W45VAK71005508 015780

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

100% Small Business Set-Aside for Sabine Neches Waterw ay, Texas, Placement Area No. 11, Shoreline Eroison Protection Repairs in Jefferson County, Texas is hereby amended as follow s:

Continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-17-B-0016

X 9B. DATED (SEE ITEM 11)

16-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2017

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M3ODXMAN

Text Box

W9126G17B0016

A0001-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W9126G17B0016, Shoreline Erosion Protection Repairs, Placement Area No. 11, Sabine-Neches Waterway, Texas, in Jefferson County, Texas, are hereby amended as follows:

a) Specifications.

(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(2) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The enclosed SECTION 01 22 00.10, entitled MEASUREMENT AND PAYMENT, supersedes that issued with this Solicitation.

(3) SECTION 31 23 16.19 45, EXCAVATION – The enclosed SECTION 31 23 16.19 45, entitled EXCAVATION, supersedes that issued with this Solicitation.

(4) SECTION 33 46 13.00 45, GEOTEXTILES USED AS FILTERS – The enclosed SECTION 33 46 13.00 45, entitled GEOTEXTILES USED AS FILTERS, supersedes that issued with this Solicitation.

(5) SECTION 35 31 19.32 45, RIPRAP – The enclosed SECTION 35 31 19.32 45, entitled RIPRAP, supersedes that issued with this Solicitation.

b) Drawings.

(1) DRAWINGS NO. G-02, C-02, AND C-06 - The enclosed drawings no. G-02, C-02, and C- 06, supersedes that issued with this Solicitation.

(2) DRAWINGS NO. C-07 AND C-08 – Drawings no. C-07 and C-08 are hereby deleted from this Solicitation.

2. This amendment shall be attached to and become a part of the Solicitation.

6 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT

3. SECTION 31 23 16.19 45, EXCAVATION

4. SECTION 33 46 13.00 45, GEOTEXTILES USED AS FILTERS

5. SECTION 35 31 19.32 45, RIPRAP

6. DRAWINGS NO. G-02, C-02, AND C-06

SWG FILE NO.:SN 103-376 SOLICITATION NO.:W9126G17B0016

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 11 00.00 45

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

1.2 MODIFICATIONS (CESWG)

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

(TO ACCOMPANY AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G17B0016)

SECTION 00 11 00.00 45

BID SCHEDULE

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 BID SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization 1 JOB SUM $___________

0002 Geotextile - Station 0+00 to Station 201+06

33,500 S.Y. $___________ $___________

0003 Riprap (80 lbs to 1,225 lbs) - Station 0+00 to Station 201+06

21,800 TON $___________ $___________

0004 Semi-compacted Berm Construction - Station 0+00 to Station 201+06

16,500 C.Y. $___________ $___________

0005 Clearing and Turfing -Station 0+00 to Station 201+06

1 JOB SUM $___________

0006 Final As-Built Drawings 1 JOB SUM $7,000

TOTAL SCHEDULE NO. 1 $___________

NOTE: Completion time stated in SECTION 00 73 00.00 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.

DOCUMENT 00 11 00.00 45 Page 2

BID SCHEDULE (CONT'D)

(TO BE ATTACHED TO STANDARD FORM 1442)

1.2 MODIFICATIONS (CESWG)

If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUBMITTALS

1.2 LUMP SUM PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Clearing and Turfing

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 As-Built Drawings

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

1.3.1 Semi-compacted Berm Construction

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.2 Riprap (80 lbs to 1,225 lbs)

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 Geotextile

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

-- End of Section Table of Contents --

SECTION 01 22 00.10 Page 1

SECTION 01 22 00.10

MEASUREMENT AND PAYMENT

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Surveys; G

Submit drawings of surveys during progress of work.

SD-03 Product Data

Gaging Table Data

Weight Certificates

Weight Scale Certification

Certified Weight Scale Tickets

Submit certified weight certificates for Riprap .

1.2 LUMP SUM PAYMENT ITEMS

Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.

All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

The Contract price for "Mobilization and Demobilization", in Schedule No.

1, will include the costs in connection with mobilization and demobilization of the plant necessary to perform work under the various bid items. The Contract price shall include transportation and other costs incidental to delivery of the plant and other equipment to the general work

SECTION 01 22 00.10 Page 2 area in condition ready for operation and, after the completion of the work, for removal of the plant and equipment from the work site(s).

Payment for mobilization and demobilization will be pursuant to the conditions as defined in the SECTION 00 72 00 CONTRACT CLAUSES.

1.2.1.2 Unit of Measure

Unit of measure: Job.

1.2.2 Clearing and Turfing

1.2.2.1 Payment

Payment for "Clearing and Turfing - Station 0+00 to Station 201+06", in Schedule No. 1, (AM#1)and "Clearing and Turfing - Station 0+00 to Station -7+00", in Option No. 1, will be made for costs associated with clearing the site for construction and incidential turf establishment, which will include all equipment, labor, maintenance and material required for its completion.

