B3_Amend-0002_W9126G18B0003.pdf
PDF 5 MB Posted
- Solicitation number
- W9126G18B0003
About this file
AMENDMENT 0002 - BID OPENING DATE IS EXTENDED TO 29 MAY 2018 @ 2:00 P.M. LOCAL TIME.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK72367964
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is shown on the pages following: see pages following:
THE BID OPENING DATE IS EXTENDED TO 29 MAY 2018 @ 2:00 P.M. LOCAL TIME
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G18B0003
X 9B. DATED (SEE ITEM 11)
23-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2018
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
2000 FORT POINT ROAD
GALVESTON TX 77550-1229
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M3ODXMAN
Text Box
W9126G18B0003
A0001-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The specifications for Solicitation No. W9126G18B0003, Hurricane Flood Protection Project, Texas, in Galveston County, Texas, Erosion Repair, are hereby amended as follows:
THE BID OPENING DATE IS HEREBY RESCHEDULED FOR 29 MAY 2018 AT 2:00 P.M.
(CDT).
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
(2) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed SECTION 01 22 00.10, entitled MEASUREMENT AND PAYMENT, supersedes that issued with this Solicitation.
(3) SECTION 01 32 01.01 45, PROJECT SCHEDULE – The enclosed SECTION 01 32 01.01 45, entitled PROJECT SCHEDULE, supersedes that issued with this Solicitation.
(4) SECTION 31 11 00.10 45, CLEARING, GRUBBING AND REMOVAL OF DEBRIS – The enclosed SECTION 31 11 00.10 45, entitled CLEARING, GRUBBING AND REMOVAL OF DEBRIS, supersedes that issued with this Solicitation.
b) Drawings.
(1) DRAWINGS NO. C-02 through C-07 - The enclosed Drawings No. C-02 through C-07, supersede those issued with this Solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
5 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT
3. SECTION 01 32 01.01 45, PROJECT SCHEDULE
4. S SECTION 31 11 00.10 45, CLEARING, GRUBBING AND REMOVAL OF DEBRIS
5. DRAWINGS NO. C-02 THROUGH C-07
SWG FILE NO.:GALV 308-384 SOLICITATION NO.:W9126G18B0003
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.2 MODIFICATIONS (CESWG)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
(TO ACCOMPANY AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G18B0003)
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Sodding
1 JOB SUM $___________
0003 Reused Riprap
1 JOB SUM $___________
0004 Levee - Select Fill 43,000 C.Y. $_________ $___________
0005 Riprap
25,320 TON $_________ $___________
0006 Blanket Stone
3,340 TON $_________ $___________
0007 Geotextile - Filter Fabric 18,000 S.Y. $_________ $___________
0008 Semi-compacted Fill 8,700 C.Y. $_________ $_________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.00 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 2
DOCUMENT 00 11 00.00 45 Page 3
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 MODIFICATIONS (CESWG)
If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Sodding
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Reused Riprap
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Levee - Select Fill
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measurement
1.3.2 Blanket Stone and Riprap
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.2.1 Stone Transported by Rail or Truck
1.3.2.2.2 Remeasurement
1.3.2.3 Unit of Measure
1.3.3 Geotextile - Filter Fabric
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 (AM#1)Semi-compact Fill
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measurement
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G
Submit drawings of surveys during progress of work by soundings or sweepings.
SD-03 Product Data
Weight Scale Certification
Certified Weight Scale Tickets
Submit certified weight certificates for riprap and blanket stone.
1.2 LUMP SUM PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, we\ill be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
Payment will be made for costs associated with "Mobilization and Demobilization", as defined in the SECTION 00 72 00 CONTRACT CLAUSES.
Payment for costs in connection with the plant necessary to perform the work, to include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation, after completion of the work for removal of the plant and
SECTION 01 22 00.10 Page 2 equipment from the work site, and submission of the final record drawings. Ten percent of the payment item amount will be made after Government approval of the final record drawings.
1.2.1.2 Unit of Measure
Unit of measure: Job.
1.2.2 Sodding
1.2.2.1 Payment
Payment for "Sodding" will be made for costs associated with sod establishment, which will include all equipment, labor, and material required for its completion.
1.2.2.2 Unit of Measure
Unit of measure: Job.
1.2.3 Reused Riprap
1.2.3.1 Payment
Payment for "Reused Riprap" will be made for costs associated with the removal of debris, removal of existing riprap, storage of existing riprap,testing of recycled rip rap, and placement of recycled riprap, which will include all equipment, labor, and materials to perform the work specified herein.
