SOLICITATION.pdf

PDF 2 MB Posted

Attached to
OPTION - CANYON LAKE EMBANKMENT TURF MAINTENANCE
Solicitation number
W9126G-18-Q-0048
Issued by

View the file

Other files

File Type Posted
Canyon_Fertilizer.pdf PDF
Past_Performance_Questionaire.doc DOC document
INSTRUCTIONS_TO_QUOTER.docx DOCX document
Amend_1_Solicitation.pdf PDF
INSURANCE_INSTRUCTION.pdf PDF
MAPS.pdf PDF
VENDOR_INFORMATION_SHEET.pdf PDF
QUALITY_ASSURANCE_SURVEILLANCE_PLAN.pdf PDF
BID_SCHEDULE.XLSX XLSX spreadsheet
PERFORMANCE_WORK_STATEMENT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9126G18Q0048 02-Aug-2018

b. TELEPHONE NUMBER

817 886 1046

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 16 Aug 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TERRENCE J ANDERSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967422 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CANYON PROJECT OFC ATTN CESWF-OD-CN

JOHN JACOBS

601 COE ROAD

CANYON LAKE TX 78133

TEL: 830-964-3341 FAX:

(817) 886-6403FAX:

TEL: (817) 886-1077

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF63

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

7/31/2018

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

EMBANKMENT MOWING SERVICE - CANYON LAKE

FFP

EMBANKMENT TURF MAINTENANCE

BASE YEAR 01 OCT 2018 THROUGH 30 SEP 2019

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 4 Job Main Dam

FFP

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 4 Job Spillway Dike

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 4 Job Ramp 1 Dike

FFP

EMBANKMENT MOWING SERVICE - CANYON LAKE

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AD 1 Job Main Dam

FFP

EMBANKMENT FERTILIZER SERVICE - CANYON LAKE

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AE 1 Job Spillway Dike

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Option Year 1 Embankment Service

FFP

EMBANKMENT MOWING SERVICE - CANYON LAKE

OPTION YEAR 01 OCT 2019 THROUGH 30 SEP 2020

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AA 4 Job Main Dam

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AB 4 Job Spillway Dike

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AC 4 Job Ramp 1 Dike

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AD 1 Job Main Dam

FFP

EMBANKMENT FERTILIZATION SERVICE - CANYON LAKE

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AE 1 Job Spillway Dike

FFP

BID SCHECULE

BID SCHEDULE

CANYON LAKE

EMBANKMENT TURF MAINTENANCE

BASE YEAR 01 OCT 2018 THROUGH 30 SEP 2019

Item Description Quantity Unit Unit Price

Price

EMBANKMENT MOWING SERVICE - CANYON LAKE

0001AA Main Dam 4 EA

0001AB Spillway Dike 4 EA

0001AC Ramp 1 Dike 4 EA

TOTAL BID ITEMS 0001AA thru 0001AC

1001AD Main Dam 1 EA

1001AE Spillway Dike 1 EA

TOTAL BID ITEMS 0001AD thru 0001AE

TOTAL BID - ITEMS 0001AA thru 0001AE

BID SCHEDULE

CANYON LAKE

EMBANKMENT TURF MAINTENANCE

OPTION YEAR 01 OCT 2019 THROUGH 30 SEP 2020

Item Description Quantity Unit Unit Price

Price

EMBANKMENT MOWING SERVICE - CANYON LAKE

1001AA Main Dam 4 EA

1001AB Spillway Dike 4 EA

1001AC Ramp 1 Dike 4 EA

TOTAL BID ITEMS 1001AA thru 1001AC

1001AD Main Dam 1 EA

1001AE Spillway Dike 1 EA

TOTAL BID ITEMS 1001AD thru 1001AE

TOTAL BID ITEMS 1001AA thru 1001AE

Page 10 of

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

0001AC Destination Government Destination Government

0001AD Destination Government Destination Government

0001AE N/A N/A N/A Government

0002 N/A N/A N/A N/A

0002AA Destination Government Destination Government

0002AB Destination Government Destination Government

0002AC Destination Government Destination Government

0002AD Destination Government Destination Government

0002AE Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 01-OCT-2018 TO

30-SEP-2019

N/A CANYON PROJECT OFC ATTN CESWF-

OD-CN

JOHN JACOBS

601 COE ROAD

CANYON LAKE TX 78133

830-964-3341

967422

0001AB POP 01-OCT-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AC POP 01-OCT-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AD POP 01-OCT-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AE POP 01-OCT-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0002 N/A N/A N/A N/A

