g12r0024_dwgs1.PDF
PDF 41 MB Posted
- Solicitation number
- W9126G-12-R-0024
About this file
Amendment No. 0002 Drawings Volume I
View the file
Other files
| File | Type | Posted |
|---|---|---|
| am_4.pdf | ||
| am_3.pdf | ||
| g12r0024_dwgs2.PDF | ||
| am_2.pdf | ||
| g12r0024.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
EL=8
.70E=3
3.0
N=10
6.1
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.84E=3
2.6
N=10
3.2
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.66E=3
0.9
N=10
0.5
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.53E=3
7.0
N=10
3.4
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.12E=3
8.6
N=10
0.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.63E=3
5.1
N=10
9.1
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.66E=3
7.0
N=10
8.5
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.95E=3
3.3
N=10
4.6
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
81.
16E=3
7.4
N=10
3.3
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
81.
24E=3
7.6
N=10
4.8
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
51.
97E=3
2.1
N=10
14.
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.90E=3
.57
N=10
4.1
W/
RED
CAP
SET
1/2
" I
RON
ROD
CP
EL=8
.80E=3
.13
N=10
.20
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.12E=3
3.7
N=10
.68
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.61E=3
3.6
N=10
18.
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.68E=3
5.2
N=10
1.8
W/
RED
CAP
SET
1/2
" I
RON
ROD
CP
EL=8
.95E=3
9.5
N=10
4.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
P .I .V
P .I .V
F
CO
CO
CO
COCO
W
W
D
D
S S S S S
CB
CB
CB CB
CB CB
CB
CB
CB
CB
CO
CO
CO
CO
CO
COVERED HARDSTAND COVERED HARDSTAND
(COF1E)
COMPANY OPERATIONS FACILITY
(COF2E)
COMPANY OPERATIONS FACILITY
S
ID
E W
A L
K
DD RR
WATERS OF THE US.
REMAIN 25-FT FROM
CONSTRUCTION MUST
WATERS OF THE US.
REMAIN 25-FT FROM
CONSTRUCTION MUST
E
X
IS
T
IN
G
E
X
IS
T
IN
G
(EXISTING)
(EXISTING)
E
X
IS
T
IN
G
L A
K E
R O
A D
E
X
IS
T
IN
G
L A
A D
E
X
IS
T
IN
G
L A
A D
O R
G A
N
IZ
A T
IO
N A
L
V
H
IC
T
A
IL
A
O R
G A
N
IZ
A T
IO
N
H
IC
A
IL
A
ORGANIZATIONAL VEHICLE TRAIL "A"
MAIN ROAD
PS
MH MH
CO
MH
W W
MH MH
GG
MH
CO
CB
CB
MANAGEMENT AREA
STORMWATER
MANAGEMENT AREA
STORMWATER
MANAGEMENT AREA
STORMWATER
CO
CO
CO
CB CB CB M
A
N A
G E
M E
N
E A
S T
O R
M W
A T
CB CB
CB
S
S
CO
CO CO
CO COCO
CB
CO
CO
CO
CO
CO
MH
COCO
CO
CB
CO
MH MH
CO
CB
MH
P .I .V
P .I .V
CO
S
CB
D
R
D
D D
(PN077187-THAAD)
COMPANY OPS
(PN071682-THAAD)
COMPANY OPS
MAIN ROAD
R
R R
(BY OTHERS)
HARDSTAND
COVERED
(BY OTHERS)
HARDSTAND
COVERED
SATS, ASLMS, & COMVAN SATS, ASLMS, & COMVAN
(PN071682 -THAAD)
SMALL TEMF
(PN077187 -THAAD)
SMALL TEMF
S T
O R
A G
B U
IL
D
IN
G O
R G
A N
IZ
A T
IO
N
C
C E
S
A D
A
A C
C E
A D
B
A C
C E
A D
D
A C
C E
A D
C
S T
O R
A
IL
D
IN
G O
R G
A N
IZ
A T
IO
N
P
L
H
Z
P O
L
H
Z
HARDSTAND
COVERED
HARDSTAND
COVERED
E=3119812.61
N=10390800.89
BUILDING
CONTROL
ELECTRICAL
PHASE 1 (MAIN ROAD)
WATER LINES)
SEWER AND CONDENSER
PHASE 1 (SANITARY
CONTRACTOR ENTRANCE)
GATE (TEMF & COF
R
G U
T H
M U
E L
L E
R
R
G U
T H
M U
E L
L E
R
N
J
M c
K E
N Z
IE
P .E
O V
E R
A
H
A S
IN
A N
II
G-105
LEGEND
CONSTRUCTION ROUTE
TEMF CONTRACT (PHASE 1)
TEMF CONTRACT (PHASE 2)
COF CONTRACT
80 0 80 160
SCALE IN FEET
J
N
M
D D
IT
IO
N
N S
T R
U C
T
IO
C E
T E
S a
PROJECT.