1.2.2.2 Unit of Measure

Unit of measure: Job.

1.2.3 As-Built Drawings

1.2.3.1 Payment

Payment for "Final As-Built Drawings" in Schedule No. 1, will be made for the amount indicated on the Bid Schedule upon completion of shoreline erosion protection system works (AM#1)(including Option No. 1, if awarded) and delivering them in the manner specified.

1.2.3.2 Unit of Measure

Unit of measure: Job.

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed shall constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.

1.3.1 Semi-compacted Berm Construction

1.3.1.1 Payment

Payment for "Semi-compacted Berm Construction - Station 0+00 to Station 201+06", in Schedule No. 1, (AM#1)and "Semi-compacted Berm Construction - Station 0+00 to Station -7+00", in Option No. 1; will be made for costs associated with constructing the berm and includes stripping, excavation, hauling, placement, compaction of fill material, and any other incidental work in connection therewith.

SECTION 01 22 00.10 Page 3

1.3.1.2 Measurement

The total quantity of "Semi-compacted Berm Construction" for which payment is to be made will be the neat-line volumes quantity between the ground surface as determined by a survey and the grade and slope of the final raised or repaired berm cross sections in accordance with the plans and specifications and as determined by surveys. In the case of berm repairs, the excavated or eroded areas will constitute the ground surface. Cross Section used for quantity calculation shall be taken not farther apart than every 50 feet and where a change in section is located. The theoretical quantity shall be calculated by the average end-area method. No allowance will be made for material outside the required slope lines unless authorized.

1.3.1.3 Unit of Measure

Unit of measure: Cubic Yard.

1.3.2 Riprap (80 lbs to 1,225 lbs)

1.3.2.1 Payment

Payment for "Riprap (80 lbs to 1,225 lbs) - Station 0+00 to Station 201+06", in Schedule No. 1 (AM#1)and "Riprap (80 lbs to 1,225 lbs) - Station 0+00 to Station -7+00", in Option No. 1, will be made at the Contract unit price for costs associated with furnishing and placing the stone layers as required and will include the costs of labor, equipment, and materials required to complete the work specified herein.

No separate payment will be made for stripping, excavation, backfilling, compactions and disposal of materials required for placement of stone protection and the costs in connection therewith will be included in the Contract unit price.

1.3.2.2 Measurement

Riprap placement is to be measured in short tons (2,000 pounds) using any of the following methods, which are more fully discussed in Appendix C of EM 1110-2-2302. The Contractor may use other methods of measurement conditioned on the Government's approval.

Where the loss of material resulting from stockpiling, re-handling, or its transportation is possibly significant, re-measurement prior to placement may be directed.

a) Measurement by Weighing Railcar and Truck Loads. Certified railroad car or truck weights measured on appropriate scales, before and after loading or before and after unloading will be accepted as the tonnage of stone placed in the finished section(s). From this weight, rejected stone will be deducted accordingly. The weight of the rejected stone will be estimated by the Government, or if the Contractor elects, the stone may be weighed. Stone is to be weighed on standard scales whose calibration has been certified by a Weighmaster. Each scale used shall be tested in the presence of a Government inspector at any time directed. Promptly after a railcar or truck has been weighed, and before the stone is placed, provide the original printed scale ticket or certified copy. The certified scale ticket must show the gross, tare, and net weights. Explain any changes on a report in writing, attach the explanation to the report, and have the Weighmaster sign it. The Government may employ an inspector at the scales

SECTION 01 22 00.10 Page 4 to observe the weighing. In this event, provide the necessary facilities for the Inspector to observe the weighing and recording of the scale weights and stenciled light weights on the railcars or trucks. The Contractor is responsible for the expenses incurred to weigh the stone.

Determine the weights of sideboards, stakes, and skips by actual weighing or by estimating using a method the Contracting Officer's Representative accepts. The weights so determined, together with the tare weight of the car or truck, shall be deducted from the gross weight to determine the net weight of stone delivered.

b) Measurement by Barge Load. Barge displacement measurements will be accepted for determining the weight of stone placed in the finished section(s). Provide the Contracting Officer a barge displacement table not less than 10 work days prior to unloading the riprap from any barge. Each table submitted shall show the name and/or number of the barge owner, the name of the fabricator, and the certification and date of certification of the person or firm that prepared the table. Provide with the displacement tables a drawing or sketch of each barge, dimensioned in sufficient detail to permit checking of the tables. The drawings must show, as a minimum, the length, width, depth of the barge and the dimensions of the rake or rakes. Each table shall have its accuracy certified by a person or firm, other than the Contractor, customarily performing this service. Each table submitted shall contain, in parallel columns, the barge freeboard in feet and tenths from zero to the full depth of the barge and the corresponding gross displacement to the nearest ton.

