Request For Proposal

Defense Information Systems Agency (DISA) Building 200 Electrical Capacity Upgrade

Port of San Antonio, Texas

W9126G-16-R-0579 December 2016

US Army Corps of Engineers Fort Worth District

DISA B200 Electrical PSAB200E

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442

00 11 00.02 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 21 30 SITE VISITS

00 22 11 LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL

PREPARATION

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 01 30 10.00 44 01 31 19.00 44 01 32 01.00 10 01 33 00 01 35 26 01 42 00 01 45 00.00 10 01 45 00.10 10 01 50 00 01 56 00.00 44 01 57 19 01 57 20.00 10 01 57 23 01 58 00 01 62 35 01 71 23.00 44 01 74 19 01 75 00.00 40 01 78 00 01 78 23 01 78 24.00 20

01 91 00.00 40

CONSTRUCTION SCHEDULE

PARTNERING

PROJECT MEETINGS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

QUALITY CONTROL SYSTEM (QCS)

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

DUST CONTROL

TEMPORARY ENVIRONMENTAL CONTROLS

ENVIRONMENTAL PROTECTION

TEMPORARY STORM WATER POLLUTION CONTROL

PROJECT IDENTIFICATION

RECYCLED / RECOVERED MATERIALS

SURVEY, LAYOUT, AND OTHER DATA

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

STARTING AND ADJUSTING

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 STRUCTURAL CONCRETE

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 FIRESTOPPING

PROJECT TABLE OF CONTENTS Page 1

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 90 00 PAINTS AND COATINGS

09 97 13.28 PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE

RODS

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19.00 10 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR

26 24 16.00 40 PANELBOARDS

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

DIVISION 31 - EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 29 LIME-STABILIZED SUBGRADE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

33 11 00 WATER DISTRIBUTION

33 52 10 SERVICE PIPING, FUEL SYSTEMS

33 52 90.00 20 WELDING FOR POL SERVICE PIPING

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 57 00 BULK FUEL RECEIVING/DISPENSING EQUIPMENT

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

Project TItle: DISA Building 200 Construct Electrical Upgrade, Port San Antonio, Texas, 78226

Firm Fixed Price - 100% Small Business Set Aside

North American Industrial Classification System (NAICS) 236220

POC: Akiba T. Muldrow (817) 886-1025 / Email - akiba.t.muldrow @usace.army.mil

CRAIG D HARPER (817) 886-1077

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-Dec-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________420 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Jan 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

W9126G

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(817) 886-6403FAX:TEL: (817) 886-1077 TEL: FAX:

W9126G-16-R-0579 37

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

0001 All Work for the Construction of the Electrical Capacity Upgrades at Building 200 1 JOB $ *** $

$TOTAL OFFER

Defense Information Systems Agency (DISA) Building 200 Electrical Capacity Upgrade Port San Antonio, Texas

Solicitation No.W9126G-16-R-0579

CLIN SCHEDULE

Section 00 11 00 Page 1

Defense Information Systems Agency (DISA) Building 200 Electrical Capacity Upgrade Port San Antonio, Texas

Solicitation No. W9126G-16-R-0579

CLIN SCHEDULE

Section 00 11 00 Page 2

NOTES:

1. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the CLIN Schedule.

2. Offerors must bid on all items.

3. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.

4. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

END OF CLIN SCHEDULE

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Data Universal Numbering System Number JUL 2013 52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.222-38 Compliance With Veterans' Employment Reporting Requirements

FEB 2016

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Swf-protest@usace.army.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Refer to Section 00 21 30

(c) Participants will meet at--

Refer to Section 00 21 30

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR):

http://farsite.hill.af.mil/VFDFARA.htm

Department of Defense FAR Supplement (DFARS):

http://farsite.hil.af.mil/VFDFARA.htm

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

SECTION 00 21 30

SITE VISITS

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed.

(b) Site visit information: The site visit will be:

Date: 14 December 2016 Time: 9:00 pm (local time) Location: 3326 General Hudnell, San Antonio, TX POC: Frank Covington; Edward Garcia EMAIL: Frank.Covington@usace.army.mil; Edward.B.Garcia@usace.army.mil Phone: Covington - (817)-886-1872; Garcia - (210) 326-7113

Offerors and subcontractors wishing to participate shall provide to the referenced POC, at least 3 working days prior to the site visit, a complete listing of all attendees and subcontractors to attend the site visit.

Parking will be available on site across the street. Include the following information for all attendees and subcontractors.

