B3_Amend-0004_W9126G18B0026.pdf

PDF 211 KB Posted

Attached to
USACE GIWW, Texas Placement Area Nos. 86/87 Improvements, Brazoria County, Texas
Solicitation number
W9126G18B0026
Issued by

About this file

Amendment 0004 - BID OPENING DATE REMAINS ON 15 AUGUST 2018 @ 2:00 P.M. LOCAL TIME.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W45VAK81364593

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is show n on the follow ing pages: See page 2

THE BID OPENING DATE REMAINS ON 15 AUGUST 2018 @ 2:00 P.M. LOCAL TIME

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G18B0026

X 9B. DATED (SEE ITEM 11)

09-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2018

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G18B0026

A0004-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. THE SPECIFICATIONS FOR SOLICITATION NO. W9126G18B0026, GULF

INTRACOASTAL WATERWAY, TEXAS, PLACEMENT AREA 86/87 IN BRAZORIA COUNTY,

TEXAS, CONTAINMENT DIKE RAISE, ARE HEREBY AMENDED AS FOLLOWS:

a) Specifications.

(1) SECTION 01 50 00.00 45, TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS– The enclosed SECTION 01 50 00.00 45 entitled TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS supersedes that issued with this Solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

1Encl:

SECTION 01 50 00.00 45, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

SWG FILE NO.: IWW 1150-1134 SOLICITATION NO.:W9126G18B0026

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 50 00.00 45

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 (AM#4)WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS

1.4 CONSTRUCTION SITE PLAN

1.5 WORKING HOURS

1.6 ACCESS

1.7 HURRICANE CONDITION OF READINESS

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

2.1.2 Construction Project and Safety Signs

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

2.2.1.1 Haul Roads Within the Project Right-of-Way

2.2.2 Barricades

2.2.3 Fencing

2.3 TEMPORARY WIRING

PART 3 EXECUTION

3.1 AVAILABILITY AND USE OF UTILITY SERVICES

3.1.1 Sanitation

3.2 CONTRACTOR'S TEMPORARY FACILITIES

3.2.1 Safety

3.2.2 Administrative Field Offices

3.2.3 Storage Area

3.2.4 Supplemental Storage Area

3.2.5 Security Provisions

3.3 GOVERNMENT FIELD OFFICE

3.3.1 Resident Engineer's Office

3.3.1.1 Internet Service

3.3.2 Trailer-Type Mobile Office

3.4 PLANT COMMUNICATION

3.5 CLEANUP

3.6 RESTORATION OF STORAGE AREA

-- End of Section Table of Contents --

SECTION 01 50 00.00 45 Page 1

(TO ACCOMPANY AMENDMENT NO. 0004 TO SOLICITATION NO. W9126G18B0026)

SECTION 01 50 00.00 45

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

AMENDMENT NO. 0004

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction,Alteration, and Demolition Operations

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14) National Electrical Code

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Site Plan ; G, DO

Submit no later than 10 days after award.

1.3 (AM#4)WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS

Coordinate construction operations through the Contracting Officer, with other Government Contractors who may be working in the vicinity.

Construction work at adjoining PA 88 may be ongoing by the time of the Notice to Proceed of this Contract. The construction work for both PA 86/87 and PA 88 Contracts are expected to be concurrent.

SECTION 01 50 00.00 45 Page 2

1.4 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a Construction Site Plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage areas (on-site and off-site)), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

Unless otherwise directed, limit the staging and stockpile areas to the project right-of-way and interior of the placement area. The Contractor is to be responsible for permits or easements necessary for staging or stockpile areas outside the project right-of-way.

1.5 WORKING HOURS

Limit working hours from sunrise to sunset 7 days a week. No work is to be accomplished on Federal holidays or Sundays without written approval.

1.6 ACCESS

The Placement Area 86/87 site is located on the Gulf side of the GIWW canal near Freeport, Texas. Paved road access ends prior to site. Site is located in a harsh marine environment.

