Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contract (MATOC) for Design-Build and Design-Bid-Build Repair and Alterations (RA) of Land Port of Entry (LPOEs) in support of the US Army Corps of Engineers (USACE) Southw estern Division (SWD) Fort Worth District (SWF).

The maximum capacity for this MATOC is $45,000,000. The maximum task order amount is $5,000,000. All task orders w ill be f irm-fixed price.

The minimum guarantee is $2,000. The estimated duration for each contract w ill be an initial Base Period of tw elve (12) months w ith up to four

(4) Option Periods of tw elve (12) months each, for a total not to exceed contract period of 60 months.

This acquisition w ill utilize a tw o phase, best value methodology to establish the MATOC base contracts. The intent is to aw ard up to four contracts to the responsible offerors w hose proposals are determined to be the "best value" to the Government.

Place of Performance: Washington, Idaho, and Montana

Offers w ill only be accepted from the follow ing Socio-Economic Category: 100% Small Business set-aside.

NAICS: 238990 Size Standard: $15M

KIMBERLY F RHEAUME 817-886-1075817-886-

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Feb-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Order

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________28 Mar 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

W9126G

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(817) 886-6403FAX:TEL: (817) 886-1077 TEL: FAX:

W9126G-16-R-0004 97

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Funded Amt:

MATOC Base Period

This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to provide Repair and Alterations (RA) for a base period of 12 (twelve) months to existing Land Ports of Entry (LPOE) Facilities.

NAICS CD: 238990

, FSC CD: Z2JZ

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

1001 1 Job

OPTION Funded Amt:

MATOC Option Period 1

This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

2001 1 Job

OPTION Funded Amt:

MATOC Option Period 2

This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

3001 1 Job

OPTION Funded Amt:

MATOC Option Period 3

This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

4001 1 Job

OPTION Funded Amt:

MATOC Option Period 4

This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to

TO BE COMPLETED DURING PHASE 2

Key Personnel Labor Rates Table for the Basic Contract

Base Period

Position Unit Fully Burdened Unit Price

Project Manager 1 Hour $___________

Construction Superintendent

1 Hour $___________

Design Team 1 Hour $___________

Civil Engineer

Mechanical Engineer

Structural Engineer

Architectural Engineer

Electrical Engineer

Option Period 1

Position Unit Fully Burdened Unit Price

Option Period 2

Position Unit Fully Burdened Unit Price

Option Period 3

Position Unit Fully Burdened Unit Price

Option Period 4

Position Unit Fully Burdened Unit Price

Notes for Key Personnel Labor Rates Tables

1) The Fully Burdened Unit Price is defined as the direct unit price along with appropriate load factors – overhead, fringe benefits, general and administrative (G&A) expense.

2) The Fully Burdened Unit Prices listed in the table (for the applicable contract period) will be used as binding not-to-exceed rates in pricing of all task orders and task order modifications issued throughout the life of the contract. Unreasonably low or high rates may result in the Offeror not being selected for contract award.

3) Descriptions and minimum qualifications for the key personnel positions listed above are defined in the following sections of the basic contract: TO BE PROVIDED DURING

PHASE II

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER

VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$2,000.00

$5,000,000.00

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 CONTRACT COST LIMITATION FOR DESIGN AND CONTRUCTION COSTS

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR'S QUESTIONS AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 PRE-PROPOSAL CONFERENCE

1.8 ACCURACY IN PROPOSALS

1.9 PROPOSAL SUBMITTAL

1.10 PROPOSAL FORMAT & GENERAL INSTRUCTIONS

1.11 JOINT VENTURE PROPOSAL REQUIREMENTS

1.12 BID GUARANTEE (PHASE 2 ONLY)

1.13 CONTRACT PRICES - BIDDING SCHEDULE (PHASE 2 ONLY)

1.14 TASK AND DELIVERY ORDER OMBUDSMAN

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK (SCOPE)

1.1.1 The US Army Corps of Engineers (USACE) Fort Worth District (SWF) intends to award a target of four (4) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) to provide Repair and Alterations (RA) services of Land Ports of Entry (LPOE) to support the Department of Homeland Security’s LPOE RA program. The geographical region covered under this scope is primarily Washington (WA), Idaho (ID) and Montana (MT) but may support other Southwestern Division (SWD) military, civil works, and International Interagency Section (IIS) projects. Task orders will be issued as firm fixed price.