OF LAKE ROAD TO ORIGINAL CONDITION OR BETTER PRIOR TO COMPLETION OF
THE ROAD FOR CONSTRUCTION ACCESS. THE CONTRACTOR SHALL RESTORE THE GRADES
CONTRACTOR’S RESPONSIBILITY TO PROVIDE ANY IMPROVEMENTS NECESSARY TO USE
10) LAKE ROAD IS CURRENTLY A GRADED COMPACTED DIRT ROAD. IT IS THE
CONTRACTORS. THIS GATE SHALL ALIGN WITH THE MAIN ROAD.
PROVIDE CONSTRUCTION ACCESS INTO THE COMPLEX FOR BOTH THE TEMF AND COF
9) THE CONTRACTOR SHALL CONSTRUCT A GATE IN THE PERIMETER FENCE TO
SHALL COORDINATE FINAL LOCATIONS WITH THE COR AFTER AWARD.
8) LAYDOWN AREAS SHOWN ON PLANS ARE A GENERAL LOCATION, THE CONTRACTOR
CONTRACTOR TO EXCHANGE ANY RESPONSIBILITY.
COF CONTRACTOR, THE TEMF CONTRACTOR SHALL COORDINATE WITH THE COF
CONTRACT HAS BEEN COMPLETED. IF THE TEMF CONTRACTOR FINISHES PRIOR TO THE
ANTICIPATED THAT THE TEMF CONTRACT WILL BE COMPLETED AFTER THE COF
CONSTRUCTION ROADS AND THE TEMF CONTRACTOR’S LAYDOWN AREA. IT IS
7) THE TEMF CONTRACTOR SHALL DEMOLISH AND RESTORE ALL TEMPORARY
REFER TO CG105-CG108 FOR STORM DRAIN LOCATIONS.
CONSTRUCTION OF STORM DRAIN LINES G AND M AND ASSOCIATED APPURTENANCES.
TO "SSMH-B2/C1". REFER TO CU100 SHEETS FOR UTILITY LOCATIONS.
TO "SSMH-A5". CONSTRUCTION OF GRAVITY SEWER LINE "B" FROM "SSMH-A2/B1"
APPURTENANCES. CONSTRUCTION OF GRAVITY SEWER LINE "A" FROM "SSMH-A2/B1"
CONSTRUCTION OF GRAVITY SEWER LINES C, D, E, AND F AND ASSOCIATED
THE EXISTING MANHOLE TO AT LEAST COORDINATE N=10391348.44, E=3120048.55.
CU105 FOR LOCATIONS. CONSTRUCTION OF THE SANITARY SEWER FORCE MAIN FROM
6) PHASE 1 INCLUDES: CONSTRUCTION OF ALL CONDENSING LINES, REFER TO SHEET
CONTRACTOR ACCESS TO ANY PART OF THE COF CONTRACTOR’S SITE.
5) THE TEMF CONTRACTOR’S CONSTRUCTION FENCE SHALL NOT DENY THE COF
AREAS SHOWN AS PHASE 1.