Page 11 of

0002AA POP 01-OCT-2019 TO

30-SEP-2020

N/A CANYON PROJECT OFC ATTN CESWF-

OD-CN

JOHN JACOBS

601 COE ROAD

CANYON LAKE TX 78133

830-964-3341

0002AB POP 01-OCT-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AC POP 01-OCT-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AD POP 01-OCT-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AE POP 01-OCT-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

Page 12 of

PERFORMANCE WORK STATEMENT

FORT WORTH DISTRICT

PERFORMANCE WORK STATEMENT

EMBANKMENT TURF MAINTENANCE

Canyon Lake

1. General: This is a non-personal services contract to provide mowing fertilization services on the embankments at Canyon Lake, Texas. The Government will not exercise any supervision or control over the contract service providers performing the services described herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services on the embankments as defined in this Performance Work Statement

(PWS). The Contractor shall perform to the standards in this contract.

1.2. Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services on the embankments at Canyon Lake, Texas. The Canyon Lake office will have soil testing conducted prior to fertilization. The results and recommendations will be utilized by the contractor for proposing formulation and quantity of fertilizer to be used at each site.

1.2.1 Embankment Mowing Requirements:

1.2.1.1 General: Mowing services shall be performed in accordance with the following specifications and the Mowing Maps (ATTACHMENT 4) as directed in the Embankment

Mowing Schedule in section 1.3 The Contractor will receive at least forty-eight (48) hours advance notice before the work start date. The Embankment type mowing covers a larger area as depicted on the Mowing Maps (ATTACHMENT 4). Prior to commencement of mowing operations in each area, the Contractor shall survey the park or area and submit a Pre-mowing

Report of all damage or vandalism to the Government. Any damage found thereafter by the

Government that has not been previously reported by the Contractor shall be assumed to be damage caused by the Contractor's operation and shall be repaired, replaced or deducted from the Contractor’s invoice, as determined by the Government, at no cost to the Government.

The Government requires the Contractor to uniformly mow and trim vegetation between four

(4) and six (6) inches in height for Embankment Mowing. Edging and trimming shall be performed as necessary along concrete walkways, curbs, guardrails, fencing and roads. All debris generated from mowing services displaced onto hard surfaces such as roadways, parking lots, sidewalks, slabs, impact areas, etc. shall be removed. All trash (i.e. paper and plastic products) that are shredded from the mowing process shall be picked up and disposed of.

1.2.1.2 Lake Elevation Fluctuation: Lake Elevations will fluctuate dependent upon precipitation amounts and operations related to flood risk management and water supply missions. During extended periods of heavy rain, mowing may be rescheduled after the embankments have dried out to prevent accidents and damage to embankment turf.

1.2.1.3 Inspections: All mowing operations required in the parks or on the embankments shall be completed and inspected by the Contractor's Quality Control Inspector prior to contacting the Government Quality Assurance Inspector for inspection. The Contractor shall notify the

Government immediately upon completion of services so that the Quality Assurance

Inspector may schedule inspection within one (1) working day of the notification. As a minimum, sufficient equipment to remedy any deficiency found shall remain available for use

Page 13 of until work has been accepted by the Government. The Contractor shall be responsible for re-performance of any and all deficiencies discovered during the quality assurance inspection within twenty four (24) hours of report of said deficiencies at no additional cost to the

Government. If re-inspections by the Quality Assurance Inspector become necessary, a re-inspection/administration cost of one hundred dollars ($100) will be applied by the

Government in accordance with the Quality Assurance Surveillance Plan (QASP) as provided in ATTACHMENT 3.

1.2.1.4 Safety Meetings: The Contractor shall hold a safety meeting with all employees prior to each mowing operation and shall notify the Government of locations and time of each meeting. Any Contractor employee that works in an unsafe manner shall be removed from the job at the request of the Government. A copy of safety meeting reports shall be submitted to the Government prior to performing mowings.

1.2.1.5 Performance Standard: All vegetation within areas designated Embankment mowing shall be uniformly cut between four (4) and six (6) inches above the ground, leaving no damage to the turf, concrete edges, signs, fences, trees, facilities, persons or other property.