Offers will only be accepted from the following Socio-Economic Category: 100% Small Business set-aside.

1.1.2 The Construction services required include a wide variety of multidisciplinary services required for preparation of, but not limited to, renovation, repairs, preventive maintenance, environmental abatement, and erosion control, earthwork and operations construction activities;

restoration of roads, parking lots, bridges, fences, gates, equipment and fixtures, as applicable under these MATOCs. The contracts are not only intended to execute design-build construction and design-bid-build, but to provide a timely response to remediation of facilities, e.g., maintenance, repair, asbestos and lead-based paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection.

1.1.3 The estimated maximum task order limitation is $5,000,000.00 with a minimum task order limitation of $2,000. The total estimated MATOC pool capacity is $45,000,000.00.

1.1.4 Offers for this solicitation will be evaluated using Two-Phase Design-Build Selection Procedures.

1.1.4.1 In Phase 1, interested firms or joint venture entities (referred to as “Offerors”) shall submit specified performance capability proposals, demonstrating their capability to successfully perform task orders under the awarded contract. The Government will evaluate the qualifications in accordance with the criteria described in this solicitation and intends to select the most highly qualified offerors of Phase 1 to compete in Phase 2.

1.1.4.2 In Phase 2, the selected Offerors will submit proposals for evaluation in accordance with Section 00 22 20. The Contracting Officer (KO)/Source Selection Authority (SSA) will award a target of four (4) firm fixed-priced IDIQ contracts to the responsible Offerors whose proposals conforms to the solicitation, is fair and reasonable with regard to pricing for the initial Task Order, and whose proposal offers the best overall value to the Government, considering the price and non-price factors described herein.

1.1.5. The Government may or may not exceed the stated minimum/maximum task order limitation upon mutual agreement of all parties.

1.1.6. This will be a negotiated acquisition; there will be no public bid opening.

1.1.7. All contracts will be awarded based upon an evaluation of the overall Best Value to the Government using the FAR Part 15 Tradeoff process.

1.1.8. General Description of Seed Task Order: Please note the following is a general description of the anticipated Seed Task Order; it is not the final description. Provide the Customs and Border Protection (CBP) Office of Administration (OA), Facilities Management and Engineering (FM&E) Directorate, Field Operations Facilities Program Management Office (FOFPMO) with construction support to repair and revise the domestic water systems at the CBP LPOE locations identified below. This work will involve separating and handling domestic and fire protection systems individually to protect the integrity of the domestic water system for potable use. This work will entail re-routing the domestic water piping away from, and around, the fire protection cistern. The ultimate goal is to achieve domestic water quality that will meet both primary and secondary drinking water regulations. Some LPOEs may also require inspection of and adjustment or replacement of water treatment systems; construction of new wells; and freeze-proofing existing supply systems.

Construction shall add or incorporate the necessary water treatment equipment to produce high quality water that is clear in vision, does not smell of any pungent odor and has a pleasant taste.

All water treatment, handling and storage designs must achieve water test results that pass both primary and secondary drinking water regulations, for all domestic water used in the facilities.

Water treatment system performance, confirmed by water quality testing results, must be clearly defined in the design specifications as a condition of acceptance of the Construction Contractor’s work.

The requirement is to treat the entire domestic system at each LPOE. The water at each location shall be treated at the source and not at the point of use (i.e. simply treated at the break room sinks). The goal is to provide full confidence in the use of the source water as a whole by the LPOE Officers, Port Directors and all the visitors in all aspects of each facility, including the public restrooms.

Locations:

Nighthawk LPOE, Loomis, WA 98297

Frontier LPOE

Northport, WA 99157

Boundary LPOE

Colville, WA

Del Bonita LPOE

Cut Bank, MT 59427-9109

1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION

COSTS

The Construction Cost Limitation (CCL) will be provided with the Request for Proposals (RFPs) for each Task Order. It is the Government's intent to award at full scope within the CCL. The Magnitude of Construction for 100% designed projects will be stated on each Task Order in accordance with DFARS 236.204. Please Note: This paragraph applies to DB projects only

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY. All solicitation documents and amendments will be posted on Federal Business Opportunities (FBO) website at http://www.fbo.gov/ and Offeror can access solicitation documents by solicitation number without dashes (W9126G16R0004).

