Amendment 0003 - BID OPENING DATE REMAINS ON 29 MAY 2018 @2:00 P.M. LOCAL TIME.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK72367964
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is show n on the pages follow ing. See pages follow ing:
BID OPENING DATE REMAINS ON 29 MAY 2018 @ 2:00 P.M. LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G18B0003
X 9B. DATED (SEE ITEM 11)
23-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2018
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
2000 FORT POINT ROAD
GALVESTON TX 77550-1229
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M3ODXMAN
Text Box
W9126G18B0003
A0003-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The specifications for Solicitation No. W9126G18B0003, Texas City, Texas, Hurricane Flood Protection Project, in Galveston County, Texas, Erosion Repair, are hereby amended as follows:
a) Specifications.
(1) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed SECTION 01 22 00.10, entitled MEASUREMENT AND PAYMENT, supersedes that issued with this Solicitation.
(2) SECTION 35 41 00, LEVEE CONSTRUCTION – The enclosed SECTION 35 41 00, entitled LEVEE CONSTRUCTION, supersedes that issued with this Solicitation.
b) Drawings
(1) None.
2. This amendment shall be attached to and become a part of the solicitation.
2 Encls:
1. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT
2. SECTION 35 41 00, LEVEE CONSTRUCTION
SWG FILE NO.:GALV 308-384 SOLICITATION NO.:W9126G18B0003
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Sodding
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Reused Riprap
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Levee - Select Fill
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measurement
1.3.2 Blanket Stone and Riprap
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.2.1 Stone Transported by Rail or Truck
1.3.2.2.2 Remeasurement
1.3.2.3 Unit of Measure
1.3.3 Geotextile - Filter Fabric
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 Semi-compact Fill
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measurement
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
(TO ACCOMPANY AMENDMENT NO. 0003 TO SOLICITATION NO. W9126G18B0003)
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G
Submit drawings of surveys during progress of work by soundings or sweepings.
SD-03 Product Data
Weight Scale Certification
Certified Weight Scale Tickets
Submit certified weight certificates for riprap and blanket stone.
1.2 LUMP SUM PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, we\ill be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
Payment will be made for costs associated with "Mobilization and Demobilization", as defined in the SECTION 00 72 00 CONTRACT CLAUSES.
Payment for costs in connection with the plant necessary to perform the work, to include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation, after completion of the work for removal of the plant and
SECTION 01 22 00.10 Page 2 equipment from the work site, and submission of the final record drawings. Ten percent of the payment item amount will be made after Government approval of the final record drawings.
1.2.1.2 Unit of Measure
Unit of measure: Job.
1.2.2 Sodding
1.2.2.1 Payment
Payment for "Sodding" will be made for costs associated with sod establishment, which will include all equipment, labor, and material required for its completion.
1.2.2.2 Unit of Measure
Unit of measure: Job.
1.2.3 Reused Riprap
1.2.3.1 Payment
Payment for "Reused Riprap" will be made for costs associated with the removal of debris, removal of existing riprap, storage of existing riprap,testing of recycled rip rap, and placement of recycled riprap, which will include all equipment, labor, and materials to perform the work specified herein.
1.2.3.2 Unit of Measure
Unit of measure: Job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.
1.3.1 Levee - Select Fill
1.3.1.1 Payment
Payment for "Levee - Select Fill" will be made for costs associated with placement of off-site borrow material and will include materials, clearing, grubbing, stripping, excavation, hauling, placing and compaction of select fill, and any other work in connection therewith. No separate payment will be made for stockpiling.
1.3.1.2 Measurement
The total quantity of "Levee - Select Fill" material for which payment is to be made will be the neat-line volumes of in-place quantity between the
SECTION 01 22 00.10 Page 3 pre-construction or excavated ground surface and the grade and slope of the final repaired levee cross sections constructed in accordance with the plans and specifications and as determined by Surveys . Cross sections used for quantity calculation will be taken no farther apart than every 100 feet and at changes in levee section. The theoretical quantity will be calculated by the average end-area method. No allowance will be made for material outside the required slope lines unless authorized.
1.3.1.3 Unit of Measurement
Unit of measure: cubic yard.
1.3.2 Blanket Stone and Riprap
1.3.2.1 Payment
Payment for providing and placing blanket stone and riprap will be made at the Contract unit prices for "Blanket Stone" and "Riprap" respectively, for each net short ton of acceptable stone placement. The price of stone placement will include the costs of material, equipment, and labor necessary to complete the required work.
No separate payment will be made for any excavation and disposal of materials that may be incidental to placing the stone.
