AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The design-build request for proposal for Dormitory – 144 Person, Lackland Air Force Base, Texas, is amended as follows:

See Continuation Sheet(s).

NOTE: Proposal receipt due date and time remain May 15, 2013, 2 p.m., CDT, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-13-R-0073

X 9B. DATED (SEE ITEM 11)

23-Apr-2013

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-May-2013

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G-13-R-0073

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. 00 21 00 – Instructions, Conditions and Notices to Offerors – Replace 00 21 00 with the attached new 00 21 00 bearing the notation “W9126G-13-R-0073, Amendment No. 0005”. Changes were made to paragraph 1.11.1.

2. 00 22 10 – Phase 1 of 2 Phase Design-Build Selection Procedures – Repalce 00 22 10 with the attached new 00 22 10 bearing the notation “W9126G-13-R-0073, Amendment No. 0005”. Changes were made to paragraph 5.1.1, (d), (iii) and paragraph 6.1.6.

End of Summary of Changes

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

LOCAL INSTRUCTIONS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

AM#5

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 NOT USED

1.3 GOVERNMENT SECURITY REQUIREMENTS

1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.5 OFFEROR'S QUESTIONS AND COMMENTS

1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 SITE VISIT

1.9 ACCURACY IN PROPOSALS

1.10 PROPOSAL SUBMITTALS

1.11 PROPOSAL FORMAT

1.12 JOINT VENTURE PROPOSAL REQUIREMENTS

1.13 SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION

OF SMALL BUSINESS CONCERNS

1.14 BID GUARANTEE

1.15 SOLICITATION PROVISIONS

W9126G-13-R-0073, Amendment No. 0005

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

The scope of project includes all work required to complete design/build construction of a standardized dormitory Lackland AFB, . The work shall be in accordance with Request for Proposal documents.

1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION COSTS

The design and construction costs will be subject to the funds available for this project. The current funds available for design and construction, base proposal plus all options, is $15,300,000.00. There is a possibility, but no guarantee, that additional funds will be made available for this project prior to contract award.

The total contract award shall not exceed the anticipated funding amount of $15,300,000.00 for this contract. Offerors are notified that they are under no obligation to approach this ceiling. The Government may not be able to make an award, if the total proposal amount exceeds the anticipated funding for this project or if the base proposal exceeds the current funds available.

1.3. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Fort Worth District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. All Mail must have the following address:

U.S. Army Corps of Engineers ATTN: CESWF-CT-C, Mr. Herman Le Jeune PO Box 17300, 819 Taylor Street (Room 2A19) Fort Worth, TX, 76102-0300

(817) 886-1059

All Federal Express/UPS/etc. packages that require a physical address must include the room number, Contract Specialist’s name and telephone number to be delivered.

1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities website at:

www.fbo.gov

It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. The Offeror must be registered with the Central Contractor Registration Database (CCR) to receive a Government contract award.

A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov/ via Quick Search (Solicitation No. W9126G-13-R-0073).

1.5. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via:

Bidder Inquiry

1.5.1 Bidder Inquiry

1.5.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

1.5.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

1.5.1.1.2 From this page you may view all bidder inquiries or add inquiry.

1.5.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.5.1.1.4 The Solicitation Number is: W9126G-13-R-0073

1.5.1.1.5 The Bidder Inquiry Key is: M2F4EX-9K9CJJ

1.5.1.2 The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

1.5.1.3 Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

1.5.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.5.1.5 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.219-1 for the small business size standard/NAICS Code.

1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.8. SITE VISIT

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed.

(b) The site visit is presently scheduled with offerors at ______________TBD_________________Central Daylight Time. Not later_______________________________, notify (name and telephone number), ext.

XXXX, of offerors intention to attend. See Section 00 21 30 for site visit information.

1.9. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.10. PROPOSAL SUBMITTALS

See Standard Form SF 1442 for proposal due date and time:

U.S. Army Corps of Engineers, Fort Worth District ATTN: Mr. Herman Le Jeune 819 Taylor Street, Room 2A19, Fort Worth, TX, 76102-0300

The Packaging that contains the Proposals shall be marked:

”Proposals for Solicitation Number: W9126G-13-R-0073, DO NOT OPEN”

1.11. PROPOSAL FORMAT

1.11.1 Phase 1 Proposal Submission Format. Volume 1 will be submitted in pdf format on CD. All pdf materials must conform to same formatting requirements as the hard copy documents to be provided for Phase 2. An original and (AM#5) three (3) four (4) (/AM#5) copies of the CD will be required.