It is solely the Contractor’s responsibility to check the fbo.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in Section 1.10 below of this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

Additional information regarding this solicitation and potential Offerors (i.e., interested vendors list) and/or subcontractors will be available fbo.gov website under the solicitation number.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

1.4.1 Bidder Inquiry

1.4.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

1.4.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click to continue.

1.4.1.1.2 From this page you may view all bidder inquiries or add inquiry. Only one question will be allowed per inquiry. If multiple questions are included in a single inquiry, only the first question will be answered. All others will remain unanswered until entered in as single inquiries.

1.4.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.4.1.1.4 The Solicitation Number is: W9126G-16-R-0004

1.4.1.1.5 The Bidder Inquiry Key is: 92J55M-6PCTYE

http://www.projnet.org/projnet

1.4.1.2 The Bidder Inquiry System will be closed to new inquiries seven (7) calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. If the System is not closed in a timely manner, an inquiry posted within seven calendar days of the receipt of proposals will still be regarded as untimely and will not afforded a substantive response.

1.4.1.3 Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

1.4.1.4 The bidder call center operates weekdays from 8am to 5pm U.S. Central Time Zone

(Chicago). The telephone number for the Call Center is 800-428-HELP.

1.4.2 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

The small business size standard for NAICS Code 238990 is $15M.

1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions. A stipend is not authorized for unsuccessful Phase 2 Offerors in accordance with Section 00 22 20.

1.7. PRE-PROPOSAL CONFERENCE

The Government intends to hold a pre-proposal conference during Phase 1 and Phase 2. The date, location, and time will be announced by Amendment. The offeror must submit, via e-mail, the firm's name, address, point of contact, telephone number, and up to three personnel planning to attend to the Government point of contact identified below no later than five (5) calendar days prior to the conference:

U.S. Army Corps of Engineers, Fort Worth District Kimberly Rheaume Contract Specialist Email: kimberly.f.rheaume@usace.army.mil

Only the most highly qualified offerors of Phase 1 will participate in the pre-proposal conference for Phase 2.

During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.

1.8. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

1.9. PROPOSAL SUBMITTALS (PHASE 1 & 2)

1.9.1 In an effect to reduce paperwork and cost, ALL Phase 1 and Phase 2 proposals shall be submitted electronically via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/safe/

At the AMRDEC SAFE website, select the link: Non-CAC Users “For users without a CAC OR if your computer is not configured to read your CAC. Using this option will allow you to access SAFE as a guest.” When completing the information for transmittal at the AMRDEC SAFE website, notification should be submitted to Contract Specialist, Kimberly Rheaume, email kimberly.f.rheaume@usace.army.mil; and Contracting Officer, Linda Eadie, email linda.d.eadie@usace.army.mil.

A copy of your proposal must be submitted to the following email address: CESWF- CTPreawardProposal@usace.army.mil.

1.9.2 Offers received by telegraph, modifications thereto, or cancellations of offers will not be accepted.

1.9.3 Facsimile offers, modifications thereto, or cancellations of offers will not be accepted.

1.9.4 Offers received by email, modifications thereto, or cancellations of offers will be accepted (optional); however, the Government’s preference is for Offerors to submit their proposal through the ARMRDEC SAFE website.

1.9.5 SITE VISIT: See Specification Section – Site Visit (PHASE 2)

IMPORTANT NOTES: (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

1.10. PROPOSAL FORMAT & GENERAL INSTRUCTIONS (PHASE 1)

1.10.1 Submit only the electronic-documents. Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages must be numbered.

1.10.2 PDF pages should be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Spreadsheets must fit to 11” x 14” or 11” x 17” paper size unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company.

https://safe.amrdec.army.mil/safe/ mailto:CESWF-CTPreawardProposal@usace.army.mil mailto:CESWF-CTPreawardProposal@usace.army.mil

1.10.3 Hard copies will not be accepted.

1.10.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215- 1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

1.10.5 In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

1.10.6 For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; and a page with information on both the front and back of a single sheet of paper will be counted as two pages. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

1.10.7 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.

Revised page will be submitted in a different color than the original pages being replaced.

1.10.8 Within three (3) days of contract award, each Contractor shall submit their conformed proposal via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE2/Welcome.aspx.