For the purpose of weighing the stone, fit each barge (at the Contractor's expense) with gages graduated in tenths of a foot increments. Locate the gages either on the inside or outside of the hull, as may be directed, and attach them solidly to the hull. Install the gages at each corner of the barge near the lower end of the rake and install two additional gages, if directed, amidship on each side. If the gages are located inside the hull, provide for the free passage of outside water to a transparent tube placed, or capable of being placed, in contact with the gage. If located outside the hull, the gages shall be protected by solid fenders or recessed into the planking, if the hull is wooden, or placed directly on the plates of a steel hull and identified with punch marks. Install the gages such that the zero mark is below water when the carrier lies in its normal trim, is light, and free from water. Do this installation when the barge is staged in a protected area near the site where approved. The Contractor may, at its option, provide an equal number of wells for determining the load instead of gages on the inside of the barge. Locate the wells as specified for the interior gages and install in an approved manner.

Fit the barges with the gages sufficiently ahead of commencing the work.

Notify the Contracting Officer a minimum of 5 days prior to the planned gage installation date to give the Government an opportunity to have an inspector present. When taking measurements, the barges must be dry-docked (at the Contractor's expense). Provide the materials and facilities necessary for taking the measurements to prepare the barge displacement tables. Pump the water from the barges when directed. Do not pump water between the time it is gage-loaded and lightened when weighing the barge load.

Fore and aft displacements due to the load must not differ more than 10 percent from their mean when determining the tonnage of each barge load of stone ready for placement. In determining the cargo tonnage, use the change in gage readings after the cargo has been offloaded.

SECTION 01 22 00.10 Page 5

Promptly report any repairs or additions made to the barges during the progress of the work. The Government may elect to have a barge re-measured at the Contractor's expense. If so, this shall be done under the observance of the Contracting Officer's Representative. No barge shall be employed that is not seaworthy or that leaks excessively to render gauging difficult. The barges used shall be so constructed that when loaded they do not bend or warp to where the gages can become unreliable. Each barge load shall contain only one class of stone.

When weighing the load, take measurements immediately before a barge starts for its point of unloading and immediately upon its return from that point. A Government inspector will record the gage readings, at which time the Contractor can be present. Any disagreement on the Contractor's part concerning the measured stone weight must be reported in writing to the Contracting Officer's Representative within 10 calendar days of the occurrence. Disputes will be handled in accordance with the CONTRACT CLAUSE entitled DISPUTES. To make sure the proper density of the surrounding water is used in calculating the weight of stone from the barge gage readings, the Government will take hydrometer measurements alongside each barge when it is empty, fully loaded, and empty again.

1.3.2.3 Unit of Measure

Unit of measure: Ton.

1.3.3 Geotextile

1.3.3.1 Payment

Payment will be made at the Contract unit price for "Geotextile - Station 0+00 to Station 201+06", in Schedule No. 1, (AM#1)and "Geotextile - Station 0+00 to Station 7+00", in Option No. 1, which will constitute full compensation for providing plant, labor, material, and equipment and performing the operations necessary for the complete and satisfactory installation of the geotextile. No payment will be made for geotextile replaced because of contamination or damage due to the Contractor's fault or negligence.

1.3.3.2 Measurement

Measurement for geotextile installed shall be in Square Yards of the as-built surface area covered by getotextile. No allowance will be made for waste, overlaps, damaged materials, repairs or material used for the convenience of the contractor.

1.3.3.3 Unit of Measure

Unit of measure: Square Yards.

-- End of Section --

SECTION 01 22 00.10 Page 6

DIVISION 31 - EARTHWORK

31 23 16.19 45

EXCAVATION

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 SHORELINE EROSION PROTECTION SYSTEM ALIGNMENTS

1.3.1 Physical Alignment Layouts

1.3.2 Changes to Alignment

1.4 PROTECTION OF EXISTING SERVICE LINES AND UTILITIES

1.5 GRADE TOLERANCE

1.6 STOCKPILING OF MATERIALS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

3.1 EXCAVATION

3.1.1 General

3.1.2 Conduct of Work

3.1.3 Foundation Preparation

3.2 DISPOSAL OF EXCAVATED MATERIALS

3.2.1 Stone

3.2.2 Excess Soil and Organic Materials

3.2.3 Inert Materials other than Removed Stone

3.2.4 Temporary Stockpiling

3.3 EROSION AND SLIDES

3.4 CONTRACTOR QUALITY CONTROL

3.4.1 Compliance Inspection

3.4.2 Records

-- End of Section Table of Contents --

SECTION 31 23 16.19 45 Page 1

31 23 16.19 45

EXCAVATION

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUMMARY

The work covered by this Section consists of providing the equipment and labor and performing the operations necessary to remove existing shoreline erosion protection system(stone protection) from the project limits (AM#1) (including Option No.1, if awarded) as shown and as specified in this section. Incidental to this work is shaping the affected slopes and preparing the excavated surfaces to receive geotextile, reused (reusable) stone and new stone as shown. Excavation work does not include the filling or backfilling of areas and voids below the prescribed lines and grades to obtain the final shoreline erosion protection systemtemplates shown.