1.11.2 Phase 2 Proposal Submission Format.

(a) Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders except that Pro Forma material and price proposal shall be submitted in a closed manila envelope.

Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein.

(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

(a) Drawing sheets: Half-size sheet bound set or in binder is required. 11” x 17” is acceptable for half-size.

acceptable.

(b) Electronic Format: Provide CDs in read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.

(c) Number of copies: Submit one original CD and four (4) copies of Volume 2 on CD. Also, submit four

(4) hard copies of drawings and printed matter (Volume 2). For Price and Pro Forma information required in Volume 3. submit one original CD and one copy on CD.

1.12. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.13. SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION

OF SMALL BUSINESS CONCERNS

(a) Application. This clause applies to all offerors submitting proposals.

(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:

52.219-8, Utilization of Small Business Concerns (Alternate I)

52.219-9, Small Business Sub Contracting Plan (Alternate I) (applies only to Large Business)

52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)

252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

(i) 30.0% of subcontracted amount contract amount with small business concerns.

(ii) 17.0% of subcontracted amount contract amount with those small business concerns owned and controlled by socially and economically disadvantaged individuals.

(iii) 5.8% of subcontracted amount contract amount with those small business concerns owned and controlled by women.

(iv) 5.0% of subcontracted amount contract amount with those small business concerns owned and controlled by HBCU/MI.

(v) 9.0% of subcontracted amount contract amount with those small business concerns owned and controlled by HUBZones.

(vi) 3.0% of subcontracted amount contract amount with those small business concerns owned and controlled by Service Disabled Veteran-Owned small business

1.14. BID GUARANTEE

A Bid Guarantee is required for proposal submission. The penal sum of the bond will be required as in provision 52.228-1, Bid Guarantee. Facsimile Bonds are not acceptable.

1.15. SOLICITIATION PROVISIONS

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Data Universal Numbering System (DUNS) Number APR 2008 52.211-7 Alternatives to Government-Unique Standards NOV 1999 52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.215-16 Facilities Capital Cost of Money JUN 2003 52.217-4 Evaluation Of Options Exercised At The Time Of Contract

Award

JUN 1988

52.217-5 Evaluation Of Options JUL 1990 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

JAN 2011

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

FEB 1999

52.225-10 Notice of Buy American Act Requirement--Construction Materials

FEB 2009

52.225-12 Notice of Buy American Act Requirement - Construction Materials Under Trade Agreements

FEB 2009

52.228-1 Bid Guarantee SEP 1996 52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)—EFARS

ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of statement)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed price (FFP) contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from U.S. Army Corps of Engineers, Fort Worth District, 819 Taylor Street, Rm 2A19 (Attn: CESWF-CT), Fort Worth, Texas 76102-0300.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR):

http://www.arnet.gov/far/

Department of Defense FAR Supplement:

http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 10 - Phase 1 of a 2 Phase-Design Build Selection Procedures

SECTION 00 22 10 PHASE 1 OF 2

SECTION 00 22 10

PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

AM#5

1.0 OVERVIEW

2.0 GENERAL INSTRUCTIONS

3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS

4.0 Volume 1 - TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET

5.0 Volume 1 - TAB B – FACTOR 1-1 – PAST PERFORMANCE

5.1. SUBMISSION REQUIREMENTS

5.2. RELEVANCY EVALUATION CRITERIA

5.3. CONFIDENCE EVALUATION CRITERIA

6.0 Volume 1 - TAB C – FACTOR 1-2 – ORGANIZATION AND TECHNICAL APPROACH

6.1. SUBMISSION REQUIREMENTS

6.2. EVALUATION CRITERIA

7.0 PHASE 1 OVERALL RATING

8.0 PHASE 1 EVALUATION PROCEDURES

8.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

8.2. EVALUATION

8.3. EVALUATION AND RATING SYSTEM

8.4. DEFINITIONS

8.5. PAST PERFORMANCE RATINGS

PHASE ONE – SECTION 00 22 10 ATTACHMENTS

1 – PROPOSAL DATA SHEETS

2 – COMPANY PAST PERFORMANCE CONSTRUCTION OR PRIME CONTRACTOR

3 – COMPANY PAST PERFORMANCE DESIGN FIRM OR IN-HOUSE DESIGN

4 – PAST PERFORMANCE EVALUATION TELEPHONE INTERVIEW QUESTIONNAIRE

1.0 OVERVIEW

1.1. This is a phased design/build project to construct a standardized dormitory. Applicable information systems, fire protection and alarm systems, building security system, and Energy Monitoring and Control Systems (EMCS) will be provided as part of construction. Sustainable Design and Development (SDD) and energy reduction features will also be provided. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping, and signage. Heating and air conditioning will be provided. Refer to included geotechnical investigations for determination of required special foundations due to the local soil conditions. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided.