AND PERFORM REQUIRED GRADING WITHIN THE COF CONTRACTOR’S BOUNDARIES AND
DRAIN, WATER, CONDENSING, COMMUNICATIONS, AND ELECTRICAL INFRASTRUCTURE
CONSTRUCT: THE TEMF CONSTRUCTION FENCE, MAIN ROAD, SANITARY SEWER, STORM
4) THE TEMF CONTRACTOR HAS 90 CALENDAR DAYS FROM NOTICE OF AWARD TO
ACCESS INTO THE TEMF SITE.
CONTRACTORS. THE TEMF CONTRACTOR SHALL CONSTRUCT A SEPARATE ENTRANCE FOR
3) THE THAAD TEMF & COF CONTRACTOR GATE ENTRANCE ALLOWS ACCESS TO BOTH
SITE, WITH THE COF CONTRACTOR.
COORDINATE THE ENTRANCE/ACCESS ROAD (MAIN ROAD), INTO AND OUT OF THE COF
ACCESS ROAD BEFORE THE COF CONTRACT IS AWARDED. THE TEMF CONTRACTOR SHALL
2) THE TEMF CONTRACTOR SHALL ESTABLISH THE MAIN ROAD AS A CONSTRUCTION
BUILDINGS ALONG WITH SITE WORK.
(COF), WHICH WILL BE A SEPARATE CONTRACT. EACH OF THE PROJECTS HAS TWO
EQUIPMENT MAINTENANCE FACILITIES (TEMF) AND COMPANY OPERATIONS FACILITIES
1) THIS PLAN INCLUDES THE PHASING OF TWO PROJECTS: THAAD TACTICAL
PHASING PLAN NOTES:
a a a
D w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
S u b m it t e d b y
D e s c r ip t io n D a t e
A c t io n
S o l N o
C o n t r o
C o n e v number:
reference
Sheet
A
B
C
D
2 3 4 5
C O
R
F
G
IN
E E
W
R T
H
T E
X
.S
A R
Y
G
IN
E
IS
T R
IC
il e n a m e
P lo t d a t e
P lo t s c a le
S y m b o l
US Army Corps of Engineers
Fort Worth District
C H
IE
F
C
IV
IL
C T
IO
N
N f h
B a s e
M a p s
S
F L
D
H A
Z
L N .d g n
P W
W
O R
K D
IR
:d m s
F H s p m d l1 .d g n
P W
W
O R
K D
IR
:d m s
F H
V M
S
G b s .D
G N
N f h
B a s e
M a p s w e t ln d .d g n
P W
W
O R
K D
IR
:d m s f h
V
M S
C p h m d l1 .d g n
R E
F E
R E
N
E S
F H
V
M S
G .d g n
:1
:5
T r a c k in g
F H
V
M S
G .d g n
D A
ID
B R
O W
N
P .E
F O
O D
T E
X A
S
T H
A
M F
P N
P N
E N
G
IN
E E
R
A N
C H
C O
N S
T R
U C
T
IS
IO
N
E N
G
IN
E E
R
IN
G
W
G
R
N O
V E
M B
E R
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
GROUNDNATURAL
EL=8
.70E=3
3.0
N=10
6.1
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.50E=3
.72
N=10
2.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.23E=3
3.1
N=10
0.6
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.53E=3
7.0
N=10
3.4
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.12E=3
8.6
N=10
0.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.63E=3
5.1
N=10
9.1
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
51.
97E=3
2.1
N=10
14.
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.90E=3
.57
N=10
4.1
W/
RED
CAP
SET
1/2
" I
RON
ROD
CP
EL=8
.80E=3
.13
N=10
.20
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.12E=3
3.7
N=10
.68
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.61E=3
3.6
N=10
18.
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.87E=3
.85
N=10
9.7
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.68E=3
5.2
N=10
1.8
W/
RED
CAP
SET
1/2
" I
RON
ROD
CP
EL=8
.95E=3
9.5
N=10
4.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
W
D
CB
CB CBCB CBCB
CB
SIDEWALK SIDEWALK
WATERS OF THE US.