1.2 MEASUREMENT AND PAYMENT

Excavation to remove the existing stone protection from project limits (AM#1)(including Option No.1, if awarded) and for incidental preparation of the slopes accordingly to build new semi-compacted berm and receive the new stone as shown and specified will be measured and paid for as stated in

SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.

1.3 SHORELINE EROSION PROTECTION SYSTEM ALIGNMENTS

1.3.1 Physical Alignment Layouts

Prior to commencing any construction activities, physically lay out in the field the alignments shown by staking them.

1.3.2 Changes to Alignment

The Contracting Officer may make adjustments to the new shoreline erosion protection system alignment and to the position of the stone templates relative to the baselines shown as he or she deems necessary before or during the progress of the work. The intent in making any such adjustment would be to make the design stone templates better correspond with the existing field conditions. Any moderate adjustments made will be implicit and incidental to the required excavation work. If the stone protection alignment or position is changed, the Contractor will be appropriately compensated for any additional excavation quantity that could result. No additional payment will be made however to make modest adjustments directed by the Contracting Officer. Any disagreement concerning the consequences of directed changes to the alignment or position of the prescribed stone templates will be resolved in accordance with the CONTRACT CLAUSE entitled

DISPUTES.

1.4 PROTECTION OF EXISTING SERVICE LINES AND UTILITIES

Affected existing utility lines which are made known to the Contractor prior to excavation must be protected from damage during excavation and filling. Immediately report to the Contracting Officer damage to existing

SECTION 31 23 16.19 45 Page 2 utility lines that are not shown or that the Contractor was not otherwise made aware of. If it is determined that the Contractor is to make the repairs, they will be ordered in accordance with the CONTRACT CLAUSE entitled CHANGES or DAMAGES TO WORK, whichever applies.

FOR INFORMATION ON VERIFYING PIPELINE OWNERSHIPS, CALL:

Lonestar Notification Center 1-713-223-4567 or 1-800-669-8344

Texas 811 (Dig-Tess) 1-800-344-8377

1.5 GRADE TOLERANCE

Excavation of the embankment slope shall be within tolerances of 3 inches above and 6 inches below the neat lines shown, as measured perpendicular to line. Where areas are below the lines and grades shown and where over-excavation is done to remove the existing stone, the areas are to be filled and backfilled withsatisfactory materials as specified in SECTION 35 41 00.01 45 - SEMI-COMPACTED BERM CONSTRUCTION . No payment will be made for backfilling areas excavated below the the specified tolerance unless the excavation was otherwise necessary to remove unsuitable soil or existing stone, as expressly allowed in this Contract, with the Contracting Officer's prior approval.

1.6 STOCKPILING OF MATERIALS

The temporary stockpiling of excavated materials adjacent to the work will be allowed where accepted. No additional payment will be made for such stockpiling or for the handling of the stockpiled material.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

3.1 EXCAVATION

3.1.1 General

Excavation to remove the existing stone is to be done to repair the shoreline erosion protection system shown. Over-excavation below the defined lines and grades will not be allowed except in those instances necessary to remove unsatisfactory material or stone as warranted or directed. Existing stone that may still be present below the prescribed grades is to be removed in its entirety. The filling of areas below the prescribed grades and backfilling of over-excavated areas necessary to achieve the lines and grades of the design stone templates shown is to be accomplished using satisfactory materials as specified in SECTION 35 41 00.01 45 - SEMI-COMPACTED BERM CONSTRUCTION. The intent of the excavation is to provide firm and relatively smooth surfaces upon which the geotextile can be laid and the reused (reusable)stone and new graded riprap can be placed.

3.1.2 Conduct of Work

Roughly excavate to the prescribed lines and grades. Remove any existing stone below these lines and grades and any material unsuitable to provide a firm foundation for the new stone. Do not advance the excavation so far ahead of protecting the slope with the new stone that the excavated slope

SECTION 31 23 16.19 45 Page 3 will be exposed for a protracted length of time as this will result in severe erosion damage due to wave attack and sheet flows. Discussion of how the Contractor plans on executing the work to reasonably limit the amount of erosion damage to completed excavations shall be included in the Work Plan. During the progress of the work, the Contracting Officer may direct the Contractor to change the conduct of its operations if severe erosion of completed excavations is occurring. If such changes are directed, the additional costs the Contractor incurs in adjusting its operations are to be borne by the Contractor because it will be the Contractor's responsibility to maintain a completed section of the excavation until its acceptance.