1.3.2.2 Measurement
The following measurement subparagraph only pertains to the means of measuring the stone by weight for payment purposes. It should not be construed as representing or implying any measurements that could be associated with related activities and logistics, such as getting the stone tested for compliance with the specifications, procuring the stone, getting it delivered to the construction site, and gaining access to the work area. Other methods of measurement may be used when approved.
1.3.2.2.1 Stone Transported by Rail or Truck
Measure the stone in short tons (2,000 pounds). Certified railroad or truck weights will be accepted for determination of the weight of stone placed in the finished section. The weight of rejected stone will be estimated by the Contracting Officer and deducted from the carload or truckload weight. The Contractor may have the rejected stone weighed if so desired, in which case the actual weight will be deducted from the carload or truckload weight. Have the stone weighed on standard railroad track scales by a certified Weighmaster. A copy of the Weight Scale Certification from the regulation agency attesting to the scale's accuracy shall be submitted for the weigh scale tickets. The Contractor shall have the scales tested in the presence of a Government Inspector at any time the Contracting Officer may require.
The original printed certified weight scale tickets or a certified copy prepared in ink or indelible pencil shall be furnished to the Contracting Officer promptly after a car or truck is weighed and before the stone is placed in the areas to be protected. The report of weight for each carload or truckload shall show the gross, tare, and net weights, and erasures or changes on a report shall be explained by a memorandum made on, or attached to, the report and be signed by the Weighmaster. If deemed advisable, the Government will employ an Inspector at the scales, in which event necessary facilities shall be furnished the inspector for
SECTION 01 22 00.10 Page 4 observing the weighing and for recording the scale weights and stenciled light weights on the cars or trucks. Expense of weighing stone and testing scales shall be borne by the Contractor. Other methods of measurement may be used when approved.
Net Weight of Delivered Stone. The weight of sideboards, stakes, and skips, if any, will be determined by actual weighing or by estimates, mutually agreed upon by the Contracting Officer and the Contractor, and the weights so determined, together with the tare weight of the car or truck, shall be deducted from the gross weight to determine the net weight of stone delivered.
1.3.2.2.2 Remeasurement
Where a loss of material due to stockpiling, rehandling, or hauling is possible, the Contracting Officer will have the discretion to require remeasurement prior to placement.
1.3.2.3 Unit of Measure
Unit of measure: Ton
1.3.3 Geotextile - Filter Fabric
1.3.3.1 Payment
Payment will be made at the Contract unit price per square yard for "Geotextile - Filter Fabric" which will constitute full compensation for providing plant, labor, material, equipment and performing the operations necessary for the complete and satisfactory installation of the filter fabric. Payment for the following items is included in the Contract unit price per square yard for Geotextile - Filter Fabric and will not be counted a second time in the process of determining the extent of geotextile placed:
(1) Material and associated equipment and operation used in laps, seams, or extra length.
(2) Associated material, equipment, and operations.
No payment will be made for geotextiles filter fabric replaced because of contamination or damage due to the Contractor's fault or negligence.
Geotextile or plastic wrapping damaged as a result of delivery, storage or handling shall be repaired or replaced, as directed, at no additional cost to the Government.
1.3.3.2 Measurement
The installed geotextile filter fabric shall be measured to the nearest square yard of the as-built surface area covered by geotextile. No allowance will be made for overlaps, waste, damaged materials, repairs or materials used for convenience of the Contractor.
1.3.3.3 Unit of Measure
Unit of measure: Square Yard
SECTION 01 22 00.10 Page 5
1.3.4 Semi-compact Fill
1.3.4.1 Payment
Payment for "Semi-compact Fill" will be made for costs associated with placement of off-site (AM#3)and on-site borrow material and will include materials, clearing, grubbing, stripping, excavation, hauling, placing and compaction of semi-compact fill, and any other work in connection therewith. No separate payment will be made for stockpiling.
1.3.4.2 Measurement
The total quantity of semi-compact fill material for which payment will be made will be the neat-line volumes of in-place quantity between the pre-construction or excavated ground surface and the grade and slope of the final repaired construction in accordance with the plans and specifications and as determined by Surveys . Cross sections used for quantity calculation will be taken no farther apart than every 100 feet and at changes in sections. The theoretical quantity will be calculated by the average end-area method. No allowance will be made for material outside the required slope lines unless authorized.