REMAIN 25-FT FROM
CONSTRUCTION MUST
ASPH. ROAD
E
X
IS
T
IN
G
E
X
IS
T
IN
G
(EXISTING)
(EXISTING)
E
X
IS
T
IN
G
L A
A D
E
X
IS
T
IN
G
L A
A D
E
X
IS
T
IN
G
L A
A D
O R
G A
N
IZ
A T
IO
N
H
IC
A
IL
A
O R
G A
N
IZ
A T
IO
N
H
IC
A
IL
A
ORGANIZATIONAL VEHICLE TRAIL "A"
PS
MH MH
CO
MH
W W
MH MH
GG
MH
CO
CB
CB
MANAGEMENT AREA
STORMWATER
MANAGEMENT AREA
STORMWATER
MANAGEMENT AREA
STORMWATER
CO
CO
CO
CB CB CB M
A
N A
G E
M E
E A
S T
O R
M W
A T
CB CB
CB
S
S
CO
CO CO
CO COCO
CB
CO
CO
CO
CO
CO
MH
COCO
CO
CB
CO
MH MH
CO
CB
MH
CO
S
CB
SATS, ASLMS, & COMVAN SATS, ASLMS, & COMVAN
(PN071682 -THAAD)
SMALL TEMF
(PN077187 -THAAD)
SMALL TEMF
S T
O R
A
IL
D
IN
G O
R G
A N
IZ
A T
IO
N
C E
A D
A
A C
C E
A D
B
A C
C E
A D
D
A C
C E
A D
C
S T
O R
A
IL
D
IN
G O
R G
A N
IZ
A T
IO
N
L
H
Z
P O
L
H
Z
HARDSTAND
COVERED
HARDSTAND
COVERED
E=3119812.61
N=10390800.89
BUILDING
CONTROL
ELECTRICAL
N
R
G U
T H
M U
E L
L E
R
R
G U
T H
M U
E L
L E
R
J
M c
K E
N Z
IE
P .E
O V
E R
A
IT
Y O
U T
80 0 80 160
SCALE IN FEET
4) REFER TO THE C-500 SHEETS FOR DETAILS.
3) ALL SIDEWALK INTERSECTION CHAMFERS ARE 3-FT x 3-FT UNLESS OTHERWISE NOTED.
2) ALL DIMENSIONS ARE TO BACK OF CURB.
1) ALL SIDEWALKS ARE 6-FT WIDE UNLESS OTHERWISE NOTED.
NOTES:
(PN071682 - THAAD) AND AN EAST TEMF (PN077187 - THAAD).
11) THIS PROJECT CONSISTS OF TWO IDENTICAL SMALL TEMF BUILDINGS, A WEST TEMF
FOR ALL OTHER UTILITY INFORMATION.
10) SEE SHEETS CG105-CG108 FOR STORM DRAIN COORDINATES AND SHEETS CU100-CU105
YARD REQUIREMENTS. (SHEETS A302, A402, S902, M-101)
9) SEE MECHANICAL, ARCHITECTURAL, AND STRUCTURAL SHEETS FOR THE MECHANICAL
SHEET A-801 AND STRUCTURAL SHEET S-701 FOR COVERED HARDSTAND DETAILS.
8) DIMENSIONS OF COVERED HARDSTAND ARE TO THE ROOF LINE. SEE ARCHITECTURAL
7) SEE SHEET ES501 AND ES505 FOR TRANSFORMER PAD DETAILS.
6) SEE SHEET CS105 FOR HORIZONTAL ALIGNMENT DATA.
5) SEE SHEET C-001 FOR LEGEND AND NOTES.
NOTES (CONT):
PLACED 2-FT FROM THE CORNERS.
PAD 2.5-FT FROM THE CORNERS. THERE SHALL ALSO BE A BOLLARD ON THE TWO SIDES
EQUIPMENT SHEET S-003. THERE SHALL BE TWO BOLLARDS PLACED IN THE FRONT OF THE
14) VSAT PAD. PAD SHALL BE 10-FT x 10-FT. REFER TO PAD DETAIL FOR ELECTICAL
13) SEE SHEETS CP110-CP113 FOR STRIPING LAYOUT.