1.7 HURRICANE CONDITION OF READINESS

Unless directed otherwise, comply with:

a. Condition FOUR (Sustained winds of 50 knots or greater expected within 72 hours): Normal daily jobsite cleanup and good housekeeping practices. Collect and store in piles or containers scrap lumber, waste material, and rubbish for removal and disposal at the close of each work day. Maintain the construction site including storage areas, free of accumulation of debris. Stack form lumber in neat piles less than 4 feet high. Remove all debris, trash, or objects that could become missile hazards. Contact Contracting Officer for weather and Condition of Readiness (COR) updates and completion of required actions.

b. Condition THREE (Sustained winds of 50 knots or greater expected within 48 hours): Maintain "Condition FOUR" requirements and commence securing operations necessary for "Condition ONE" which cannot be completed within 18 hours. Cease all routine activities which might interfere with securing operations. Commence securing and stow all gear and portable equipment. Make preparations for securing buildings. Review requirements pertaining to "Condition TWO" and continue action as necessary to attain "Condition THREE" readiness.

Contact Contracting Officer for weather and COR updates and completion of required actions.

c. Condition TWO (Sustained winds of 50 knots or greater expected within 24 hours): Curtail or cease routine activities until securing operation is complete. Reinforce or remove form work and scaffolding. Secure machinery, tools, equipment, materials, or remove from the jobsite. Expend every effort to clear all missile hazards

SECTION 01 50 00.00 45 Page 3 and loose equipment from general base areas. Contact Contracting Officer for weather and COR updates and completion of required actions.

d. Condition ONE. (Sustained winds of 50 knots or greater expected within 12 hours): Secure the jobsite, and leave Government premises.

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning work, provide in accordance with USACE EM 385-1-1 , a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size and having not less than two hinged or sliding glazed doors with provisions for locking for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the Contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to employees, as approved by the Contracting Officer.

The posters specified above, can be obtained from the U.S. Department of Labor .

2.1.2 Construction Project and Safety Signs

The requirements for the signs, their content, and locations are as specified in SECTION 01 58 13.01 45 PROJECT IDENTIFICATION. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

Construct access and haul roads necessary for proper prosecution of the work under this Contract. Construct with suitable grades and widths;

sharp curves, blind corners, and dangerous cross traffic are be avoided.

Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times.

Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

2.2.1.1 Haul Roads Within the Project Right-of-Way

Access to the work area within the right-of-way will be discussed at the Preconstruction Meeting. Coordinate with the Contracting Officer access for each project site. The use of construction equipment on dike roads is to be limited to no more than 3/4-ton vehicles or less unless otherwise approved. The Contractor is to be responsible for repairs needed to dike roads damaged during the construction process.

SECTION 01 50 00.00 45 Page 4

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.2.3 Fencing

Provide fencing along the construction site at all open excavations and tunnels to control access by unauthorized people. The safety fencing must be a high visibility colored, high density polyethylene grid or approved equal, a minimum of 48 inches high and maximum mesh size of 2 inches, supported and tightly secured to steel posts. Fencing is to be able to restrain a force of at least 250 pounds against it.

2.3 TEMPORARY WIRING

Provide temporary wiring in accordance with NFPA 241 and NFPA 70 , Article 305-6(b), Assured Equipment Grounding Conductor Program. Include frequent inspection of all equipment and apparatus.

PART 3 EXECUTION

3.1 AVAILABILITY AND USE OF UTILITY SERVICES

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

Utilities will not be furnished by the Government.

3.1.1 Sanitation

Provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system. Any penalties or fines associated with improper discharge will be the responsibility of the Contractor.

Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system.

Maintain these conveniences at all times without nuisance. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.