Vegetation along concrete walkways, concrete drainage channels, curbs, roads, around trees, sign posts, traffic barricade posts and rocks shall be neatly trimmed or edged without causing damage to such facilities. All hard surfaces such as roadways, parking lots, sidewalks, slabs, impact areas, etc. shall be free of all debris produced during mowing services.

1.2.1.6 Traffic Regulations and Safety: The work to be performed under this contract shall be within the boundaries of land administered by the U.S. Army Corps of Engineers. The

Contractor and contract employees are subject to all Title 36 regulations while completing work under this contract. No special provisions or entitlements shall be granted to the

Contractor or contract employees. The attention of the Contractor and his employees shall be directed to the need for extreme caution and care while driving and operating equipment in these locations. The Contractor and employees shall comply with all state and local traffic laws. The Contractor shall comply with all pertinent provisions of the Corps of Engineers

Manual, EM 385-1-1, Safety and Health Requirement Manual. An observed violation of safety requirements shall be grounds for the Government to stop work. Work shall not continue until the violation is corrected.

1.2.1.7 Accident Reporting: The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer in the manner and time limitations and on the forms prescribed by the Contracting Officer, all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incidental to work performed under this contract. Medical expenses for Contractor personnel are the responsibility of the Contractor.

1.2.1.8 Equipment: The Contractor shall utilize equipment that equals or exceeds the quantity and quality set forth in this contract and as approved by the Government for award of the contract. If the Contractor demonstrates that the requirements of this contract can be met with less equipment or a different kind of equipment after work commences, the amount and/or type of equipment may be modified upon written approval of the Contracting Officer (KO). If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, the Contractor shall immediately obtain additional equipment necessary to fulfill the requirements of this contract at no additional cost to the

Government.

1.2.1.8.1 Additional Requirements: Equipment shall be sufficient to meet requirements and in compliance with Section 18 of Safety Manual. Embankment type mowing for the main dam and dikes requires mowing equipment that must be certified in writing by the manufacturer as safe for operation on a maximum twenty-seven (27) degree angle of incline. Certification shall address the stability of the equipment on these inclines and

Page 14 of slopes and shall be specific in nature as to address the applicability of the design or factory modification for the prevention of equipment roll-over. This certification shall be submitted as part of Contractor’s bid. All equipment must be operated in such a manner as to not cause damage to facilities, persons or property. One (1) 2-½ pound

ABC dry chemical fire extinguisher shall be required on all tractors and mowers capable of being ridden. String trimmers may not utilize steel or other type of cord that will cause damage to trees, shrubs, wooden fence posts, wooden traffic barricade posts, building siding, etc.

1.2.1.8.2 Condition of Equipment: All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with Safety

Manual. A regular schedule of preventive maintenance must be followed on all equipment. All maintenance shall be conducted off Government property. The

Contractor shall ensure leaking and unsafe equipment is repaired immediately and shall be responsible for containment and cleanup of leaks. The Contractor shall remove and dispose of, and restore to original condition all contaminated soils resulting from leaks or spills in accordance with Federal, State, County and Municipal laws, codes and regulations.

1.2.1.9 Safety Inspections: Prior to work commencement, all equipment shall be inspected by the Government to ensure compliance with Section 18 of Safety Manual. The Contractor shall present all equipment to the Government for inspection whenever equipment is brought to the

Lake. The Contractor shall notify the Government at least two (2) days prior to bringing equipment on-site so that the time and place of these inspections may be scheduled. The

Government may inspect equipment at any time it is operated on Government Property. Any equipment found deficient shall be taken out of service immediately until faulty conditions have been corrected and passed by the Government. No such removal will reduce the

Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

1.2.1.10 Vehicles: All vehicles, including the Contractor’s and any Subcontractors’ utilized under this contract shall be presentable, serviceable and shall comply with insurance and safety standards as required by the State of Texas. Vehicles shall be identified with company name or logo conspicuously displayed on door panels. Professionally prepared hand-lettering, magnetic signs or pressure sensitive decals shall be used.

1.2.1.11 Maps: Mowing Maps are provided in ATTACHMENT 5 and indicate the approximate areas where services shall be performed. Due to the large scale of service areas, actual boundaries on-site may not be discernible from the maps and delineation on-site by the

Government will govern.

1.2.1.12 Reports: The Contractor shall prepare and submit Daily Activity Reports and

Quality Control Reports as specified. The Contractor shall develop and provide their own reports. A Daily Activity Report shall be completed each day work is performed and shall be submitted to the Government as directed no later than the following day. A Quality Control

Report shall be submitted to the Government at the end of each work week as directed.