1.11. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

1.12. BID GUARANTEE (PHASE 2 ONLY)

A Bid Guarantee is not required for the Phase 1 proposal submission. A Bid Guarantee will be required for the initial Task Order during Phase 2 of this solicitation. The penal sum of the bond for the task order will be required as in provision 52.228-1, Bid Guarantee. Facsimile Bonds are not acceptable.

1.13. CONTRACT PRICES - BIDDING SCHEDULE (PHASE 2 ONLY)

https://safe.amrdec.army.mil/SAFE2/Welcome.aspx

Payment for the various items listed in the Bidding Schedule shall constitute full compensation for furnishing all plant, labor, equipment, appliances, materials and bonds (performance and payment), and for performing all operations required to complete the work in conformity with the drawings and specifications. All costs for work not specifically mentioned in the Bidding Schedule shall be included in the contract prices for the items listed.

1.14 TASK AND DELIVERY ORDER OMBUDSMAN:

USACE Task and Delivery Order Ombudsman:

Ms. Jacqueline C. Woodson

Acquisition Support Division

U.S. Army Corps of Engineers

7701 Telegraph Road, Casey Building, Room 2115

Alexandria, VA 22315

Phone: 703-428-6323

Email: Jacqueline.C.Woodson@usace.army.mil

OFFEROR INFORMATION

1.0. This solicitation will be evaluated under the 2 Phase Design Build Process. In Phase 1, interested firms or joint venture entities (referred to as “Offerors”) shall submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction IDIQ contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described in the solicitation and intends to select the most highly qualified offeror to compete in Phase 2.

2.0. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and intends to award the first IDIQ to the Offeror whose proposal is determined to represent the best overall value to the Government based on the evaluated ratings from Phase 1 and Phase 2 proposals and the proposed price for the initial task order. Award of the subsequent contracts will be made to the Offeror(s) whose proposal(s) is (are) considered to represent the second (2nd) and a target of four (4) best value(s) to the Government based on the evaluated ratings from Phase 1 and Phase 2 and the proposed price for the initial task order. Offeror(s) selected for the MATOC pool (not awarded the seed contract) will be awarded an initial task order based on the minimum guarantee amount of $2,000.00.

3.0. All projects under this MATOC pool shall not exceed the total estimated contract capacity of

$45,000,000.00. Any unused capacity in one contract period may be carried over in the subsequent contract period. The Government anticipates award a target of four (4) IDIQ contracts as a result of this solicitation. Task orders will be competed amongst the MATOC Pool contractors that will be selected for award of the IDIQ contracts.

4.0. It is not intended for the Offerors to complete and provide price information in Phase 1. A Task

Order CLIN schedule will be provided in Phase 2, which will require pricing by the Offeror.

5.0. Contractors are cautioned against submitting conditional proposals.

6.0. Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and speak with the Contracting Officer if instructions are not understood.

7.0. Proposals shall completely and adequately address the requirements of this solicitation.

Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques,etc., are not necessary.

Proposal Expenses and Pre-Contract Costs: The request for proposal (RFP) solicitation does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.215-16 Facilities Capital Cost of Money JUN 2003

52.222-15 Certification of Eligibility MAY 2014

52.225-10 Notice of Buy American Requirement-- Construction Materials

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ)

Contract resulting from this solicitation.

(End of provision)

52.216-27 Single or Multiple Awards. (OCT 1995)

The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.

The Government intends to award a target of four 100% Small Business awards under this

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.232-35 DESIGNATION OF OFFICE FOR GOVERNMENT RECEIPT OF

ELECTRONIC FUNDS TRANSFER INFORMATION (JULY 2013)

(a) As provided in paragraph (b) of the clause at 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management, the Government has designated the office cited in paragraph (c) of this clause as the office to receive the Contractor's electronic funds transfer (EFT) information, in lieu of the payment office of this contract.

(b) The Contractor shall send all EFT information, and any changes to EFT information to the office designated in paragraph (c) of this clause. The Contractor shall not send EFT information to the payment office, or any other office than that designated in paragraph (c). The Government need not use any EFT information sent to any office other than that designated in paragraph (c).

(c) Designated Office:

Name:

Mailing Address:

Telephone Number:

Person to Contact:

Electronic Address:

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Linda Eadie

Contracting Officer

US Army Corps of Engineers

819 Taylor Street, Rm 2A17

Fort Worth, TX 76102

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visit(s) will be established and specified in Phase 2 of the solicitation.