1.2.3.2 Unit of Measure
Unit of measure: Job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.
1.3.1 Levee - Select Fill
1.3.1.1 Payment
Payment for "Levee - Select Fill" will be made for costs associated with placement of off-site borrow material and will include materials, clearing, grubbing, stripping, excavation, hauling, placing and compaction of select fill, and any other work in connection therewith. No separate payment will be made for stockpiling.
1.3.1.2 Measurement
The total quantity of "Levee - Select Fill" material for which payment is to be made will be the neat-line volumes of in-place quantity between the
SECTION 01 22 00.10 Page 3 pre-construction or excavated ground surface and the grade and slope of the final repaired levee cross sections constructed in accordance with the plans and specifications and as determined by Surveys . Cross sections used for quantity calculation will be taken no farther apart than every 100 feet and at changes in levee section. The theoretical quantity will be calculated by the average end-area method. No allowance will be made for material outside the required slope lines unless authorized.
1.3.1.3 Unit of Measurement
Unit of measure: cubic yard.
1.3.2 Blanket Stone and Riprap
1.3.2.1 Payment
Payment for providing and placing blanket stone and riprap will be made at the Contract unit prices for "Blanket Stone" and "Riprap" respectively, for each net short ton of acceptable stone placement. The price of stone placement will include the costs of material, equipment, and labor necessary to complete the required work.
No separate payment will be made for any excavation and disposal of materials that may be incidental to placing the stone.
1.3.2.2 Measurement
The following measurement subparagraph only pertains to the means of measuring the stone by weight for payment purposes. It should not be construed as representing or implying any measurements that could be associated with related activities and logistics, such as getting the stone tested for compliance with the specifications, procuring the stone, getting it delivered to the construction site, and gaining access to the work area. Other methods of measurement may be used when approved.
1.3.2.2.1 Stone Transported by Rail or Truck
Measure the stone in short tons (2,000 pounds). Certified railroad or truck weights will be accepted for determination of the weight of stone placed in the finished section. The weight of rejected stone will be estimated by the Contracting Officer and deducted from the carload or truckload weight. The Contractor may have the rejected stone weighed if so desired, in which case the actual weight will be deducted from the carload or truckload weight. Have the stone weighed on standard railroad track scales by a certified Weighmaster. A copy of the Weight Scale Certification from the regulation agency attesting to the scale's accuracy shall be submitted for the weigh scale tickets. The Contractor shall have the scales tested in the presence of a Government Inspector at any time the Contracting Officer may require.
The original printed certified weight scale tickets or a certified copy prepared in ink or indelible pencil shall be furnished to the Contracting Officer promptly after a car or truck is weighed and before the stone is placed in the areas to be protected. The report of weight for each carload or truckload shall show the gross, tare, and net weights, and erasures or changes on a report shall be explained by a memorandum made on, or attached to, the report and be signed by the Weighmaster. If deemed advisable, the Government will employ an Inspector at the scales, in which event necessary facilities shall be furnished the inspector for
SECTION 01 22 00.10 Page 4 observing the weighing and for recording the scale weights and stenciled light weights on the cars or trucks. Expense of weighing stone and testing scales shall be borne by the Contractor. Other methods of measurement may be used when approved.
Net Weight of Delivered Stone. The weight of sideboards, stakes, and skips, if any, will be determined by actual weighing or by estimates, mutually agreed upon by the Contracting Officer and the Contractor, and the weights so determined, together with the tare weight of the car or truck, shall be deducted from the gross weight to determine the net weight of stone delivered.
1.3.2.2.2 Remeasurement
Where a loss of material due to stockpiling, rehandling, or hauling is possible, the Contracting Officer will have the discretion to require remeasurement prior to placement.
1.3.2.3 Unit of Measure
Unit of measure: Ton
1.3.3 Geotextile - Filter Fabric
1.3.3.1 Payment
Payment will be made at the Contract unit price per square yard for "Geotextile - Filter Fabric" which will constitute full compensation for providing plant, labor, material, equipment and performing the operations necessary for the complete and satisfactory installation of the filter fabric. Payment for the following items is included in the Contract unit price per square yard for Geotextile - Filter Fabric and will not be counted a second time in the process of determining the extent of geotextile placed:
(1) Material and associated equipment and operation used in laps, seams, or extra length.
(2) Associated material, equipment, and operations.
No payment will be made for geotextiles filter fabric replaced because of contamination or damage due to the Contractor's fault or negligence.