3.1.3 Foundation Preparation

Make sure that all stone below the the excavation line has been entirely removed. Shape and grade the excavated surfaces to the extent practicable to conform to the grades shown or as required below the grades shown to provide relatively smooth surfaces, including transition surfaces, upon which to lay the geotextile, reused (reusable) stone and new graded riprap. Maintain the completed section until its acceptance. Once accepted, immediately install the geotextile and place the reused (reusable) stone and new graded riprapas specified in SECTION 35 31 19.32 45

RIPRAP

3.2 DISPOSAL OF EXCAVATED MATERIALS

3.2.1 Stone

Dispose removed stone in accordance with the provisions of SECTION

35 31 19.32 45 RIPRAP.

3.2.2 Excess Soil and Organic Materials

Dispose excess excavated material that cannot be used elsewhere in the work and that does not contain appreciable amounts of stone, and unsatisfactory organic materials within the designated Disposal Area for Excess Excavated Materials located within PA 11. Alternatively, these materials may be disposed at a location off site at the Contractor's discretion. Material disposed of within the designated disposal area shall be deposited in an approved manner.

3.2.3 Inert Materials other than Removed Stone

Remove and dispose off site inert materials such as the existing geotextile underlayment and certain types of trash. Do not put debris within the placement areas or leave debris at the worksites.

3.2.4 Temporary Stockpiling

The temporary stockpiling of excavated materials will be allowed on site where approved. Temporary stockpiles must be maintained in relatively neat condition with provision for providing a safe working environment.

Routinely collect from the work areas debris encountered during initial clearing and accumulated debris up until final acceptance and properly dispose it in an approved landfill.

3.3 EROSION AND SLIDES

If erosion or sliding of any part of the excavated slopes occurs during

SECTION 31 23 16.19 45 Page 4 their construction or after their completion, but prior to their acceptance, promptly notify the Contracting Officer. Do not re-establish/restore the affected area(s), unless the Contracting Officer directs otherwise. If the slide resulted because the Contractor did not reasonably protect the completed slope against erosion and slides, was not timely in notifying the Government that an excavated area had been completed, was otherwise negligent in its responsibility to reasonably maintain the completed excavation, or because of the Contractor's construction activities, the additional quantity of stone that will have to be placed to build the prescribed shoreline erosion protection system templates will be at the Contractor's expense. The additional quantity of stone placed will be deducted from the total quantity of stone placed when computing the payment for this item. If the erosion or slide was not caused by the Contractor's operations or conduct or the Contractor's reasonable efforts to protect against these occurrences, the additional tonnage of stone that will have to be placed will be paid for as specified.

3.4 CONTRACTOR QUALITY CONTROL

3.4.1 Compliance Inspection

Inspect for compliance with the Contract requirements and record the inspection of operations including, but not limited to, the following:

(1) Excavation - Lines and grades, relatively smooth planar surfaces, removal of existing stone below the prescribed lines and grades.

(2) Execution - Protecting completed sections in a timely manner;

limiting slope exposure to wave attack.

3.4.2 Records

Submit with each day's Quality Control report copies of the records of inspections and required tests, when appropriate, and note in the report corrective actions taken.

-- End of Section --

SECTION 31 23 16.19 45 Page 5

DIVISION 33 - UTILITIES

SECTION 33 46 13.00 45

GEOTEXTILES USED AS FILTERS

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 REFERENCES

1.4 SUBMITTALS

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 GEOTEXTILE

2.2 SEAMS

2.3 ACCEPTANCE REQUIREMENTS

2.4 DETERMINATION OF PERCENT OF OPEN AREA

PART 3 EXECUTION

3.1 MOBILIZATION AND DEMOBILIZATION

3.2 GEOTEXTILE INSTALLATION

3.2.1 General

3.2.2 Placement

3.3 PROTECTION

3.4 CONTRACTOR QUALITY CONTROL

3.4.1 Compliance Inspection

3.4.2 Reports

-- End of Section Table of Contents --

SECTION 33 46 13.00 45 Page 1

SECTION 33 46 13.00 45

GEOTEXTILES USED AS FILTERS

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUMMARY

The work covered in this Section consists of furnishing plant, labor, material, and equipment and performing the operations required for furnishing, hauling, and placing the geotextile, complete, as specified herein and as shown, and for maintaining the geotextile until installation of the shoreline erosion protection system (stone protection) is completed and accepted.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for geotextiles used as filters will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND

PAYMENT.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D123 (2015b; E 2016) Standard Terminology Relating to Textiles

ASTM D3884 (2009; R 2013; E 2014) Abrasion Resistance of Textile Fabrics (Rotary Platform, Double-Head Method)

ASTM D4355 (2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus

ASTM D4491 (2017) Water Permeability of Geotextiles by Permittivity

ASTM D4533 (2011) Trapezoid Tearing Strength of Geotextiles

ASTM D4632 (2008) Grab Breaking Load and Elongation of Geotextiles

ASTM D4751 (2016) Standard Test Method for Determining Apparent Opening Size of a Geotextile

ASTM D6241 (2014) Standard Test Method for the Static

SECTION 33 46 13.00 45 Page 2

Puncture Strength of Geotextiles and Geotextile-Related Products Using a 50-mm Probe

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-04 Samples

Textile Pins

At least two temporary textile pins shall be submitted prior to delivery of material to the worksite.