Comprehensive building and furnishings related interior design services are required. Accessibility for individuals with disabilities will be provided.. The Government will evaluate the qualifications in accordance with the criteria described herein and will select no more than five (5) of the Phase 1 Offerors to compete in Phase 2.

1.2. In Phase 2, the selected Phase 2 Offerors will submit proposals for evaluation in accordance with Section 00 22 20. In Phase 2, the Contracting Officer will award a firm fixed-price contract to the firm whose proposal offers the best overall value to the Government, considering the price and non-price factors described in Phase 2.

1.3. The selected Phase 2 Offerors will be announced by special notice or synopsis to the Federal Business Opportunities website. Offerors may be contacted separately to request their approval.

2.0 GENERAL INSTRUCTIONS

2.1. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

2.2. Submit the Phase 1 proposal in electronic format, as described in Section 00 21 00. Note that the Government will not evaluate any material that exceeds the page limits, in paragraph 6.1.1 below.

PHASE 1 DOES NOT INVOLVE PRICING SUBMISSION.

3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS

Location Factor Number Description Relative Importance

Tab A SF 1442 and Proposal Data Sheet N/A

Tab B Factor 1-1 Past Performance Equal to Factor 1-2

Tab C Factor 1-2 Organization and Technical Approach

Equal to Factor 1-1

4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET

4.1. Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section) and Joint Venture Agreement (if applicable)

5.0 TAB B – FACTOR 1-1 – PAST PERFORMANCE

5.1. SUBMISSION REQUIREMENTS

The Offeror’s construction and design entities should each demonstrate past performance through the submission of similar projects, using the Construction – Past Performance Form – (Attachment 2), and Designer – Past Performance Form – (Attachment 3). If the Offeror is a joint venture, limited liability corporation, or integrated design-build firm, provide past performance information for design and construction projects relevant to each of the proposed roles on this project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Design firms may list prime contractors they have worked for or Government, private or commercial customers. If projects were design-build, so identify them. Both the prime contractor and the design firm(s) shall each submit no more than five (5) projects completed or substantially completed within 5 years from the date of this solicitation that best represent their experience similar to the scope of work for this solicitation. Two (2) of the five (5) projects submitted may be fully designed and at least 50% construction progress completed. If Offeror is proposing as a Joint Venture (JV) and past performance cannot be provided as a JV, each partner shall submit past performance information, with no more than five (5) projects each.

5.1.1. Projects will be considered relevant to this procurement if they are similar in complexity, in type, scope, or magnitude. Relevancy is defined as:

(a) Design/build a standardized dormitory or their equivalent or similar commercial or institutional housing type; and

(b) Typical project size should reflect a minimum of 40,000 square feet per building; and

(c) Construction value of at least $15,000,000.00.

(d) Additionally, projects should reflect the following features in terms of complexity:

(i) Design-build construction

(ii) Anti-Terrorism and Force Protection

(iii) (AM#5) Phased construction of multiple buildings (/AM#5)

(iv) Concurrent construction of multiple buildings

(v) Building envelope air barrier system and building air leakage testing

(vi) LEED certifiable or LEED certification*

* The firm(s) preparing the design must demonstrate qualifications and performance in sustainable design, based on project performance on projects that have achieved US Green Building Council’s LEED certification or were certifiable at LEED Silver or better. Additional consideration will be given if both the constructor and the design firm(s) demonstrate qualifications and performance with LEED.

5.1.2. The Offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate past performance that is not directly related to the specific projects above is applicable to this project and how the Government will benefit. The following information may be considered:

5.1.2.1. Describe previous design-build past performance. The Offeror may include past performance on other types of projects.

5.1.2.2. Describe team members’ experience on LEED projects.

5.1.2.3. Describe team members’ experience with building envelope air barrier tightness design, construction and testing, including a discussion on air leakage rates achieved on previous projects.

5.1.2.4. The above information is limited to projects that are fully designed and at least 50% construction progress completed or that have been completed and turned over no longer than the past five years preceding the date of this solicitation.