Geotextile or plastic wrapping damaged as a result of delivery, storage or handling shall be repaired or replaced, as directed, at no additional cost to the Government.
1.3.3.2 Measurement
The installed geotextile filter fabric shall be measured to the nearest square yard of the as-built surface area covered by geotextile. No allowance will be made for overlaps, waste, damaged materials, repairs or materials used for convenience of the Contractor.
1.3.3.3 Unit of Measure
Unit of measure: Square Yard
SECTION 01 22 00.10 Page 5
1.3.4 (AM#1)Semi-compact Fill
1.3.4.1 Payment
Payment for "Semi-compact Fill" will be made for costs associated with placement of off-site borrow material and will include materials, clearing, grubbing, stripping, excavation, hauling, placing and compaction of semi-compact fill, and any other work in connection therewith. No separate payment will be made for stockpiling.
1.3.4.2 Measurement
The total quantity of semi-compact fill material for which payment will be made will be the neat-line volumes of in-place quantity between the pre-construction or excavated ground surface and the grade and slope of the final repaired construction in accordance with the plans and specifications and as determined by Surveys . Cross sections used for quantity calculation will be taken no farther apart than every 100 feet and at changes in sections. The theoretical quantity will be calculated by the average end-area method. No allowance will be made for material outside the required slope lines unless authorized.
1.3.4.3 Unit of Measurement
Unit of measure: cubic yard.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.10 Page 6
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 01.01 45
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
1.2 QUALITY ASSURANCE
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Construction Sequence
3.1.2 Approved Project Schedule
3.1.3 Updated Progress Schedule
3.1.4 Default Terms
3.1.5 Hurricane Season
3.1.5.1 Temporary Flood Protection Plan
3.2 BASIS FOR PAYMENT AND COST LOADING
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
-- End of Section Table of Contents --
SECTION 01 32 01.01 45 Page 1
SECTION 01 32 01.01 45
PROJECT SCHEDULE
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with the SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Schedule ; G
Submit to the Contracting Officer no later than 10 calendar days after acknowledgement of the Notice To Proceed.
1.2 QUALITY ASSURANCE
Designate an authorized representative to be responsible for the preparation of the Schedule and the required updating (activity status) and preparation of reports. The authorized representative is to be experienced in scheduling projects similar in nature and complexity to this project and be experienced in the use of the scheduling software that meets the requirements of this specification.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule , as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project, including the design and construction sequences, is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel is to actively participate in its development. Subcontractors and suppliers working on the project are to also contribute in developing and maintaining an accurate Project Schedule. Provide a Schedule that is forward planning and is a project monitoring tool. It should be noted that any construction effecting the overall stability of the levee can not be performed during peak hurricane season (August 1 through October 31). This requirement is specifically applicable to zones 3 and 4. The Project Schedule will include as a minimum:
(1) The phasing and construction of the earthwork, geotextile placement, stone shore protection, and sodding.
SECTION 01 32 01.01 45 Page 2
(2) Estimated start and completion dates for each phase.
(3) A complete list of plant and equipment to be used for each phase of work.
3.1.1 Construction Sequence
This contract will be executed in accordance with criteria and general sequence specified herein. The sequence was developed, in part, to return the damaged areas of the Hurricane Flood Protection System in Texas City (Galveston County) to the pre-Hurricane Ike level of protection prior to the next hurricane event. The project repair construction sequence priority is as follows:
(1) Repairs at Zone 4
(2) Repairs at Zone 3
(3) Repairs at Zones 1, 2, and 6
(4) Repairs at Zone 5
The repairs at Zones 1, 2, and 6 can be completed in any order after the repairs at Zones 3 and 4 have been completed. (AM#1)NOTE: Depending on time-frame of contract award, the Construction Sequence may be negotiated to better accommodate scheduling and project completion.
3.1.2 Approved Project Schedule
The approved Project Schedule will be used to measure the progress of the work and to aid in evaluating time extensions. The Schedule will depict activity durations, be based on the percentage of fiscal completion, and provide the basis for progress payments. Use ENG Form 2454 or equivalent produced by a scheduling program to depict the Progress Schedule and ensure that the Schedule conforms with the requirements outlined in the FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. Schedule will show anticipated earnings per Contract Line Item Number (CLIN) for each pay period, and total earnings per pay period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required Schedule. Once approved, the Contractor may not change the schedule for any reason without permission from the Contracting Officer or the ACO.
