A1.2_BP335335-VOLUME_3.pdf
PDF 8 MB Posted
- Attached to
- Falfurrias Checkpoint Border Patrol Solicitation
- Solicitation number
- W9126G16R0085
About this file
Volume Three
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVAL RECOMMENDED BY:
ON THIS SHEET.
OF ALL DRAWINGS IN THIS SET AS INDEXED
OFFICIAL RECOMMENDATION AND APPROVAL
SIGNATURES AFFIXED BELOW INDICATE
their employment as required by ER 1110-1-8152 appear on these project documents within the scope of signatures and registration designations of individuals of the U.S. Army Corps of Engineers. The initials or
This project was designed by the Fort Worth District
CHIEF, ENGINEERING BRANCH DATE
US ARMY CORPS
OF ENGINEERS
Ft. Worth District
FALFURRIAS HWY 281 CHECKPOINT
FALFURRIAS, TEXAS
F A
L F
U R
R
IA
S , T
E X
A S
F A
L F
U R
R
IA
S
T E
X A
S
BORDER PATROL SERVICE
VOLUME THREE OF FIVE
V O
L U
M E
T H
R
O F
IV
E
SOLICITATION NO. W9126G-14-R-0053
S O
L
N O
W
G
R
F A
L F
U R
R
IA
S
W
Y
C
H E
C K
P O
IN
P N : 3
F A
L F
U R
R
C
H E
C K
P O
IN
N
PN: 335335 FY14
DATED: 20 APRIL 2015
y m b o l
F A
L F
U R
R
IA
S T E
X A S
F A
L F
U R
R
Y
C
H E
C K P
O
IN
T
B O
R D
R
A
T R
O L
S
E R
V
IC
NUMBER
SEQUENCE
SHEET
D e s ig n e d b y
D ra w n b y
R e v ie w e d b y
S u b m it te d b y
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
C
R P
S O
F E
N G
IN
E E
R
B
-G
-0 .D
G N
/2
/2
P lo t s c a le lo t d a te
C o n tr N o
S o l
N o
D a te
R e v
F il e n a m e c ti o n
T ra c k in g N o
D a te
D e s c ri p ti o n
C
D
A
B
1 4 52 3
Fort Worth District of Engineers
US Army Corps
P W
W
O R
K D
IR
:d
\B
P -G
-B S .D
G N
P W
W
O R
K D
IR
:d
\B
P -G
-I N
D X -M
D L .D
G N
R E
F E
R E
N C
E F
IL
E S
/2
/2
B P -G
-0 .D
G N
:4
:4
A
M
W
G
R
P N
A
P R
IL
NUMBER
IDENTIFICATION
SHEET
INDEX OF DRAWINGS
TITLE / DESCRIPTION
NUMBER
IDENTIFICATION
SHEET
TITLE / DESCRIPTION
DESIGNED BY: DENNIS MICHAEL KELLEY
STRUCTURAL
ARCHITECTURAL
V O
L U
M E T
H R
E E I
N D
E X O
F D
R A
W
IN
G S
G-006
J A
C K D
O S
B O
R N
E P .E
C H
IE
F
D E
S
IG
N B
R A
N C
PRIMARY INSPECTION COMMERCIAL CANOPY
SHORT STAY KENNEL BUILDING (CONTINUED)
PRIMARY INSPECTION NON-COMMERCIAL CANOPY
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
SHORT STAY KENNEL BUILDING
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
SECONDARY INSPECTION COMMERCIAL CANOPY
INTERIORS
MECHANICAL
ELECTRICAL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
C
M A
C K
C
M A
C K
C
M A
C K
VOLUME THREE INDEX OF DRAWINGS
VOLUME THREE COVER SHEET
PRIMARY INSPECTION COMMERCIAL CANOPY -COVER SHEET
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -COVER SHEET
SHORT STAY KENNEL BUILDING -COVER SHEET
SECONDARY INSPECTION COMMERCIAL CANOPY -COVER SHEET
BA501
BA302
BA301
BA202
BA201
BA121
BA120
BA102
BA101
BA001
CA501
CA302
CA301
CA202
CA201
CA120
CA104
CA101
EA501
EA302
EA301
EA202
EA201
EA102
EA101
SPECIAL SYSTEM PLAN - AREA B
SPECIAL SYSTEM PLAN - AREA A
LIGHTING PLAN - AREA B
LIGHTING PLAN - AREA A
ELECTRICAL LEGEND
SPECIAL SYSTEM PLAN - AREA B
SPECIAL SYSTEM PLAN - AREA A
LIGHTING PLAN - AREA B
LIGHTING PLAN - AREA A
ELECTRICAL LEGEND
POWER PLAN
LIGHTING PLAN & FIXTURE SCHEDULE
ELECTRICAL LEGEND
DA601
DA510
DA405
DA404
DA401
DA320
DA310
DA302
DA301
DA202
DA201
DA104
DA103
DA102
DA101
DA001
SHORT STAY KENNEL BUILDING -PARTITION TYPES
SHORT STAY KENNEL BUILDING -CEILING DETAILS
SHORT STAY KENNEL BUILDING -GUTTER DETAILS
SHORT STAY KENNEL BUILDING -ROOF DETAILS
SHORT STAY KENNEL BUILDING -MILLWORK DETAILS
SHORT STAY KENNEL BUILDING -INTERIOR FENCE DETAILS
SHORT STAY KENNEL BUILDING -WALL SECTIONS
SHORT STAY KENNEL BUILDING -BUILDING LONGITUDINAL SECTIONS
SHORT STAY KENNEL BUILDING -BUILDING CROSS SECTIONS
SHORT STAY KENNEL BUILDING -EAST AND WEST ELEVATIONS
SHORT STAY KENNEL BUILDING -NORTH AND SOUTH ELEVATIONS
SHORT STAY KENNEL BUILDING -ROOF PLAN
SHORT STAY KENNEL BUILDING -FIRST FLOOR REFLECTED CEILING PLAN
SHORT STAY KENNEL BUILDING -FIRST FLOOR DIMENSION PLAN
SHORT STAY KENNEL BUILDING -FIRST FLOOR PLAN
SHORT STAY KENNEL BUILDING -ABBREVIATIONS
SIGNAGE DETAILS AND SCHEDULE
FINISH DETAILS AND SCHEDULES
FURNITURE, FINISHES AND SIGNAGE
SECONDARY INSPECTION COMMERCIAL CANOPY -FIRST FLOOR REFLECTED CEILING PLAN
SECONDARY INSPECTION COMMERCIAL CANOPY -BUILDING LONGITUDINAL SECTION
SECONDARY INSPECTION COMMERCIAL CANOPY -BUILDING CROSS SECTION
SECONDARY INSPECTION COMMERCIAL CANOPY -EAST AND WEST ELEVATIONS
SECONDARY INSPECTION COMMERCIAL CANOPY -NORTH AND SOUTH ELEVATIONS
SECONDARY INSPECTION COMMERCIAL CANOPY -ROOF PLAN
SECONDARY INSPECTION COMMERCIAL CANOPY -FIRST FLOOR PLAN
DA801
DA604
DA603
DA602
SHORT STAY KENNEL BUILDING -PERSPECTIVE VIEWS
SHORT STAY KENNEL BUILDING -DOOR DETAILS
SHORT STAY KENNEL BUILDING -DOOR SCHEDULE AND DETAILS
SHORT STAY KENNEL BUILDING -EXTERIOR FENCING
PRIMARY INSPECTION COMMERCIAL CANOPY -FIRST FLOOR REFLECTED CEILING PLAN
PRIMARY INSPECTION COMMERCIAL CANOPY -BUILDING LONGITUDINAL SECTIONS
PRIMARY INSPECTION COMMERCIAL CANOPY -BUILDING CROSS SECTIONS
PRIMARY INSPECTION COMMERCIAL CANOPY -EAST AND WEST ELEVATIONS
PRIMARY INSPECTION COMMERCIAL CANOPY -NORTH AND SOUTH ELEVATIONS
PRIMARY INSPECTION COMMERCIAL CANOPY -COMMERCIAL DUAL LEVEL BOOTH
PRIMARY INSPECTION COMMERCIAL CANOPY -COMMERCIAL DUAL LEVEL BOOTH
PRIMARY INSPECTION COMMERCIAL CANOPY -ROOF PLAN
PRIMARY INSPECTION COMMERCIAL CANOPY -FIRST FLOOR PLAN