5.1.3. Offerors are not required to submit any additional past performance information. The Government will utilize CCASS, ACASS, CPARS and any other information deemed relevant to assess confidence in the Offeror’s ability to perform.

5.1.3.1. Offerors may submit awards, award fee determinations, customer letters of commendation, or other forms of performance recognition relevant to the submitted projects to demonstrate the Offeror’s performance capabilities and customer satisfaction.

5.1.3.2. Offerors may submit information on past performance issues and corrective actions taken to prevent these issues from reoccurring. Discuss whether these corrective actions have been implemented on contracts awarded subsequent to the performance issues, the effectiveness of the corrective actions, and POC information for the subsequent contracts.

5.1.3.3. Past Performance Questionnaire. For each project submitted for Factor 1-1 Past Performance that does not have a final CCASS evaluation, the Offeror is provided a Past Performance Questionnaire (Attachment 4) to submit to the client. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires shall be submitted directly to the Government’s point of contact, Mr. Herman Le Jeune via email at herman.n.lejeune@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

5.1.3.4. Do not request past performance questionnaires on projects that have final CCASS evaluations.

If a CCASS evaluation exists and a Past Performance questionnaire is provided for the same project, the CCASS evaluation will be reviewed as the official past performance record for the project, and the Past Performance questionnaire will not be considered by the Source Selection Board or the Source Selection Authority.

5.1.3.5. For USACE or other DoD projects which are underway but do not yet have an interim or final CCASS evaluation, one past performance questionnaire per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) for the contract.

5.2. RELEVANCY EVALUATION CRITERIA:

5.2.1. The Government will evaluate the Offeror’s past performance to determine how relevant the past performance is to the project under consideration. Past performance on the projects identified in the project forms will receive more consideration than past performance provided in the supplemental narrative. The Government will place greater value on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project past performance will not be rated inherently more important than non-Federal Government project past performance.

5.2.2. More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

5.3. CONFIDENCE EVALUATION CRITERIA:

5.3.1. The SSEB will review the past performance information available, to include ACASS, CCASS, CPARS and other past performance information deemed relevant, to determine the quality and usefulness as it applies to performance confidence assessment. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer.

Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting design or construction errors, warranty work, etc.

5.3.2. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.3.3. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

5.3.4. The confidence rating will be established based on the past performance of the firms or that of its predecessor, if applicable. An entity may not establish past performance based on the past performance of its key personnel apart from that of the entity. If the Government does not obtain past performance information and cannot establish a past performance record for the Offeror through other sources, a rating of Unknown (Neutral) confidence will be assigned.

5.3.5. If negative information is received, the Offeror will be given an opportunity to provide input as required by FAR 15. ACASS, CCASS, and CPARs that are part of the official record will be utilized as if the Offeror has already had an opportunity to respond.

6.0 TAB C – FACTOR 1-2 - ORGANIZATION AND TECHNICAL APPROACH

6.1. SUBMISSION REQUIREMENTS:

6.1.1. This information should address the Offeror’s organization and intended technical approach to executing the contract. Demonstrate an understanding of the fundamental design-build problem, i.e., a design and construction proposal that complies with the RFP requirements including the funding constraints of the cost limitation (CCL). Demonstrate an understanding of the risk management process associated with design-build process. Limit the information to fifteen (15) pages or less clearly but concisely describe the organizational and technical approach to project management and execution.

6.1.2. Describe the team members, their resources, how their resources will be utilized, and their roles and responsibilities. Provide an organizational chart of the proposed design-build team.

6.1.3. Describe any previous teaming experience between current team members.

6.1.4. Provide a general description of the work the Offeror will self-perform to be compliant with the requirements of Federal Acquisition Regulation (FAR) clause 52.236-1, Performance of Work by Contractor in Section 00 72 00.

6.1.5. Describe the technical approach to design and construction of this facility type. Include information on design and construction. Describe your firm’s familiarity with applicable codes.

6.1.6. Describe your plan for coordinating project work with privately owned utility providers at (AM#5) Lackland AFB Fort Polk (/AM#5).

6.1.7. Describe your familiarity with local conditions, to include labor, subcontractors, and suppliers, and your familiarity with Texas sales tax requirements.

6.1.8. Describe interactions within the team and with the Corps of Engineers during the design. Discuss the role and interaction of the design team with the construction team during design and construction.