Geotextile Fabric

Two fabric samples measuring approximately 2 feet by 2 feet shall be submitted to the Area Office to be forwarded to Geotechnical and Structures Section for materials files.

SD-07 Certificates

Geotextile; G

A certificate of compliance attesting that the geotextile meets the chemical, physical, and manufacturing requirements specified herein.

1.5 DELIVERY, STORAGE, AND HANDLING

Synthetic geotextiles that are not to be installed immediately and during periods of shipment and storage, shall be protected from direct sunlight, ultra-violet rays, temperatures greater than 140 degrees F, mud, dirt, dust, and debris. To the extent possible, the fabric shall be maintained wrapped in a heavy duty protective covering.

PART 2 PRODUCTS

2.1 GEOTEXTILE

The geotextile shall be a woven pervious sheet of plastic yarn in accordance with ASTM D123. The geotextile shall meet the physical requirements listed in the TABLE below. The geotextile fabric shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of propylene, ethylene, ester, amide, or vinylidene-chloride, and shall contain stabilizers or inhibitors added to the base plastic if necessary to make the filaments resistant to deterioration due to ultra-violet and heat exposure. The edges of the geotextile shall be finished to prevent the outer fiber from pulling away from the geotextile.

2.2 SEAMS

The seams shall be sewn with thread of a material meeting the chemical requirements given above for geotextile yarn or shall be bonded by

SECTION 33 46 13.00 45 Page 3 cementing or by heat. The sheets of geotextile shall be attached at the factory or another approved location, if necessary, to form sections not less than 18 feet wide. (AM#1)Seams are not allowed to run transverse to the slope unless they are sewn. Seams shall be tested in accordance with

ASTM D4632.

2.3 ACCEPTANCE REQUIREMENTS

Brands of geotextile to be used shall be accepted on the following basis.

The Contractor shall submit in duplicate, a mill certificate or affidavit signed by a legally authorized official of the company manufacturing the geotextile. The mill certificate or affidavit shall attest that the geotextile meets the chemical, physical, and manufacturing requirements specified in this Section.

(AM#1)TABLE - PHYSICAL REQUIREMENTS

PROPERTY TEST METHOD UNIT MINIMUM TEST

VALUE

Apparent Opening Size (U.S. Sieve)

ASTM D4751 U.S. Sieve #70 (or greater)

Permittivity ASTM 4491 Sec -1 1.5 (or greater)

Permeability ASTM D4491 cm/sec 0.01 (or greater)

CBR Puncture Strength

ASTM D6241 lbs 1250

Grab Tensile Strength In any principal direction

ASTM D4632 lbs and % 300, 15% minimum strain

Trapezoidal Tear ASTM D4533 lbs 100

Ultraviolet Degradation (percent strength retained at 500 hours)

ASTM D4355 90% strength retained for all classes

Seam Strength ASTM D4632 lbs/inch 300

Abrasion Resistance ASTM D3884 lbs *

Percent Open Area See Paragraph:

DETERMINATION OF

PERCENT OPEN AREA

below

% 4 (or greater)

* 55% residual breaking load in any principal direction

2.4 DETERMINATION OF PERCENT OF OPEN AREA

Five samples of unaged woven geotextile shall be placed separately in a

SECTION 33 46 13.00 45 Page 4

2-inch by 2-inch slide holder and the image projected with a slide projector on a rigid screen. A square block of 25 openings near the center of that image shall be selected and the length and width of each of the 25 openings shall be measured to the nearest 0.02-inch. The total area shall be determined by measuring the length of the sides of the five openings and five adjacent fibers in each direction to the nearest 0.02-inch. The Percent Open Area (POA) is determined by dividing the sum of the 25 open areas by the total area of the 25 openings and their adjacent fibers. The POA shall be quoted as the percent determined by averaging the POAs of the five individual specimens. However, if more than one of the five specimens are outside the specified POA limits, the fabric shall be considered to have failed the test.

PART 3 EXECUTION

3.1 MOBILIZATION AND DEMOBILIZATION

Mobilize sufficient personnel and equipment at the worksite to begin required operations. Upon successful completion of the work required as specified herein, the Contractor shall remove the construction equipment, materials, and supplies from the site after acceptance of the work by the Contracting Officer.

3.2 GEOTEXTILE INSTALLATION

3.2.1 General

The geotextile shall be placed as specified and at the locations shown. At the time of installation, the geotextile shall be rejected if it has defects, rips, holes, flaws, deterioration, or damage incurred during manufacture, transportation, or storage.