PRIMARY INSPECTION COMMERCIAL CANOPY -ABBREVIATIONS
BEY102
BEY101
BEL102
BEL101
BE-001
CS101
CS005
CS004
CS003
CS002
CS001
PRIMARY CANOPY NOTES
GENERAL NOTES & DETAILS IV
GENERAL NOTES & DETAILS III
GENERAL NOTES & DETAILS II
GENERAL NOTES & DETAILS I
STRUCTURAL ABBREVIATIONS
CG001
CEY102
CEY101
CEL102
CEL101
CE-001
DS301
DS111
DS101
DS005
DS004
DS003
DS002
DS001
DG001
FOUNDATION SECTIONS
FRAMING PLAN
FOUNDATION PLAN
GENERAL NOTES & DETAILS IV
GENERAL NOTES & DETAILS III
GENERAL NOTES & DETAILS II
GENERAL NOTES & DETAILS I
STRUCTURAL ABBREVIATIONS
PRIMARY CANOPY NOTES
GENERAL NOTES & DETAILS IV
GENERAL NOTES & DETAILS III
GENERAL NOTES & DETAILS II
GENERAL NOTES & DETAILS I
STRUCTURAL ABBREVIATIONS
BS101
BS005
BS004
BS003
BS002
BS001
G-006
G-005
BG001
DI103
DI102
DI101
HVAC CONTROLS
HVAC AND PLUMBING FLOOR PLAN
DMI301
DM-101
DEP101
DEL101
DE-001
EG001
ES101
ES005
ES004
ES003
ES002
ES001
SECONDARY CANOPY NOTES
GENERAL NOTES & DETAILS IV
GENERAL NOTES & DETAILS III
GENERAL NOTES & DETAILS II
GENERAL NOTES & DETAILS I
STRUCTURAL ABBREVIATIONS
EEY101
EEL101
EE-001
SPECIAL SYSTEM PLAN
LIGHTING PLAN
ELECTRICAL LEGEND
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -FIRST FLOOR REFLECTED CEILING PLAN
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -BUILDING LONGITUDINAL SECTION
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -BUILDING CROSS SECTION
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -EAST AND WEST ELEVATIONS
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -NORTH AND SOUTH ELEVATIONS
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -NON COMMERCIAL INSPECTION BOOTH
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -ROOF PLAN
PRIMARY INSPECTION NON-COMMERCIAL CANOPY -FIRST FLOOR PLAN
1 2 3 4 5
C
B
A
US Army Corps of Engineers ®
D
C
B
A
G B
G
1 -
FALFURRIAS, TEXAS
FALFURRIAS HWY 281 CHECKPOINT
PN335335 FY2014
April 20, 2015
CUSTOMS AND BORDER PROTECTION
PRIMARY INSPECTION CANOPY
MAP DATA ©GOOGLE, INEGI
SOLICITATION NUMBER: W9126G-14-R-0053
STRUCTURAL ABBREVIATIONS
A.F.F. ABOVE FINISHED FLOOR
ALT. ALTERNATE
ACI AMERICAN CONCRETE INSTITUTE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERING
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
A.B. ANCHOR BOLT
ARCH ARCHITECT, ARCHITECTURAL
@ AT (MEASUREMENT)
BM BEAM
BRG BEARING
B.F.F. BELOW FINISHED FLOOR
B.O.B. BOTTOM OF BEAM
B.O.D. BOTTOM OF DECK
B.O.F. BOTTOM OF FOOTING
B.P. BRACING ANCHOR POINT
BLDG BUILDING
C.I.P. CAST IN PLACE
C.J.P. COMPLETE JOINT PENETRATION
COL COLUMN
C.L. CENTERLINE
C.L.B. CENTERLINE OF BEAM
C.L.C. CENTERLINE OF COLUMN
C.L.F. CENTERLINE OF FOOTING
C.L.W. CENTERLINE OF WALL
CLR CLEAR
CONC. CONCRETE
CJ. CONTROL OR CONSTRUCTION JOINT
CMU CONCRETE MASONRY UNIT
CONN CONNECTION
CONT. CONTINUOUS
D.L. DEAD LOAD
DBL DOUBLE
DIA. DIAMETER
DIM. DIMENSION
DN DOWN
DOC DOCUMENT
DTL DETAIL
DWG(S) DRAWING(S)
E EXISTING
ELEV. (EL.) ELEVATION
E.O.S. EDGE OF SLAB
EQ EQUAL
EQUIP. EQUIPMENT
EXP. ANC. EXPANSION ANCHOR
EXP. JT (E.J.) EXPANSION JOINT
E.W. EACH WAY
E.F. EACH FACE
F.F. FINISHED FLOOR
F.O.S. FACE OF STEEL
F.O.W. FACE OF WALL
F.S. FAR SIDE
FT. FOOT, FEET
GA GAGE
GALV. GALVANIZED
G.S.N. GENERAL STRUCTURAL NOTES
GLB(GLULAM) GLUE-LAMINATED BEAM
G.B. GRADE BEAM
HAS WELDED HEADED ANCHOR STUD
HDG HOT DIPPED GALVANIZED
HORIZ. HORIZONTAL
H.S.B. HIGH-STRENGTH BOLT (ASTM A325)
I.F.W. INSIDE FACE OF WALL
IJ ISOLATION JOINT
JST JOIST
k KIP OR KIPS klf KIPS PER FOOT ksf KIPS PER SQUARE FOOT kcf KIPS PER CUBIC FOOT k ft KIP FOOT
L.L. LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
L.W. LONG WAY
MFR('S) MANUFACTURER('S)
MCJ MASONRY CONTROL JOINT
MAX. MAXIMUM
MECH MECHANICAL
MBMA METAL, BUILDING MANUFACTURERS' ASSOCIATION
MPH MILES PER HOUR
MIN. MINIMUM
M.C. MOMENT CONNECTION
N.T.S. NOT TO SCALE
N.S. NEAR SIDE
O.C. ON CENTER
OCEW ON CENTER EACH WAY
OCEF ON CENTER EACH FACE
O.F.W. OUTSIDE FACE OF WALL
OPP OPPOSITE
lb(s) POUND(S) plf POUNDS PER FOOT psf POUNDS PER SQUARE FOOT pcf POUNDS PER CUBIC FOOT lb ft POUND FOOT
P.C. PRECAST CONCRETE
PREFAB PREFABRICATED
P.E.J. PREFABRICATED EXPANSION JOINT
PEMB PRE-ENGINEERED METAL BUILDING
PT. POINT
REINF REINFORCING
REQ'D, (REQ) REQUIRED
S.J. SAW JOINT
SCHD. SCHEDULE
SIM SIMILAR
SOG SLAB-ON-GRADE
SQ SQUARE
STD STANDARD
SSMR STANDARD SEAM METAL ROOF
SJI STEEL JOIST INSTITUTE
SP SPACING
S.W. SHORT WAY
T.L. TOTAL LOAD
T&B TO AND BOTTOM
T.O. TOP OF
T.O.B. TOP OF BEAM
T.O.B.P. TOP OF BEARING PLATE
T.O.C. TOP OF CONCRETE
T.O.D. TOP OF DECK
T.O.F. TOP OF FOOTING
T.O.L. TOP OF LEDGER
T.O.M. TOP OF MASONRY
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TYP TYPICAL
UFC UNIFORM FACILITIES CRITERIA
U.O.N. UNLESS OTHERWISE NOTED
VERT. VERTICAL
W.P. WORKING POINT
W.W.F. WELDED WIRE FABRIC
w/ WITH w/o WITHOUT
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
A ct io n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N
2"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS001
S T
RU
C T U
RA
L
AB
B
RE
VI
A
TI
O N
S E
. S
AL
A H
AT
, P
.E
/1
4/
1. USE AIR-ENTRAINED 4000psi NORMAL WEIGHT CONCRETE FOR FLOOR SLAB
(FOOTING, PILASTERS, CONTINUOUS FOOTINGS, SLABS, ETC.) U.O.N.
2. CONCRETE REINFORCEMENT SHALL CONFORM WITH ASTM A 615 GRADE 60.
3. REINFORCEMENT LAP SPLICES AND EMBEDMENT LENGTHS SHALL CONFORM
TO TABLE A, CLASS B, CASE 2 LENGTHS SHOWN ON THIS DRAWING.