Provide information on how your design-build team will manage co-location of design and construction team members manage Government comments, the design team’s involvement throughout construction, and how sub-contractors will be integrated into design and construction. Discuss how the configuration management system will track and control design evolution and changes during design for quality control and to facilitate quicker Government reviews. Describe the role of the construction team members during design. Describe the role and interaction of the design team with the construction team during construction, addressing, as a minimum, maintaining configuration management of the design during construction, including control and approval of revisions to the accepted design; requests for information;

shop drawing and submittal reviews and approvals; progress meetings; site visits, if any; contract completion, closeout, as-built and completion documentation.

6.1.9. Provide information on your team’s project scheduling capabilities for design and construction.

Identify the system you will utilize and how your team will implement the schedule to manage design and construction. Discuss internal procedures for handling delays to minimize “schedule creep”. The Government is looking for ways the design-builder will streamline design and construction, manage labor and other resource constraints in an effort to reduce costs and provide an achievable and flexible schedule that will work with the installation’s troop movement schedule. In Phase 2, the Offeror will develop a summary schedule. In Phase 1, the Government is interested in the Offeror’s planning and scheduling capabilities.

6.1.10. Provide information on your team’s capabilities to assure quality control. Describe your quality control approach, corporate systems, and capabilities to maintain quality control of the design and construction. Provide specific information on how you will manage design quality control, track design evolution and changes during design to meet the schedule and to facilitate quicker Government reviews.

Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. After contract award, the selected design-builder will submit their Quality Control Plan for Government Approval.

6.2. EVALUATION CRITERIA:

6.2.1. The Government will evaluate the strengths, weaknesses, and any deficiencies in the organization and technical approach. The Government will evaluate the firm’s understanding of design-build and the capability to execute the project. Some additional specific evaluation criteria are listed below.

6.2.2. The Government will evaluate the clarity and strength of the overall organization, the structure and key personnel staffing to execute the entire scope of work. The Offeror is required to select and commit to design firms to achieve an “acceptable” rating. Joint venture participants’ contribution to the project should be commensurate with their skills and background. Previous teaming by the construction contractor and design firm(s) will be considered a strength.

6.2.3. The Government will evaluate the Offeror’s capability and intent to comply with the applicable requirements for self-performance of work by the prime contractor.

6.2.4. The Government will evaluate the Offeror’s proposed technical approach to design and construction of this facility type. The Government will evaluate demonstrated familiarity with applicable codes.

6.2.5. The Government will evaluate the Offeror’s understanding of the processes and procedures for coordinating any necessary utility work with both the Corps of Engineers local office and the privately owned utility providers.

6.2.6. The Government will evaluate the Offeror’s understanding of local conditions, to include labor, subcontractors, and suppliers, and understanding of Texas sales tax requirements.

6.2.7. The Government will evaluate the integration of the design and construction firms and the staff during design and construction. The constructor must be actively involved in the design process (see Special Contract Requirement: “Constructor’s Role during Design”, Section 00 73 00). The Offeror must have an effective configuration management system to control and track revisions to the design. The Government will evaluate the Offeror’s understanding of the design process and the roles of the designers of record and the Government reviewers. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction. Additional consideration will be given to a team that includes as many subcontractors as possible (e.g., the key subs for electrical and mechanical, the fire protection subcontractor, fabricators, etc.) during design development, prior to release of the applicable design packages for construction, so that systems and trade coordination can reduce interferences, increase constructability and speed up construction operations.

6.2.8. The Government will evaluate the Offeror’s scheduling capabilities to develop and implement an integrated fast track design-build schedule and the systems that will be utilized to implement the schedule. The Government places a higher value on an offer that provides methods to streamline construction and manage labor and other resource constraints in an effort to reduce costs and supports an achievable and flexible schedule that will work with the installation’s troop movement schedule.

6.2.9. The Government will evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for both design and construction. The Government places value upon continued participation by the designers of record during the construction quality control process. The Government will evaluate the adequacy of the staffing plan to cover all required tasks and responsibilities.

7.0 PHASE 1 OVERALL RATING

7.1. In addition to individual factor ratings, the SSA will assign an overall rating for the Phase 1 proposal.

8.0 PHASE 1 EVALUATION PROCEDURES

8.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

8.1.1. The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any proposal incorporated by reference, except as expressly allowed by this solicitation.

8.2. EVALUATION

8.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor.

Offerors are cautioned to put forth their best efforts for the Phase 1 submission and to furnish all information clearly to allow the Government to determine their performance capability. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it in response to Phase 1.

8.2.2. The Government reserves the right to allow proposal corrections, if deemed necessary, to determine the most highly qualified Offerors to short-list for Phase 2.