Quality Control inspectors shall ensure all reports are complete, legible and comprehensible.

1.2.1.13 Area Sizes and Tabulation of Facilities: Mowing Maps provided in

ATTACHMENT 5 and the Tabulation table provided in ATTACHMENT 6 depict mowing areas and provide acreage estimates and facility quantities within each park. Lake personnel will show the Contractor the service limits and requirements during an on-site visit of the areas where required mowing services shall be performed. If the number of facilities listed on the tabulation sheets and maps differs from the number of facilities actually on the ground, then the tabulation sheets and maps will be used for contract purposes. This tabulation depicts

Page 15 of current conditions only and does not reflect any future work such as remodeling, re-design upgrades, new construction, demolition or moving facilities within areas which may occur within required service areas during performance of contract. Government reserves the right to perform any future work at its discretion and to modify any and all Schedules within contract for any resulting impact upon the Contractor and Contractor’s required services.

1.2.1.14 Work Sequence: The Government will provide the Contractor with a preferred mowing sequence for parks and/or embankments with each Letter Order.

1.2.1.15 Work Completion: Work under this Contract will be requested by Letter Order. The

Contractor will be allowed a specified number of working days, exclusive of Saturdays, Sundays and Federal holidays to accomplish mowings dependent upon the number of geographic locations to be mowed simultaneously. All work will commence on the date specified in the Letter Order. The starting and completion dates are critical in the performance of this contract. If work cannot be commenced on the starting date the

Contractor shall provide written notification to the Government and submit for Government approval of a revised schedule. Delays in service requiring an extension to the completion date due to inclement weather or conditions beyond the Contractor's control may only be allowed with the approval of the Government.

1.2.1.16 Additional Service Work Requirements:

1.2.1.16.1 Occupied Facilities: If a facility is occupied by the public at the time of the scheduled servicing, Contractor shall ask their permission to service the facility. If the public objects to the performance of the service, Contractor shall immediately record the unit (by park, facility type and number) on the Quality Control Daily Report as a non-serviced unit. If the facility becomes unoccupied while Contractor is still in the park, Contractor may service the unit as required and remove the unit from the Quality

Control Daily Report. If the facility is still occupied, Quality Control Daily Report shall remain as is and shall be turned into the Government for non-payment. The

Daily Activity Report must be kept current during work performance so that a unit which has not been serviced and was later rejected by the Government's Quality Assurance

Inspector can be verified as non-performed because facility was occupied by the public.

A site that is confirmed as being occupied may then be counted as non-performance, rather than as a reject.

1.2.1.16.2 All Quality Control Inspectors and subcontractors, if used, shall possess as a minimum a copy of that portion of the contract which governs the work in which they are engaged. Failure to comply will result in the stopping of work and removal of employees until such time that this requirement can be met.

1.2.1.16.3 Payment: Payment will be made upon completion and acceptance of requested services.

1.2.2 Embankment Fertilization Requirements:

1.2.2.1 General: Fertilization services shall be performed in accordance with the following specifications and the Mowing Maps (ATTACHMENT 4) as directed in the Embankment

Fertilization Schedule in section 1.3 The Contractor will receive at least forty-eight (48) hours advance notice before the work start date.

1.2.2.2 Application Requirements: Application procedures, to include fertilizer formulation, quantity and application method, shall be submitted to the COR in writing for approval prior to application. Distribute fertilizer in such a manner to insure complete and even coverage. If liquid fertilizer is used, a suitable dye which is highly visible after drying will be added to the fertilizer to indicate where application has occurred.

Page 16 of

1.2.2.3 Weather Conditions: Fertilization will be dependent on weather conditions. If embankments are wet due to rain or likelihood of heavy rain, fertilization may be rescheduled after the embankments have dried out to prevent accidents and damage to embankment turf.

Wind speeds and other factors may prevail to such an extent that unsatisfactory results might occur, the COR may at their discretion stop all phases of the work. The work shall resume when, in the opinion of the COR, the desired results are likely to be obtained.