4. CONCRETE COVER OVER REINFORCEMENT SHALL CONFORM TO THE
MINIMUMS REQUIRED BY TABLE B ON THIS DRAWING.
5. REINFORCEMENT DETAILING AND PLACEMENT SHALL CONFORM TO ACI 318
AND ACI SP-66.
6. MECHANICAL EQUIPMENT PADS ON FLOOR SLABS SHALL BE 4" THICK (MIN) AND
REINFORCED WITH #4'S AT 12" ON CENTER (MAX) EACH WAY, UNLESS OTHERWISE
NOTED.
7. SUBSTITUTION OF EXPANSION OR DRILLED AND GROUTED-IN ANCHORS FOR
EMBEDDED ANCHORS SHOWN ON THE DRAWINGS WILL NOT BE PERMITTED.
9. THE STRUCTURE SHALL NOT BE CONSIDERED TO BE STABLE DURING
CONSTRUCTION UNTIL ALL ELEMENTS ARE IN PLACE AND CONNECTED. THE
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY CONSTRUCTION
BRACING REQUIRED.
10. SEE SPECIFICATIONS FOR REQUIRED USE OF RECYCLED MATERIALS, STEEL
FRAMING, LIGHT GAGE STEEL FRAMING AND METAL DECK SHALL CONTAIN A
MINIMUM OF 20 PERCENT RECYCLED CONTENTS. ADDITIONALLY, A MINIMUM
OF 10 PERCENT REGIONAL MATERIAL SHALL BE USED IN THE PROJECT. A
MATERIAL OBTAINED WITHIN 500 MILES RADIUS FROM THE PROJECT SITE IS
CONSIDERED AS REGIONAL MATERIAL.
11. CONTRACTOR TO ESTABLISH AND OBSERVE A MATERIALS ACQUISITION
PLAN THAT WILL OBTAIN NO FEWER THAN FOUR (4) LEED-NC V2009 ("v3.0")
POINTS FROM THE COMBINED TOTALS EARNED IN CATEGORIES MR2, MR4,
AND MR5, AND ANY CONSEQUENT ID POINTS ASSOCIATED WITH CATEGORY
ACHIEVEMENTS.
12. EXPANSION JOINT FILLER SHALL BE NON-EXTRUDING PREMOLDED MATERIAL
COMPOSED OF FIBERBOARD IMPREGNATED WITH ASPHALT CONFORMING TO THE
REQUIREMENTS OF ASTM D1751 UNLESS NOTED OTHERWISE.
CAST-IN-PLACE CONCRETE NOTES
GENERAL STRUCTURAL NOTES
PRE-CAST CONCRETE WALL NOTES
1. ALL PANELS SHALL BE CAST WITH OUTSIDE FACE OF WALL PANEL DOWN,
UNLESS OTHERWISE NOTED.
2. CASTING BED FOR PANELS SHALL BE COATED WITH AN APPROVED BOND
BREAKING COMPOUND IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
3. AT THE CONTRACTOR'S OPTION, PANELS MAY BE CAST ON SITE OR SHOP
FABRICATED.
4. WALL PANEL CONSTRUCTION SHOWN HAS BEEN DESIGNED ON THE BASIS OF
GRAVITY AND WIND LOADS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DESIGN REQUIREMENTS FOR LIFTING OF PANEL IN PLACE AND TEMPORARY
SHORING, TEMPORARY SHORING SHALL REMAIN IN PLACE UNTIL LATERAL
BRACING AND WALL PANELS ARE PROPERLY CONNECTED TO THE BUILDING
FRAME, AND THE WALL PANEL HAS DEVELOPED A MINIMUM COMPRESSIVE
STRENGTH OF 4000 PSI.
5. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR REVEALS, REGLETS,
OPENINGS AND ALL EMBEDDED ITEMS NOT SHOWN ON STRUCTURAL
DRAWINGS, WHICH ARE TO BE PROPERLY POSITIONED BEFORE CASTING
PANELS.
6. SEE ARCHITECTURAL DRAWINGS FOR REQUIRED FINISHES.
7. ALL CAST-IN-PLACE CONCRETE NOTES SHALL APPLY TO THIS SECTION
UNLESS OTHERWISE NOTED HEREIN.
8. CONCRETE PANELS SHALL BE INSULATED (SANDWICH) WITH 6" THICK
CONCRETE ON INTERIOR SIDE. REFER TO ARCHITECTURAL AND MECHANICAL
DRAWINGS FOR THICKNESS OF INSULATION AND THICKNESS OF EXTERIOR
SIDE OF PANEL. INSULATION SHALL BE CONTINUOUS THROUGHOUT AND
EXTENDS TO EDGE OF PANEL IN ALL DIRECTIONS, U.O.N..
9. 28 DAYS COMPRESSIVE STRENGTH OF THE CONCRETE FOR THE PANELS
SHALL BE 5000psi.
BAR
SIZE
BAR
DIAMETER
(in.)
CLASS B LAP (in.)
TOP BAR OTHER BARS
CASE 1 CASE 2
TOP BAR OTHER BARS
CASE 1 CASE 2CASE 1 CASE 2 CASE 1 CASE 2
22 32 17 25 28 42 22 32 29 43 22 33 37 56 29 43
0.375 0.500 0.625 0.750 0.875 1.000 1.128 1.270
1.410 101
196 101
DEVELOPMENT AND
CLASS A LAP (in.)
1. TABLE A PRESENTS TENSION DEVELOPMENT LENGTHS AND TENSION LAP SPLICE LENGTHS BASED ON ACI318, SECTION 12.2.2.
2. CLASS A LAP LENGTHS APPLY WHEN BAR LAPS ARE STAGGERED TO LAP HALF OR FEWER BARS AT THE SAME LOCATIONS OR WHEN BARS ARE LAPPED AT A LOCATION WHERE THE REINFORCEMENT AREA PROVIDED IS AT LEAST TWICE THAT REQUIRED.
3. CLASS B LAP LENGTHS APPLY WHEN MORE THAN HALF THE BARS ARE SPLICED AT A LOCATION OF MAXIMUM STRESS IN THE BARS.
4. CASE 1 LENGTHS APPLY TO BEAMS AND COLUMNS WITH CONCRETE COVER EQUAL TO OR GREATER THAN THE BAR DIAMETER, CLEAR BAR SPACING EQUAL TO OR GREATER THAN THE BAR DIAMETER AND WITH STIRRUPS OR TIES NOT LESS THAN THE CODE MINIMUM THROUGH OUT THE LENGTH IN THE TABLE; AND FOR OTHER ELEMENTS WITH CONCRETE COVER EQUAL TO OR GREATER THAN TWO TIMES THE BAR DIAMETER AND CLEAR SPACING NOT LESS THAN TWO TIMES BAR DIAMETER.
5. CASE 2 LENGTHS APPLY TO BEAMS AND COLUMNS WITH CONCRETE COVER LESS THAN THE BAR DIAMETER, OR CLEAR BAR SPACING LESS THAN THE BAR DIAMETER; AND FOR OTHER ELEMENTS WITH CONCRETE COVER LESS THAN THE BAR DIAMETER
OR CLEAR BAR SPACING LESS THAN TWO TIMES THE BAR DIAMETER.
6. TOP BARS ARE HORIZONTAL REINFORCEMENT PLACED SO THAT MORE THAN 12" OF CONCRETE IS CAST BELOW THE REINFORCEMENT.
7. MULTIPLY LENGTHS SHOWN BY 0.87 FOR 4,000 psi CONCRETE.
8. MULTIPLY LENGTHS SHOWN BY 1.3 FOR LIGHTWEIGHT AGGREGATE CONCRETE.
9. MULTIPLY LENGTHS SHOWN BY 1.3 FOR EPOXY-COATED BARS.
fy = 60,000 psi, f'c = 3,000 psi (see notes)
TABLE A - REINFORCEMENT TENSION LAPS AND DEVELOPMENT
DESCRIPTION SINGLE LAYER
TWO LAYERS
REMARKS
SLAB
BEAMS
OTHER
ON GRADE
OF RIBBED MATS
SUPPORTED
ON CARTON FORMS
ON CONCRETE
ON METAL DECK
FORMED GRADE BEAMS
IN RIBBED MATS
ABOVE GRADE
JOISTS
SPOT FOOTINGS
COLUMNS AND PLINTHS
DESCRIPTION
1 1/2" FROM TOP
TOP BOTTOM
CENTERED
CENTERED
3/4"
3/4"
3/4"
3"
3/4"
1 1/2"
SIDE TOP BOTTOM
1 1/2"
1 1/2"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
1 1/2"
2"
3"
3/4" 3/4"
2"
3"
1 1/2"
3/4"
3"
1 1/2" WHEN EXPOSED TO
WEATHER
T/4 (1 1/2"<T/4 <2 1/2")
T = SLAB THICKNESS2
3 2" FOR #6 AND LARGER OR
EXPOSED TO EARTH
4 3" IF CAST ON EARTH
2" FOR #6 AND LARGER WHEN
EXPOSED TO WEATHER
5 5
1 1
NOTE: UNLESS OTHERWISE NOTED ON DRAWINGS, CONCRETE COVER OVER PRIMARY REINFORCEMENT, TIES, STIRRUPS, AND SPIRALS SHALL COMPLY WITH LISTED VALUES. COVER SHALL COMPLY WITH REQUIREMENTS OF ACI 318 FOR ELEMENTS NOT DESCRIBED.
