B3_17-T-0080_Amendment_Portable_Toilets_Extension.pdf
PDF 97 KB Posted
- Attached to
- Portable Toilets Belton
- Solicitation number
- W9126G-17-T-0080
About this file
Extension Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_17-T-0080_Portable_Toilets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Extend the closing date from 3 March 2017 to 4 April 2017; and
2. Adjust the start date of the Period of Perfromance from 13 March 2017 to 15 April 2017; and
3. Insert the corrected Bid Schedule; and
4. Change the site visit time to Monday 20 March 2017 at 10:00am
This amendment is the result of the requirements at DFARS Subpart 2516.371-2(a)(2) Promote Competition.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-17-T-0080
X 9B. DATED (SEE ITEM 11)
22-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2017
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-17-T-0080
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Mar-2017 12:00 AM to 04-Apr-2017 12:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials (except those specified to be provided by the Government), supervision, and other items and non-personal services necessary to provide toilet services as specified at Temple Lake Park recreation area on Belton Lake, Texas. The Contractor is responsible for the following operations:a) Delivery/Removal of portable toilet facilityb) Securing toilet facility by use of anchoring systemc) Maintaining/servicing of temporary toilet facility to The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials (except those specified to be provided by the Government), supervision, and other items and non-personal services necessary to provide toilet services as specified at Temple Lake Park recreation area on Belton Lake, Texas. Period of Performance 15 April 2017 to 30 September 2017.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 13-MAR-2017 TO
30-SEP-2017
N/A BELTON LAKE OFFICE
RONALD BRUGGMAN
3110 FM 2271
BELTON TX 76513-9717
254-939-2461 FOB: Destination
9674CD
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 15-APR-2017 TO
30-SEP-2017
N/A BELTON LAKE OFFICE
RONALD BRUGGMAN
3110 FM 2271
BELTON TX 76513-9717
254-939-2461 FOB: Destination
9674CD
The following have been modified:
BID SHEET
Portable Toilets Services for Temple's Lake Park, Belton Lake
Bid Schedule
Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to provide and service portable toilets at Temple's Lake Park on Belton Lake, US Army Corps of Engineers, Capital Region, Fort
Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.
CONTRACT PERIOD
15-April-2017 through 30-September-2017
Temple's Lake Park : Sandy Point, South Boat Ramp, Beach Area
ITEM DESCRIPTION QUANTITY UNIT
PRICE
# MONTHS AMOUNT
April
0001 Rental & Cleaning of Standard Portable Toilet
12 0.5
0002 Rental & Cleaning of ADA Portable Toilet
3 0.5
0003 Unscheduled Cleaning 5 N/A
May-August
0004 Rental & Cleaning of Standard Portable Toilet
12 4
0005 Rental & Cleaning of ADA Portable Toilet
3 4
0006 Unscheduled Cleaning 50 N/A
September
0007 Rental & Cleaning of Standard Portable Toilets
3 1
0008 Rental & Cleaning of ADA Portable Toilet
3 1
0009 Unscheduled Cleaning 5 N/A
BELTON LAKE - PORTABLE TOILETS - ITEMS 0001 THROUGH 0009
TOTAL
PWS
PERFORMANCE WORK STATEMENT (PWS)
Portable Toilet Services Belton Lake, Capital Region
1. General: This a non-personal services contract to provide portable toilet services at Temple Lake Parks on Belton Lake. The US Army Corps of Engineers (refer to as Government) shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, portable toilets, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide toilets and cleaning services as defined in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract.
1.2. Scope:
1.2.1 Belton Lake, Texas: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials (except those specified to be provided by the Government), supervision, and other items and non-personal services necessary to provide toilet services as specified at Temple Lake Park recreation area on Belton Lake, Texas. The Contractor is responsible for the following operations:
a) Delivery/Removal of portable toilet facility
b) Securing toilet facility by use of anchoring system
c) Maintaining/servicing of temporary toilet facility
1.2.1.1 Service Requirements:
a) Delivery/Removal: The portable toilets will be placed per attachment 4 and in a line with each unit approximately five (5) foot from each other.