3.2.2 Placement

The surface to receive the geotextile shall be prepared to a relatively smooth condition free of obstructions, depressions, debris, and soft or low density pockets of material. Erosion features including rills or gullies, shall be graded out of the surface before geotextile placement. The geotextile shall be placed with the long dimension perpendicular to the centerline of the top of slope and laid smooth and free of tension, stress, folds, wrinkles, or creases. The strips shall be placed to provide a minimum width of 18 inches overlap for each joint. (AM#1) Seaming will be considered in lieu of overlapping adjacent geotextile strips in submerged area. Temporary pinning of the textile to hold it in place until the stone protection is placed shall be allowed. The temporary pins shall be removed as the stone protection is placed to relieve high tensile stress which may occur during placement of material on the geotextile. At least two temporary pins shall be submitted for approval prior to delivery of material to the worksite. Damaged geotextile, during installation or placement of the stone protection, shall be replaced by the Contractor at no additional cost to the Government. The work shall be scheduled so that covering the geotextile with a layer of the specified material is accomplished within 3 calendar days after placement of the geotextile.

Failure to comply shall require replacement of geotextile.

3.3 PROTECTION

The geotextile shall be protected from damage prior to and during the placement of the stone protection. Before placement of the stone

SECTION 33 46 13.00 45 Page 5 protection, the Contractor shall demonstrate that the placement technique will prevent damage to the geotextile. No equipment shall be allowed on the unprotected geotextile.

3.4 CONTRACTOR QUALITY CONTROL

3.4.1 Compliance Inspection

Prior to placement, the Contractor shall inspect each section of geotextile for holes, tears, or other defects or deterioration. In addition, if sewed seams are selected to be used along transverse joints at each section of geotextile, each seam shall be inspected for continuity prior to placement.

3.4.2 Reports

Reports of the inspection activity and corrective action taken shall be submitted with the daily reports.

-- End of Section --

SECTION 33 46 13.00 45 Page 6

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 31 19.32 45

RIPRAP

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 REFERENCES

1.4 DEFINITIONS

1.4.1 Shoreline Erosion Protection System

1.4.2 Graded Riprap

1.4.3 Reused (or reusable) Stone

1.5 SUBMITTALS

1.6 SYSTEM DESCRIPTION

1.6.1 Revision of Bid Schedule Quantities

1.6.2 Re-revision of Estimated Quantities

1.7 CHANGES TO SHORELINE EROSION PROTECTION SYSTEM ALIGNMENT

1.8 QUALITY ASSURANCE

1.8.1 General

1.8.2 Sources

1.9 SURFACE TOLERANCES

1.9.1 Stone for Shoreline Erosion Protection System

1.9.2 Excess Stone Placement

1.9.2.1 Determination of Excess Stone

1.9.2.2 Final Surveys

1.9.3 Stockpiled Stone

1.10 STORAGE OF CONSTRUCTION MATERIALS

PART 2 PRODUCTS

2.1 STONE

2.1.1 General

2.1.2 Quality

2.1.2.1 Gradation Test

2.1.2.2 Proportional Dimension Limitations

2.2 GRADED RIPRAP

2.2.1 General

2.2.2 Gradation

PART 3 EXECUTION

3.1 GENERAL

3.2 BASE PREPARATION

3.3 STONE PLACEMENT

3.3.1 Geotextile

3.3.2 Riprap

3.3.3 Stone Placement in Advance

3.4 TESTS AND INSPECTIONS

3.4.1 Pre-Production

3.4.2 Placement Control

3.4.2.1 Alignment

SECTION 35 31 19.32 45 Page 1

3.4.2.2 Check Surveys

3.5 DISPOSAL

3.6 DISPOSITION OF MATERIAL NEAR OR WITHIN NAVIGABLE WATERWAYS

3.6.1 Misplaced Material

3.7 CONTRACTOR QUALITY CONTROL

ATTACHMENTS:

GRADATION TEST DATA SHEET

-- End of Section Table of Contents --

SECTION 35 31 19.32 45 Page 2

SECTION 35 31 19.32 45

RIPRAP

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUMMARY

The work in this Section includes furnishing labor, equipment, and material for placing riprap as erosion protection as part of operations in connection with repairs to shoreline erosion protection system at Sabine-Neches Water Way, PA # 11.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for riprap will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C127 (2012) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate

ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete

ASTM C535 (2012) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM D5519 (2014) Particle Size Analysis of Natural and Man-Made Riprap Materials

ASTM D4791 (2010) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate

ASTM D4992 (2014; E 2015) Evaluation of Rock to be Used for Erosion Control

ASTM D5312/D5312M (2012; R 2013) Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions

SECTION 35 31 19.32 45 Page 3

ASTM D5313/D5313M (2012; R 2013) Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 144 (1992) Standard Test Method for Resistance of Rock to Freezing and Thawing

1.4 DEFINITIONS

1.4.1 Shoreline Erosion Protection System

shoreline erosion protection system is defined in this Contract as a system consisting of a layer or layers of filter material, such geosynthetic fabric (geotextile) beneath a layer or layers of riprap.