3/4" FROM BOTTOM
1 1/2" FROM BOTTOM
WALLS INTERIOR FACES
EXTERIOR EXPOSED FACES
CENTERED
CENTERED
3/4"
1 1/2"
TABLE B
CONCRETE COVER (in) FOR CAST-IN-PLACE
NON-PRESTRESSED CONCRETE FOR BUILDINGS
1 1
1. STRUCTURES SHOWN ON DRAWINGS AS PRE-ENGINEERED METAL BUILDINGS SHALL BE A
MANUFACTURER'S STANDARD PREFABRICATED METAL STRUCTURE OF THE
APPROXIMATE INSIDE AREA SHOWN EXCEPT AS NOTED. COLUMN OR RIGID FRAMES
SHALL BE SPACED AS SHOWN ON PLANS, HOWEVER, MINOR VARIATIONS MAY BE
PERMITTED (SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER), BUT OVERALL
DIMENSIONS SHALL REMAIN AS SHOWN ON PLANS. MINIMUM WEB THICKNESS OF
COLUMNS OR RIGID FRAMES SHALL BE 3/16". FINAL COLUMN POSITIONS/ORIENTATIONS TO
BE DETERMINED BY P.E.M.B. MANUFACTURER AND SHALL BE COORDINATED WITH ARCH.
DRAWINGS.
2. THE STRUCTURE SHALL BE DESIGNED & FABRICATED ACCORDING TO THE CONTRACT
SPECIFICATION, AISC, MBMA, AND AISI LATEST SPECIFICATIONS. THE DIMENSIONAL
TOLERANCES OUTLINED IN THE AWS CODE UNDER WORKMANSHIP & THE TOLERANCES
APPLICABLE TO HOT ROLLED STEEL UNDER THE AISC "STANDARD MILL PRACTICE" SHALL
BE REQUIRED IN THE FABRICATION OF THE STEEL BUILDING FRAMES.
3. A COMPLETE DESIGN ANALYSIS SHOWING ALL CALCULATIONS FOR THE RIGID FRAMES,
GIRTS, PURLINS, JOISTS, X-BRACING, FRAMING REQUIRED AROUND DOORS, AND
STRUCTURAL ITEMS SHOWN ON THIS SHEET IN 'NOTES TO PRIME CONTRACTOR' AND
LAYOUT OF ANCHOR RODS AND OTHER EMBEDDED ITEMS SHALL BE SUBMITTED FOR
APPROVAL WITH ALL THE MAIN MEMBERS, TYPICAL CONNECTIONS (SHOWING BOLT HOLES
AND WELDS), AND ERECTION DRAWINGS.
4. THE STRUCTURES SHALL BE DESIGNED TO SUPPORT ALL MECHANICAL EQUIPMENT
INCLUDING HEATERS, SPRINKLERS, EXHAUST SYSTEMS & ALL OTHER ITEMS NEEDED OR
INDICATED IN THE CONTRACT DRAWINGS. ADDITIONAL GIRTS, JOISTS, OR PURLINS SHALL
BE ADDED TO ACCOMMODATE THESE LOADS.
5. DESIGN LOADS SHALL CONFORM WITH LIVE LOADS, WIND LOAD AND SEISMIC LOAD
PARAMETERS GIVEN IN THE GENERAL NOTES PLUS COLLATERAL DEAD FROM
MECHANICAL EQUIPMENT, CEILING, AND SPRINKLERS (HOWEVER NOT LESS THAN NOTED
UNDER GENERAL NOTES) AS APPLICABLE. LOAD COMBINATIONS AND DESIGN STRESSES
SHALL COMPLY WITH AISC SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS.
6. RIGID FRAME ANCHOR RODS SHALL BE DESIGNED AND FURNISHED BY THE
CONTRACTOR. ANCHOR RODS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER FOR
THE FRAME REACTIONS FURNISHED BY THE METAL BUILDING MANUFACTURER. AND
SHALL BE SUBMITTED FOR APPROVAL. BASE REACTIONS OF MOMENT FRAMES AND ALL
OTHER COLUMNS SHALL BE BASED ON PINNED CONNECTIONS AT THE FOUNDATION. A
MINIMUM OF FOUR (4) ANCHOR RODS SHALL BE PROVIDED AT EACH COLUMN.
7. THE PRE-ENGINEERED METAL BUILDING SUPPLIER SHALL VERIFY FOUNDATION FOR
ACTUAL REACTIONS. FOUNDATIONS SHOWN SHALL BE THE MINIMUM REQUIRED AND ANY
NECESSARY REVISIONS TO THE FOUNDATION SHALL BE DONE AT NO ADDITIONAL COST TO
THE GOVERNMENT.
8. REFER TO SPECIFICATION 13 34 19 (PREENGINEERED METAL BUILDINGS) FOR
COLLATERAL (MECH/ELEC) LOADS, AND OTHER REQUIREMENTS. LATERAL DEFLECTION OR
DRIFT AT THE ROOF LEVEL SHALL BE LESS THAN H/240, WHERE H IS BUILDING EAVE
HEIGHT, UNDER FULL WIND PRESSURE (NO REDUCED WIND LOAD IS ALLOWED).
PRE-ENGINEERED METAL BUILDING NOTES
DESIGN CRITERIA
GOVERNING BUILDING CODES:
INTERNATIONAL BUILDING CODE (IBC) 2012
ASCE 7-10
ACI 318-11
AISC 14TH EDITION
AISC 360-10
MBMA/MBSM 2006
AISI 2007
SDI 2004
SJI 2007
1. DESIGN LOADS:
DEAD LOADS: ACTUAL LOAD OF MATERIAL
MIN. ALLOWANCE FOR MECHANICAL & MISC. 7PSF
LIVE LOADS:
ROOF - 20PSF
ADMINISTRATION BUILDING FLOOR LOAD - 150PSF
STORAGE BUILDING FLOOR LOAD - 150PSF
WIND LOAD: (ASCE 7-10)
BASIC WIND SPEED - 135MPH
IMPORTANCE FACTOR - 1.0
WIND DRIFT LIMIT h/240
SEISMIC LOADS: (IBC 2012)
0.2 SEC. SPECTRAL ACCELERATION Ss - 0.084g
1 SEC. SPECTRAL ACCELERATION S1 - 0.020g
SITE CLASS - D
SITE COEFFICIENT Fa - 1.6 SITE COEFFICIENT Fv - 2.4
0.2 SEC. SPECTRAL RESPONSE Sds - 0.090
1 SEC. SPECTRAL RESPONSE Sd1 - 0.030
SEISMIC DESIGN CATEGORY - A
OCCUPANCY CATEGORY - II
IMPORTANCE FACTOR, I - 1.0
SNOW LOADS:
GROUND SNOW LOADS Pg - 0
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
Ac tio n D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N
2"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS002
G
EN
ER
A
L N O
TE
S
DE
T A
IL
S I
E . S
AL
A
H
AT
, P .E
/1
FOUNDATION NOTES
1. FOUNDATION SHALL BE DESIGNED BASE ON SOIL REPORT DATED FEBRUARY 2014
PREPARED BY THE US ARMY CORPS OF ENGINEERS, FORT WORTH DISTRICT. REFER TO
THE FALFURRIAS, TEXAS U.S. BORDER PATROL CHECKPOINT (U.S. HIGHWAY 281)
FOUNDATION AND PAVEMENT DESIGN ANALYSIS REPORT FOR ADDITIONAL
INFORMATION.