The ADA toilet will be placed on the end as the terrain will allow to maintain ADA guidelines.
b) Securing toilet facility: The Contractor shall be responsible for setting, leveling, anchoring, and maintaining the appearance and hardware of each unit so that privacy is protected. Anchored shall mean secured to the ground in such a manner as to prevent a person for tipping the unit over and to with stand normal wind in the area. Anchor system will meet or exceed industry standards with regards to materials used and safety standards. If ramps are used for wheelchair accessibility, they shall be secured rigid to the unit and meet ADA requirements.
c) Maintaining/servicing: All facilities shall be cleaned each scheduled cleaning day. The Toilets shall be thoroughly cleaned inside and outside.
All fixtures (sinks, toilet lids and risers, urinals, mirrors, tissue holders, fittings, etc.) benches, floors, walls, windows, doors, ceilings, sinks, recesses, eaves, and soffits and grounds within 5 feet shall be cleaned.
Service shall also include pump out of holding tanks, if needed or as required by the State. The Contractor shall cleanup of any spillage, and dispose of effluent. If damage occurs to the facility, it shall be immediately repaired or replaced.
1.2.2 Special Requirements:
1.2.2.1 Regulations and Permits: All current County, State, and Federal rules and regulations governing sanitary standards of drinking water, protection of public water sources and solid waste disposal shall be met and maintained throughout the performance of the work specified under this contract. All liquid or solid waste removed from the portable toilets shall be properly disposed of off Government property in an appropriate Texas Commission on Environmental Quality (TCEQ) waste treatment facility. All trash collected on Government property shall be placed in bulk refuse containers (BRR) in the park. If BRR are full in the park, the contractor shall dispose of trash in nearest BRR in adjacent parks. When the trash/waste is hauled off Government property, the Contractor shall make all the necessary arrangements, obtain permits required and make all payments for proper disposal in a facility that is licensed by the Texas Commission on Environmental Quality. If the proposed disposal area is not presently being utilized as a State authorized City or County garbage disposal area, the Contractor must furnish the Government a letter from the Texas Commission on Environmental Quality approving the area for disposal. This approval will be required even if the Contractor owns the land. If fees are charged for use of the disposal area, the Contractor shall furnish to the Government, on a monthly basis, copies of all receipts for fees paid.
1.2.2.2 Traffic Regulations and Safety: The work to be performed under this contract shall be within the boundaries of land administered by the U.S. Army Corps of Engineers. The Contractor and contract employees are subject to all Title 36 regulations while completing work under this contract. No special provisions or entitlements shall be granted to the Contractor or contract employees. The attention of the Contractor and his employees shall be directed to the need for extreme caution and care while driving and operating equipment in these locations. The Contractor and employees shall comply with all state and local traffic laws. The Contractor shall comply with all pertinent provisions of the Corps of Engineers Manual, EM 385-1-1, Safety and Health Requirement Manual. An observed violation of safety requirements shall be grounds for the Government to stop work. Work shall not continue until the violation is corrected.
1.2.2.3 Accident Reporting: The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (KO) or their designated official in the manner and time limitations and on the forms prescribed by the official, all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incidental to work performed under this contract. Medical expenses for Contractor personnel are the responsibility of the Contractor.
1.2.2.4 Equipment: The Contractor shall utilize equipment that equals or exceeds the quantity and quality set forth in this contract and as approved by the Government for award of the contract. If the Contractor demonstrates that the requirements of this contract can be met with less equipment or a different kind of equipment after work commences, the amount and/or type of equipment may be modified upon written approval of the KO. If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, Contractor shall immediately obtain additional equipment necessary to fulfill the requirements of this contract.
1.2.2.5 Condition of Equipment: All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with Safety Manual. A regular schedule of preventive maintenance must be followed on all equipment. All maintenance shall be conducted off Government property. Contractor shall insure leaking and unsafe equipment is repaired immediately and shall be responsible for containment and cleanup of leaks. Contractor shall remove and dispose of contaminated soils resulting from leaks or spills in accordance with Federal, State, County and Municipal laws, codes and regulations.