1.4.2 Graded Riprap

Graded riprap is reasonably well graded, or other material that is durable and dense and deliberately selected and graded. It is loosely placed along or around shorelines, streambeds, bridge abutments pilings, and other shoreline structures to protect these features against water erosion.

Riprap is normally produced by mechanical with a jaw crusher and grizzly after the stone has been mined by blasting in a quarry.

1.4.3 Reused (or reusable) Stone

Reused stone is stone obtaind from the required excavations and removal of existing shoreline erosion protection system within the shown work limits (AM#1)(including Option No.1, if awarded). The removed or excavated stones will be reused to reconstruct the shoreline erosion protection system at the project sites (AM#1)(including Option No.1, if awarded).

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Work Plan; G, AO

Prior to starting construction, submit a construction Work Plan that includes descriptions and details on what measures will be taken to protect the existing shoreline and adjacent completed works from being compromised or damaged by the proposed construction activities and operations. Describe the materials, equipment, construction techniques, sequences, and procedures that will be used to mobilize and transport the materials to the worksites, stockpile salvaged stone, excavate the embankment slopes for stone placement, and place the stone as specified.

Provide detailed plans as to how the worksites are going to be accessed from the water. State how the worksites are going to be maintained during construction, cleaned up afterwards, and how demobilization will be executed.

SECTION 35 31 19.32 45 Page 4

SD-02 Product Data

Riprap; G, AO Bulk Specific Gravity; G, AO

Submit stone source documentation, descriptions of the stone characteristics/properties, and close-up digital photographs of representative stone samples a minimum of 40 days before the stone is expected to be delivered to the worksite. Include in the descriptions of the stone properties representative unit weights of the graded stone, installed, i.e. tons per cubic yard, so that the tonnage of stone placed can be computed from as-built surveys.

SD-03 Test Reports

Gradation; G, AO

Submit gradation test results in accordance with the reporting requirements outlined in ASTM C136/C136M and ASTM D5519 for graded riprap.

Quality Tests; G, AO

Quality test the riprap in accordance with PART 2 of this section under Subparagraph: Quality. At least 40 days prior to delivering the stone, submit a copy of the laboratory inspection report along with actions taken to correct deficiencies. Submit a copy of the testing report.

Bulk Specific Gravity; G, AO

SD-04 Certificates

Riprap; G, AO

Certificates of compliance validating that the stone meets the specified requirements. Submit the certificates at least 50 days before planned delivery to the worksite.

Weigh Scale Certification Certified Weight Scale Tickets

Laboratory; G, AO

Copies of the documents issued by the Materials Testing Center (MTC), U.S. Army Corps of Engineers Engineering Research and Development Center, that validate that the commercial testing laboratory used or the Contractor's testing facilities can perform the required tests. The individual tests covered by the validation are to be listed with their date of inspection.

SD-05 Closeout Submittals Test and Service Records; G

Suitable tests and service records to determine the acceptability of stone shall be submitted.

SECTION 35 31 19.32 45 Page 5

1.6 SYSTEM DESCRIPTION

Factors Used for Converting In-Place Volume to Weights

The following factors were used in converting the in-place volume to the quantities shown in the BID SCHEDULE.

Bulk Stone Material Bulk Specific Gravity

(SSD)

Percent Voids

Cubic Feet of Volume per Ton, including Compensation Voids (for Excess Quantity Calculations)

Graded Riprap 2.65 28 16.80

Reused Stone 2.65 31 17.53

1.6.1 Revision of Bid Schedule Quantities

The estimated stone quantities given in the BID SCHEDULE were computed based on stone having a bulk specific gravity (saturated surface dry (SSD) basis) relative to water having a unit weight of 62.4 pounds per cubic foot and percentage of voids as shown in the above table. When the bulk specific gravity (SSD) of the stone to be used in the work is other than that shown in the above table, the estimated quantities will be revised by multiplying them by the fraction which results when the bulk specific gravity (SSD) of the stone furnished is divided by the value shown in the table for each respective stone gradation. Revision for the percentage of voids will likewise be made. The Contracting Officer will issue a modification to the Contract in accordance with the Contract Clause:

CHANGES to adjust the estimated quantities in the BID SCHEDULE. The revised quantities will then be the quantities from which the allowable fifteen percent (15%) variation in estimated quantity, for payment purposes, will be determined as defined in CONTRACT CLAUSE entitled

VARIATIONS IN ESTIMATED QUANTITY.

1.6.2 Re-revision of Estimated Quantities

If during the progress of the work it is determined that the stone actually placed has a bulk specific gravity range or percentage of voids different from that on which the quantities in the BID SCHEDULE are based, the BID SCHEDULE will be further revised in accordance with Subparagraph: Revision of Bid Schedule Quantities.

1.7 CHANGES TO SHORELINE EROSION PROTECTION SYSTEM ALIGNMENT

The Contracting Officer reserves the right to make adjustments to the new shoreline erosion protection system alignment and to the position of the stone…