1.3.4.3 Unit of Measurement
Unit of measure: cubic yard.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.10 Page 6
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 41 00
LEVEE CONSTRUCTION
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
1.3.2 Unsatisfactory Materials
1.3.3 Embankment
1.3.4 Excavation
1.3.5 Classification of Soils
1.3.6 Degree of Compaction
1.3.6.1 Cohesive Material
1.4 SYSTEM DESCRIPTION
1.4.1 Embankment and Backfill Materials
1.4.2 Haul Roads
1.4.3 Stockpiling
1.4.4 Slides and Foundation Failures
1.4.5 Drainage Requirements
1.5 SUBMITTALS
1.6 REGULATORY REQUIREMENTS
1.7 PERMITS
1.8 PROJECT SITE CONDITIONS
1.8.1 Protection of Cultural and Natural Resources
1.8.2 Protection of Man-Made Facilities and Natural Features
1.8.3 Subsurface Data
PART 2 PRODUCTS
2.1 TYPES OF FILL MATERIALS
2.1.1 Select Fill
2.1.2 Topsoil
2.1.3 Semicompacted Fill
PART 3 EXECUTION
3.1 CONSTRUCTION
3.1.1 Lines and Grades
3.1.2 Conduct of the Work
3.2 DEWATERING AND DIVERSION
3.3 EXCAVATION
3.3.1 Over Excavation
3.3.1.1 Outside Limits of Levee Foundations or Structures
3.3.1.2 Within Limits of Levee Foundations or Structures
3.3.2 Slopes and Surcharges
3.3.3 Borrow Areas
3.3.3.1 Contractor-Furnished
SECTION 35 41 00 Page 1
3.3.4 Existing Levees and Spoil Banks
3.3.5 Riprap and Bedding
3.4 TOLERANCES
3.5 SLIDES
3.6 STOCKPILES
3.7 SURFACE DRAINAGE OF COMPLETED AREAS
3.8 DISPOSITION OF EXCAVATED MATERIALS
3.8.1 Satisfactory Materials
3.8.2 Unsatisfactory Materials
3.9 PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS
3.9.1 Earth
3.10 TEST FILL STRIPS
3.10.1 General
3.10.2 Testing and Reporting Requirements for Test Strips
3.11 PLACEMENT AND SPREADING
3.11.1 General
3.11.1.1 Gradation and Distribution
3.11.1.2 Foundations and Partial Embankment Fills
3.11.1.3 Equipment Traffic
3.11.2 Select Fill
3.11.3 Semicompacted Fill
3.12 MOISTURE CONTROL
3.12.1 General
3.12.1.1 Insufficient Moisture for Suitable Bond
3.12.1.2 Excessive Moisture for Suitable Bond
3.12.1.3 Drying Wet Material
3.12.1.4 Increasing Moisture in Dry Material
3.12.2 Select Fill
3.12.3 Semicompacted Fill
3.13 COMPACTION
3.13.1 Compaction Equipment
3.13.1.1 Tamping Rollers
3.13.1.1.1 Towed
3.13.1.1.2 Self-Propelled
3.13.1.2 Rubber-tired Rollers
3.13.1.3 Hand Operated Compactors
3.13.1.3.1 Power Tampers
3.13.1.3.2 Vibratory Plate Compactor
3.13.1.4 Crawler-type Tractors
3.13.1.5 Sprinkling Equipment
3.13.1.6 Miscellaneous Equipment
3.13.2 Compaction of Select Fill
3.13.3 Compaction of Semicompacted Fill
3.13.4 Compaction Adjacent to Structures and Utilities
3.13.5 Topsoil
3.14 FIELD QUALITY CONTROL
3.14.1 Excavation
3.14.2 Embankment
3.14.2.1 General
3.14.2.1.1 Earthwork Equipment
3.14.2.1.2 Foundation Preparation
3.14.2.2 Materials Testing
3.14.2.2.1 Soil Classification Tests
3.14.2.2.2 Cohesive Material Testing
3.14.2.2.2.1 Moisture Density Relationships
3.14.2.2.2.2 Water (Moisture) Content Tests
3.14.2.2.2.3 In-place Density Testing for Cohesive Materials
3.14.2.2.3 Additional Testing
3.14.2.3 Materials
SECTION 35 41 00 Page 2
3.14.2.4 Fill Placement
3.14.2.5 Grade and Cross Section
3.14.2.6 Testing by the Government
3.14.2.7 Reporting
-- End of Section Table of Contents --
SECTION 35 41 00 Page 3
35 41 00
LEVEE CONSTRUCTION
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
Measurement and payment for for all fill materials and any associated specified construction activities and laboratory testing requirements will be paid for in accordance with provisions of the SECTION 01 22 00.10
MEASUREMENT AND PAYMENT.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D2216 (2010) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D4318 (2017) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D4643 (2017) Standard Test Method for Determination of Water Content of Soil and Rock by Microwave Oven Heating
ASTM D6913/D6913M (2017) Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis
ASTM D6938 (2017) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
ASTM D7928 (2017) Standard Test Method for
SECTION 35 41 00 Page 4
Particle-Size Distribution (Gradation) of Fine-Grained Soils Using the Sedimentation (Hydrometer) Analysis
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
Satisfactory materials consists of materials classified in accordance with ASTM D2487 as CL, CH, CL-ML, ML, SC, SP, SW, free from: roots and other organic matter; contamination from hazardous, toxic or radiological substances; trash, debris; and frozen materials. Not all satisfactory materials can be used in levee. Only the satisfactory materials stated above, meeting the additional or modified requirements of paragraph TYPES OF FILL MATERIALS, can be used for levee construction.