1.2.2.6 Safety Inspections: Prior to work commencement, all equipment shall be inspected by the Government to insure compliance with Section 18 of current version of EM385-1-1 (Safety Manual.) Contractor shall present all equipment to the Government for inspection whenever equipment is mobilized at the Lake. Contractor shall notify the Government at least two (2) days prior to bringing equipment on-site so that the time and place of these inspections may be scheduled. The Government may inspect equipment at any time it is operated on Government Property. Any equipment found deficient shall be taken out of service immediately until faulty conditions have been corrected and passed by the Government. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
1.2.2.7 Vehicles: All vehicles, including Contractor and any subcontractors, utilized under this contract shall be present a neat and clean appearance, be serviceable and shall comply with insurance and safety standards as required by the State of Texas. Vehicles shall be identified with company name or logo conspicuously displayed on door panels.
Professionally prepared hand-lettering, magnetic signs or pressure sensitive decals shall be used.
1.2.2.8 Maps: Maps are provided in Attachment 4 and indicate the approximate areas where services shall be performed. It may become necessary to relocate a toilets due to flooding events at no cost to the Government. The Contractor will be responsible for communicating with Government concerning lake levels.
1.2.2.9 Reports: The Contractor shall prepare and submit Quality Control Reports as specified. Contractor shall develop and provide their own reports. A Quality Control Report shall be submitted to the Government at the end of each work week as directed. Quality Control Inspector(s) shall ensure all reports are complete, legible and comprehensible.
1.2.2.10 Frequency & Tabulations: The required frequency of service is provided in the Frequency Schedules (Reference Attachment 3).
1.2.2.10.1 Holiday Cleanings: An extra service shall be required on Memorial Day, 4th of July, and Labor Day (see Frequency Schedules). If this Holiday, Extra Service falls on the regular service day, then the Extra Service will be performed on the next day if agreeable with Government. The tabulations of the number of portable toilets shall be included in Attachment 3.
1.2.2.10.2 Unscheduled Extra Cleanings: An unscheduled servicing will be at the direction of the Government. The contractor shall be available within 24 hours of notification to perform these servicing. The unscheduled servicing shall be per unit and the request maybe for one unit. Servicing will include a standard cleaning and pumping of the facility as specified within.
1.2.2.11 Work Schedules: The Contractor shall submit a work schedule for each service to include approximate times for beginning work and ending work for each required service.
Work schedules must be submitted within ten (10) days after the beginning of initial services and prior to frequency changes. This work schedule is extremely important as it controls the time at which the quality assurance inspections are performed, ensuring that inspections are conducted only after the required service has been completed. Any variation or unforeseen change, such as being ahead or behind the approved work schedule, must be reported immediately by telephone or in person. Any proposed change to an approved work schedule must be submitted with 24 hours in writing and approved by the Government in advance of actual work schedule changes.
1.2.2.12 Additional Service Work Requirements:
1.2.2.12.1 Restrictions: Raw lake water shall not be used for cleaning.
1.2.2.12.2 Occupied Facilities: If a toilet is occupied by the public at the time of the scheduled servicing, contractor will wait until the toilet becomes unoccupied to perform cleaning and servicing. If the toilet becomes unoccupied while Contractor is still in the park, Contractor shall service the unit as required. If the toilet is still occupied, the Contractor shall note the non-cleaning on the Quality Control Daily Report and it shall be turned into the Government for non-payment. The Government shall not pay for services not received.
1.2.2.12.3 All Quality Control Inspectors and subcontractors, if used, shall possess as a minimum a copy of that portion of the contract/contract specifications which governs the work in which they are engaged. Failure to comply may result in cessation of work and removal of employees until such time that this requirement can be met.
1.2.2.12.4 Payment: Payment for completed and accepted work will be done on a monthly basis. The Contractor shall only invoice after the end of each month.