CLAUSES INCORPORATED BY FULL TEXT

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

Section 00 22 10 - Phase 1 of a 2 Phase-Design Build Selection Procedures

SECTION 00 22 10

PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

1.0 OVERVIEW

2.0 BASIS OF AWARD

3.0 GENERAL INSTRUCTIONS

4.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS

5.0 Volume 1 - TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET

6.0 Volume 1 - TAB B – FACTOR 1 – EXPERIENCE

6.1. SUBMISSION REQUIREMENTS

6.2. EVALUATION CRITERIA

7.0 Volume 1 - TAB C – FACTOR 2 – ORGANIZATION AND TECHNICAL

APPROACH

7.1. SUBMISSION REQUIREMENTS

7.2. EVALUATION CRITERIA

8.0 Volume 1 – TAB D – FACTOR 3 – PAST PERFORMANCE

8.1. SUBMISSION REQUIREMENTS

8.2. EVALUATION CRITERIA

8.3. DEFINITIONS

9.0 PHASE 1 – RATINGS – PHASE 1 EVALUATION PROCEDURES

9.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

9.2. EVALUATION

9.3. DISCUSSIONS

9.4. EVALUATION AND RATING SYSTEM

9.5. DEFINITIONS

9.6. PAST PERFORMANCE RISK RATINGS

SECTION 00 22 10 ATTACHMENTS

1 – PROPOSAL DATA SHEETS

2 - EXPERIENCE INFORMATION

3 - RESUME FORM – KEY PERSONNEL AND QUALIFICATIONS

4 – DESIGNER – PAST PERFORMANCE ASSESSMENT WORKSHEET

5 – NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE

1.0 OVERVIEW

1.1. The Fort Worth District intends to award a Multiple Award Task Order Contract (MATOC) with a target of four (4) Indefinite Delivery Indefinite Quantity (IDIQ) contracts to provide Repair and Alterations (RA) services of Land Ports of Entry (LPOE) in of the support the Department of Homeland Security’s LPOE RA program. The estimated maximum task order limitation is $5,000,000 with a minimum task order limitation of $2,000.

1.2. In Phase 1 of the 2 phase design build selection procedures, interested firms or joint venture entities (referred to as “Offerors”) shall submit specified performance capability proposals, demonstrating their capability to successfully execute a wide variety of multidisciplinary services required for preparation of, but not limited to, renovation, repairs, preventive maintenance, environmental abatement, and erosion control, earthwork and operations construction activities; restoration of roads, parking lots, bridges, fences, gates, equipment and fixtures, as applicable under these MATOCs. The contracts are not only intended to execute design-build construction and design-bid-build, but to provide a timely response to remediation of facilities, e.g., maintenance, repair, asbestos and lead-based paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. The Government will evaluate the qualifications in accordance with the criteria described herein to select the most responsible offerors to compete in Phase 2.

1.3. In phase 2, the selected Phase 2 Offerors will submit proposals for evaluation in accordance with Section 00 22 20. In Phase 2, the Contracting Officer will award a MATOC with a target of four (4) firm fixed-price Indefinite Delivery Indefinite Quantity contracts. Award will be fair and reasonable with regard to pricing for the initial task order, and whose proposals offer the best overall value to the Government, considering the price and non-price factors described herein.

2.0 BASIS OF AWARD (MATOC)

2.1. The Contracting Officer will award a target of four (4) firm fixed-price Indefinite Delivery Indefinite Quantity contracts to the responsible Offerors whose proposals the Source Selection Authority determines conforms to the solicitation, is fair and reasonable with regard to pricing for the initial task order, and whose proposals offer the best overall value to the Government, considering the price and non-price factors described herein. All evaluation factors, other than price, when combined, are considered significantly more important than the price; however the initial Task Order award may not exceed the cost limitation described in Section 00 73 10, which will be provided during Phase 2 for the seed project. The intent of this solicitation is to obtain the best value proposal within the contract cost limitation for the initial task order. There is no obligation to approach or match the contract cost limitation in the offer. Innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria.

After the Government evaluates and rates each proposal, the SSEB prepares the comparative analysis to determine best value and make a recommendation to the SSA which proposals represent the best value for award.

2.2. First Award and Seed Project. Award of the first IDIQ will be made to the Offeror whose proposal is determined to represent the best overall value to the Government based on the evaluated ratings and the proposed price for the initial task order. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the SSA must determine that the added value of a more expensive proposal for the initial task order would justify award to that Offeror.