1.3.2 Unsatisfactory Materials
Unsatisfactory materials shall not be used in any levee or other required fill. Unsatisfactory materials includes all other materials that are not defined above as satisfactory materials.
1.3.3 Embankment
The terms "levee" or "embankment" as used in these specifications are defined as the earth fill portions of the levee structure or other fills related to the levee structure, which includes all types of earth fill and filter materials for the levee and all other fills within the limits of the levee
1.3.4 Excavation
Excavation consists of removal of material to the lines and grades shown on the drawings, or as otherwise directed or approved by the Contracting Officer and as described in subpart 3.3 EXCAVATION in PART 3 EXECUTION.
1.3.5 Classification of Soils
Materials used to construct the embankments and for backfills shall be classified in accordance with ASTM D2487 (Unified Soil Classification System). Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic.
1.3.6 Degree of Compaction
1.3.6.1 Cohesive Material
Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D698, abbreviated hereinafter as percent laboratory maximum density.
SECTION 35 41 00 Page 5
1.4 SYSTEM DESCRIPTION
The work covered by this section consists of furnishing all equipment, labor, materials, and incidentals, and performing all operations necessary for excavation of borrow areas and existing levees, and for all other excavations incidental to the construction of levees as specified and shown; foundation preparation and the construction of levee embankments, including enlargement of existing levee, berms, road crossings, and other incidental earthwork as may be necessary to complete the levee as specified herein and as shown on the drawings. All work under this section shall comply with the requirements of EM 385-1-1 .
1.4.1 Embankment and Backfill Materials
At least 30 days prior to delivery of any Contractor-furnished material to the site of the work, submit soil classification test results, moisture-density curves, gradation curves, and laboratory results of the required tests of the proposed material. Materials for embankment and backfill construction will be obtained from sources provided by the Contractor . All roots, limbs, and wood fragments shall be removed from embankment materials. Materials containing sod, other organic or perishable material, trash, debris, and frozen materials shall not be used in the embankment. Submit to the Contracting Officer the source or sources intended to provide materials for embankment construction. If a source is selected other than a commercial quarry or other commercial entity from which earth or rock material will be directly purchased and where the Contractor or his subcontractor will perform the borrow excavation, a written statement will be provided to the Contracting Officer indicating permission to utilize the area. It is the Contractor's responsibility to obtain Federal, State, and local permits which may be required for excavation and reclamation of the borrow area. The Contracting Officer will require material samples from any proposed borrow source to be submitted as indicated in paragraph Quality Control.
1.4.2 Haul Roads
Locate and construct haul roads approved by the Contracting Officer .
Prior to the commencement of construction submit for approval a site plan detailing the location of all haul roads within the project limits. Haul roads shall be constructed to maintain the intended traffic, be free draining, and be maintained in good condition throughout the contract period.Haul roads constructed during the contract duration shall be removed after work is completed and the impacted area restored to its preconstruction conditions.All haul roads within the right-of-way that will remain as public thoroughfares after construction shall be cleaned daily and maintained in the preconstruction condition. All costs associated with these haul roads shall be considered as a subsidiary obligation of the Contractor.
1.4.3 Stockpiling
Any on-site stockpiling of embankment materials shall be in accordance with paragraph 3.6 Stockpiles. No payment will be made for such stockpiling nor for the reloading and hauling of these materials to their final position.
1.4.4 Slides and Foundation Failures
When sliding occurs in any part of the embankment and backfills prescribed
SECTION 35 41 00 Page 6 in this section after they have been placed, but prior to final acceptance of all work under the contract, repair the slide as directed by the Contracting Officer. When the slide is caused through the fault of the Contractor, the repair shall be made at no cost to the Government. When the slide is not the fault of the Contractor, an equitable adjustment in the contract price shall be made pursuant to the Contract Clause CHANGES to cover the cost of the repairs.