1.2.2.13 Cleaning Services
1.2.2.13.1 Grounds Cleanup: Grounds Cleanup shall be performed within five (5) feet on all sides of the portable toilets unless specified otherwise, as part of each scheduled toilet cleaning day using any acceptable method to remove large refuse, fish/animal remains and all litter, including, but not limited to cigarette butts, glass, broken glass, bottle caps, paper, food scraps and can tabs within these areas surrounding facilities. Grounds Cleanup is considered part of the cleaning service for each toilet and shall be included in the Contractor’s bid price for the toilet cleaning. Litter collected shall be disposed of within bulk refuse receptacles and large refuse such as abandoned appliances, barrels, furniture, etc., shall be removed from Government property. Contractor will not be required to remove tree branches or timber or other natural drift deposited during high water or by high winds.
1.2.2.13.2 Hazardous/Special Waste, Public-Generated: Public use areas will very infrequently contain hazardous/special wastes as defined by the Texas Commission on Environmental Quality. Examples of such wastes include but are not limited to used oil filters, tires, lead acid batteries, paint cans and/or dead animals. Contractor shall dispose of such waste found in accordance with Federal, State, County and Municipal laws, codes and regulations.
1.2.2.13.3 Performance Standards: Grounds Cleanup shall result in grounds with a neat and clean appearance, with large refuse and litter and fish/animal remains removed and properly disposed. Grounds Cleanup shall result in grounds with a neat and clean appearance, with all large refuse, fish/animal remains and all litter, including, but not limited to cigarette butts, glass, broken glass, bottle caps, paper, food scraps and can tabs removed and properly disposed.
1.2.2.13.4 Portable Toilets
1.2.2.13.4.1 General - Portable toilet units shall be both standard and/or disability accessible portable toilet units, industry standard, interior locking, ventilated, single occupant facilities with toilet seat, toilet paper holder, and a minimum ten gallon holding tank. These units shall be constructed of durable material for outside use.
Contractor's service shall include maintenance of unit, cleaning, and re-supplying the toilet paper at the frequency specified. On the “BIDDING SCHEDULE”, delivery/pickup of each unit shall be included in on the per unit price of the portable toilet, which shall include the maintenance.
1.2.2.13.4.2 Toilet Seats - Contractor shall remove/replace damaged or missing toilet seats and lids when performing scheduled cleaning.
1.2.2.13.4.3 Toilet Tissue – Dispensers shall be left at no less 75% full during a scheduled cleaning.
1.2.2.13.4.4 Performance Standard - Toilet shall be free of insects, insect nests, webs, dust, dirt, debris, grime, scum, grease, gum, fecal and organic matter, stains, markings, graffiti, garbage, litter, standing water and any other matter. All urinals and toilets will be disinfected. Grounds surrounding toilet shall be free of all refuse, fish/animal remains and all litter, including, but not limited to cigarette butts, glass, broken glass, bottle caps, paper, food scraps and can tabs. All toilet seats and lids shall be in proper condition and all urinals and toilets shall be properly draining.
1.2.3 Site Visit: A site visit shall be performed in order to clarify expectations and answer any questions concerning the requirements of the specified work. A formal site visit will be at 10:00am Local Time, Monday, 20 March 2017. The Government Point of Contact (POC) for this action is Ronnie Bruggman (254) 939-1829.
1.4 Period of Performance: Contract period of performance shall be a 15 April 2017 through 30 September 2017.
1.5 General Information
1.5.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s Quality Control (QC) program is the means by which he assures himself that his work complies with the requirement of the contract. The Quality Control Plan (QCP) will be submitted to Government at the pre-work conference for review. After acceptance of the QCP the Contractor shall receive Government acceptance in writing for any proposed change to his QC system. The contractor shall submit to Government a daily Quality Control report for each day that services are performed.
1.5.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Government Holidays: All toilet cleaning services shall be performed on Government Holiday if holiday falls on a scheduled service date.
