B3_RFQ_Amd_01_Insurance&Site_Visit.pdf
PDF 166 KB Posted
- Solicitation number
- W9126G17Q0009
About this file
W9126G17Q0009 Amendment#0001 Revised Insurance Requirement Information and Site Visit Information for Each Lake Location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_RFQ_Amd_03_Rocky_Creek_ShiftB.pdf | ||
| B3_RFQ_Amd_02_WDs_Update.pdf | ||
| B3_RFQ_with_Attachments_14Aug2017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The insurance information provided in solicitation W9126G17Q0009 is being revised in this amendment. Also, Site Visit information for each Lake has been included w ith this amendment. All other terms and conditions of the solicitation remain unchanged.
Please see SF30 Continuation Page for the Insurance Information for solicitation W9126G17Q0009.
Quote Due Date remains unchanged: 14 September 2017 10:00AM.
Point of Contact (POC): Daisy Ciarlariello, Contract Specialist (817) 886-1051, Daisy.Ciarlariello@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G17Q0009
X 9B. DATED (SEE ITEM 11)
14-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2017
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G17Q0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
Amd#01 INSURANCE
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O. Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
US Army Corp of Engineers Belton Lake Office ATTN: Ronnie Bruggman
3740 FM 1670
Belton, Texas 76513
Or email to: Daisy.Ciarlariello@usace.army.mil Phone: (817) 886-1051 Fax: (817)886-6403
REQUIRED INSURANCE – In accordance with FAR 52.228-5 Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the lake office. The contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable
Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage.
Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.
(b) General Liability. Contractors shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. Minimum requirements for the State of Texas: $30,000 for each injured person, up to a total of $60,000 per accident, and $25,000 for property damage per accident. This basic coverage is called 30/60/25 coverage.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
REQUIRED INSURANCE – In accordance with FAR 52.228-5
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the lake office. The Contractor shall maintain, during the entire period of his performance under this contract, the minimum insurance requirements of the State of Texas: $30,000 for each injured person, up to a total of $60,000 per accident, and $25,000 for property damage per accident. This basic coverage is called 30/60/25 coverage.
Amd#01 mailto:Daisy.Ciarlariello@usace.army.mil
W9126G17Q0009
52.237-1 SITE VISIT
FAR 52.237-1 Highly Recommends potential offerors attend a Site Visit.
Vendors must confirm their intent to attend the Site Visit with the Point of Contact (POC) listed below prior to attending the event.
A Site Visit is being scheduled for each Capital Region Lake location. Please see the information below.
Date: Tuesday, August 29, 2017 1:00PM
Somerville Lake: 1560 Thornberry Drive, Somerville, TX 77879 POC: Russell Meier Tel: (979) 596-1622
Canyon Lake: 601 C.O. E. Road, Canyon Lake, TX 78133 POC: Terri Beth Teaschner Tel: (830) 964-3341
Belton Lake: 3740 FM 1670, Belton, TX 76513 POC: Robert Giacomozzi Sr.
Tel: (254) 939-2461
Stillhouse Hollow Lake: 3740 FM 1670, Belton, TX 76513 POC: Robert Giacomozzi, Sr.
Tel: (254) 939-2461
Lake Georgetown: 500 Lake Overlook Drive, Georgetown, TX 78633 POC: David Drain Tel: (512) 819-9046 Extension 24
Granger Lake: 3100 Granger Dam Road, Granger, TX 76530 POC: David McCann Tel: (512)859-2668
(End of Summary of Changes)
| Amd#01 INSURANCE |
| REQUIRED INSURANCE – In accordance with FAR 52.228-5 |
File details come from the government source that posted it. Updated .