1.4.5 Drainage Requirements
Submit written evidence consisting of an authenticated copy of the easement under which the Contractor acquired the property rights and access thereto, prepared and executed in accordance with applicable State and local requirements. Do not block or restrict the flow in a natural drain, existing culvert, ditch or channel at any time without obtaining prior written approval from the Contracting Officer. This approval will not relieve the Contractor from responsibility for any damage caused by the operation. Monitor the water levels in the bay and provide sufficient free discharge areas so that conditions are not worsened by possible floods during construction. Surface water shall be directed away from excavations and construction sites so as to prevent erosion and undermining of foundations. Diversion ditches, dikes, and grading shall be provided and maintained as necessary during construction. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site and the area immediately surrounding the site and affecting operations at the site shall be continually and effectively drained. If private property is to be used for drainage, submit written evidence that the right has been obtained from the property owner for drainage on his property.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Drainage Requirements
SD-03 Product Data
Excavation ; G
Borrow Areas ; G, DO
Embankment and Backfill Materials ; G, DO
Nuclear Density ; G, DO
1.6 REGULATORY REQUIREMENTS
The state statutory and regulatory requirements listed below form a part of this specification to the extent referenced.
SECTION 35 41 00 Page 7
1.7 PERMITS
In accordance with Contract Clause PERMITS AND RESPONSIBILITIES, obtain all necessary permits required for disposal, hauling, erosion control, burning, and pay all fees associated with permitting and compliance.
Comply with the terms of these permits and with the requirements of Section 01 57 20.00 45 ENVIRONMENTAL PROTECTION, and this section.
1.8 PROJECT SITE CONDITIONS
1.8.1 Protection of Cultural and Natural Resources
All work and operations shall comply with the requirements of Section 01 57 20.00 45 ENVIRONMENTAL PROTECTION and with the requirements of this section.
1.8.2 Protection of Man-Made Facilities and Natural Features
Excavation shall follow the same requirements specified above for felling trees and shall be in compliance with EM 385-1-1 . Existing utility lines that are shown on the drawings or the locations of which are made known to the Contractor prior to excavation and that are to be retained shall be protected from damage during excavation. When utility lines that are to be removed are encountered within the area of operations, notify the applicable utility companies in sufficient time for measures to be taken to prevent interruption of the services.
1.8.3 Subsurface Data
Subsurface soil boring logs are shown on the drawings. These data represent subsurface information at the boring locations; however, variations may exist in the subsurface between boring locations.
Groundwater levels indicated on the soil boring logs were levels found at the time of exploration. The groundwater table can vary significantly depending on time of year, variation from normal precipitation, and river stage or tide level.
PART 2 PRODUCTS
2.1 TYPES OF FILL MATERIALS
2.1.1 Select Fill
Select fill embankment material shall be obtained from sources provided by the Contractor. This material shall consist of satisfactory impervious material classified as lean clay (CL) and fat clay (CH) in accordance with
ASTM D2487.
2.1.2 Topsoil
Topsoil consists of organic soil and shall be placed on the levee slopes as shown on the contract drawings and as specified in Section 32 92 23
SODDING.
2.1.3 Semicompacted Fill
Material for semicompacted fill shall consist of satisfactory materials classified in accordance with ASTM D2487.
SECTION 35 41 00 Page 8
PART 3 EXECUTION
3.1 CONSTRUCTION
3.1.1 Lines and Grades
The embankment shall be constructed to the lines, grades, and cross sections indicated on the drawings, unless otherwise directed by the Contracting Officer. The Government reserves the right to increase or decrease the foundation widths and embankment slopes or to make such other changes in the embankment sections as may be deemed necessary to produce a safe structure. Changes in quantities resulting from such revisions will not constitute justification for change in contract unit prices, except as provided for in the Variations in Estimated Quantities Clause.
3.1.2 Conduct of the Work
Maintain and protect the embankment in a satisfactory condition at all times until final completion and acceptance of all work under the Contract. If, in the opinion of the Contracting Officer, the hauling equipment causes horizontal shear planes or slicken sides, rutting, quaking, heaving, cracking, or excessive deformation of the embankment or backfill, limit the type, load, or travel speed of the hauling equipment on the embankment or backfill. The Contractor may be required to remove, at no additional payment, any embankment material placed outside of prescribed slope lines. Any approved embankment or backfill material which is lost in transit or rendered unsuitable after being placed in the embankment or backfill and before final acceptance of the work shall be replaced in a satisfactory manner and no additional payment will be made therefore. Excavate and remove from the embankment or backfill any material which is unsatisfactory, dispose of such material, and refill the excavated area as directed, all at no cost to the Government.
3.2 DEWATERING AND DIVERSION
Surface and groundwater control shall be accomplished in coordination with the required excavation and embankment construction. Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams and/or dewatering by the use of pumping. Methods for care of surface water and for controlling the surface and groundwater levels shall be subject to approval of the Contracting Officer.