1.5.4 Hours of Operation: Work hours shall be 7:00 AM to 4:00 PM on the scheduled service days. If for any reason the day's required cleaning service cannot be completed by the designated time, the Contractor must notify the Government by 2:30 p.m. of that day, either by telephone or in person (followed in writing), advising of the facilities not serviced and the reason work was not completed. Should the Government allow, services not completed may be rescheduled for the following day. Otherwise, deductions in payment for services not performed will be made in accordance with the Bid Schedule and the Payment Analysis portions of this contract.
1.5.5 Place of Performance: The work to be performed under this contract will be performed at Temple Lake Park Recreation Area, Belton Lake (Bell County, Texas).
1.5.6 Type of Contract: Firm Fixed Price.
1.5.7 Security Requirements
1.5.7.1 Physical Security: At the close of each work period, any Government areas opened for access shall be secured by the Contractor.
1.5.7.2 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys to Government.
1.5.7.2.1. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by Government. All Government keys provided to Contractors will be issued and controlled IAW Army Regulation 190-51.
1.5.7.2.2 All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.5.7.2.3 The contractor and all associated sub‐contractors shall brief all employees on the local I-WATCH, Corps Watch, or See Something, Say Something program. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Government NLT 5 calendar days after the completion of the training.
1.5.7.2.4 The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the Governemnt no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the KO and shall become part of the official contract file.
1.5.8 Special Qualifications: N.A.
1.5.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.5.10 Contracting Officer’s Representative (COR): N.A.
1.5.11 Contractor Key Personnel: The following personnel are considered key personnel by the Government: Contractor, field supervisor and QC personnel. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.5.12 Identification of Contractor Employees:
“Identification of Contractor Employees in the Federal Workplace” (Aug 2008):
(a) The contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, an identification (ID) badge and a standardized uniform that displays the company’s name/logo and the employee’s name. The ID badge shall clearly display the contractor’s name and the employee’s name and color photograph. It is the contractor’s responsibility to ensure that all contractor personnel wear the ID badge and uniform at all times when performing work under this contract. Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.
(b) Contractor personnel shall clearly identify themselves to all attendees as a contractor employee before the commencement of meetings with Government or other contractor personnel. Contractor personnel shall clearly and immediately identify themselves as a contractor employee when placing, answering or participating in telephone/VTC conversations with Government or other contractor personnel.
(c) When contractor personnel send e-mail messages to a Government-owned computer, they shall include a signature block that includes their employer’s name and the employee’s full name and e-mail address.
(d) Each of the requirements set forth in paragraphs a-c above, must be included in all subcontracts at any tier.
1.5.13 Contractor Travel: N.A.
1.5.14 Data Rights: N.A.
1.5.15 Organizational Conflict of Interest: N.A.
1.6. GOVERNMENT FURNISHED ITEMS AND SERVICES:
1.6.1 Facilities: N.A.
1.6.2 Equipment: N.A.
1.6.3 Materials: N.A.
1.7 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
1.7.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this PWS.
1.7.2 Equipment: The Contractor shall furnish all equipment necessary to accomplish the requirements under this PWS.
1.7.3. Materials: The Contractor shall provide all materials necessary to accomplish the requirements under this PWS. All supplies and materials provided by the Contractor shall be of high quality, per industry standards, and environmentally friendly. A proposed list of supplies and materials shall be submitted to the Government for Government’s approval ten (10) calendar days prior to the commencement of work on this contract. Contractor shall also provide as part of their Safety Plan, Safety Data Sheets for all cleaning solutions or agents, enzymes, bacterial agents, disinfectants, graffiti remover, insecticides, herbicides or any other materials of a chemical nature used in Contractor’s operation. Contractor shall furnish all required soap, detergents, toilet tissue, additional trash cans desired by Contractor, trash can liners, deodorant cakes, non-restricted insecticides, cleaning solutions, enzymes and/or bacterial agents, disinfectant/deodorizer, graffiti remover, signs, locks, safety equipment, and all other materials to be utilized in the work.
1.7.4 Sustainability:
1.7.4.1 Recycled Content – The contractor shall utilized recycled content as outlined by the EPA and ensure materials utilized contain recycled-content for all contactor-furnished supplies.