COORDINATES ARE GRID.
CENTRAL ZONE, NAD-83. VERTICAL CONTROL SHALL BE BASED ON NGVD. ALL
12) HORIZONTAL CONTROL IS BASED ON TEXAS STATE PLANE COORDINATE SYSTEM, SOUTH
NOTES (CONT):
a
A D
D
IT
Q
P M
N T a a a
CS100
J A
N a a a a a a
2 2
D w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
S u b m it t e d b y
D e s c r ip t io n D a t e
A c t io n
S o l N o
C o n
C o n
Sheet
A
B
C
D
2 3 4 5
C O
R
G
IN
E E
R T
H
T E
X
A R
G
IN
E
T R
IC
e n a m e
P lo t d a t e
P lo t s c a le
S y m b o l
US Army Corps of Engineers
Fort Worth District
C H
IE
F
C
C T
IO
N
P W
W
O R
K D
IR
:d m s f h
V
M S
C k p m d l1 .d g n
P W
W
O R
K D
IR
:d m s
F H
V s p m d l_
G R
ID
.d g n
R E
F E
R E
N
E S
F H
V
M S
C S
.d g n
:3
:2
T r a c k
F H
V
M S
C S .d g n
D A
B R
O W
N
P .E
F O
O D
T E
X A
S
T H
A
M F
P N
P N
E N
G
IN
E E
R
A N
C H
C O
N S
T R
U C
T
IS
IO
N
E N
G
IN
E E
R
IN
G
W
G
R
N O
V E
M B
E R
CS103
CS101 CS102
CS104
GROUNDNATURAL
EL=8
.53E=3
7.0
N=10
3.4
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.12E=3
8.6
N=10
0.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.63E=3
5.1
N=10
9.1
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.68E=3
5.2
N=10
1.8
W/
RED
CAP
SET
1/2
" I
RON
ROD
CP
CB
WATERS OF THE US.
REMAIN 25-FT FROM
CONSTRUCTION MUST
(EXISTING)
MH
CO
MH
W
MH
G
CO
CB
CB
CB CB CB
CO
CO
MH
MH
P .I .V
CO
SATS, ASLMS, & COMVAN
E=3119498.81
N=10391334.43
(PN071682 -THAAD)
SMALL TEMF
TEMF PERIMETER FENCE
P
R K
IN
G
CURB
GRAVEL CLEAR ZONE
GRAVEL CLEAR ZONE
E=3119738.79
N=10391529.15
E=3119831.06
N=10391492.77
GRAVEL CLEAR ZONE
10’ 20’
(TYP)(TYP)
30’
65’
E=3119990.69
N=10391346.79
E=3119487.17
N=10391510.36
B O
O T
W A
S H
6.65’55.7’6.65’
E=3119579.30
N=10391797.62
E=3119606.00
N=10391824.68
0+00
1+00
2+00
3+00
3+36
0+0 0.
00POB
3+3 5.
67POE
E=3119501.99
N=10391505.53
E=3119611.62
N=10391787.08
E=3119894.11
N=10391377.74
E=3119922.06
N=10391205.61
E=3119912.15
N=10391175.18
E=3119916.30
N=10391153.50
56.58’
15’
.3
.1
.6
E=3119672.17
N=10391277.93
15’
11.67’
.1
69’
’1
USED OIL STORAGE YARD.