3.1.3 Updated Progress Schedule
Provide an updated Progress Schedule on at least a monthly basis and submit this updated Schedule along with the monthly pay request. The Government may request the Contractor to provide the Government with an updated Schedule as a result of a change in order of work, activity sequences, or activity duration prior to the monthly pay request. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved Schedule, the Contractor will take steps necessary to improve its progress including those that may be required by the Contracting Officer, without additional cost to the Government and submit an updated Progress Schedule to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, or the amount of construction plant, and to
SECTION 01 32 01.01 45 Page 3 submit for approval supplementary Schedule or Schedules as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
3.1.4 Default Terms
Failure of the Contractor to comply with the requirements of the Contract will be grounds for a determination, by the Contracting Officer, that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in this Contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or separable parts of it, in accordance with the default terms of the Contract.
3.1.5 Hurricane Season
The approved project schedule should take into consideration Hurricane Season and the impacts it will have on construction. Hurricane season starts June 1 and extends through November 30, with "peak season" starting August 1 extending through October 31. During hurricane season, but not during peak season, construction is perishable on all portions of the system. However, if a storm appears to threaten the region (area that will experience tropical conditions, i.e. depression, storm, and/or hurricane) then a Temporary Flood Protection Plan must be implemented within 96 hours prior to storm making landfall and be completed 48 hours prior to storm making landfall in the region. This plan should ensure the system is restored to preconstruction conditions and/or built to conditions suitable to not alter overall stability of the system and maintain a sufficient level of protection for surrounding areas. The Temporary Flood Protection should be submitted to the Contracting Officer and Government for review.
During peak season, work will not be allowed on any zones that will effect the overall stability of the system. System features that will effect the overall stability of the system include, but are not limited to, the bayside slopes and berms running along the system. Other features may be worked on during this time frame but careful monitoring of these features and related construction activities will be required.
3.1.5.1 Temporary Flood Protection Plan
A Temporary Flood Protection Plan will be required in order to make modifications to a hurricane flood protection system levee during hurricane season. The plan must clearly delineate the maximum length of levee open to construction at any one time and detail how the length can be secured against flooding within a maximum of 48 hours. It is also mandatory that the Contractor maintain materials and equipment to provide immediate protection of all areas during inclement weather conditions, an impending and approaching tropical system or hurricane, or as directed by the Contracting Officer. The Contractor shall note the type of equipment and materials and all details of emergency procedures and sequences for provided flood protection. During emergency situations the Contractor shall be required to immediately repair, construct, and/or replace all areas for completed flood protection.
After the passing of the the storm event or as directed by the Contracting Officer, the Contractor shall remove all temporary flood protection, and repair or replace any permanent construction damaged by its installation.
No separate measurement or payment will be made for maintaining materials, SECTION 01 32 01.01 45 Page 4 labor, or equipment as required herein, or for any other cost associated with maintaining readiness to perform flood protection measures as required by the Emergency Flood Protection Plan.
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining Contract earnings during each update period and therefore the amount of each progress payment. Lack of an approved Schedule update, or qualified scheduling personnel, will result in the inability of the Contracting Officer to evaluate Contract earned value for the purposes of payment. Failure of the Contractor to provide required information will result in the disapproval of the preliminary, initial, and subsequent Schedule updates. If Schedule revisions are directed by the Contracting Officer and those revisions have not been included in subsequent revisions or updates, the Contracting Officer may hold retainage up to the maximum allowed by this Contract, each payment period, until revisions to the Project Schedule have been made. Activity cost loading shall be reasonable, as determined by the Contracting Officer.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
A computer software system utilized to produce and update the Project Schedule is to be capable of meeting the requirements of this specification. Failure of the Contractor to meet the requirements of this specification will result in the disapproval of the Schedule.
-- End of Section --
SECTION 01 32 01.01 45 Page 5
DIVISION 31 - EARTHWORK
SECTION 31 11 00.10 45
CLEARING, GRUBBING, AND REMOVAL OF DEBRIS
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.3 DEFINITIONS
1.3.1 Clearing
1.3.2 Grubbing
1.3.3 Removal of Riprap
1.3.3.1 Reused Riprap
1.3.3.2 Other Riprap
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
3.1.2 Utility Lines
3.2 CLEARING
3.2.1 Excavation and Fill Areas
3.3 GRUBBING
3.4 REMOVAL OF DEBRIS
3.5 REUSED RIPRAP
3.5.1 Estimated Quantities
3.6 DISPOSAL OF MATERIAL
-- End of Section Table of Contents --
SECTION 31 11 00.10 45 Page 1
SECTION 31 11 00.10 45
CLEARING, GRUBBING, AND REMOVAL OF DEBRIS
AMENDMENT NO. 0001
PART 1 GENERAL
1.1 SUMMARY
The work covered in this Section consists of furnishing plant, labor, and equipment necessary to perform the operations in connection with clearing, grubbing, removal of debris, and removal and reuse of riprap from the areas specified herein, and the satisfactory disposal of cleared and removed materials.
