AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for THAAD TEMF FY2012 Fort Hood, TX, is amended as follows:
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is to January 30, 2012, 2:00 p.m., CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G-12-R-0024
X 9B. DATED (SEE ITEM 11)
16-Dec-2011
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2012
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G-12-R-0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. Replace the following specifications with the attached new specifications bearing the notation “W9126G-
12-R-0024, Amendment No. 0004”:
01 33 00 - SUBMITTAL PROCEDURES
08 51 13 - ALUMINUM WINDOWS
13 12 80 - RELOCATABLE HAZARDOUS MATERIAL (POL) STORAGE AND
HARZARDOUS WASTE STORAGE BUILDINGS
32 31 13 - CHAIN LINK FENCES AND GATES
2. 26 35 44 - 28 VOLT DC POWER SUPPLY is added to this project. See the attached bearing the notaion
“W9126G-12-R-0024, Amendment No. 0004”.
3. Delete the following specifications from the project in their entirety:
08 60 00 - SKYLIGHTS
07 81 00 – FIREPROOFING
4. Drawings – Replace the following drawing sheets, bearing the notation “AM0004”.
C-515 - FENCE DETAILS I
A-303 – BUILDING THERMAL ENVELOPE
A-402 – WALL SECTION
A-403 – WALL TYPES
A-404 – WALL TYPES
A-501 – CONNECTION DETAILS
A-502 – PENETRATION DETAILS
A-506 – MISCELLANEOUS DETAILS
5. Clarification for Amendment No. 0003 : Drawing Sheet MI601 was revised and provided in Amendment
No. 0003. Drawing Sheet MI609 has been deleted from this project in its entirety.
End of Summary of Changes
Fort Hood THAAD TEMF, PN 077187, PN 071682 FHTDTEMF
SECTION 01 33 00
SUBMITTAL PROCEDURES
Amendment No. 0004
PART 1 GENERAL
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work) issuance of notice to proceedor the start of the next major phase of the construction on a multi-phase contract. Includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work, submitted prior to start of construction work or next major phase of construction.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
SECTION 01 33 00 Page 1
W9126G-12-R-0024, Amendment No. 0004
List of proposed products
Construction Progress Schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices
Health and safety plan
Work plan
Quality control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by
SECTION 01 33 00 Page 2 responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."
SECTION 01 33 00 Page 3
1.3.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.4 PREPARATION
1.4.1 Transmittal Form
Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract.
Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.5 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.6 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.6.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.6.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation
SECTION 01 33 00 Page 4 required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.6.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.6.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.7 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS). The Government will provide the initial submittal register in electronic format
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.7.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
SECTION 01 33 00 Page 5
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.7.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.7.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.7.4 Government Review Action Codes
Entries for columns (j) and (o), are to be used are as follows (others may be prescribed by Transmittal Form):
"A" - "Approved as submitted"; "Completed"
"B" - "Approved, except as noted on drawings"; "Completed"
"C" - "Approved, resubmission required"; "Resubmit"
"D" - "Returned by correspondence"; "Completed"
"E" - "Disapproved (See attached)"; "Resubmit"
"F" - "Receipt acknowledged"; "Completed"
"G" - "Other (Specify)"; "Resubmit"
SECTION 01 33 00 Page 6
"X" - "Receipt acknowledged, does not comply"; "Resubmit"
1.7.5 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.8 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. (AM#3) Adequate time (a minimum of 21 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. (AM#3) No delay damages or time extensions will be allowed for time lost in late submittals. An additional (AM#4)60 10 (/AM#4) calendar days will be allowed and shown on the register for review and approval of submittals for refrigeration and HVAC control systems.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.9 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. 2 copies of the approved submittal will be retained by the Contracting Officer and 1 copies of the submittal
SECTION 01 33 00 Page 7 will be returned to the Contractor. 1.10 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.11 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.12 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract requirements.
SECTION 01 33 00 Page 8
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.13 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.14 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 9
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 10
SECTION 08 51 13
ALUMINUM WINDOWS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF-45 (2003) Designation System for Aluminum Finishes
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 1503 (2009) Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors and Glazed Wall Sections
AAMA 611 (1998; R 2004) Voluntary Specification for Anodized Architectural Aluminum
AAMA/WDMA/CSA 101/I.S.2/A440 (2008; Update 1 2008; Update 2 2008;
Update 3 2009) North American Fenestration Standard/Specification for Windows, Doors, and Skylights
ASTM INTERNATIONAL (ASTM)
ASTM A 276 (2008a) Standard Specification for Stainless Steel Bars and Shapes
ASTM D 1972 (1997; R 2005) Standard Practice for Generic Marking of Plastic Products
ASTM F 1642 (2004) Standard Test Method for Glazing and Glazing Systems Subject to Airblast Loadings
GREEN SEAL (GS)
GS-36 (2000) Commercial Adhesives
INTERNATIONAL WINDOW CLEANING ASSOCIATION (IWCA)
IWCA I-14.1 (2001) Window Cleaning Safety Standard
NATIONAL FENESTRATION RATING COUNCIL (NFRC)
NFRC 100 (2004) Procedure for Determining Fenestration Product U-Factors
NFRC 200 (2004) Procedure for Determining
SECTION 08 51 13 Page 1
Fenestration Product Solar Heat Gain Coefficient and Visible Transmittance at Normal Incidence
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (1989; R 2005) Adhesive and Sealant Applications
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction
(LEED-NC)
1.2 CERTIFICATION
Each prime window unit must bear the AAMA Label warranting that the product complies with AAMA/WDMA/CSA 101/I.S.2/A440. Certified test reports attesting that the prime window units meet the requirements of AAMA/WDMA/CSA 101/I.S.2/A440, including test size, will be acceptable in lieu of product labeling.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Windows; G
Fabrication Drawings
SD-03 Product Data
Windows; G
Hardware; G
Fasteners; G; (LEED)
Window performance; G
Thermal-Barrier Windows; G
Mullions; G
Window Cleaners' Bolts; G
SECTION 08 51 13 Page 2
Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.