2. DESIGN FOUNDATION BEARING PRESSURE (NET) 2000 PSF, REFER TO SOIL REPORT FOR
SITE PREPARATION AND MORE INFORMATION.
3. CONSTRUCTION JOINTS (C.J.) SHALL BE PLACED IN LANES THRU SLABS AND BEAMS AND
SAW CUT JOINTS IN SLABS PERPENDICULAR TO THE LANES AT THE SPACING SHOWN ON
THE FOUNDATION PLAN.
4. COORDINATE WITH TABLE B ON SHEET BS002 FOR CONCRETE COVER REQUIREMENTS.
5. CHECK FOUNDATION PLANS AND UNDERFLOOR PLUMBING PLANS FOR APPROXIMATE
LOCATION OF LINES AND SLEEVES THROUGH FOUNDATION SLABS. GENERAL
CONTRACTOR SHALL VERIFY LOCATION BEFORE CONCRETE PLACEMENT.
C
LR
3"
G R
O U
T
1/ 2"
N O
N -S
H R
IN
K
4' -6
" M
IN
1'
6"
8#7
#3 TIES @ 9"
(3 @ 3" @ TOP)
2" CLR.
NOTE:
30" MINIMUM PILASTER DIAMETER TO
ACCOMODATE ANCHOR BOLTS
CANOPY COLUMN PER
CANOPY PROVIDER
3' -0
" M
IN
3" 3"
3"
TY
P .9"
COMPRESSABLE JOINT
FILLER W/SEALANT
PAVEMENT REFER
TO CIVIL DWG.
GALVANIZED ANCHOR BOLTS
PER CANOPY PROVIDER
#7 @ 12 " T&B
8'-0" x 8'-0" MIN. FOR SECONDARY NON-COMMERCIAL CANOPIES
12'-0" x 12'-0" MIN. FOR MAIN CANOPIES & SECONDARY COMMERCIAL CANOPIES
2' -0
" M
IN
2'
-0 " M
IN
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
Ac tio n D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N A s in di ca te d
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS003
G
EN
ER
A
L N
O
TE
S
DE
T A
IL
S
II
E
. S
AL
A H
AT
, P
.E
/1
4/
3/4" = 1'-0"1 FOOTING SECTION
1. UNLESS OTHERWISE SPECIFIED, HOT-ROLLED STEEL BUILDING MEMBERS USING W-SHAPES
SHALL BE ASTM A992, M-, S-, AND CHANNEL SHAPES ASTM A572 GRADE 50, SQUARE,
RECTANGULAR & ROUND HSS SHAPES ASTM A 500 GRADE B, ANGLES AND MISCELLANEOUS
STIFFENER PLATES ASTM A36.
2. CONNECTIONS DESIGN SHALL BE THE CONTRACTOR'S RESPONSIBILITY. ALL SHEAR
CONNECTIONS NOT DETAILED OR OTHERWISE NOTED SHALL BE STANDARD AISC WELDED OR
AISC BOLTED CONNECTIONS AND SHALL HAVE SUFFICIENT CAPACITY TO SUPPORT THE END
REACTION EQUAL TO THE TOTAL UNIFORM LOAD CAPACITY SHOWN IN THE ALLOWABLE
UNIFORM LOAD TABLES IN PART 10 OF AISC STEEL CONSTRUCTION MANUAL. CONNECTIONS
SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER AND SUBMITTED FOR APPROVAL PRIOR
TO FABRICATION.
3. WELDING SHALL CONFORM WITH AWS D1.1 STRUCTURAL WELDING CODE. MINIMUM WELD SIZE
SHALL BE 3/16" CAPACITY U.O.N.
4. ALL BOLTS FOR BEAM CONNECTIONS SHALL BE ASTM A325N WITH A MINIMUM DIAMETER OF 3/4"
UNLESS OTHERWISE NOTED. ALL BOLTED CONNECTIONS SHALL BE BEARING TYPE
CONNECTIONS, UNLESS NOTED AS SLIP CRITICAL. WASHERS SHALL BE INSTALLED UNDER NUTS
OF FASTENERS WHEN REQUIRED BY THE SPECIFICATION FOR STRUCTURAL JOINTS.
5. ALL ANCHOR RODS SHALL BE ASTM F1554, GRADE 36, UNLESS OTHERWISE NOTED.
6. STEEL ROOF DECK SHALL BE 1 1/2" DEEP WR 20 GA. THICKNESS. STANDARD METAL DECKING
SHALL BE ASTM A653 SQ. GRADE 33KSI MINIMUM WITH G90 GALVANIZED COATING. DECKING
SHALL BE CONTINUOUS OVER AT LEAST THREE (3) SPANS MINIMUM WITH THE FOLLOWING
MINIMUM PROPERTIES; I = .212 in^4, Sp = 0.234 in^3/ft, Sn = 0.247 in^3/ft.
7. SUBPURLINS SHALL BE DESIGNED TO SUPPORT LOADS SHOWN WITH LIVE DEFLECTION LIMITED
TO L/360 AND WITH TOTAL LOAD DEFLECTIONS LIMITED TO L/240 (L IS CLEAR SPAN).
8. ALL SHELF ANGLES, STRUCTURAL ANGLES, EMBEDDED PLATES, STEEL LINTELS, ETC.
SUPPORTING MASONRY VENEER SHALL BE HOT DIP GALVANIZED, G-90. ALL EXPOSED ANGLES,
PLATES, ETC. SHALL BE HOT DIP GALVANIZED, G-90.
STEEL FRAMING NOTES
1. DESIGN, FABRICATION AND ERECTION OF JOISTS, JOIST EXTENSIONS, JOIST
SUBSTITUTES, AND JOIST GIRDERS SHALL CONFORM TO THE CURRENT SJI STANDARD
SPECIFICATIONS.
2. STEEL JOISTS, JOIST EXTENSIONS, JOIST SUBSTITUTES, AND JOIST GIRDERS SHALL BE AS
SHOWN ON THE PLANS FOR THE INDICATED SLOPES AND FOLLOWING CRITERIA:
A. ALL ROOF JOISTS, JOIST EXTENSIONS, JOIST SUBSTITUTES, AND JOIST GIRDERS ARE
DESIGNED FOR:
1. ROOF DEAD LOAD OF 20psf
2. ROOF LIVE LOAD OF 20psf WITH LIVE LOAD DEFLECTION LESS THAN L/360 AND WITH TOTAL
LOAD DEFLECTIONS LIMITED TO L/240 (L IS CLEAR SPAN).
3. FOR CALCULATING NET UPLIFT VALUES, REDUCE BY 60 PERCENT OF THE ACTUAL DEAD
LOAD (NOT DESIGN DEAD LOAD).
4. ANY CONCENTRATED LOADS OVER 50lbs (COORDINATE WITH MANUFACTURER AND
PROVIDE DETAIL ON SHOP DRAWINGS) INCLUDING (BUT NOT LIMITED TO)
MECHANICAL EQUIPMENT.
B. THE TOP CHORDS OF THE ROOF JOISTS SHALL BE DESIGNED TO SUPPORT:
1. CONCENTRATED LOADS FROM THE ROOF SYSTEM.
2. 20psf LIVE LOAD.
3. WIND UPLIFT LOADS.
4. ANY CONCENTRATED LOADS OVER 50lbs (COORDINATE WITH JOIST MANUFACTURER
AND PROVIDE DETAIL ON SHOP DRAWINGS) INCLUDING (BUT NOT LIMITED TO)
MECHANICAL EQUIPMENT.
C. JOIST BRIDGING SHALL BE PROVIDED BY THE JOIST MANUFACTURER AS REQUIRED TO
ACCOMMODATE GRAVITY LOADING AND WIND UPLIFT.
D. JOISTS WITH INSTALLED SLOPES GREATER THAN 1/2" PER FOOT HAVE BEEN SELECTED
FROM THE STANDARD LOAD TABLE USING THE SLOPED SPAN LENGTH OF THE JOIST AND
COMPONENT DEAD AND LIVE LOADS NORMAL TO THE JOIST. THE COMPONENT OF THE
LOAD PARALLEL TO THE TOP CHORD (AXIAL FORCE) SHALL BE ADDED TO THE JOIST BY
THE JOIST FABRICATOR.