3.2 CONTRACTOR'S TEMPORARY FACILITIES

3.2.1 Safety

Protect the integrity of any installed safety systems or personnel safety devices. If entrance into systems serving safety devices is required, the Contractor must obtain prior approval from the Contracting Officer. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of

SECTION 01 50 00.00 45 Page 5 protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

3.2.2 Administrative Field Offices

Provide and maintain administrative field office facilities within the construction area at the designated site at a location approved by the Contracting Officer. Government office and warehouse facilities will not be available to the Contractor's personnel.

3.2.3 Storage Area

Provide a temporary storage area for equipment and materials when not being used in the construction at a location approved by the Contracting Officer.

3.2.4 Supplemental Storage Area

Upon Contractor's request, the Contracting Officer will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity to the construction site but will be within the facility boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor is responsible for cleanliness and orderliness of the area used and for the security of material or equipment stored in this area.

Utilities will not be provided to this area by the Government.

3.2.5 Security Provisions

Provide adequate outside security lighting at the Contractor's temporary facilities. The Contractor will be responsible for the security of its own equipment; in addition, the Contractor will notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.

3.3 GOVERNMENT FIELD OFFICE

3.3.1 Resident Engineer's Office

Provide the Government Resident Engineer with an office, approximately 200 square feet in floor area, located where directed and providing air conditioning, space heat, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 4 by 8 foot plan table, computer work space a standard size office desk and chair, and telephone. Provide weekly janitorial service. Parking access so to be provided for Government vehicles. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities will be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.

3.3.1.1 Internet Service

Provide reliable Internet service for the Resident Office. The Contractor is to utilize a Government network approved installer for wiring the Government office. The Government will be responsible for equipment and hardware.

SECTION 01 50 00.00 45 Page 6

3.3.2 Trailer-Type Mobile Office

The Contractor may, at its discretion furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and providing as a minimum the facilities specified above. Securely anchor the trailer to the ground at all four corners to guard against movement during high winds.

3.4 PLANT COMMUNICATION

Whenever the Contractor has the individual elements of its plant so located that operation by normal voice between these elements is not satisfactory, the Contractor must install a satisfactory means of communication, such as telephone or other suitable devices and made available for use by Government personnel.

3.5 CLEANUP

Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store any salvageable materials resulting from demolition activities within the fenced area described above or at the supplemental storage area. Neatly stack stored materials not in trailers, whether new or salvaged.

3.6 RESTORATION OF STORAGE AREA

Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site.

After removal of trailers, materials, and equipment from within the fenced area, remove the fence that will become the property of the Contractor.

Restore to the original or better condition, areas used by the Contractor for the storage of equipment or material, or other use. Gravel used to traverse grassed areas must be removed and the area restored to its original condition, including top soil and seeding as necessary.

-- End of Section --

SECTION 01 50 00.00 45 Page 7

SF30-AMEND-0004_W9126G18B0026
Amend 0004 page-2
01 50 00.00 45
01 50 00.00 45 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 00.00 45 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 AM#4WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS
1.4 CONSTRUCTION SITE PLAN
1.5 WORKING HOURS
1.6 ACCESS
1.7 HURRICANE CONDITION OF READINESS
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.1.2 Construction Project and Safety Signs
2.2 TEMPORARY TRAFFIC CONTROL
2.2.1 Haul Roads
2.2.1.1 Haul Roads Within the Project Right-of-Way
2.2.2 Barricades
2.2.3 Fencing

2.3 TEMPORARY WIRING

PART 3 EXECUTION
3.1 AVAILABILITY AND USE OF UTILITY SERVICES
3.1.1 Sanitation
3.2 CONTRACTOR'S TEMPORARY FACILITIES
3.2.1 Safety
3.2.2 Administrative Field Offices
3.2.3 Storage Area
3.2.4 Supplemental Storage Area
3.2.5 Security Provisions
3.3 GOVERNMENT FIELD OFFICE
3.3.1 Resident Engineer's Office
3.3.1.1 Internet Service

3.3.2 Trailer-Type Mobile Office

3.4 PLANT COMMUNICATION
3.5 CLEANUP
3.6 RESTORATION OF STORAGE AREA