1.2.2.4 Inspections: All fertilization operations required on the embankments shall be completed and inspected by the Contractor's Quality Control Inspector prior to contacting the

Government Quality Assurance Inspector for inspection. The Contractor shall notify the

Government immediately upon completion of services so that the Quality Assurance Inspector may schedule inspection within one (1) working day of the notification. The Contractor shall be responsible for re-performance of any and all deficiencies discovered during the quality assurance inspection within twenty four (24) hours of report of said deficiencies at no additional cost to the Government. If re-inspections by the Quality Assurance Inspector become necessary, a re-inspection/administration cost of one hundred dollars ($100) will be applied by the Government in accordance with the Quality Assurance Surveillance Plan

(QASP) as provided in ATTACHMENT 3.

1.2.2.5 Performance Standard: Fertilizer will be distributed evenly on the embankments.

1.2.2.6 Equipment: The embankment slopes range up to 2:1. Any equipment to be used on these slopes must be certified for use on such slopes and certification submitted to the COR prior to use.

1.2.2.7 Maps: Mowing Maps are provided in ATTACHMENT 4 and indicate the approximate areas where fertilization services shall be performed.

1.2.2.8 Area Sizes: Mowing Maps provided in ATTACHMENT 4 and the Tabulation table provided in 1.4.6 depict mowing areas and provide acreage estimates. Lake personnel will show the Contractor the service limits and requirements during an on-site visit of the areas where required mowing and fertilization services shall be performed. This tabulation depicts current conditions only and does not reflect any future work such as remodeling, re-design upgrades, new construction, demolition or moving facilities within areas which may occur within required service areas during performance of contract. Government reserves the right to perform any future work at its discretion and to modify any and all Schedules within contract for any resulting impact upon the Contractor and Contractor’s required services.

1.2.1.15 Work Completion: The Contractor will be allowed a specified number of working days, exclusive of Saturdays, Sundays and Federal holidays to accomplish mowing dependent upon the number of geographic locations to be mowed simultaneously. All work will commence according to the schedule in 1.3. The starting and completion dates are critical in the performance of this contract. If work cannot be commenced on the starting date the

Contractor shall provide written notification to the Government and submit for Government approval of a revised schedule. Delays in service requiring an extension to the completion date due to inclement weather or conditions beyond the Contractor's control may only be allowed with the approval of the Government.

1.2.2.16 Payment: Payment will be made upon completion and acceptance of requested services.

1.2.3 Site Visit: A site visit shall be performed in order to clarify expectation and answer any questions concerning the requirement of the specified work. A formal site visit will be scheduled as indicated on the

Request for Proposal. The Government Point of Contact (POC) for this action is at Canyon Lake. 601

COE Road, Canyon Lake, TX 78133. 830-964-3341

Page 17 of

1.3 Period of Performance: From 1 October 2018 to 30 September 2019 Base Year with 1 Option Year 1

October 2019 to 30 September 2020. Period of Performance is the three (3) weeks leading up to the date specified. The fertilizer will be applied during the month of May, weather dependent.

Mowing Schedule Fertilization Schedule

December 24 May

March 31

June 30

Unscheduled (To Be Determined)

1.4 General Information

1.4.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s Quality

Control (QC) program is the means by which he or she assures the work complies with the requirements of the contract. The Quality Control Plan (QCP) will be submitted to the Contracting Officer’s Representative

(COR) at the pre-work conference for review. After acceptance of the QCP, the Contractor shall receive the Contracting Officer’s acceptance in writing. The Contractor shall submit to the COR a daily Quality

Control report for each day that services are performed.

1.4.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP) provided in ATTACHMENT 3. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.4.3 Workdays & Work Hours: Embankment mowing services on the main dam from the top drainage terrace to the bottom downstream toe can be performed any day of the week during daylight hours.

Embankment mowing services from the top of the dam (the crest) down to the top drainage terrace shall only be performed on weekdays during daylight hours, excluding Federal holidays.

1.4.4 Federal Holidays and Special Occasions: For information purposes only, observed federal holidays are as follows:

New Year’s Day Labor Day

Martin Luther King Jr. Day Columbus Day

Presidents Day Veterans Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

NOTE: Specific dates for each Federal Holiday can be obtained from the lake office.

1.4.5 Rain Days: Rain days are delays in service requiring an extension to the completion date, due to inclement weather or conditions beyond the Contractor’s control. They may only be allowed with concurrence and approval of the COR. The Contractor is responsible to notify the COR on days when weather or poor ground working conditions prohibit performance of services. The Contractor shall ascertain if the work day is considered a rain day by COR. In no instance may the Contractor operate equipment during conditions that shall result in damage to turf or ground surfaces on Government property.

Page 18 of

1.4.6 Place of Performance: The work to be performed under this contract will be performed at Canyon

Lake (Comal County, Texas).