3. SLOPED JOISTS SHALL HAVE A MIN. JOIST SEAT DEPTH AS PER SJI (U.O.N.) STANDARD
SPECIFICATIONS. DEPTHS SHALL BE ADJUSTED AS REQUIRED TO PROVIDE UNIFORM EAVE
HEIGHT OF FINISH ROOF ELEVATION.
4. UNLESS OTHERWISE NOTED, ALL JOISTS, PURLING OR SUBPURLINS SUPPORTING THE
ROOF DECK SHALL BE FIELD WELDED TO SUPPORTING MEMBERS OR TO PRESET
BEARING PLATES.
5. WELD ALL STEEL JOIST TO STEEL BEARING WHERE SUCH BEARING OCCURS, EXCEPT
WHERE BOLTED CONNECTIONS ARE REQUIRED TO COMPLY WITH THE GOVERNING
STANDARDS OR REGULATIONS.
6. WHERE JOIST BEARING CONDITIONS REQUIRE NONSTANDARD BEARING ENDS, JOISTS
FABRICATOR SHALL PROVIDE SPECIAL BEARING ENDS TO ACCOMMODATE SUCH
CONDITIONS AND THE REQUIRED BEARING LENGTH, PROVIDE SPECIALLY FABRICATED
SLOPED END BEARING ON ALL ROOF JOISTS WITH A SLOPE GREATER THAN 1/4" PER FOOT.
7. BETWEEN PANEL POINTS OF STEEL JOISTS, THE BOTTOM CHORD SHALL NOT SUPPORT
OVER 50lb VERTICAL LOAD WITHOUT ADEQUATE REINFORCING OF BOTTOM CHORD, NO
VERTICAL LOAD SHALL BE IMPOSED ON BRIDGING.
STEEL JOIST NOTES
COLD FORMED METAL NOTES
1. UNLESS OTHERWISE NOTED, ALL COLD FORMED METAL STRUCTURAL FRAMING
MEMBERS SHALL BE MANUFACTURED FROM ZINC COATED SHEET CONFORMING TO
CURRENT ASTM A653 WITH MINIMUM YIELD STRENGTH OF 33 KSI.
18 GA. Fy=33 KSI 16 GA. AND HEAVIER Fy=50 KSI
2. ALL COLD FORMED METAL STUD WALLS SHALL BE FULL HEIGHT WITHOUT
INTERMEDIATE SPLICES UNLESS OTHERWISE DETAILED.
3. BOTTOM RUNNER SHALL BE FASTENED TO CONCRETE SLAB AT A MAXIMUM SPACING OF
16" O.C. USE HILTI X-ZF OR TO STEEL USING HILTI X-U 15 POWER ACTUATED FASTENER
WITH TOP HAT CLAMPING WASHERS, OR APPROVED EQUAL.
4. PROVIDE COLD FORMED CHANNEL HORIZONTAL BRIDGING THROUGH
THE STUD PUNCH OUTS.
5. EXTERIOR WALL STUDS SHALL BE 600S162-43 AT 16" O.C. MAX. WITH 600T125-43
TRACK. (TYP, U.O.N.)
6. ALL EXTERIOR COLD FORMED FRAMING SHALL BE 18 GA (MIN) OR AS REQUIRE BY
DESIGN, WHICHEVER IS HEAVIER.
1. MINIMUM CLEARANCE OF 1" OR LIVE LOAD DEFLECTION, WHICHEVER GREATER, FOR SLAB ON GRADE
FLOORS. WHEN STUDS EXTEND TO DECK OR FLOOR ABOVE, PROVIDE THE REQUIRED MINIMUM
CLEARANCE WITH LATERAL SUPPORT AT BOTTOM CHORD.
2. THIS LATERAL SUPPORT DETAIL IS ALSO FOR WHEN CROSS WALL SUPPORT SPACING EXCEEDS 8'-0".
PERPENDICULAR TO JOISTS, TRUSSES, BEAMS AND GIRDERSPARALLEL TO JOISTS, TRUSSES, BEAMS AND GIRDERS
METAL DECK, ROOF OR FLOOR
FIRE STOPPING MATERIAL AS REQUIRED
CONT. TRACK
L2 1/2x2x3/16 (LLV)x6" @
6'-0" O.C. WELD TO 3/16" L
(SEE NOTE 4)
BEAM/GIRDERS BOTTOM
FLANGE OR JOIST/TRUSS
BOTTOM CHORD (TYP)
L2x2x3/16 WELD TO JOIST/TRUSS
BOTTOM CHORD OR BEAM BOTTOM
FLANGE @ 6'-0" O.C.
SEE NOTE 1
SEE NOTE 1
CONT. TRACK
L2x2x3/16 (LLV) x8" WELD TO BOTTOM
CHORD OF JOISTS OR TRUSS OR
BEAM BOTTOM FLANGE
FIRE STOPPING MATERIAL AS REQUIRED
SEE NOTE 1
SEE NOTE 1
METAL DECK, ROOF OR FLOOR
JOIST OR TRUSS BOTTOM CHORD
OR BEAM BOTTOM FLANGE
BOTTOM RUNNER
TRACK
BRIDGING
TOP
RUNNER
TRACK
METAL STUD
16" TYP. SPACING
METAL
STUD BRIDGING
16 GAGE CLIP
ANGLE
1/
2" C
LE
AR
DO NOT ATTACH
STUDS TO TRACK
BELOW BEAM
METAL STUD
(TYP.)
REFER "LIGHT GAGE
METAL NOTES"
CONCRETE
FLOOR
TRACK (TYP.)
16 GA. DEEP
LEG
DEFLECTION
TRACK
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
Ac tio n D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N A s in di ca te d
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS004
G
EN
ER
A
L N
O
TE
S
D
ET
AI
LS
II
I
E . S
AL
A
H
AT
, P .E
/1
4/
3/4" = 1'-0"BS004
METAL STUD INTERIOR PARTITIONS LATERAL
SUPPORT
3/4" = 1'-0"BS004
TYPICAL METAL STUD HORIZONTAL BRIDGING
ISOMETRIC
1" = 1'-0"BS004
3 TYPICAL STUD TRACK ANCHOR TO FLOOR
GYPSUM WALLBOARD CEILING
ACOUSTICAL TILE CEILING
PLASTER CEILING
4'-0"
5'-0"
6'-0"
7'-0"
8'-0"
4'-0"
3'-6"
3'-0"
3'-0"
2'-6"
24 GA. 7/8"
24 GA. 1 5/8"
24 GA. 2 1/2"
24 GA. 2 1/2"
24 GA. 3 5/8"
3'-0"
4'-0"
5'-0"
6'-0"
7'-0"
8 GAGE
8'-0"
8 GAGE
6 GAGE
6 GAGE
6 GAGE
B.F.
1 1/2" C.R. 48"
1 1/2" C.R. 36"
1 1/2" H.R. 36"
1 1/2" H.R. 36"
2" H.R. 36"
2 1/2" H.R. 36"
MAX.
JOIST
SPACING
JOIST
SPACING
C.R. - COLD ROLLED
H.R. - HOT ROLLED
B.F. - BOLTED FLAT (3/8" DIA. BOLTS & 1"x3/16" BAR)
HANGER
SIZE
FURRING
SIZE SPACING
FURRING
SIZE
HANGER
SPACING
DECK
COLD-FORMED
LIGHT-GAGE
TRUSSES,
JOISTS OR
BEAMS
DESIGN NOTE:
SUSPENDED CEILING IS SHOWN.
WHERE SUSPENDED CEILING IS NOT
REQUIRED, AT EACH FURRING
(CHANNELS OR STUDS AS REQUIRED
BY SPAN) DIRECTLY TO BOTTOM OF
JOIST OR BEAMS.
FURRING @ 16" O.C.
GYPSUM BOARD CEILING
DECK
1 1/2" RUNNER CHANNELS
T BAR GRID SYSTEM
DECK
RUNNER
FURRING
SEE SPECS PLASTER CEILING
TRUSS, BEAM OR JOIST SPACING
@ 4'-0" O.C. OR LESS
COLD-FORMED LIGHT GAGE
TRUSSES, BEAMS, OR JOISTS
12 GA. HANGING
WIRES @ 4'-0" O.C.
MAX.E.W.
8 GA. HANGING
WIRES
DECK
T BAR GRID SYSTEM
12 GA. HANGING
WIRES @ 4'-0" O.C.