E=3119696.28
N=10391463.25E=3119474.91
N=10391535.39
E=3120053.30
N=10391346.90
T
Y P
T
Y P
10’
(TYP)(TYP)
20’
E=3119710.27
N=10391538.45
E=3119820.62
N=10391493.02
E=3119799.92
N=10391429.47
E=3119686.98
N=10391483.11 E=3119819.14
N=10391440.04
E=3120015.27
N=10391359.29( T
Y P
T
Y P
.1
CURB
E=3119560.37
N=10391523.32
R
R
R
E=3119551.39
N=10391808.82
E=3119640.77
N=10391779.69
R
R
E=3119903.41
N=10391406.26
E=3119719.78
N=10391535.35
A C
C E
A D
A
P O
L
H
Z
12.67’
.3
FOR DETAIL)
(SEE SHEET C-512
OIL/WATER SEPARATOR
E=3119804.40
N=10391507.77
MECHANICAL YARD
HARDSTAND
COVERED
38.33’
GRAVEL CLEAR ZONE
40’ DOUBLE SWING GATE
STORAGE YARD.
OUT OF SPEC WASTE FUEL
USED ENGINE COOLANT &
SHEETS FOR DETAILS)
BOLLARDS (SEE ELECTRICAL
RECEPTACLE PANELS AND
7’ PERSONNEL GATE
E=3119422.62
N=10391367.15
(7’-8" x 4’-2")
TRANSFORMER PAD
E=3120009.15
N=10391179.15
(7’-8" x 4’-2")
TRANSFORMER PAD
E=3119782.55
N=10391377.81
(14’ x 7’)
TRANSFORMER PAD
E=3119914.43
N=10391582.35
(7’-8" x 4’-2")
TRANSFORMER PAD
M
A P
HANDRAILS
RAMP WITH
.1
SIDEWALK
E=3119764.87
N=10391267.09
.5
’ 7.67’
E=3119702.74
N=10391371.74
E=3119529.39
N=10391428.24
YARD
MECHANICAL
SWING GATE
18’ DOUBLE
61.58’
15’
E=3119775.82
N=10391308.75
CURB
STRIPING)
(SEE SHEET CP112 FOR
EEU VEHICLE SPACE
(10’ x 10’)
VSAT PAD
N
R
G U
T H
M U
E L
L E
R
R
G U
T H
M U
E L
L E
R
J
M c
K E
N Z
IE
P .E
30 0 30 60
SCALE IN FEET
1) SEE SHEET CS100 FOR NOTES.
NOTE:
CS101
S
Y O
U T
I
O
F
S H
E
S H
E
SHEET CS101
SHEET CS103
a
A
D D
IT
P M
N T
J A
N a a a
D w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
S u b m it t e d b y
D e s c r ip t io n D a t e
A c t io n
S o l N o
C o n
C o n
Sheet
A
B
C
D
2 3 4 5
C O
R
G
IN
E E
R T
H
T E
X
A R
G
IN
E
T R
IC
e n a m e
P lo t d a t e
P lo t s c a le
S y m b o l
US Army Corps of Engineers
Fort Worth District
C H
IE
F
C
C T
IO
N
P W
W
O R
K D
IR
:d m s
F H
V s p m d l_
G R
ID
.d g n
P W
W
O R
K D
IR
:d m s f h
V
M S
C k p m d l1 .d g n
R E
F E
R E
N
E S
F H
V
M S
C S
.d g n
:3
:0
T r a c k
F H
V
M S
C S .d g n
D A
B R
O W
N
P .E
F O
O D
T E
X A
S
T H
A
M F
P N
P N
E N
G
IN
E E
R
A N
C H
C O
N S
T R
U C
T
IS
IO
N
E N
G
IN
E E
R
IN
G
W
G
R
N O
V E
M B
E R
EL=8
.12E=3
3.7
N=10
.68
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
EL=8
.95E=3
9.5
N=10
4.9
W/
RED
CAP
SET
1/2 " I
RON
ROD
CP
E
X
IS
T
IN
G
E
X
IS
T
IN
G
E
X
IS
T
IN
G
L A
A D
E
X
IS
T
IN
G
L A
A D
O R
G A
N
IZ
A T
IO
N
H
IC
A
IL
A
O R
G A
N
IZ
A T
IO
N
H
IC
A
IL
MHMH
MH
G
CO
CO
CO
M A
N A
G E
M E
E A
S T
O R
M W
A T
CO
CO
CO
MH
CO
P .I .V
P .I .V
SATS, ASLMS, & COMVAN
E=3120077.21
N=10391145.93
E=3120107.78
N=10391239.74
(PN077187 -THAAD)
SMALL TEMF
STOP SIGN
T E
R
IM
E T
N C
E
C U
R B
CURB
G R
A V
E
Z
N E
GRAVEL CLEAR ZONE
TEMF PERIMETER FENCE
E=3120267.04
N=10391357.00
GRAVEL CLEAR ZONE
10’
(TYP)
20’
(TYP)
30’
E=3120066.12
N=10391321.68
E=3120569.18
N=10391158.35
E=3120476.22
N=10391188.03
E=3120492.38
N=10391182.76
65’
E=3120790.25
N=10391458.19
E=3120145.12
N=10391295.94
.1
E=3119922.06
N=10391205.61
E=3119912.15
N=10391175.18
E=3119916.30
N=10391153.50
56.58’
.6
.1
E=3120250.56
N=10391089.43
15’
.1
B O
O T
W A
S H
6.65’ 55.7’ 6.65’
69’
USED OIL STORAGE YARD.