Requirements for visitors:

Visitor Name and Company Name Texas drivers license number Total number of people attending Must be a US Citizen No cell phones allowed No cameras - The Customer will take any needed pictures No computers will be permitted on the network

(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a proposal after receipt of proposal or for a claim after award of the contract.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DOCUMENT 00 21 30 Page 1

SECTION 00 22 11 Page 1

SECTION 00 22 11

Evaluation Criteria

LOW PRICED TECHNICALLY ACCEPTABLE (LPTA)

Proposal Preparation W9126G-16-R-0579

DISA Building 200 Electrical Capacity Upgrade, Port San Antonio, TX.

PART I – GENERAL INFORMATION

1. INQUIRIES

OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:

Contract Specialist – Primary POC U.S. Army Corps of Engineers, Fort Worth District ATTN: Akiba T. Muldrow 819 Taylor Street, Room 2A17 Fort Worth, TX 76102-0300

Phone: 817-886-1025 Email: Akiba.T.Muldrow@usace.army.mil

Bidder Inquiry Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via:

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9126G-16-R-0579 The Bidder Inquiry Key is: QBCYQV-29HIN3

The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

SECTION 00 22 11 Page 2

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Identify other method required: None

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

As this is a competitive negotiation acquisition, there is no public bid opening and no information will be given out as to the number of offerors or the results of the competition until all awards are made.

2. DIRECTIONS FOR SUBMITTING PROPOSALS

a. ELECTRONIC OFFERS. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W9126G-16-R-0579_COMPANY NAME_PRICE

W9126G-16-R-0579_COMPANY NAME_TECHNICAL

Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE2/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).

When completing the information for transmittal at the AMRDEC SAFE website, notification should also be submitted to the Contract Specialist that you have submitted (and uploaded) a proposal in the AMRDEC SAFE Website. The Contract Specialist for this project is: Akiba T. Muldrow. Email address is Akiba.T. Muldrow@usace.army.mil.

Include the solicitation number is your Email Subject Line: W9126G-16-R-0579

b. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will or will not be accepted.

c. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellations of offers will or will not be accepted.

d. E MAIL OFFERS. Offers received by e mail, modifications thereto, or cancellations of offers will or will not be accepted.

3. PREPROPOSAL CONFERENCE / SITE VISIT

SITE VISIT: Refer to specification 00 21 30

SECTION 00 22 11 Page 3

IMPORTANT NOTES: (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

PART II -- PROPOSAL INSTRUCTIONS

1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

(1) Each Offeror must submit both a Price Proposal and a Technical Proposal electronically. The Price Proposal and the Technical Proposal must be submitted as separate volumes/files.

(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer.

b. DISCUSSIONS. The Government does not intend to enter into discussions with offerors prior to determining those contractors within the competitive range, in accordance with FAR 52.215-1, Instructions to Offerors—Competitive Acquisitions.

c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.

d. GENERAL INSTRUCTIONS.

(1) Submit only the electronic-documents. Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

(2) PDF pages should be formatted to print on 8 ½ by 11 inch paper size, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Spreadsheets must fit to (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company.

SECTION 00 22 11 Page 4

(3) Hard copies will not be submitted.

(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

(5) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page. . Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

(7) Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, and shall show the date of revision.

(8) Within three (3) days of contract award, the awardee shall submit a conformed Technical Offer on an electronic CD Rom or DVD +/-R.

e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL

(1) Submit the price proposal as one separate PDF file titled:

W9126G-16-R-0579_COMPANY NAME - PRICE

(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages in PDF format. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

Technical pages are limited to: See (f) (3). Electronic documents must meet page sizes in case documents require printed.

(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.

SECTION 00 22 11 Page 5

TAB CONTENTS OF THE PRICE PROPOSAL

#1 The Proposal Cover Sheet

#2 Signed 1442 and SF 30 Acknowledgement of Amendments

#3 Section 00 11 00, Pricing Schedule

#4 Section 00 45 00, Representations, Certifications, and Other Statements of Offerors or statement that offeror has electronic certifications in ORCA

#5 JV Agreement or Articles of Organization for LLC, if applicable.

#6 Bid Guarantee (Bid Bond)

#7 Subcontracting Plan

(4) Detailed Submission Instructions for the Price Proposal

TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:

PROPOSAL COVER SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available):

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item:

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB 2: Signed 1442, duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

SECTION 00 22 11 Page 6

TAB 3: Section 00 11 00, Pricing Schedule is to be completed in its entirety by all Offerors.

See Section 00 11 00 with attached notes, for further instructions.

TAB 4: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations / certifications found in the solicitation. The offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.

TAB 5: If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not yet been finalized / approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties. If the Offeror is a Limited Liability Company, include a copy of the Articles of Organization.