3.3 EXCAVATION
Excavation shall consist of removal of material in preparing the foundations to the lines and grades shown on the drawings, removal of material from ditches and channels to the lines and grades shown on the drawings, removal of objectionable materials and obtaining required fill materials from the borrow areas. Blasting will not be permitted. Over excavation shall be backfilled to grade with similar over excavated material or satisfactory material and compacted to a density of at least that of the surrounding material. Submit a written excavation plan 30 days prior to the beginning of any excavation. Approval of the detailed plan shall be obtained from the Contracting Officer prior to starting the work. If necessary, modify the plan as required to meet field conditions, and the modifications shall be approved prior to use. As a minimum, the plan shall contain the following:
a. Proposed methods for preventing interference with, or damage to, SECTION 35 41 00 Page 9 existing underground or overhead utility lines, trees designated to remain and other man-made facilities or natural features designated to remain within or adjacent to the construction rights-of-way.
b. Provision for coordinating the work with other Contractors working in the construction rights-of-way or on facilities crossing or adjacent to this work.
c. The proposed methods for controlling surface and ground water in the borrow areas and required excavations.
d. Stockpiling plan for embankment material before it is transported to the project site showing locations, stockpile heights, slopes, limits, and drainage around the stockpile areas.
e. A complete listing of equipment used for excavation and to transport the excavated material.
f. The proposed sequence of work for excavating the borrow areas with plan and cross sectional views showing starting and final work locations and clearing, grubbing and stripping limits.
g. The proposals for conserving arable land and for making optimum use of available borrow, including the Contractor's proposed methods for grading the bottom of the borrow areas after completing use of the borrow areas.
h. The proposed road pattern, and plan for implementing dust control measures.
3.3.1 Over Excavation
3.3.1.1 Outside Limits of Levee Foundations or Structures
Over excavation outside the limits of the foundations of levees or structures shall be backfilled to grade with similar over excavated material or satisfactory material and compacted to a density of at least that of the surrounding material.
3.3.1.2 Within Limits of Levee Foundations or Structures
Over excavation within the limits of the foundations of levees or structures shall be backfilled to grade in accordance with paragraph
PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS.
3.3.2 Slopes and Surcharges
Temporary excavation slopes for any channel, structure excavation, or other required excavation shall not be steeper than the specified finished slope or the specified construction slope, as applicable, and subject to the approval of the Contracting Officer. This may be accomplished by benching the temporary slope so that the average slope is not steeper than the specified slope. In addition, no temporary, permanent, or construction slope shall be surcharged with excavated or stockpiled material or with heavy construction equipment which would have the same effect as the surcharge material. The toe of stockpiled material shall be maintained a minimum distance back from the top of the finished excavation equal to the depth of the excavation. Determine the maximum height of such stockpile without causing instability of the excavation slope. Any
SECTION 35 41 00 Page 10 slide or other adverse conditions caused by failure of the Contractor to maintain these conditions shall be considered the responsibility of the Contractor and remedial measures shall be at the Contractor's expense.
3.3.3 Borrow Areas
Submit a written statement to the Government not later than 30 days after receipt of Notice to Proceed providing information with regards to the Contractor's furnished borrow area(s).
3.3.3.1 Contractor-Furnished
Proposed borrow areas shall be subject to approval by the Contracting Officer. Any borrow sources proposed, accepted and approved by the Contracting Officer shall meet all applicable Federal, State and local requirements. No payment will be made for Contractor-furnished borrow areas.
3.3.4 Existing Levees and Spoil Banks
Existing levees and spoil banks shall be removed as shown on the drawings. In areas where the existing levee is located within the random or berm zone of the levee, it shall be incorporated into the embankment.
Portions of existing embankments which lie within the impervious zone of the levee shall be removed. When excavated , the existing levee shall be removed to the adjacent ground surface in a uniform manner, and shaped to maintain drainage in accordance with the adjacent natural drainage pattern. When lower levels of flood protection would be caused by levee construction provide the Contracting Officer a plan to maintain existing levels of protection during the construction period.
3.3.5 Riprap and Bedding
Excavations for riprap and bedding shall be performed at the locations and to the lines and grades shown.
3.4 TOLERANCES
A tolerance of six inches above or below the prescribed grade will be allowed in the excavation for channels, ditches, inspection trenches, cutoff trenches, excavations for riprap and bedding, and mandatory borrow areas. A tolerance of 6 inches below the prescribed grade will be allowed in the excavation for all other borrow areas.