When the SSA determines that the best value proposal is other than the lowest-priced proposal, the document must explicitly justify paying a price premium regardless of the superiority of the proposal's non-cost rating. The justification must clearly state what benefits or advantages the Government is receiving for the added price and why it is in the Government's interest to expend the additional funds. This justification is required even when the solicitation indicates that non-cost factors are more important than cost/price. Likewise, where the SSA determines the non-cost benefits offered by the higher-priced, technically superior proposal are not worth the price premium as compared to the other offeror(s), an explicit justification also is necessary. The Offeror receiving the first award will receive the task order for the seed project with the award of the basic IDIQ.

2.3. Subsequent Awards and Minimum Guarantee Task Orders. Award of the subsequent IDIQ contracts will be made to the Offeror(s) whose proposal(s) is (are) considered to represent the a target of three (3) next best value(s) to the Government based on the evaluated ratings and the proposed price for the seed project; with a target of four (4) total IDIQ awards. The price proposed under Phase 2 will be used to assist in the evaluation of the best value proposals for award of an IDIQ.

3.0 GENERAL INSTRUCTIONS

3.1. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Joint-Venture offerors must be in compliance with FAR 19.1403. Any legally organized Offeror may submit a proposal. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

3.2. Submit the Phase 1 proposal in electronic format, as described in Section 00 21 00.

Note that the Government will not evaluate any material that exceeds the page limits, in paragraph 6.1.1 below.

4.0 PHASE 1 - PROPOSAL CONTENTS AND RELATED EVALUATION

FACTORS

PHASE 1 - VOLUME 1 – TECHNICAL CAPABILITY

Factor Location Description Relative Importance

Vol.1, Tab A SF 1442 and Proposal Data Sheet N/A

Factor 1 Vol. 1, Tab B Experience Most important factor

Factor 2 Vol. 1, Tab C Organization and Technical Approach

Less important than Factor 1

Factor 3 Vol. 1, Tab D Past Performance Less important than Factor 2

5.0 PHASE 1 - VOLUME 1, TAB A - STANDARD FORM 1442 AND PROPOSAL

DATA SHEET

5.1. Submit the SF 1442, completed and signed by a person authorized by the Offeror.

Include the completed proposal data sheet (See attachment 1, provided at the end of this Section) and the following documents (if applicable). If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not been finalized/approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorizes between the JV parties. If the Offeror is a Limited Liability Company, include a copy of the Articles of Organization and Operating Agreement. If the Offeror has teaming agreements and/or letters of commitment, please include under this Tab.

6.0 VOLUME 1, TAB B – FACTOR 1 – EXPERIENCE

6.1. SUBMISSION REQUIREMENTS

6.1.1. The offeror must submit at least three (3) examples of recent, relevant repair, alteration or construction experience of the firm or proposed team members using only the Experience Information Form provided as Attachment 2. Each example is not to exceed three (3) pages. Offeror shall submit no more than five (5) projects total. (Documentation submitted that exceeds twenty (20) pages will not be considered by the Government).

6.1.2. Recent means completed, or currently in progress with at least 75% construction completed, within the past seven (7) years from the date of this solicitation.

Projects will be considered relevant to this procurement if they are the same or similar in complexity, in type, scope, and magnitude:

An example of repair, alteration, or construction of a facility involving at least three of these trades; architectural, MEP, structural or civil with a construction value of at least $200,000.

Note: Ensure the descriptions clearly identify which required project type(s) it meets.

6.1.3. Offeror must be the Prime Contractor on a minimum of two projects submitted.

6.1.4. If the Offeror is a joint venture, limited liability corporation, or integrated design-bid-build firm, provide experience information for construction projects relevant to each of the projects listed above. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer.

6.1.5. The Offeror may provide a supplemental narrative (not project list), not to exceed two pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the Government will benefit. In any case, the experience submission shall not exceed 20 pages.

6.2. EVALUATION CRITERIA

6.2.1. The Government will review the project descriptions submitted, subject to the established quantity limitations, to ensure the experience requirements have been met. Experience in the following project types may be considered a strength.

(a) A minimum of two examples of repair, alteration, or construction of a facility involving any of these trades; architectural, MEP, structural or civil with a construction value of at least $200,000.

(b) A minimum of one example repair, alteration, or construction of a facility involving two of more of these trades; architectural, MEP, structural or civil with a construction value of at least $500,000.

6.2.2. The Government will review any supplemental narratives submitted, up to two pages, to determine how the corporate experience described may benefit the Government, which may be considered a strength.

7.0 VOLUME 1, TAB C – FACTOR 2 – ORGANIZATION AND TECHNICAL

APPROACH

7.1. SUBMISSION REQUIREMENTS

7.1.1. This information should address the Offeror’s organization and intended technical approach to executing the contract. Limit the information to fifteen

(15) pages or less clearly but concisely describing the organizational and technical approach to project management and execution. The offeror shall provide an organizational chart within the fifteen-page limit. Resumes are excluded from the maximum fifteen (15) page limit. Documentation that exceeds fifteen (15) pages will not be considered by the Government.

7.1.2. Organization: Identify the construction firm that will be utilized on this contract, their technical competencies, roles and responsibilities. Demonstrate an understanding of the risk management process associated with design-build processes. Describe any previous teaming experience between current team members. Describe the team members, their resources, how their resources will be utilized, their roles and responsibilities, and include an Organizational Chart. Project Managers must have a minimum of 10 years’ experience managing construction projects or a minimum of 5 years’ experience managing construction projects combined with an Engineering or Construction Management bachelor’s degree. Construction superintendents must have at least ten (10) years’ experience on construction projects. The Design Lead must have a minimum of five years design experience combined with an Engineering bachelor’s degree. Design Team will include a Civil, Mechanical, Structural, Architectural, and Electrical Engineer; each will have a minimum of at least two years combined with a bachelor’s degree in the appropriate trade.

The resume Form – Key Personnel and Qualifications (Attachment 3) must be used.

7.1.3. Capability:

7.1.3.1. Describe your resources in personnel; construction, plant and equipment available to self- perform required work under individual Task Orders. Fully describe the type of work your firm is capable of self-performing and describe the types of work you intend to self-perform to be compliant with the requirements of Federal Acquisition Regulation (FAR) clause 52.219-14, Limitations on Subcontracting in Section 00 72 00, if awarded this contract.

7.1.3.2. Describe your capability to support this project concurrently with other projected on-going or new work. Describe your resources available and your capabilities to manage and execute several concurrent Task Orders, which may be located in remote locations throughout the US. Describe why your firm is especially qualified to undertake this contract.

7.1.3.3. Single Contract and Aggregate Bonding Capacity: Evidence of Bonding Capacity: Submit a letter of commitment from a surety, signed by an officer or agent authorized to bond, that identifies the offeror’s available bonding capacity and limits that the surety will bond the Offeror, as the successful awardee for this project, taking into consideration the Cost Ceiling Limitation described in this Solicitation. Evidence of minimum aggregate bonding capacity of $20,000,000.00. The surety must be acceptable to the Government and must appear on the Department of Treasury Circular 570 “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies.” If the Offeror submits evidence from an individual Surety, the individual surety must include documentation meeting the requirements of FAR 28.203 and contract clause 52.228-11. If the joint venture involves a constructor and an A-E firm and the constructor intends to provide the bond, provide a complete explanation with confirmation from the surety.

7.2. EVALUATION CRITERIA

7.2.1. Organization: The Government will evaluate the construction team members proposed to be utilized on this contract, their technical competencies, roles and responsibilities to determine experience and skills.

7.2.2. Evidence of previous teaming experience between current team members will be evaluated and may be considered a strength.

7.2.3. The credentials of the proposed Project Manager will be reviewed to ensure they have an Engineering or Construction Management degree and at least five

(5) years’ experience on construction projects or a minimum of 10 years’ experience managing construction projects. Additional experience over 10 years with an Engineering or Construction Management degree may be considered a strength.

7.2.4. The credentials of the proposed Construction Superintendent(s) will be reviewed to ensure they have at least ten (10) years’ experience on construction projects. Additional experience over 15 years may be considered a strength.

7.2.5. The credentials of the proposed Design Lead will be reviewed to ensure they have an Engineering degree and at least five (5) years’ experience on design projects. Additional experience over 10 years may be considered a strength.

7.2.6. The credentials of the proposed Design Team will be reviewed to ensure they each have an Engineering degree in…

This is the start of the file's text. The full file is on GovTribe.