8.2.3. The Contracting Officer, independently exercising prudent business judgment, will select up to five (5) of the most highly qualified Offerors to short-list for Phase 2.

8.3. EVALUATION AND RATING SYSTEM

8.3.1. General: The Government will review the proposals and rate the quality of each evaluation factor. The SSEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements.

8.3.2. Review Write-up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.

8.3.3. Rating System: After listing proposal strengths, weaknesses, and deficiencies, the SSEB will assign an adjectival rating of ““Outstanding”, “Good”, “Acceptable”, “Marginal”, or “Unacceptable” to each factor except Past Performance. The rating will reflect the Government’s confidence in each Offeror’s technical ability, as demonstrated in its proposal, to perform the requirements stated in the RFP.

8.4. DEFINITIONS

8.4.1. Deficiency. A deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

8.4.2. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance.

See FAR 15.001.

8.4.3. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

8.4.4. Strength. Any aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

8.4.5. Significant Strength. A significant strength appreciably enhances the merit of a proposal or appreciably enhances the probability of successful contract performance.

8.4.6. Outstanding. Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

8.4.7. Good. Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

8.4.8. Acceptable. Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

8.4.9. Marginal. Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

8.4.10. Unacceptable. Proposal does not meet requirements and contains one or more deficiencies.

Proposal is unawardable.

8.5. PAST PERFORMANCE RATINGS. Two ratings shall be assigned to Past Performance, a relevancy rating and a confidence rating.

8.5.1. The relevancy rating will evaluate the Offeror’s past performance to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired under this solicitation. Relevancy is defined in paragraph 5.1.1 of this Section.

8.5.2. The confidence rating assess the risks associated with each Offeror's likelihood of success in performing the requirements stated in the RFP based on the Offeror's demonstrated performance on recent contracts. SSEB members and the SSA may use personal knowledge or information from other sources in its evaluation of an Offeror’s past performance, provided such information is consistent with the established evaluation criteria of the RFP. Offerors that have no relevant performance record will be given a neutral/unknown confidence rating.

8.5.3. Relevancy Rating System

8.5.3.1. Very Relevant. Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

8.5.3.2. Relevant. Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

8.5.3.3. Somewhat Relevant. Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

8.5.3.4. Not Relevant. Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

8.5.4. Confidence Rating System

8.5.4.1. Unknown Confidence (Neutral). No relevant performance record is identifiable upon which to base a meaningful performance risk prediction. A search was unable to identify any relevant past performance information for the Offeror or key team members/subcontractors. This is neither a negative or positive assessment. .

8.5.4.2. Substantial Confidence. Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

8.5.4.3. Satisfactory Confidence. Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

8.5.4.4. Limited Confidence. Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

8.5.4.5. No Confidence. Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

PHASE 1 - TAB A

PROPOSAL DATA SHEET

SECTION 00 22 10 - ATTACHMENT 1

Solicitation Number

Firm

Address

Phone

Fax

Email

Tax ID Number

DUNS Number Also provide any other assigned number that identifies the member firm(s) in the ACASS or CCASS databases. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1 Nature of Association DUNS Number

Firm 2 Nature of Association DUNS Number

Firm 3 Nature of Association DUNS Number

Authorized Negotiators IAW FAR 52.215-11 - The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).

Name

Title

Address

Telephone

Email

COMPANY PAST PERFORMANCE- CONSTRUCTION OR PRIME CONTRACTOR

SECTION 00 22 10 - ATTACHMENT 2

Provide the following information to show examples of projects your company constructed within the last five years indicating past performance with projects of similar type and scope. Use one form per project.

Your Firm’s Name

Type of Facility Represented

Name of Project

Location of Project

Owner Design Build or Design Bid Build?

Firm Fixed Price or Cost ?

General Scope of Construction Project

Your Role (Prime, Joint Venture, Subcontractor, etc.) and Work Your Company Self- Performed:

Extent and Type of Work You Subcontracted Out

Describe Relevancy to this Requirement

Awarded Construction Cost

Final Construction Cost

Explain Cost Growth, if any

Date of Award Initial Completion Date Final Completion Date

Explain Time Growth, if any Your Performance Evaluation by Owner, if known

Contracting Officer or Owner’s Point of Contact for Reference Name

Company

Telephone

COMPANY PAST PERFORMANCE- DESIGN FIRM OR IN-HOUSE DESIGN

SECTION 00 22 10 - ATTACHMENT 3

Provide the following information to show examples of projects your company constructed within the last five years indicating past performance with projects of similar type and…