All embankments and backfills shall be constructed to the grades, lines, and cross-sections shown on the drawings. At all points a tolerance of 6 inches above the prescribed grade will be permitted in the final dressing, provided that any excess material is so distributed that the crown of the levee drains and that there are no abrupt humps or depressions in any surfaces. For topsoil, a tolerance of 6 inches above the thickness as shown on the drawings will be permitted.
3.5 SLIDES
In case sliding occurs in any part of the excavations prescribed in this section after they have been excavated, but prior to final acceptance of all work under the contract, repair the slide as directed by the Contracting Officer. In case the slide is caused through the fault of the Contractor, it shall be repaired at no cost to the Government. In case
SECTION 35 41 00 Page 11 the slide is due to no fault of the Contractor, an equitable adjustment in the contract price will be made for the repairs in accordance with the Contract Clause CHANGES.
3.6 STOCKPILES
Provisions of paragraph SLOPES AND SURCHARGES are applicable to all stockpiled materials. Upon completion of construction operations, all remaining stockpiled material shall be removed and disposed of by the disposal methods specified in paragraph DISPOSITION OF EXCAVATED MATERIALS.
3.7 SURFACE DRAINAGE OF COMPLETED AREAS
The areas shown on the drawings designated as the finished embankment areas shall be graded to the lines and grades shown on the drawings. The surface shall be free from sharp ridges, gullies, potholes, sinkholes, and any other surface irregularities. A tolerance of 6 inches above or below the prescribed grade will be allowed provided that the surface drains in the direction as indicated on the drawings.
3.8 DISPOSITION OF EXCAVATED MATERIALS
3.8.1 Satisfactory Materials
Satisfactory excavated material shall be incorporated in the appropriate zones of the embankment. Satisfactory material shall consist of material as defined in paragraph DEFINITIONS, subparagraph SATISFACTORY MATERIALS.
When direct placement is not practicable, satisfactory material from the excavation may be stockpiled for subsequent use in parts of the work for which it is specified herein and/or as indicated on the drawings.
Satisfactory materials in excess of the quantity necessary to construct backfills and embankments shall be disposed of as specified for unsatisfactory materials.
3.8.2 Unsatisfactory Materials
Unsatisfactory materials shall be as defined in paragraph DEFINITIONS, subparagraph UNSATISFACTORY MATERIALS. Unsatisfactory materials from the excavations prescribed in this section shall be permanently disposed of by removal from the site to a Contractor-furnished disposal area . The material shall be shaped so that its surface is free from abrupt changes in grade and shall be sloped to drain. No additional payment will be made for Contractor-furnished disposal areas.
3.9 PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS
3.9.1 Earth
After excavation (as described in paragraph EXCAVATION) or stripping (as described in section 31 14 13.23 45 STRIPPING) of the embankment foundation to the extent indicated or otherwise required, the sides of cavities or depressions shall be broken down so as to flatten out the slopes, and the sides of the cut or hole shall be scarified to provide bond between the foundation material and the fill. Unless otherwise directed, each depression shall be filled with the same material type that is to be placed immediately above the foundation. The fill shall be placed in layers, moistened, and compacted in accordance with the applicable provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION for the specific material type. Materials which cannot be
SECTION 35 41 00 Page 12 compacted by roller equipment because of inadequate clearances shall be compacted with power tampers in accordance with the paragraph COMPACTION for the specific material type. After filling of depressions and immediately prior to placement of compacted fill in any section of the embankment, the foundation of such section shall be loosened thoroughly by scarifying, plowing, discing or harrowing to a minimum depth of 6 inches , and the moisture content shall be adjusted to the amount specified in paragraph MOISTURE CONTROL for the appropriate type of material.
Immediately prior to placement of compacted fill on or against the surfaces of any partial fill section, all soft or loose material, all material containing cracks or gullies, and all material that does not conform with the specified zoning of the embankment shall be removed. The remaining surface of the partial fill shall be loosened by scarifying, plowing, discing or harrowing to a minimum depth of 6 inches , and the moisture content shall be adjusted as specified in paragraph MOISTURE CONTROL for the appropriate type of material. The surface of the partial fill section upon which fill is to be placed shall then be compacted as hereinafter specified for the appropriate type of fill. No separate payment will be made for loosening and rolling the foundation area, the abutment area, or the surfaces of partial fill sections, but the entire cost thereof shall be included in the applicable contract price for fill.