1.7.4.2 The Contractor shall meet the BioPrefered Program requirements set forth by the USDA (http://www.biopreferred.gov/BioPreferred/ <http://www.biopreferred.gov/BioPreferred/>).
1.8 Contractor Management Reporting (CMR) N.A.
1.9 Applicable Publications (current editions)
1.9.1 The Contractor shall abide by all applicable local, state, and federal regulations, publications, manuals, policies and procedures to include the most current Safety and Health Requirements Manual (EM385-1-1).
1.9.2 Submittals: Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are provided for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
1.9.2.1 Safety Plan “G” - The contractor shall provide a Safety Plan in accordance with requirements of EM-385-1-1 Appendix “A”. When developing the Safety Plan, the contractor shall follow Appendix “A” and reference each item in the plan back to Appendix “A”. Safety Plans that are not outlined as shown in the EM-385-1-1 Appendix “A” will be rejected.
1.9.2.2 Activity Hazard Analysis ‘G’ - The contractor shall provide an activity hazard analysis (AHA) for each feature of work involved in this contract. AHAs shall be in accordance with EM385-1-1 paragraph 01.A.15.
1.9.2.3 Work Plan ‘G’ - The contractor shall provide a work plan that describes his planned approach to accomplishing the work described herein. The contractor shall include safety requirements incidental to the work.
1.10 Attachment List:
1.10.1 Attachment 1– Performance Requirements Summary
1.10.2 Attachment 2– Deliverables Schedule
1.10.3 Attachment 3– Tabulation & Frequency
1.10.5 Attachment 4– Park Map
ATTACHMENT 1
Performance Requirements Summary
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. The Government expects the Contractor to perform at a minimum, the identified acceptable levels throughout the life of the contract, and the Contractor’s performance shall be given significant consideration when exercising contract option year and evaluating recommendations for future Government contracts and or awards.
Performance Objective: Describes the work that is to take place.
Standard: Describes the desired results that are to be achieved.
Performance Threshold: The Contractor shall be rated acceptable or unacceptable based upon the scores of all inspections for a month. Deficiencies will be noted for each month for each Performance Objective item. This number is identified as the Performance Threshold.
Acceptable Performance: Acceptable Performance is achieved if inspections scores are above 85%.
Unacceptable Performance: Government’s inspection scores fall below 85% or work specified by contract is incomplete.
Method of Surveillance: The Government will monitor the Contractor’s service performance using the Random, Planned, or 100% sampling methods as detailed in “Quality Assurance Surveillance Plans (QASP)”. Government has the right to change or modify inspection methods at its discretion.
Performance Objectives Standards Performance Threshold
Methods of Surveillance
PRS #1.
GROUNDS CLEANUP
Collect and properly dispose of all small refuse removing fish/animal remains and all litter, including, but not limited to cigarette butts, glass, broken glass, bottle caps, paper, food scraps and can tabs within five (5) feet on all sides of the toilet as designated. (PWS Paragraph 1.2.2.13.1)
Specified grounds with neat and clean appearance, with all small refuse removed from toilet area and properly disposed.
Scores 85% minimum on all inspections for the month or 30 calendar day period.
Inspection by Periodic Inspections by the
PRS #2
TOILET CLEANING
Clean and disinfect urinals and toilets. Replace following items discovered in non-functioning or condition: re-supply toilet paper, toilet seats, toilet lids and collect and properly dispose of all fish/animal remains, large refuse and all litter. (PWS Paragraphs 1.2.2.13.4.4)
Toilet free of insects, insect nests, webs, dust, dirt, debris, grime, scum, grease, gum, fecal and organic matter, stains, markings, graffiti, garbage, litter, standing water and any other matter. All urinals and toilets disinfected.
Scores 85% minimum on all inspections for the month or 30 calendar day period.