E=3120053.30
N=10391346.90
E=3120328.16
N=10391257.32
E=3120248.02
N=10391363.19
E=3120593.66
N=10391170.79 E=3120215.22
N=10391310.95
E=3120347.38
N=10391267.88
E=3120015.27
N=10391359.29
20’
(TYP)(TYP)
10’
T
Y P
T
Y P
T
Y P
T
Y P
.1
CURB
E=3120541.79
N=10391486.05 E=3120631.17
N=10391456.923
R
R
E=3120455.69
N=10391231.53
R
R
R
E=3120602.13
N=10391519.50
E=3120740.40
N=10391418.17
E=3120773.55
N=10391519.90
R
R
E=3120600.58
N=10391459.87
E=3120547.93
N=10391537.16
0+0 0.
00POB
2+5 4.
86POE
E=3120154.41
N=10391324.46
E=3120238.52
N=10391366.29
E=3120610.28
N=10391478.45
E=3120772.56
N=10391425.57
SIDEWALK
51.58’
10’
A C
C E
A D
B
E=3120490.54
N=10390986.68
15’
.3
P O
L
H
Z
E=3120500.45
N=10391017.11
E=3120359.31
N=10391320.62
.3
12.67’
FOR DETAIL)
(SEE SHEET C-512
OIL/WATER SEPARATOR
P
R K
IN
G
MECHANICAL YARD
HARDSTAND
COVERED
E=3120332.64
N=10391335.62
E=3120348.87
N=10391320.86
38.33’
40’ DOUBLE SWING GATE
STORAGE YARD.
OUT OF SPEC WASTE FUEL
USED ENGINE COOLANT &
SHEETS FOR DETAILS)
BOLLARDS (SEE ELECTRICAL
RECEPTACLE PANELS AND
GATE
PERSONNEL
7’
E=3120009.15
N=10391179.15
(7’-8" x 4’-2")
TRANSFORMER PAD
E=3120353.21
N=10391188.15
(14’ x 7’)
TRANSFORMER PAD
E=3120437.44
N=10391411.90
(7’-8" x 4’-2")
TRANSFORMER PAD
M
A P
11.67’
.1
HANDRAILS
RAMP WITH
SIDEWALK
.5
7.67’
E=3120343.27
N=10391078.59
E=3120281.14
N=10391183.24
E=3120224.53
N=10391291.09
18’ DOUBLE SWING GATE
61.58’
15’
E=3120354.21
N=10391120.25
STRIPING)
(SEE SHEET CP113 FOR
EEU VEHICLE SPACE
0+00.00
PI
3+35.67
POE
0+00
1+00
2+00
3+00
3+36
-0+18.50
0+57.00
POB ("B")
PI (MAIN)
C U
R B
E=3120567.24
N=10391467.32
(10’ x 10’)
VSAT PAD
N
R
G U
T H
M U
E L
L E
R
R
G U
T H
M U
E L
L E
R
J
M c
K E
N Z
IE
P .E
30 0 30 60
SCALE IN FEET
1) SEE SHEET CS100 FOR NOTES.
