liner.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 5
CONFERENCE ROOM
CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces in Conference room, empty trash receptacles and clean floor covering.
The Contractor's cleaning shall result in all surfaces of the conference room including conference table, chairs, credenzas, book shelves, ceiling fans, picture frames, light switches, phones, computers, monitors, audio visual equipment, HVAC vents chair rails and window sills and window blinds shall be free of dust. Light fixtures shall be free of insects, insect nest and dust. Chairs shall be neatly arranged around tables. Trash receptacles shall be emptied of all trash with a fresh liner.
Ceiling and walls shall be free of dust and cob webs/insect nest.
Floors shall be free of dirt and insects.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 6
RECEPTION AREA AND
HALLWAY
The Contractor shall furnish all labor, equipment, and materials to clean all surfaces in the reception area and hall way, empty trash and recyclable containers and clean floor covering.
The Contractor's cleaning shall result in all surfaces of the reception area including desk surface, counter tops chairs, credenzas, book shelves, ceiling fans, picture frames, light switches, phones, computers, filing cabinets, printers, monitors, HVAC vents, chair rails, displays, fire extinguishers, window sills and window blinds shall be free of dust. Light fixtures shall be free of insects, insect nest and dust. Trash receptacles shall be emptied of all trash with a fresh liner. Ceiling and walls shall be free of dust and cob webs/insect nest. Multiple recyclable paper containers shall be empty. Floors shall be free of dirt and insects.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic
PRS # 7
BUILDING AND GROUNDS
CLEANING
The Contractor shall furnish all labor, equipment, and materials to collect and dispose of litter.
The Contractor shall remove all insect nests from the exterior of the office building. The Contractor grounds cleaning shall result in removal of all litter from the office yard from the building to the edge of the city streets. ***NOTE***This does not include inside the fenced compound
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 8
WINDOW CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean windows and glass doors.
The Contractor’s work shall result in both inside and outside of all windows, glass doors, eves, blinds and screens shall be free of streaks, smudges, fingerprints, spotting, all insects, insect nests, webs, dirt, dust, organic material, fecal matter, markings, stains and other debris with screens returned to their original locations.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 9
STEAM CLEANING AND
SCOTCH GUARDING OF
CARPETED FLOORS
The Contractor shall furnish all labor, equipment, and materials to Steam Clean and scotch guard carpeted
Contractor’s work shall result in all fabric floors in offices steam cleaned thorough enough to remove all stains and foreign matter and Scotch Guard applied to the carpets that have been cleaned.
Only steam units shall be approved for use, units utilizing hot water only shall not be approved. Carpets shall not be left excessively wet. Any furniture or other items with the exception of desks, tables, or filing cabinets shall be moved to facilitate cleaning and returned to their original position.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the DI or QAR.
PRS # 10
WAX REJUVENATOR
The Contractor shall furnish all labor, equipment, and materials to clean tile flooring and apply wax rejuvenation product.
Contractor’s work shall result in all tile wax rejuvenation floors in the office thoroughly cleaned of scuff marks, stains, dirt, and any other foreign with Wax rejuvenation applied uniformly with a highly polished surface, free of bubbles, streaks and dull areas.
Scores a minimum of 85% on all inspections for the month or 30 calendar day period
Inspection by Periodic
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Item a. The Contractor shall attend a pre-work conference with the DI and Government personnel 10 calendar days prior to initiation of any work. The Contractor shall be required to attend any performance standards meeting with in 2 calendar day of any Contractor Deficiency Report (CDR) initiated by the DI or Government Representative.
Contractor shall be required to attend a meeting prior to commencement of initial work or at any time the KO or DI determines performance does not meet the minimum standards of this contract.
Submission of a response is required to satisfy all corrective actions to prevent the reoccurrence of substandard performance results, or Contractor Deficiency Report.
The Contractor shall submit responses by hard copy, fax or electronic, email format to resolve deficiencies or provide corrective action plans. The Government may provide forms for CDR responses as determined by the KO, DI or DI
Hords Creek Lake Office 230 Friendship Park Rd., Coleman, TX 76834
Item b. The Contractor shall submit a work schedule, calendar, names, addresses, and phone numbers of employees, and sub-Contractors to the KO. The schedule shall include the approximate time of performance for all scheduled services.
Any change or variation from an approved schedule or employees list must be reported and approved by the DI, DI or QAR prior to any change taking effect, refer to PWS paragraphs 1.4.3.
Contractor shall submit schedule, employee, sub- Contractor and sub- Contractor employee list with 5 calendar days of award and prior to the start of any services.
2 copies required and subject to review and approval by the KO or DI.
The Contractor may submit required documents by hardcopy or by email to the KO or
DI.
Hords Creek Lake Office 230 Friendship Park Rd., Coleman, TX 76834
Item c. The Contractor shall
Contractor shall a detailed Safety Plan
2 copies required and subject to
The Contractor shall submit required
Hords Creek Lake Office
Deliverable Frequency # of Copies Medium/Format Submit To submit a detailed Safety Plan for review and approval by the KO. This plan shall describe the Contractor’s method to insure safe operations, emergency accident prevention and response, the nearest emergency medical treatment facility for intended use.
Activity Hazard Analysis (AHA), Safety Data Sheets (SDS) and Personal Protective Equipment needs and uses shall be included in this plan.
prior to the Pre-work Conference. Any proposed changes to an approved Safety Plan or AHA shall require review and approval by the KO before changes may be instituted. All plans and analysis shall be prepared in accordance with OSHA and the U.S.
Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1- 1, latest edition.
review and approval by the DI.
2 complete sets of Safety Data Sheets (SDS) for each product the Contractor will be using shall be required.
documents in hardcopy form to the
KO.
230 Friendship Park Rd., Coleman, TX 76834
Item d. Contractor shall submit a detailed Quality Control Plan for review and approval by the DI. This plan shall describe the Contractor’s method to insure quality performance to meet the minimum standards required by the Performance Work Statement and the Performance Requirements Summary.
2 copies required and subject to review and approval by the DI with in 30 calendar days of award. The Contractor shall be required to submit in writing any proposed changes to a previously approved plan for review and approval of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.