1.2 MEASUREMENT AND PAYMENT
Measurement and payment for clearing, grubbing, and removal of debris will be paid for in accordance with provisions of the SECTION 01 22 00.10
MEASUREMENT AND PAYMENT.
1.3 DEFINITIONS
1.3.1 Clearing
Clearing consists of the removal and satisfactory disposal of all aboveground and below ground trees, downed timber, snags, slash, brush, garbage, trash, debris, fencing, and other items occurring in the designated areas to be cleared. Areas that require clearing and stripping, shall be stripped prior to any clearing activities.
1.3.2 Grubbing
Grubbing consists of the removal and satisfactory disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Grubbing also includes filling of holes from the grubbing operation. Where grubbing is to occur, the grubbing activity shall occur after clearing has been completed.
1.3.3 Removal of Riprap
Existing riprap within Zones 1, 2, 3, and 6 will be removed and stockpiled to be used as 'Reused Riprap' in the revetment construction. The existing riprap will be defined as 'Reused Riprap' prior to the addition of earth fill or shaping of the levee in each respective zone. Any existing riprap not meeting the requirements of 'Reused Riprap' as stated below will be placed at the location shown on sheet C-01 (AM#1)reused in zone 5. Excess riprap will be placed in the location shown .
1.3.3.1 Reused Riprap
'Reused Riprap' will consist of existing riprap greater than 2" in size, that meets the requirements of Section 35 31 19.32 45 RIPRAP AND BLANKET
STONE.
SECTION 31 11 00.10 45 Page 2
1.3.3.2 Other Riprap
Existing riprap, greater than 2" in size, that does not meet the requirements of Section 35 31 19.32 45 RIPRAP AND BLANKET STONE.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
Keep roads and walks free of dirt and debris at all times.
3.1.2 Utility Lines
Protect existing utility lines that are indicated to remain from damage.
Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor will be responsible for repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service.
3.2 CLEARING
Clearing is to be accomplished within the limits of existing ground to receive embankment , together with strips 5 feet wide, beyond and contiguous thereto, existing levees to be degraded, ponding areas, ditches, structures, traverses, channels, riprap, revetment, borrow areas and ramps. Trees, downed timber, snags, slash, brush, garbage, trash, debris, fencing, and other items are to be cleared flush with the existing ground surface. Trees and vegetation designated to be left standing or to remain are to be protected from damage from construction operations.
Clearing of borrow areas are to be limited to the minimum area required for construction operations.
3.2.1 Excavation and Fill Areas
Excavation and fill areas shown are to be cleared prior to placement of fill.
3.3 GRUBBING
Grubbing is to be accomplished within the limits of existing ground to receive embankment, together with strips 5 feet wide, beyond and contiguous thereto, existing levees to be degraded, ponding areas, ditches, structures, traverses, channels, riprap, revetment, borrow areas and ramps. Grubbing is to be accomplished to a depth of at least 3 feet below the existing ground surface. Holes caused by grubbing operations and removal of pipes and drains, excluding holes in borrow areas, channels and ditches above required grade, are to be filled with satisfactory material as specified in section 35 41 00 LEVEE CONSTRUCTION.
3.4 REMOVAL OF DEBRIS
Rubbish, timber, automobile tires, piling, riprap, and other objectionable
SECTION 31 11 00.10 45 Page 3 materials are to be completely removed from the area within the right-of-way limits. Also, the Contractor may be directed to remove other debris from the project location.
3.5 REUSED RIPRAP
Work areas that contain existing riprap, to be utilized as "Reused Riprap", include Zones 2 and 3. Existing riprap, that meets the requirements stated in Section 35 31 19.32 45 RIPRAP AND BLANKET STONE, shall be removed and stockpiled in an approved location to be reused in the revetment construction within the same Zone as originally removed from. Any excess existing riprap from these Zones shall be placed at the designated location near Zone 1. Rip Rap not meeting acceptable requirements will be deemed as "other riprap" and shall be place in zone 5.
