Amendment 0001.pdf

PDF 78 KB Posted

Attached to
Award Notification Fort Bliss Replacement Hospital
Solicitation number
W9126G-12-R-0054
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
am_7.zip ZIP file
am6_dwg_Vol6-8.zip ZIP file
am6_dwg_Vol3.zip ZIP file
am6_dwg_Vol4-5.zip ZIP file
am6_dwg_Vol1-2.zip ZIP file
am6_specs.zip ZIP file
am_5.zip ZIP file
am4_dwg_Vol_8.zip ZIP file
am4_specs.zip ZIP file
am4_dwg_Vol_3.04a-3.11.zip ZIP file
am4_dwg_Vol_1.zip ZIP file
am4_dwg_Vol_7.zip ZIP file
am4_dwg_Vol_4.zip ZIP file
am4_dwg_Vol_3.01-3.03a.zip ZIP file
am4_dwg_Vol_6.zip ZIP file
am4_dwg_Vol_5.zip ZIP file
am4_dwg_Vol_2.zip ZIP file
am3_specs.zip ZIP file
am3_dwg_Vol_305-311.zip ZIP file
am3_dwg_Vol_301-304.zip ZIP file
am3_dwg_Vol_1-2 4-11.zip ZIP file
A08b_Pre-proposal Conference 28 Aug 2012.pdf PDF
A08b_Sign_In_Sheet_Preproposal_Conference.pdf PDF
am2_Geot Specs.zip ZIP file
am2_dwgs_Vol.3.01-3.08b_b.zip ZIP file
am2_dwgs_Vol.3.08b_b.zip ZIP file
am2_dwgs_Vol.1.zip ZIP file
am2_dwgs_Vol.2.1a.zip ZIP file
am2_dwgs_Vol.8.zip ZIP file
am2_dwgs_Vol.3.08b_a.zip ZIP file
am2_dwgs_Vol.4.zip ZIP file
am2_dwgs_Vol.7.zip ZIP file
am2_dwgs_Vol.2.1b-2.3.zip ZIP file
Dwgs_Vol.3.07a_b-PLUMBING.zip ZIP file
Specifications.zip ZIP file
Dwgs_Vol.3.09_b-FIRE_PROTECTION.zip ZIP file
Dwgs_Vol.2.01B_b-CIVIL.zip ZIP file
Dwgs_Vol.4.06_b-MECHANICAL.zip ZIP file
Dwgs_Vol.6.01-S_A_I_Q_SW.zip ZIP file
Dwgs_Vol.3.01-STRUCTURAL.zip ZIP file
Dwgs_Vol.3.02e-ARCHITECTURE-INTERIOR.zip ZIP file
Dwgs_Vol.2.01A_a-CIVIL.zip ZIP file
Dwgs_Vol.3.05a-SIGNAGE_AND_WAYFINDING.zip ZIP file
Dwgs_Vol.3.09_a-FIRE_PROTECTION.zip ZIP file
Dwgs_Vol.3.07b_a-PLUMBING.zip ZIP file
Dwgs_Vol.1.1-LIFE_SAFETY.zip ZIP file
Dwgs_Vol.3.08a_b-ELECTRICAL.zip ZIP file
Dwgs_Vol.3.04a-EQUIPMENT.zip ZIP file
Dwgs_Vol.3.02c-ARCHITECTURE-EXTERIOR.zip ZIP file
Dwgs_Vol.8.01a-ARCHITECTURAL_DETAILS.zip ZIP file
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

072481

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9126G-12-R-0054, Fort Bliss Replacement Hospital

This solicitation is amendment as follows:

1. The bid schedule has been replaced in its entirety.

2. Section 00 21 30, the site visit date has been changed from August 24, 2012 to August 28, 2012.

3. Section 00 22 11, para 10.2.2, last sentence has been changed to read: "This is an acceptable/unacceptable evaluation factor.”

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-12-R-0054

X 9B. DATED (SEE ITEM 11)

10-Aug-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2012

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A17

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Section 00 11 00 Page 1

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

0001 All work required by the Plans and Specifications for the construction of Fort Bliss Hospital Replacement, including Central Energy Plant, complete, including site work and utilities to the 5-foot line(s), and exclusive of all other work listed separately. 1 LS $ *** $

0002 Exterior Work outside the building's 5 foot line including utilities, earthwork, paving, sidewalk, curb and gutter, and all other work not listed separately. 1 LS $ *** $

0003 Drilled Piers

0003AA 24-Inch Drilled Caissons 10170 LF $ $

0003AB 24-Inch Dia. Casings 1020 LF $ $

0003AC 30-Inch Drilled Caissons 3030 LF $ $

0003AD 30-Inch Dia. Casings 303 LF $ $

0003AE 36-Inch Drilled Caissons 3950 LF $ $

0003AF 36-Inch Dia. Casings 395 LF $ $

0003AG 42-Inch Drilled Caissons 2200 LF $ $

0003AH 42-Inch Dia. Casings 220 LF $ $

0003AJ 48-Inch Drilled Caissons 4760 LF $ $

0003AK 48-Inch Dia. Casings 476 LF $ $

0003AL 54-Inch Drilled Caissons 1200 LF $ $

0003AM 54-Inch Dia. Casings 120 LF $ $

0003AN 60-Inch Drilled Caissons 5000 LF $ $

0003AP 60-Inch Dia. Casings 500 LF $ $

Ft. Bliss Hospital Replacement Fort Bliss, Texas

Solicitation No.W9126G-12-R-0054

CLIN SCHEDULE

[(To be attached to SF 1442)]

ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-12-R-0054

Section 00 11 00 Page 2

Item No. Description Quantity Unit Unit Price Amount

Ft. Bliss Hospital Replacement Fort Bliss, Texas

Solicitation No.W9126G-12-R-0054

CLIN SCHEDULE

[(To be attached to SF 1442)]

ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-12-R-0054

0003AQ 66-Inch Drilled Caissons 1200 LF $ $

0003AR 66-Inch Dia. Casings 120 LF $ $

0003AS 72-Inch Drilled Caissons 5900 LF $ $

0003AT 72-Inch Dia. Casings 590 LF $ $

0003AU 78-Inch Drilled Caissons 275 LF $ $

0003AV 78-Inch Dia. Casings 75 LF $ $

0003AW 90-Inch Drilled Caissons 445 LF $ $

0003AX 90-Inch Dia. Casings 75 LF $ $

0003AY 96-Inch Drilled Caissons 2500 LF $ $

0003AZ 96-Inch Dia. Casings 250 LF $ $

0003BA 102-Inch Drilled Caissons 315 LF $ $

0003BB 102-Inch Dia. Casings 75 LF $ $

0003BC 108-Inch Drilled Caissons 530 LF $ $

0003BD 108-Inch Dia. Casings 75 LF $ $

0003BE 114-Inch Drilled Caissons 750 LF $ $

0003BF 114-Inch Dia. Casings 75 LF $ $

0003BG 120-Inch Drilled Caissons 560 LF $ $

0003BH 120-Inch Dia. Casings 75 LF $ $

0003BJ 126-Inch Drilled Caissons 800 LF $ $

0003BK 126-Inch Dia. Casings 80 LF $ $

Section 00 11 00 Page 3

Item No. Description Quantity Unit Unit Price Amount

Ft. Bliss Hospital Replacement Fort Bliss, Texas

Solicitation No.W9126G-12-R-0054

CLIN SCHEDULE

[(To be attached to SF 1442)]

ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-12-R-0054

0004 Maintenance and Disposal of Government Office Complex 1 LS *** $

0005 Site Security (See Section 01 30 00

- Administrative Requirements) 1 LS *** $

0006 Photo Documentation (See Section 01 32 33 - Project Photographic Documentation) 1 LS *** $

0007 Web Cameras (See Section 01 32 34.01 - Construction Camera System) 1 LS *** $

0008 Operation and Maintenance Manuals 1 LS *** $ 200,000.00

0009 Final Record Drawings 1 LS *** $ 400,000.00

*Contract Duration in Calendar Days After the Notice to Proceed is Received (Not To Exceed the maximum time stated in Section 01 00 00.00 44 CONSTRUCTION SCHEDULE) (See Note #5)

PROJECT COMPLETION TIME ______ Calendar days*

TOTAL OFFER

Ft. Bliss Hospital Replacement Fort Bliss, Texas

Solicitation No.W9126G-12-R-0054

CLIN SCHEDULE

Section 00 11 00 Page 4

NOTES:

1. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the CLIN Schedule.

2. Offerors must bid on all items with the exception of the CLINs already filled in by the Government.

3. Costs attributable to Division 01 - General Requirements are assumed to be prorated among CLIN items listed with the exception of the CLINs already filled in by the Government.

4. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

5. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for design and construction through completion, ready for turnover shall not exceed the number of calendar days specified in Section 01 00 00.00 44 Construction Schedule. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.

6. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. LF (linear feet)

b. LS (lump sum)

7. DRILLED CAISSONS and CASINGS

Payment for drilled caissons and casings shall be made in accordance with section 31 63 26 DRILLED

CAISSONS.

END OF CLIN SCHEDULE

W9126G-12-R-0054

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been modified:

SECTION 00 21 30 SITE VISIT

SECTION 00 21 30.00 44

SITE VISITS

SITE VISIT SCHEDULED DATE: 28 AUGUST 2012

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed.

(b) Site visit information: See Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS for site visit dates, time, location, and point of contact information.

(c) Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email, to the referenced Base Access POC, a minimum of seven (7) calendar days prior to the preproposal site visit. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF, and this individual will be responsible for all other personnel:

Offeror's and offeror's subcontractor personnel full names Date of Birth Home Address Driver's License, including the State Issued SSN (last 4 digits) Firm

NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases. Persons with questionable criminal records or outstanding warrants will be denied access to the installation.

(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a proposal after receipt of proposal or for a claim after award of the contract.

W9126G-12-R-0054

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

SECTION 00 22 11 – DESIGN –BID-BUILD SELECTION PROCEDURES

The following have been modified:

10.2.2 The S-Curve will be evaluated to ensure that the proposed placement (spend rate) is planned so as to stay within available funding. This is an acceptable/unacceptable evaluation factor.

AMENDMENT NO. 0001
CLIN SCHEDULE
SF 30 BLOCK 14 CONTINUATION PAGE

File details come from the government source that posted it. Updated .