NOTE:
CS102
S
Y O
U T
II
SHEET CS102
SHEET CS104
S H
E
S H
E a a a
J A
N
A D
D
IT
P M
N T a
D w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
S u b m it t e d b y
D e s c r ip t io n D a t e
A c t io n
S o l N o
C o n
C o n
Sheet
A
B
C
D
2 3 4 5
C O
R
G
IN
E E
R T
H
T E
X
A R
G
IN
E
T R
IC
e n a m e
P lo t d a t e
P lo t s c a le
S y m b o l
US Army Corps of Engineers
Fort Worth District
C H
IE
F
C
C T
IO
N
P W
W
O R
K D
IR
:d m s
F H
V s p m d l_
G R
ID
.d g n
P W
W
O R
K D
IR
:d m s f h
V
M S
C k p m d l1 .d g n
R E
F E
R E
N
E S
F H
V
M S
C S
.d g n
:3
:5
T r a c k
F H
V
M S
C S .d g n
D A
B R
O W
N
P .E
F O
O D
T E
X A
S
T H
A
M F
P N
P N
E N
G
IN
E E
R
A N
C H
C O
N S
T R
U C
T
IS
IO
N
E N
G
IN
E E
R
IN
G
W
G
R
N O
V E
M B
E R
| G001 |
| G002 |
| G101 |
| G102 |
| G103 |
| G104 |
| G105 |
| B101 |
| B201 |
| B202 |
| B203 |
| B204 |
| B205 |
| C001 |
| CD100 |
| CD101 |
| CD102 |
| CD103 |
| CD104 |
| CD105 |
| CS100 |
| CS101 |
| CS102 |
| CS103 |
| CS104 |
| CS105 |
| CG100 |
| CG101 |
| CG102 |
| CG103 |
| CG104 |
| CG105 |
| CG106 |
| CG107 |
| CG108 |
| CP100 |
| CP101 |
| CP102 |
| CP103 |
| CP104 |
| CP105 |
| CP106 |
| CP107 |
| CP108 |
| CP109 |
| CP110 |
| CP111 |
| CP112 |
| CP113 |
| CU100 |
| CU101 |
| CU102 |
| CU103 |
| CU104 |
| CU105 |
| C201 |
| C202 |
| C203 |
| C204 |
| C205 |
| C206 |
| C207 |
| C208 |
| C209 |
| C210 |
| C211 |
| C212 |
| C220 |
| C221 |
| C222 |
| C223 |
| C224 |
| C225 |
| C226 |
| C227 |
| C228 |
| C229 |
| C230 |
| C231 |
| C501 |
| C502 |
| C503 |
| C504 |
| C505 |
| C506 |
| C507 |
| C508 |
| C509 |
| C510 |
| C510B |
| C510C |
| C511 |
| C512 |
| C513 |
| C514 |
| C515 |
| C516 |
| C517 |
| C518 |
| C519 |
| C520 |
| C521 |
| C522 |
| C523 |
| C524 |
| C525 |
| C526 |
| C527 |
| C528 |
| C529 |
| C530 |
| L200 |
| L201 |
| L202 |
| L203 |
| L204 |
| L501 |
| S001 |
| S002 |
| S003 |
| S004 |
| S005 |
| S006 |
| S007 |
| S008 |
| S101 |
| S102 |
| S111 |
| S301 |
| S302 |
| S303 |
| S501 |
| S502 |
| S503 |
| S504 |
| S509 |
| S521 |
| S701 |
| S901 |
| S902 |
| S903 |
| A001 |
| A002 |
| A101 |
| A102 |
| A103 |
| A104 |
| A105 |
| A106 |
| A107 |
| A201 |
| A202 |
| A203 |
| A301 |
| A302 |
| A303 |
| A401 |
| A402 |
| A403 |
| A404 |
File details come from the government source that posted it. Updated .