TAB 6: Provide a fully executed Bid Bond as required by FAR Clause 52.228-1(c), Bid Guarantee.

TAB 7: Offerors must submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219- 7003 (or DFARS 252.219-7004 if the offeror has a comprehensive subcontracting plan). Other than U.S. Small Businesses must submit acceptable subcontracting plans to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan.

f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

(1) Technical Proposal. Submit an electronic document of the Technical Proposal.

(2) Format and Contents of the Technical Proposal and List of Tabs. The technical proposal shall be organized using the tabs specified in the following chart.

TAB CONTENTS OF THE TECHNICAL

PROPOSAL

Tab 1, Factor #1 CONSTRUCTION EXPERIENCE

Tab 2, Factor #2 CONSTRUCTION SCHEDULE

Tab 3, Factor #3 PAST PERFORMANCE

SECTION 00 22 11 Page 7

(3) Page Limitations. The following page limitations are established for each factor described above:

Factor #1 Construction Experience Limited to 2 pages per project (maximum of five (5) forms) sent electronically

Factor #2 Construction Schedule Limited to ten (10) 8 1/2" x 11" pages or five (5) 11" x 14" fold-out pages (including narrative)

Factor #3 Past Performance No page limitation

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

PART III - EVALUATION OF OFFEROR PROPOSALS

1. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the FAR, no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2. SOURCE SELECTION USING THE LOW-PRICED, TECHNICALLY ACCEPTABLE

PROCESS

An evaluation for acceptability will be performance on each proposal in accordance with FAR 15.101- 2(b)(3). The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award.

3. BASIS OF AWARD

Award will be made on the basis of the lowest evaluated price of technically acceptable proposals meeting or exceeding the acceptability standards for non-cost factors. Tradeoffs will not be permitted.

Proposals are evaluated for acceptability but not ranked using non-cost/price factors.

4. EVALUATION OF THE PRICE PROPOSALS

a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror.

Additionally, all offers will be analyzed for unbalanced pricing.

b. The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a, CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

SECTION 00 22 11 Page 8

5. INTENT TO AWARD WITHOUT DISCUSSIONS

The Government intends to evaluate proposals and award a contract without discussions. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

6. PROPOSAL EXPENSE AND PRE-AWARD COSTS

The Request for Proposal does not commit the Government to pay any costs incurred in the preparation and submission of the initial and/or any subsequent proposals.

7. EVALUATION OF THE TECHNICAL PROPOSAL

The Technical Proposal will be evaluated based on the criteria identified in the individual attachments for the Factors.

8. GENERAL TECHNICAL CRITERIA

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included in the proposal may result in the offer being found deficient.

c. The Government cannot make award based on a deficient offer. Therefore, receipt of an “UNACCEPTABLE” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.

9. 52.217-5 EVALUATION OF OPTIONS (If applicable)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options (if options are applicable) to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

FACTOR #1

TAB 1: FACTOR 1, CONSTRUCTION EXPERIENCE: Demonstrate the experience of the offeror and/or proposed team, including subcontractors on projects same/similar in SIZE, SCOPE, and COMPLEXITY to that described in the solicitation. All submitted projects must be renovation/installation of new electrical switchgear, critical distribution switchgear, UPS Modules including batteries, Generators, Generator Paralleling Switchgear and Utility Transformers in a critical and occupied operating data center facility type. If using subcontractors as team members in demonstrating experience describe the roles the prime contractor and sub-contractors will play in the project and the percentage and type of work each will perform.

SECTION 00 22 11 Page 9

The Contractor shall complete a minimum of three (3), but no more than five (5), “Construction Experience Form”, (See Attachment 1), in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete for current on-going projects and for projects that are 100% complete, these projects must have been completed within the last six (6) years. At least two (2) of the projects provided must be valued at over $4,000,000 each.

If any of the information required is not included in the form then the contractor will be considered non-responsive and evaluated as “UNACCEPTABLE”.

(SEE CONSTRUCTION EXPERIENCE FORM IN ATTACHMENT 1)

FACTOR 1: CONSTRUCTION EXPERIENCE WILL BE EVALUATED BASED ON THE

FOLLOWING CRITERIA:

The Government will review the project experience of the offeror, including subcontractors, on projects provided in response to the Construction Experience Factor. Offerors must meet all of the following minimum acceptability standards to receive an “ACCEPTABLE” on this factor:

Relevancy is established with the following two items:

(1) Offeror must have at least three (3) projects that are same/similar in SIZE, SCOPE and COMPLEXITY to that of the work found in this solicitation. All submitted projects must be renovation/installation of new electrical switchgear, critical distribution switchgear, UPS Modules including batteries, Generators, Generator Paralleling Switchgear and Utility Transformers in a critical and occupied operating data center facility type. The proposal shall describe how the project was same/similar to that of the work found in this solicitation, AND

(2) At least two (2) of the projects, meeting the criteria of (1), shall be valued at over $4,000,000 each, AND

(3) All “Experience Information” forms submitted under Factor 1 must be completely filled out.

Recency is established with the following item:

(1) All projects submitted under this Factor 1 must be at least 50% complete for current on-going projects and for projects that are 100% complete, these must have been completed within the last 6 years.

Relevancy and Recency are not separately rated. A single rating will be assigned for the submission under Factor 1.

Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

SECTION 00 22 11 Page 10

ATTACHMENT 1 –

CONSTRUCTION EXPERIENCE FORM

(To be completed for each project submitted)

CONSTRUCTION OR PRIME CONTRACTOR PROJECT #_

Offeror:

Project and Location:

Was this project performed by the division or unit of the company submitting the offer for W9126G-16-R- 0579?

Yes No

Owner:

Owner’s Point of Contact for Reference: Telephone:

Awarded Construction Cost: Final Construction Cost:

Explain Cost Growth, if any:

Date of Award: Original Completion Date: Revised Completion Date: Percent Complete:

Explain Time Growth, if any:

General Scope of Construction and Offeror’s Role:

Work Your Company Self-Performed: Extent and Type of Work You Subcontracted Out:

SECTION 00 22 11 Page 11

Describe extent of relevancy and complexity of the project by checking all applicable boxes below. RELEVANCY:

Offeror must have at least three (3) projects that are same/similar in SIZE, SCOPE and COMPLEXITY to that of the work found in this solicitation. All submitted projects must be renovation/installation of new electrical switchgear, critical distribution switchgear, UPS Modules including batteries, Generators, Generator Paralleling Switchgear and Utility Transformers in a critical and occupied operating data center facility type. The proposal shall describe how the project was same/similar to that of the work found in this solicitation, AND

At least two (2) of the projects, meeting the criteria stated above, shall be valued at over $4,000,000 each, AND

All “Experience Information” forms submitted under Factor 1 must be completely filled out.

Describe extent of recency and complexity of the project by checking all applicable boxes below.

RECENCY:

All projects submitted under this Factor 1 must be at least 50% complete for current on-going projects and for projects that are 100% complete, these must have been completed within the last 6 years.

Provide additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).

Your Performance Evaluation by Owner, if known :

SECTION 00 22 11 Page 12

FACTOR #2

TAB 2: FACTOR 2, CONSTRUCTION SCHEDULE: The Offeror shall provide a Narrative and a time scaled (Gantt Chart) summary level network construction schedule that demonstrates the Offeror has a clear understanding of the requirements of the contract and the contract duration. The summary network schedule will indicate the total contract duration in calendar days on the Schedule. The summary schedule will, after contract award, be replaced with a project schedule as required by specifications.

The Schedule shall fully demonstrate how the Offeror plans to complete all contract work, with the specified completion of Base Offer and Option Item work from the receipt of the contract Notice-to- Proceed (NTP) in accordance with Section 01 00 00.00 44 Construction Schedule. The submitted Schedule is to include sequencing of work for construction activities, mandatory tasks, specified time for Government required review and approval periods of required submittals, construction submittals, long lead procurement items, all required construction phasing of work, all Option work items, and contract closeout submittal items. (See Section 01 32 01.00 10 Project Schedule and Section 01 33 00 Submittal Procedures). The submitted Schedule shall identify and include all Option Work Items and any specified phasing of work in accordance with the Breakout Price Schedule, Section 00 11 01. Completion of option work items is in accordance with the Breakout Price Schedule Notes unless otherwise noted in the solicitation Construction Schedule.

The Narrative shall include discussion of any construction challenges the Offeror foresees that may jeopardize the successful completion of all contract work to include required construction phasing, construction execution without impacting facility operation, and Option work items. The Offeror shall describe the plans for overcoming these challenges including the steps to guarantee that facility operation is neither impacted nor disrupted by the Contractor’s workmen. If no challenges are foreseen, then state as such. Any deviation from the solicitation requirements will be considered non-responsive and evaluated as unacceptable.

Offerors must submit a summary schedule for construction. Offerors must meet all of the following minimum acceptability standards to receive an “ACCEPTABLE” on this factor. The Government will take into account how well the summary schedule supports the contract duration, as well as other information, such as (but not limited to) independent judgment concerning logic, constraints and typical construction durations. The summary schedule shall be task oriented, indicating the number of calendar days after notice to proceed by which milestones are to be achieved. Give attention to the following features:

(1) Show the overall construction schedule and duration for the base bid and all options.

(2) Explain the greatest risk(s) to completing the project on schedule. Provide Narrative that discusses how any construction challenges the Offeror foresees are overcome to insure all contract work is successfully completed within contract requirements.

NOTE: SCHEDULES ARE TO BE IN SUFFICIENTLY CLEAR AND COMPLETE FORM

SUCH THAT THE SUCCESSFUL OFFEROR, UPON AWARD OF THE TASK ORDER, WILL

BE ABLE TO BEGIN MEANINGFUL WORK IMMEDIATELY. THE SCHEDULES ARE

BINDING IN INTENT WITH REGARD TO COMPLETION DATE.

SECTION 00 22 11 Page 13

FACTOR 2: CONSTRUCTION SCHEDULE WILL BE EVALUATED BASED ON THE

FOLLOWING CRITERIA:

The Government will review the documentation provided in response to Factor 2. Offerors must demonstrate all of the following minimum acceptability standards for the schedule and narrative to receive an “ACCEPTABLE” on this factor:

The schedule described above shall demonstrate all of the following:

(1) Task oriented schedule with all required Government review periods and approval periods of construction submittals, long lead procurement items, proposed phasing of work, all Option work items, and contract closeout submittal items;

(2) Indicating the number of calendar days (not to exceed the guidelines located in

SECTION 01 00 00.00 44);

The schedule narrative shall include discussion of each the following items and demonstrate how each item will be managed to successfully complete this project:

(1) Proposed construction phasing/sequencing of work;

(2) Award of option work items;

(3) Understanding of the complexity to perform the work in an occupied facility without shutting down existing mechanical, electrical, and plumbing systems.

Failure to demonstrate the minimally acceptability standards for the schedule and for the narrative under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

SECTION 00 22 11 Page 14

FACTOR #3

TAB 3: FACTOR 3, PAST PERFORMANCE:

The Past Performance Questionnaire included in the solicitation (Attachment 3) is provided for the offeror or its team members to submit to the client for each project the offeror included in its proposal for Factor

1. Ensure correct phone numbers and email addresses are provided for the client point of contact.

Completed Past Performance Questionnaires (PPQ) should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If any negative past performance information is received, and the contractor has not yet been given an opportunity to provide a response, the contractor will be given an opportunity to provide a response. If the client request, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist, Akiba T. Muldrow, via email at: Akiba.T. Muldrow@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposals PPQ’s previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

NOTE: Do not request past performance questionnaires (PPQ) on projects that have final CCASS or ACASS evaluations. If a CCASS or ACASS evaluation exists and a PPQ is provided for the same project, the CCASS or ACASS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the Source Selection Board, Contracting Officer, or the Source Selection Authority (if applicable).

For USACE or other DoD projects which are underway but do not yet have an interim or final CCASS or ACASS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) for the contract.

Also include performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluation past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS number of team members (Partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquires of owner representative(s), Federal Awardees Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rest with the Offeror.

New entities that have no past customers shall notify the KO in writing, prior to the date and time established for the Solicitation or Request for Proposal closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided; It is the contractor’s responsibility to

SECTION 00 22 11 Page 15 ensure that the reference documentation is provided and accurate, as the Government may not make additional requests for past performance information from the references.

The Government will review all CPARS, ACASS, CCASS and the Government wide Past Performance Information Retrieval System (PPIRS) evaluations regardless of project and past performance questionnaires for projects submitted under the Factor for Experience. The Government may contact points of contacts listed on the “Experience Information” forms submitted.

FACTOR 3: PAST PERFORMANCE WILL BE EVALUATED BASED ON THE FOLLOWING

CRITERIA:

Submit the Past Performance Questionnaire or the CCASS ratings for each project the offeror included in the proposal for Factor 1.

Each contractor shall provide no more five ten (5) past performance ratings. Any rating an offeror has in ACASS, CCASS, CPARS and PPIRS will count toward this requirement. The offeror is responsible for ensuring that the Contracting Officer has received any completed questionnaires prior to the closing date/time.

All past or current references must have overall ratings of satisfactory or above in order to receive an “ACCEPTABLE” rating.

In accordance with FAR 15.101-2(b)(1), if the Contracting Officer determines that a small business' past performance is not acceptable, the matter is referred to the Small Business Administration for a Contracting Officer’s Compliance determination.

In accordance with FAR 15.305 (iv), in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. Offerors with no past performance information will receive an “Unknown” or NEUTRAL rating for this factor. Therefore, an Offeror receiving an “Unknown” rating may not be evaluated favorably or unfavorably on past performance.