3.5.1 Estimated Quantities
Estimated quantities are based on square yardage as measured horizontally, not along the slope and are as follows:
Zone 2 1,300 Square Yards
Zone 3 4,200 Square Yards
3.6 DISPOSAL OF MATERIAL
Materials obtained from clearing, grubbing, and removal of debris operations are to be removed from the construction area and disposed in areas off-site provided by the Contractor in compliance with the Federal, State, and local laws and ordinances.. Debris consisting of inert and essentially insoluble industrial solid wastes including, but not limited to rock, brick, dirt, concrete, shingles, and glass materials that are not readily decomposable, and that are categorized as Class III wastes, are to be removed from the construction area and disposed in the designated disposal area. Class III wastes are defined in Title 30, Part 1, Chapter 335, Subchapter A, Rule 335.1 of the Texas Administrative Code. Debris consisting of trees, shrubs, and logs are to be disposed in a Type IV landfill as approved. Other classes of waste materials including, but not limited to metal, plastic, and rubber are to be disposed in appropriate areas furnished by the Contractor. Automobiles, abandoned boats, and tires are to be disposed in a Type VIII landfill as approved.
-- End of Section --
SECTION 31 11 00.10 45 Page 4
| B3_SF30_AMEND0002 |
| Amend 0001 page-2 |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 |
1.2 MODIFICATIONS CESWG
| 01 22 00.10 |
| 01 22 00.10 - MEASUREMENT AND PAYMENT |
| 01 22 00.10 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 LUMP SUM PAYMENT ITEMS |
| 1.2.1 Mobilization and Demobilization |
| 1.2.1.1 Payment |
| 1.2.1.2 Unit of Measure |
| 1.2.2 Sodding |
| 1.2.2.1 Payment |
| 1.2.2.2 Unit of Measure |
| 1.2.3 Reused Riprap |
| 1.2.3.1 Payment |
| 1.2.3.2 Unit of Measure |
| 1.3 UNIT PRICE PAYMENT ITEMS |
| 1.3.1 Levee - Select Fill |
| 1.3.1.1 Payment |
| 1.3.1.2 Measurement |
| 1.3.1.3 Unit of Measurement |
| 1.3.2 Blanket Stone and Riprap |
| 1.3.2.1 Payment |
| 1.3.2.2 Measurement |
| 1.3.2.2.1 Stone Transported by Rail or Truck |
| 1.3.2.2.2 Remeasurement |
1.3.2.3 Unit of Measure
| 1.3.3 Geotextile - Filter Fabric |
| 1.3.3.1 Payment |
| 1.3.3.2 Measurement |
| 1.3.3.3 Unit of Measure |
| 1.3.4 AM#1Semi-compact Fill |
| 1.3.4.1 Payment |
| 1.3.4.2 Measurement |
| 1.3.4.3 Unit of Measurement |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 32 01.01 45 |
| 01 32 01.01 45 - PROJECT SCHEDULE |
| 01 32 01.01 45 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 QUALITY ASSURANCE |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.1.1 Construction Sequence |
| 3.1.2 Approved Project Schedule |
| 3.1.3 Updated Progress Schedule |
| 3.1.4 Default Terms |
| 3.1.5 Hurricane Season |
| 3.1.5.1 Temporary Flood Protection Plan |
| 3.2 BASIS FOR PAYMENT AND COST LOADING |
| 3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 31 11 00.10 45 |
| 31 11 00.10 45 - CLEARING, GRUBBING, AND REMOVAL OF DEBRIS |
| 31 11 00.10 45 - CLEARING, GRUBBING, AND REMOVAL OF DEBRIS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 MEASUREMENT AND PAYMENT |
| 1.3 DEFINITIONS |
| 1.3.1 Clearing |
| 1.3.2 Grubbing |
| 1.3.3 Removal of Riprap |
| 1.3.3.1 Reused Riprap |
| 1.3.3.2 Other Riprap |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Roads and Walks |
| 3.1.2 Utility Lines |
| 3.2 CLEARING |
| 3.2.1 Excavation and Fill Areas |
| 3.3 GRUBBING |
| 3.4 REMOVAL OF DEBRIS |
| 3.5 REUSED RIPRAP |
| 3.5.1 Estimated Quantities |
3.6 DISPOSAL OF MATERIAL
| W9126G18B0003-Plans - AMD 0001 |
| C-02 AMD-001 |
| C-03 AMD-001 |
| C-04 AMD-001 |
| C-05 AMD-001 |
| C-06 AMD-001 |
| C-07 AMD-001 |