MAX. E.W.
@ MORE THAN 4'-0" O.C.
COLD-FORMED LIGHT GAGE
TRUSSES, BEAMS, OR JOISTS
AUXILIARY FURRING @ 4'-0" O.C.
SIZE AS REQUIRED BY JOIST
SPACING, WELDED OR BOLTED
TO JOIST
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
Ac tio n D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS005
G
EN
ER
A
L
NO
TE
S
DE
T A
IL
S I V
E . S
AL
A
H
AT
, P .E
/1
4/
1" = 1'-0"BS005
1 SUSPENDED CEILING DETAILS
GENERAL CANOPY NOTES
1. CONTRACTOR IS RESPONSIBLE FOR ALL FOUNDATION DESIGN, ANCHOR BOLT
DESIGN, BASE PLATE DESIGN AND SUPERSTRUCTURE DESIGN. CONTRACTOR
SHALL DEIGN THE BUILDING FOR FUTURE EXPANSION AND SHALL PROVIDE FOR
CONNECTION OF FUTURE EXPANSION. THE DESIGN SHALL BE SUBMITTED TO
CONTRACTING AUTHORITY PRIOR TO FABRICATION FOR REVIEW AND APPROVAL.
2. THE STRUCTURE SHALL HAVE A MINIMUM COLUMN SPACING OF 25 TO 30 FEET.
CONTRACTOR SHALL COORDINATE COLUMN LOCATIONS WITH LICENSE PLATE
READER (LPR) PROVIDER, TO ENSURE COLUMN LOCATIONS DO NOT INTERFERE
WITH LPR SIGHTLINES.
3. REFER TO GEOTECHNICAL REPORT FOR SOIL PARAMETERS AND FOUNDATION
DESIGN REQUIREMENTS.
4. MINIMUM THICKNESS OF EXPOSED STEEL SHALL BE 3/16.
5. CONTRACTOR SHALL LIMIT THE DRIFT TO L/50.
6. CONTRACTOR SHALL ASSUME A PIN CONNECTION AT BASE OF COLUMNS.
7. CONTRACTOR SHALL PROVIDE A MINIMUM DIAPHRAGM OF 22 GAGE METAL DECK.
8. REFER TO AND COORDINATE WITH ARCHITECTURAL, CIVIL, MECHANICAL AND
ELECTRICAL DRAWINGS.
9. THE PRE-ENGINEERED METAL BUILDING SUPPLIER SHALL VERIFY FOUNDATION FOR
ACTUAL REACTIONS. FOUNDATIONS SHOWN SHALL BE THE MINIMUM REQUIRED
AND ANY NECESSARY REVISIONS TO THE FOUNDATION SHALL BE DONE AT NO
ADDITIONAL COST TO THE GOVERNMENT.
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
Ac tio n D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H C
H
IE
F, S
TR
U
C
TU
R
AL
S
EC
TI
O
N
2"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A
P R
IL
W
G
-1 4-
R -0
Fort Worth District
N . A
LM
A
SR
I, P .E
J.
R
O
BB
IN
S
ZA
C
H
AR
Y H
. G
ER
IC
H
, P .E
BS101
PR
IM
AR
Y
C A N
O
PY
N O
TE
S
E . S
AL
A
H
AT
, P .E
/1
DRAWING ABBREVIATIONS
CONCRETE/ PRECAST
CONCRETE
SOIL
GYPSUM BOARD
BRICK
CMU
GROUT/SAND
RIGID INSULATION
BATT INSULATION
GLASSMAT SHEATHING
CEILING SYMBOLS
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED
BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H -------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
1i
0 GRID / COLUMN
LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
EXIT LIGHT
INTERIOR ELEVATION
1i WALL TYPE
WINDOW TYPE
A101
SIM
SECTION
Room name
101 ROOM NAME/NUMBER
A101
Ref
A101
Ref
EXTERIOR ELEVATION
1 REVISION TAG
A-101
SIM
PLAN, BLOW-UP DETAIL
PLAN NORTH
NORTH ARROW w/
TRUE NORTH INDICATIONSPOT ELEVATION
Name Elevation
FLOOR LEVEL & NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAAB/MM
FLUID APPLIED AIR BARRIER/MOISTURE MEMBRANE
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED BY
GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLASGYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RMMACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RMMECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PVB POLYVINYL BUTYRAL
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SND SANITARY NAPKIN DISPENSER
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
SSMR STANDING SEAM METAL ROOF
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TPD TOILET PAPER DISPENSER
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
U --------------------
UNO UNLESS NOTED OTHERWISE
URN URINAL
W --------------------
WR WASTE RECEPTACLE
2' x 2' ACT CEILING
2' x 4' ACT CEILING
SHEET KEYNOTE
GYP. BD. CEILING
1' x 1' ACT CEILING
2 X 4 LIGHT FIXTURE
2 x 2 LIGHT FIXTURE
SUSP. FLUORESCENT LIGHT
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
INDEX OF DRAWINGS
1. TYPICAL NOTES AND LEGENDS ON THIS SHEET ARE APPLICABLE TO
ARCHITECTURAL DRAWINGS ONLY.
2. UNO, ALL DIMENSIONS ARE TO FACE OF STRUCTURAL WALL, GYPSUM BOARD,
OR COLUMN CENTERLINE.
3. ALL DIMENSIONAL DATA IS IN IMPERIAL UNITS.
4. REFER TO CIVIL DRAWINGS FOR ALL CURBS, SIDE-WALKS, RAMPS, AND OTHER
CONSTRUCTION OUTSIDE THE BUILDING PERIMETER.
5. REFER TO CA-310, CA-311, CA-312, AND CA313 FOR WALL TYPE
CONSTRUCTION.
6. REFER TO CA-603 FOR DOOR SCHEDULE.
7. DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
8. CONTRACTOR TO PROVIDE BLOCKING FOR ALL WALL MOUNTED ITEMS.
10. ALL SHORING AND BRACING SHALL BE IN ACCORDANCE WITH OSHA
REQUIREMENTS AND OTHER AGENCIES HAVING JURISDICTION.
11. REFER TO CA-605 FOR GLAZING SCHEDULE.
WOOD
ARCHITECTURAL
CONCRETE
STONE
METAL
GRANULAR FILL
GENERAL NOTES
FLOOR PLAN GENERAL NOTES
CA-001
BUILDING ID
DISCIPLINE
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
I - INTERIOR
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
SHEET NUMBER WITHIN SERIES
NUMBERING SYSTEM
LEGEND
ANNOTATION CALLOUTS/DRAWING SYMBOLS
MATERIALS
1 View Name 1/8" = 1'-0"
DRAWING TITLE
DRAWING SCALE
NUMBER ON SHEET
A
,OH
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
A ct io n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
/1 6"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A pr il
, 2
W
G
-1 4-
R -0
Fort Worth District
A An ya eg bu na m
J.
G
AR
ZA
, S . W
EI
S
SE
N
ST
E
IN
W
IL
LI
A
M J
. L
AW
R E
N C
E, R
.A
C H
IE
F
AR
C
H
IT
EC
TU
R E
BA001
A
BB
R E
VI
AT
IO
NS
A
An ya eg bu na m
/2
0/
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
VE
RT
IC
AL
G
RA
B B
AR
DE
SK
DE
SK
BA201
BA2021
BA201
BA202
0'
-0 " M
IN
F
R O
M F
R O
N T
ED
G
E O
F C
AN
O
PY
T
O B
O O
TH
DUAL ELEVATION
INSPECTION BOOTH
RE: BA120 FOR BOOTH
DETAILS
DUAL ELEVATION
INSPECTION BOOTH
RE: BA120 FOR BOOTH
DETAILS
TRAFFIC ISLAND STRIPING
AND EQUIPMENT PER CIVIL
AND ELECTRICAL DRAWINGS
COLUMN LOCATIONS AND
GRID SHOWN ARE
SCHEMATIC AND FOR
ILLUSTRATION PURPOSES
ONLY.