Area Acres

Main Dam 42.0

Spillway Dike 5.7

Dike Ramp 1 0.3

1.4.7 Type of Contract: Firm Fixed Price

1.4.8 Security Requirements

1.4.8.1 Physical Security: At the close of each work period, any Government areas opened for access shall be secured by the Contractor.

1.4.8.2 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. No keys issued to the Contractor by the Government will be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys to the

COR.

1.4.8.2.1 The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. All

Government keys provided to Contractors will be issued and controlled IAW Army Regulation 190-51.

1.4.8.2.2 All Contractor and all associated subcontractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.4.8.2.3 The Contractor and all associated subcontractors shall brief all employees on the local I-

WATCH, Corps Watch, or See Something, Say Something program. The Contractor and all associated subcontractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. The I-watch/CORPS watch training video and literature can be found at the following web-site;

http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx

1.4.8.2.4 The Contractor must pre‐screen Candidates using the E‐verify Program

(http://www.dhs.gov/E‐Verify ) website to meet the established employment eligibility requirements.

The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx http://www.dhs.gov/E‐Verify

Page 19 of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a

Form I‐9, Employment Eligibility Verification, with the designated Government representative. This

Form will be provided to the Contracting Officer and shall become part of the official contract file.

1.4.9 Special Qualifications: NA

1.4.10 Post Award Conference/QA Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative

(COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the

Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.4.11 Contracting Officer’s Representative (COR): The COR will be identified by separate letter. The

COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;

maintain written and oral communications with the Contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of

Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

1.4.12 Contractor Key Personnel: The following personnel are considered key personnel by the

Government: The Contractor, the Contractor’s superintendent and the Contractor’s quality control (QC) inspector. The Contractor shall designate a contract superintendent who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the superintendent is absent shall be designated in writing to the Contracting Officer (KO) and the

Contracting Officer’s Representative (COR). The contract superintendent or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

1.4.13 Identification of Contractor Employees:

“Identification of Contractor Employees in the Federal Workplace” (Aug 2008):

(a) The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, identification (ID) badge and a standardized uniform that displays the company’s name/logo and the employee’s name. The ID badge shall clearly display the Contractor’s name and the employee’s name and color photograph. It is the Contractor’s responsibility to ensure that all

Contractor personnel wear the ID badge and uniform at all times when performing work under this contract. Unless otherwise specified in the contract, each Contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.

(b) Contractor personnel shall clearly identify themselves to all attendees as a Contractor employee before the commencement of meetings with Government or other Contractor personnel. Contractor personnel shall clearly and immediately identify themselves as a Contractor employee when placing, answering or participating in telephone and teleconference conversations with Government or other

Contractor personnel.

Page 20 of

(c) When Contractor personnel send e-mail messages to a Government-owned computer, they shall include a signature block that includes their employer’s name and the employee’s full name, title and e-mail address.

(d) Each of the requirements set forth in paragraphs a-c above, must be included in all subcontracts at any tier.

1.4.14 Performance Evaluation Meetings: The Contractor, the Contractor’s superintendent and the

Contractor’s quality control (QC) inspector shall meet with the COR once monthly in order to discuss performance. At any point a Contract Deficiency Report (CDR) is issued in writing by the Government to the Contractor a meeting shall be held no later than two (2) Government working days after the Contractor receives the written CDR. Mutual effort shall be made to resolve any and all problems as soon as possible.

Written minutes of these meetings shall be prepared and signed by the COR, the Contractor and their respective employees.

1.4.15 Contractor Travel: NA

1.4.16 Data Rights: NA

1.4.17 Organizational Conflict of Interest: NA

1.5. GOVERNMENT FURNISHED ITEMS AND SERVICES:

1.5.1 Facilities: NA

1.5.2 Equipment: NA

1.5.3 Materials: NA

1.6 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

1.6.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this PWS.

1.6.2 Equipment: The Contractor shall furnish all equipment necessary to accomplish the requirements under this PWS.

1.6.3. Materials: The Contractor shall provide all materials necessary to accomplish the requirements under this PWS, except as noted in Materials, Para. 1.5.3. All supplies and materials provided by the Contractor shall be of high quality, per industry standards, and environmentally friendly. A proposed list of supplies and materials shall be submitted to the Government for Government’s approval ten (10) calendar days prior to the commencement of work on this contract. Contractor shall also provide as part of their Safety Plan, Material Safety Data Sheets for all materials of a chemical nature used in Contractor’s operation.

1.6.4 All supplies provided by the Contractor must meet the recycled content requirements set forth by

EPA at https://www3.epa.gov/epawaste/conserve/tools/cpg/resources.htm#resources. .

The contractor must meet the Bio Preferred Program requirements set forth by USDA. The following link to USDA designated product categories:

https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

1.6.5 NA

1.7 Contractor Management Reporting (CMR): NA

1.8 Applicable Publications (current editions):

https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

Page 21 of

1.8.1 The Contractor shall abide by all applicable local, state, and federal regulations, publications, manuals, policies and procedures to include the Safety and Health Requirements Manual (EM385-1-1).

1.8.2 Submittals: Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are provided for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

1.8.2.1 Safety Plan “G”: The Contractor shall provide a Safety Plan in accordance with requirements of

EM-385-1-1 Appendix “A”. When developing the Safety Plan, the Contractor shall follow Appendix “A” and reference each item in the plan back to Appendix “A”. Safety Plans that are not outlined as shown in the EM-385-1-1 Appendix “A” will be rejected.

1.8.2.2 Activity Hazard Analysis ‘G’: The Contractor shall provide an activity hazard analysis (AHA) for each feature of work involved in this contract. AHAs shall be in accordance with EM385-1-1 paragraph

01.A.13 and utilizing the AHA form or similar shown at the end of this SOW.

1.8.2.3 Work Plan ‘G’: The Contractor shall provide a work plan that describes his planned approach to accomplishing the work described herein. The Contractor shall include safety requirements incidental to the work.

1.9 Attachments:

1.9.1 Attachment 1: Performance Requirements Summary

1.9.2 Attachment 2: Deliverables Schedule

1.9.3 Attachment 3: Quality Assurance Surveillance Plan (QASP)

1.9.4 Attachment 4: Maps for Embankment Mowing and Fertilization

Page 22 of

ATTACHMENT 1

Performance Requirements Summary

The Contractor’s service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. The Government expects the Contractor to perform at a minimum, the identified acceptable levels throughout the life of the contract, and the Contractor’s performance shall be given significant consideration when exercising contract option years and evaluating recommendations for future Government contracts and/or awards.

Performance Objective: Describes the work that is to take place.

Standard: Describes the desired results that are to be achieved.

Performance Threshold: The Contractor shall be rated acceptable or unacceptable based upon the scores of all inspections for a month. Deficiencies will be noted for each month for each Performance Objective item. This number is identified as the Performance Threshold.

Acceptable Performance: Acceptable Performance is achieved if inspections scores are at or above 95%.

Unacceptable Performance: Government’s inspection scores fall below 95% or work specified by contract is incomplete.

Method of Surveillance: The Government will monitor the Contractor’s service performance using the 100% sampling method as detailed in Quality Assurance Surveillance Plans (QASP) provided in ATTACHMENT 3. The

Government has the right to change or modify inspection methods at its discretion anytime throughout the life of the contract.

Performance Objectives Standards Performance

Threshold

Methods of

Surveillance

PRS #1

EMBANKMENT MOWING

Uniformly mow and trim vegetation between four (4) and six (6) inches in height.

Vegetation along concrete walkways, curbs and roads shall be neatly trimmed or edged. All debris generated from mowing services displaced onto hard structures such as roadways, parking lots, sidewalks, slabs, etc.

shall be removed. (PWS

Paragraph 1.2.1.1)

All vegetation within areas designated as

Embankment mowing shall be uniformly cut between four (4) and six

(6) inches above the ground, leaving no damage to the turf, concrete edges, signs, fences, trees, facilities, persons or property.

Vegetation along walkways, curbs and roads shall be trimmed or edged. All hard surfaces such as roadways, etc.

shall be free of all debris produced during mowing services.

Scores 95% on all inspections.

100% Inspection by the

Government.

PRS #2

EMBANKMENT MOWING

The contactor provided fertilization of grassed slopes of Canyon Lake

100%. 100% Inspection by the

Page 23 of

Performance Objectives Standards Performance

Threshold

Methods of

Surveillance

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform fertilization services as defined in this

Performance Work Statement

(PWS).

dam and dike, in accordance with PWS, Paragraphs 1.2 and 1.2.2

Page 24 of

ATTACHMENT 2

Deliverables Schedule

Deliverable Frequency # of Copies Medium/Format Submit To

Item A –

Pre-work Conference /

Periodic Progress /

Contractor Deficiency

Report Meetings:

Contractor shall attend a pre-work conference with the Government.

Contractor shall attend any periodic progress meetings and meetings discussing

Contractor Deficiency

Reports (CDR) initiated by the Government. (PWS

Paragraph:1.4.1, 1.4.10, 1.4.14)

Pre-work

Conference: One

(1) meeting held within seven (7) calendar days of contract award.

Periodic

Meetings: As determined by

CDR Meetings:

One (1) meeting per CDR issued, scheduled within two (2)

Government working days after CDR issued.

Hard copy/email/fax COR

601 COE Rd

Canyon Lake, TX

78133

Item B –

Safety Plan: Contractor shall develop detailed

Safety Plan for review and approval by the COR.

Safety Plan shall indicate in detail the general policies, procedures and

Personal Protective

Equipment required for full compliance with the safety requirements set forth in latest edition of Safety

Manual and OSHA. Plan shall include procedures to be followed in case of emergencies, including nearest emergency medical treatment facility information. All Activity

Hazard Analyses and

Material Safety Data

Sheets (MSDS) shall be included. Future proposed changes to approved plan shall be submitted to KO for review and approval.

(PWS Paragraph 1.8.2.1)

Provided 10 days prior to commencement of work.

601 COE Rd

Item C –

Quality Control Plan:

Contractor shall submit a

Provided 10 days prior to

1 Hard copy/email/fax COR

601 COE Rd

Page 25 of detailed Quality Control

Plan for review and approval by the COR. Plan shall describe detailed methods the Contractor shall utilize to ensure all work complies with the

Performance Work

Statement and the

Performance Requirements

Summary. (PWS

Paragraph 1.4.1)

Proposed

Changes to

Approved Quality

Control Plan:

Shall be submitted to KO for review and approval prior to use.

Item D –

Daily Activity Report and

Quality Control Report:

Contractor shall develop

Daily Activity Report and

Quality Control Report containing minimum required information. Daily

Activity Report shall be completed each day work is performed and shall be submitted to the

Government as directed no later than the following day. A Quality Control

Report shall be submitted to the Government at the end of each work week as directed. Submitted reports shall be complete, legible and comprehensible.

(PWS Paragraph 1.2.1.14)

Provided 10 days prior to

Approved Daily

Activity Report and Quality

Control Report:

Shall be submitted to KO for review and approval prior to use.

Daily Activity

Report:

Completed each day work is performed and shall be submitted no later than the following day.

Quality Control

Report: Shall be submitted to the

Government at the end of each work week as directed.

Proposal and

Proposed

Changes to

Approved Daily

Activity Report and Quality

Control Report:

One.

Report and

Quality Control

Report: One.

Hard copy or email.

Daily Activity

Report and Quality

Control Report: E-mail, Fax or hand delivery to the

Government

Proposal and

Proposed Changes to Approved Daily

Activity Report and

Quality Control

Report:

Canyon Lake Office, 601 COE Rd., Canyon Lake, Texas

Report and Quality

Control Report:

Headquarters where work performed.

Item E –

Employees /

Subcontractors: The

Contractor shall submit names, addresses and phone numbers of all employees and subcontractors who will be performing each service for

Submit to COR within three (3) calendar days after award.

1 Hard copy/email/fax COR

601 COE Rd

Page 26 of each lake. (PWS

Paragraph 1.4.13 (c)

Item K –

Form I-9 Employment

Eligibility Verification

Form: Complete and submit I-9 form for each employee.(PWS Paragraph

1.4.8.2.4)

Provided to COR ten (10) calendar days prior to work commencement.

601 COE Rd

Canyon Lake, TX

78133

Item L –

Proof of Required

Insurance

Provided to COR ten (10) calendar

601 COE Rd

Canyon Lake, TX

78133

Item M –

Fertilizer Provide COR with copies of invoices showing formulation and quantity of fertilizer purchased.

Provided to COR ten (10) calendar

601 COE Rd

Page 27 of

EMABANKMENT MAPS

Embankment

Mowing

And

Fertilization

Maps

The U. S. Army Corps of Engineers has provided these spatia l data as a representation of the various geographic in formation gathered from multiple sources. These data should be viewed only as a representation of the provided in formation and should not be used for any other purpose. No guarantee is m ade by the U. S.