3.10 TEST FILL STRIPS
3.10.1 General
Before beginning embankment construction, construct test strip(s) for select and semicompacted fill materials to demonstrate that the equipment and compaction procedure will achieve the moisture-dry density relationship as specified. The test strips may be incorporated as part of the final embankment, if the fills meet the requirements of the specifications. The test strips for select fill materials shall be constructed using materials from the borrow sources which have been approved by the Contracting Officer. Test strips for semicompacted fill shall be constructed using soils excavated from the site (AM#3)or materials from the borrow site which are approved by the Contacting Officer. A test strip shall be performed for each of the following types of fill materials; select fill and semicompacted fill. Each test strip shall be of sufficient size to allow compaction equipment to achieve normal operating speed over a 50 foot length. The test strip shall be a minimum of two (2) times wider than the compaction equipment. Each test strip shall be constructed with a minimum of 4 lifts. Prior to the construction of the test strips, the foundation (subgrade) shall be proof rolled and an 8 inch thick subbase layer installed. The subbase layer shall consist of the same material to be used in the test strip and shall be spread and compacted to the same requirements. The test strips shall be constructed in accordance with the applicable provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION for the specific material type. The fill material shall be placed and spread in layers in accordance with the applicable provisions of paragraphs PLACEMENT for the specific material type. Each layer of the fill shall be compacted with a minimum of four (4) complete coverages using the specified compaction equipment, and as many additional coverages as may be required to achieve the specified density. Even if the results from the test strips show that the required densities can be obtained with less than four coverages by the compaction equipment, compaction of the select and semicompacted fills with a minimum of (4) complete coverages is still required. If the use of the proposed compaction equipment causes shearing of the fill, laminations in the fill, or results in inadequate compaction, the Contracting Officer
SECTION 35 41 00 Page 13 may direct that such roller be removed from the fill and that another appropriate tamping roller be used.
3.10.2 Testing and Reporting Requirements for Test Strips
Prior to construction of the test strips, perform one laboratory compaction test for each type of material used in test strips. The compaction tests shall be performed in accordance with the requirements specified in paragraph MATERIALS TESTING. Test results shall be submitted to the Contracting Officer before construction of the test strips. After placement and spreading of the fill in the test strip, but prior to compaction, five samples shall be obtained from each lift for moisture content determination in accordance with ASTM D2216. Use nuclear density testing equipment in accordance with ASTM D6938. In addition, the following condition shall apply:
a. Prior to using the nuclear density testing equipment on the site, submit to the Contracting Officer a certification that the operator has completed a training course approved by the nuclear density testing equipment manufacturer, the most recent data sheet from the manufacturer's calibration, and a copy of the most recent statistical check of the standard count precision.
b. The nuclear density testing equipment shall be capable of extending a probe a minimum of 6 inches down into a hole.
After compaction of the fill, a minimum of 5 in-place nuclear density and moisture content tests (in accordance with ASTM D6938) and one (1) sand cone density test (in accordance with ASTM D1556/D1556M ) shall be performed on each lift. One sample shall be obtained from each test strip for classification testing as specified in paragraph MATERIALS TESTING.
All testing and sampling locations shall be determined by the Contracting Officer. The Contractor's QC personnel shall monitor and document construction and testing of the test strips. Documentation shall include weather conditions, soil type, spreading and compaction equipment type, lift thickness, number of coverages, moisture content, dry density, and a plan showing approximate location of sampling and testing. Documentation of the test strip construction procedures and results of all testing shall be provided to the Contracting Officer. Full scale embankment construction shall not commence until the equipment and placement methods are approved by the Contracting Officer.
3.11 PLACEMENT AND SPREADING
3.11.1 General
Prior to beginning embankment placement on the levee foundation, notify the Government that the foundation is ready to receive fill. No fill shall be placed on any part of the embankment foundation until such areas have been inspected and given final approval by the Contracting Officer.
3.11.1.1 Gradation and Distribution
The gradation and distribution of materials throughout each zone of the levee shall be such that the embankment will be free from lenses, pockets, streaks, and layers of material differing substantially in texture or gradation from surrounding material of the same class. If lenses, pockets, or layers of materials differing substantially in texture or gradation from surrounding material occur in the spread material, the
SECTION 35 41 00 Page 14 layer shall be mixed by harrowing or any other approved method to blend the materials. During the placing and spreading process, maintain at all times a force of workers adequate to remove all roots, debris, and oversize stone from all embankment materials. All stones and rock fragments larger than 1 inches in any dimension shall be removed at the source prior to hauling from the fill source. No fill shall be placed upon a frozen surface, nor shall snow, ice, or frozen earth be incorporated in the embankment.
3.11.1.2 Foundations and Partial Embankment Fills
The foundations and all partial embankment receiving fills shall be kept thoroughly drained. Placing operations will be such as to avoid mixing of materials from adjacent sections as much as practicable.
3.11.1.3 Equipment Traffic
Equipment traffic on any embankment zone shall be routed to distribute the compactive effort as much as practicable. Ruts formed in the surface of any layer of spread material will be filled before that material is compacted.