EDGE OF CANOPY ABOVE
RE: ROOF PLAN FOR LIMITS OF
CONSTRUCTION
'-0
M
IN
5'
-0 " M
IN
2'-10"
2'-9 11/16"
AREA WHERE COLUMNS SHALL BE
LOCATED BY PEMB MANUFACTURER
AREA WHERE COLUMNS SHALL BE
LOCATED BY PEMB MANUFACTURER
6' -0
'-0
M
IN
5'
-0 " M
IN
2'-10"
'-0
M
IN
5'
-0 " M
IN
'-0
M
IN
5'
-0 " M
IN
2'-10"
2'-10"
6' -0
'-0
'-0
'-0
'-0
'-0
'-0
2' -9
44'-0" 52'-0"
1'-4"
2'-10"
5'-0" 17'-0" 5'-0" 17'-0" 5'-0" 17'-0" 5'-0" 25'-0" 5'-0"
6'-0" 6'-0"
6' -0
7'-0"
6' -0
6'-0"
'-0
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
A ct io n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
/1 6"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A pr il
, 2
W
G
-1 4-
R -0
Fort Worth District
A An ya eg bu na m
J.
G
AR
ZA
, S . W
EI
S
SE
N
ST
E
IN
W
IL
LI
A
M J
. L
AW
R E
N C
E, R
.A
C H
IE
F
AR
C
H
IT
EC
TU
R E fil e na m e
BA101
F I R
ST
F
LO
O
R P
LA
N
A An ya eg bu na m
/2
0/
SCALE:
0 16' 32'
1/16" = 1' - 0"
16' 32'
PLAN
NORTH
TRUE
NORTH
1/16" = 1'-0"BA101
2 FIRST FLOOR PLAN (OVERALL DIMS ONLY)
BA201
BA2021
BA201
BA202
BA301
BA302
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
ROOF DRAIN
LOCATE DRAINS AT
STRUCTURAL COLUMNS
PER PEMB MANUFACTURER
SLOPE ROOF TO DRAIN (TYP)
SLOPE ROOF TO DRAIN (TYP)
SLOPE ROOF TO DRAIN (TYP)
SLOPE ROOF TO DRAIN (TYP)
SLOPE ROOF TO DRAIN (TYP)
6'-0"
6' -0
6' -0
6'-0"
56'-0"
'-0
52'-0"
'-0
4'
-0
6' -0
6'-0" 6'-0"
SLOPE ROOF TO DRAIN (TYP)
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed b y:
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
, T
EX
A
S
R ev ie w ed b y:
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
A ct io n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
/3 2"
'-0
FA
LF
UR
R
IA
S, T
EX
A S
FA
L F
UR
R I
AS
H
W Y
C
HE
CK
PO
IN
T
PN
5 3
F Y2
PR
IM
AR
Y
IN
SP
E C
TI
O N
C O
M M
ER
C I
AL
C A
NO
P Y
A pr il
, 2
W
G
-1 4-
R -0
Fort Worth District
A An ya eg bu na m
J.
G
AR
ZA
, S . W
EI
S
SE
N
ST
E
IN
W
IL
LI
A
M J
. L
AW
R E
N C
E, R
.A
C H
IE
F
AR
C
H
IT
EC
TU
R E
BA102
R O
O F
PL
A
N A
An ya eg bu na m
/2
0/
3/32" = 1'-0"BA102
1 ROOF PLAN
GENERAL NOTE:
NUMBER OF ROOF DRAINS AND LOCATIONS PER PEMB MANUFACTURER
6"
8"
" 8 - ' 4" 0 - ' 3" 4 - ' 2" 4 - ' 2
13'-0"
6" 2' 0"
3' 0"
8"
6" 1'
3' 0"
4"4"
2' 51 _ 2
11 _ 2 " 4
2' 8"
4" 11 _ 2
2' 81 _ 2
3' 4"
6' 01 _ 2
4'-0" 2'-2"
19'-2"
6'-2"
6"
3' 0"
J BOX POWER AND DATA
BULLET RESISTANT GLAZING
BULLET RESISTANT GLAZING
BULLET RESISTANT GLAZING
SLIDING DOOR
BULLET RESISTANT DOOR
BULLET RESISTANT GLAZING IN SLIDING DOOR
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D ra w n by
D es ig ne d by
S ub m itt ed by
Fi le N am e:
D at e :
C on t ra ct
N o.
S ol ic ita tio n
N o.
U .S
. A R
M Y
EN
G
IN
EE
R D
IS
TR
IC
T, C O
R
PS
O F
EN
G
IN
EE
RS
FO
RT
W
O R
TH
, T
EX
A
S
R ev ie w ed by
US Army Corps of Engineers ®
D
C
B
A
P
LO
T
SC
A
LE
P
LO
T
D
AT
E:
R ev
Sy m b o l
D es c r ip tio n
Tr ac k i ng
N o.
A ct io n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
/2
'-0
FA
LF
U R R
IA
S , TE
XA
S
FA
L F U
RR
IA
S H W
Y2 8 1
CH
E C
KP
O
IN
T
PN
5 3
F Y
Ap ril
0, W
G
-1 4-
R -0
ED
W
AR
D
C
IT
ZL
ER
ED
W
AR
D
C
IT
ZL
ER
W
IL
LI
AM
J . L
A W
R
EN
C E
R .A
C
H
IE
F
AR
C H
IT
EC
TU
R
E
B O
O
TH
V3
BA-120
C O
M M
ER
CI
A L
D U
AL
LE
VE
L
B O
O
TH
A.
A
N
YA
EB
U
N
AM
/2
0/ sec1
BA121
3 FRONT ELEVATION INSPECTION SIDE
1/8" = 1'-0"
1 BI-LEVEL INSPECTION BOOTH - FLOOR PLAN
1/8" = 1'-0"
2 LEFT ELEVATION TRAFFIC APPROACH SIDE
1/8" = 1'-0"
4 RIGHT ELEVATION TRAFFIC DEPARTURE SIDE
1/8" = 1'-0"
PR
IM
A
RY
IN
SP
EC
TI
O N
C O
M M
ER
C
IA
L
C A
N
PY
6"
8"
1' 6"
1' 4"
1'-6"
" 6 - ' 6" 6 - ' 6
6" 6"
8"
3' 0"
3' 0"
BULLET RESISTANT GLAZING
BULLET RESISTANT GLAZING IN SLIDING DOOR
BULLET RESISTANT GLAZING
DX HVAC UNIT
SAFETY RAIL
SAFETY CHAIN
BULLET RESISTANT GLAZING
BULLET RESISTANT GLAZING IN SLIDING DOOR
BULLET RESISTANT GLAZING
INSPECTION BOOTH REQUIREMENTS
PART 1 - GENERAL
1.1 Provide all labor, equipment and materials to furnish and install prefabricated portable steel building
(s) where shown on the civil drawings.
1.2 Prefabricated portable steel building's wall assemblies shall be UL 752 level III bullet resistant.
Wall assemblies include but are not limited to: wall panels, windows, glazing, and sliding doors.
1.3 Electrical service supply and connection. Factory installed wiring system shall comply with the current NFPA’s National Electrical Code.
1.4 Shop Drawings shall include elevations, section, floor plan, electric schedule, service entrance locations, and anchor clip detail.
1.5 Color charts illustrating available colors and patterns for specified finishes shall be submitted with the shop drawings.
1.6 Structures shall be the product of a manufacturer with a minimum of 5 years-documented experience in the design and fabrication of portable steel buildings.
1.7 Design loads: Live Loads: Floor 50 PSF, roof 50 PSF, wind 110 MPH.
PART 2 - PRODUCTS
2.1 Structure: Prefabricated steel building shall be single unit welded steel construction with a minimum14-gauge galvannealed steel panels and tubing on the exterior and a minimum 18-gauge galvannealed steel interior panels. Building to be shipped completely assembled. All welded joints ground smooth.
2.2 Base and floor: Base height shall be 4 inches for outside use. Floor shall be 12-gauge galvanized steel, 4-way tread plate. Four 1/4" steel angle iron anchor clips with pre-drilled holes are provided to secure building. Anchors provided by installer shall be galvanized or stainless steel. Provide 1 anti-fatigue floor mat, measuring 2' 0" x 2' 0", in each booth.
2.3 Door(s) shall be top-suspended heavy duty sliding steel, fully weather-stripped, include view window and all roller assembly hardware. Trolleys shall be ball bearing, adjustable pendant type.
2.4 Windows: Shall be clear anodized aluminum construction and include glazing and all hardware as required.
2.5 Glazing: All windows and doors shall contain clear, low E glazing. All glazing shall be UL 752 level III bullet resistant.
2.6 Finish: All interior and exterior steel surfaces except rooftop and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .