B3_Solicitation_W9126G-16-B-0003-Plans.pdf

PDF 8 MB Posted

Attached to
GIWW Galveston Causeway TXDOT Debris Mechanical Dredging, Galveston County, TX
Solicitation number
W9126G-16-B-0003
Issued by

About this file

Solicitation Plans

View the file

Other files

File Type Posted
C1_ABSTRACT_W9126G-16-B-0003.pdf PDF
Amend-0003_W9126G-16-B-0003.pdf PDF
AMEND0002_Extend_Bid_Opening_Date.pdf PDF
B3_AMEND0001.pdf PDF
B3_Solicitation_W9126G-16-B-0003-Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET #

of 17 TITLE

1 COVER

2 LOCATION PLAN AND INDEX OF DRAWINGS

3 PLAN - DEBRIS REMOAVAL LOCATIONS

4 PLAN - CONCRETE DEMOLITION AND REMOVAL LOCATIONS

5 PLAN - FENDER DEMOLITION AND REMOVAL LOCATIONS

6 PLAN - DEBRIS REMOVAL STA. 362+300 TO STA. 363+100

7 GIWW - DEBRIS REMOVAL CROSS SECTIONS STA. 362+300 TO STA. 363+100

8 GIWW - DEBRIS REMOVAL CROSS SECTION STA. 363+250

9 PREVIOUS GALVESTON CAUSEWAY BRIDGE LAYOUT

10 U.S.A.C.E. MULTIBEAM SURVEY BETWEEN GALVESTON CAUSEWAY AND

GALVESTON BRIDGE

11 PREVIOUS TIMBER FENDER SYSTEM LAYOUT

12 PREVIOUS TIMBER FENDER SYSTEM DETAILS

13 PREVIOUS TIMBER FENDER SYSTEM DETAILS

14 PREVIOUS TIMBER FENDER SYSTEM DETAILS

15 PREVIOUS MONOPILE DOLPHIN FENDER LAYOUT

16 PREVIOUS MONOPILE DOLPHIN FENDER DETAILS

17 PREVIOUS MONOPILE DOLPHIN FENDER DETAILS

17 -- Total Number of Drawings

INDEX OF DRAWINGS

NAME PID EASTING (X)

NAD-83 TX-SC

NORTHING (Y)

NAD-83 TX-SC

ELEV

(NAVD88)

1486 C 2012 DO9997 3,275,184.460 13,680,977.130 12.00

HORIZONTAL CONTROL MONUMENTS

NAD83, TEXAS SOUTH-CENTRAL ZONE, US SURVEY FEET

CHANNEL TIDE STAFF NORTHING EASTING LATITUDE LONGITUDE

GULF INTRACOASTAL WATERWAY - TEXAS SOUTH-CENTRAL

GIWW CAUSEWAY BOAT RAMP 362+300.00 363+100.00 13,675,677 3,283,319 29º 17' 19.06" 94º 52' 26.97"

TIDE STAFFS

STATION TO STATION

NAME EASTING (X) NORTHING (Y)

H-1 3,279,426.71 13,678,579.87

3,279,393.35 13,678,596.98 3,279,368.23 13,678,547.97 3,279,401.60 13,678,530.87

H-2 3,279,401.60 13,678,530.87 3,279,368.23 13,678,547.97 3,279,315.84 13,678,445.76 3,279,349.21 13,678,428.65

H-3 3,279,333.59 13,678,398.19 3,279,300.22 13,678,415.29 3,279,269.36 13,678,355.09 3,279,302.73 13,678,337.99

H-4 3,279,286.10 13,678,305.54 3,279,252.73 13,678,322.64 3,279,211.22 13,678,241.65 3,279,244.59 13,678,224.54

H-5 3,279,586.22 13,678,534.81 3,279,552.85 13,678,551.92 3,279,514.74 13,678,477.04 3,279,547.85 13,678,459.94

H-6 3,279,539.75 13,678,444.15 3,279,506.38 13,678,461.25 3,279,469.78 13,678,389.84 3,279,503.15 13,678,372.74

H-7 3,279,492.84 13,678,352.63 3,279,459.47 13,678,369.73 3,279,444.16 13,678,339.61 3,279,477.54 13,678,322.76

H-8 3,279,432.22 13,678,234.36 3,279,399.42 13,678,251.17 3,279,355.75 13,678,167.37 3,279,389.12 13,678,150.27

DEBRIS LIMITS

C-1 3,279,255.57 13,678,218.58

3,279,211.08 13,678,241.38 3,279,125.41 13,678,074.23 3,279,169.90 13,678,051.43

C-2 3,279,389.06 13,678,150.15 3,279,344.57 13,678,172.96 3,279,258.89 13,678,005.82 3,279,303.39 13,677,983.01

CONCRETE LOCATIONS

F-1 3,279,485.66 13,678,648.29

3,279,441.13 13,678,671.11 3,279,132.35 13,678,068.41 3,279,042.97 13,678,004.12 3,279,087.47 13,677,981.31 3,279,176.85 13,678,045.61

F-2 3,279,603.85 13,678,588.40 3,279,559.36 13,678,611.21 3,279,250.47 13,678,008.57 3,279,250.47 13,677,897.76 3,279,294.97 13,677,874.95 3,279,294.97 13,677,985.76

FENDER LOCATIONS

FED CHANNEL 3,279,657.73 13,678,756.54

STA. 362+300 TO 3,279,546.49 13,678,813.55

STA. 363+100 3,279,181.58 13,678,101.63

BOTTOM WIDTH 125' 3,279,292.82 13,678,044.61

DEBRIS LOCATION

W9126G-16-B-0003-PLANS
2 LOCATION PLAN AND INDEX OF DRAWINGS
3 PLAN - DEBRIS REMOAVAL LOCATIONS
4 PLAN - CONCRETE DEMOLITION AND REMOVAL LOCATIONS
5 PLAN - FENDER DEMOLITION AND REMOVAL LOCATIONS
6 PLAN - DEBRIS REMOVAL STA. 362+300 TO STA. 363+100
7 GIWW - DEBRIS REMOVAL CROSS SECTIONS STA. 362+300 TO STA. 363+100
8 GIWW - DEBRIS REMOVAL CROSS SECTION STA. 363+250
9 PREVIOUS GALVESTON CAUSEWAY BRIDGE LAYOUT
10 U.S.A.C.E. MULTIBEAM SURVEY BETWEEN GALVESTON CAUSEWAY AND GALVESTON BRIDGE
11 PREVIOUS TIMBER FENDER SYSTEM LAYOUT
12 PREVIOUS TIMBER FENDER SYSTEM DETAILS
13 PREVIOUS TIMBER FENDER SYSTEM DETAILS
14 PREVIOUS TIMBER FENDER SYSTEM DETAILS
15 PREVIOUS MONOPILE DOLPHIN FENDER LAYOUT
16 PREVIOUS MONOPILE DOLPHIN FENDER DETAILS
17 PREVIOUS MONOPILE DOLPHIN FENDER DETAILS

File details come from the government source that posted it. Updated .