Inspection by Periodic Inspections by the
ATTACHMENT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Item A – Safety Plan: Contractor shall develop detailed Safety Plan for review and approval by the Government designated personnel. Safety Plan shall indicate in detail the general policies, procedures and Personal Protective Equipment required for full compliance with the safety requirements set forth in latest edition of Safety Manual and OSHA. Plan shall include procedures to be followed in case of emergencies, including nearest emergency medical treatment toilet information. All Activity Hazard Analyses and Material Safety Data Sheets (MSDS/SDS) shall be included. Future proposed changes to approved plan shall be submitted to KO for review and approval.
(PWS Paragraph 1.9.2.1)
Provided 10 days prior to commencement of work.
Proposed changes to approved Safety Plan:
Submitted to
GOVERNMEN
T for review and approval, including revisions to Activity Hazard Analyses or additional MSDSs shall be submitted to
GOVERNMEN
T for review and approval.
One. Digital or Hard copy
Stillhouse Office
3740 FM 1670,
Belton, TX 76513
Item B – Quality Control Plan:
Contractor shall submit a detailed Quality Control Plan for review and approval by the Government designated personnel. Plan shall describe detailed method Contractor shall utilize to ensure all work complies with the
Provided 10 days prior to commencement of work.
Proposed Changes to Approved Quality Control Plan: Shall be submitted to
GOVERNMEN
One.
Digital or Hard copy
Stillhouse Office
Performance Work Statement and the Performance Requirements Summary.
(PWS Paragraph 1.5.1)
T for review and approval prior to use.
Item C – Quality Control Report:
Contractor shall develop a Quality Control Report containing minimum required information. A Quality Control Report shall be submitted to the Government at the end of each work week as directed. Submitted reports shall be complete, legible and comprehensible.
(PWS Paragraph 1.2.2.9)
Provided 10 days prior to commencement of work.
Proposed Changes to Approved Quality Control Report: Shall be submitted to
GOVERNMEN
T for review and approval prior to use.
One.
Digital or Hard
Stillhouse Office
Item D – Supplies and Materials List: Contractor shall submit list of proposed supplies and materials to be utilized. All materials shall be of high quality, per industry standards, and environmentally friendly. (PWS Paragraph 1.7.3)
Provided ten
(10) calendar days prior to work commencement.
One. Digital or Hard
Stillhouse Office
Item E – Employees / Subcontractors: The Contractor shall submit names, addresses and phone numbers of all employees and subcontractors who will be performing each service. (PWS Paragraph 1.5.12)
Submit to
GOVERNMEN
T within five (5) calendar days after award.
Stillhouse Office
3740 FM 1670,
Belton, TX 76513
Item F – Work Schedules: The Contractor shall submit a work schedule to include approximate times for
Submit to
GOVERNMEN
T within five (5) calendar days after the
One. Digital or Hard copy
Stillhouse Office beginning work and ending work.
(PWS Paragraph 1.2.2.11) preferred work sequence is received from Government to Contractor.
Item G – Form I-9 Employment Eligibility Verification Form: Complete and submit I-9 form for each employee.(PWS Paragraph 1.5.7.2.3 and 1.5.7.2.4)
Provided to
GOVERNMEN
T ten (10) calendar days prior to work
One per Employee.
Digital or Hard copy
Stillhouse Office
3740 FM 1670,
Belton, TX 76513
Item H – Proof of Required Insurance. (PWS Paragraph 1.2.2.7)
Provided to
GOVERNMEN
T ten (10) calendar days prior to work
Stillhouse Office
ATTACHMENT 3
TABULATIONS AND FREQUENCIES
BELTON LAKE
TEMPLE'S LAKE
PARK
QUANTITY for
September
QUANTITY for
April-August
DAYS SERVICED
TOILET TYPE
Sandy Point STANDARD 1 5 MON & FRI
ADA 1 1 MON & FRI
South Picnic Area STANDARD 1 4 MON & FRI
Beach STANDARD 1 3 MON & FRI
Holiday Cleaning ALL Memorial Day, Independence Day, & Labor Day
TOTALS 6 15
(End of Summary of Changes)
File details come from the government source that posted it. Updated .