Screens; G
Weatherstripping; G
Accessories; G
Adhesives; (LEED)
Submit manufacturer's product data, indicating VOC content.
Thermal performance
Submit documentation for Energy Star qualifications.
Local/Regional Materials; (LEED)
Documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
SD-04 Samples
Finish Sample
Window Sample
SD-05 Design Data
Structural calculations for deflection; G
Design Analysis; G
Submit design analysis with calculations showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the minimum antiterrorism standards required by UFC 4-010-01 "DoD Minimum Antiterrorism Standards for Buildings" and paragraph "Minimum Antiterrorism Performance" below. unless conformance is demonstrated by Standard Airblast Test results. Calculations verifying the structural performance of each window proposed for use, under the given loads, shall be prepared and signed by a registered Professional Engineer. The window components and anchorage devices to the structure, as determined by the design analysis, shall be reflected in the shop drawings.
SD-06 Test Reports
Minimum condensation resistance factor
Standard Airblast Test; G
For Minimum Antiterrorism windows, in lieu of a Design Analysis, SECTION 08 51 13 Page 3 results of airblast testing, whether by arena test or shocktube, shall be included in a test report, providing information in accordance with ASTM F 1642, as prepared by the independent testing agency performing the test. The test results shall demonstrate the ability of each window proposed for use to withstand the airblast loading parameters and achieve the hazard level rating specified in paragraph "Standard Airblast Test Method".
SD-10 Operation and Maintenance Data
Windows, Data Package 1; G
Submit in accordance with Section 01 78 23.00 44 OPERATION AND
MAINTENANCE DATA.
Plastic Identification
When not labeled, identify types in Operation and Maintenance Manual.
1.4 QUALITY ASSURANCE
1.4.1 Shop Drawing Requirements
Provide drawings that indicate elevations of windows, full-size sections, thickness and gages of metal, fastenings, proposed method of anchoring, size and spacing of anchors, details of construction, method of glazing, details of operating hardware, mullion details, method and materials for weatherstripping, method of attaching screens, material and method of attaching subframes, stools, casings, sills, trim, installation details, and other related items.
1.4.2 Sample Requirements
1.4.2.1 Finish Sample Requirements
Submit color chart of standard factory color coatings when factory-finish color coating is to be provided.
1.4.2.2 Window Sample Requirements
Submit one full-size corner of each window type proposed for use. Where screens or weatherstripping is required, fit sample with such items that are to be used.
1.4.3 Design Data Requirements
Submit calculations to substantiate compliance with deflection requirements and Minimum Antiterrorism Performance criteria. A registered Professional Engineer must provide calculations.
Submit design analysis with calculations showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the requirements of paragraph "Minimum Antiterrorism Performance Criteria". Calculations verifying the structural performance of each window proposed for use, under the given loads, must be prepared and signed by a registered professional engineer. Reflect the window components and anchorage devices to the structure, as determined by the
SECTION 08 51 13 Page 4 design analysis, in the shop drawings.
1.4.4 Test Report Requirements
Submit test reports for each type of window attesting that identical windows have been tested and meet the requirements specified herein for conformance to AAMA/WDMA/CSA 101/I.S.2/A440 including test size, and minimum condensation resistance factor (CRF), and, for Minimum Antiterrorism windows, in lieu of a Design Analysis, results of a Standard Airblast Test.
1.5 DELIVERY AND STORAGE
Deliver windows to project site in an undamaged condition. Use care in handling and hoisting windows during transportation and at the jobsite.
Store windows and components out of contact with the ground, under a weathertight covering, so as to prevent bending, warping, or otherwise damaging the windows. Repair damaged windows to an "as new" condition as approved. If windows can not be repaired, provide a new unit.
1.6 PROTECTION
Protect finished surfaces during shipping and handling using the manufacturer's standard method. Do not apply coatings or lacquers to surfaces to which calking and glazing compounds must adhere.
1.7 SUSTAINABLE DESIGN REQUIREMENTS
1.7.1 Local/Regional Materials
See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Window materials may be locally available.
1.7.2 Plastic Identification
Verify that plastic products to be incorporated into the project are labeled in accordance with ASTM D 1972. Where products are not labeled, provide product data indicating polymeric information in the Operation and Maintenance Manual.
a. Type 1: Polyethylene Terephthalate (PET, PETE).
b. Type 2: High Density Polyethylene (HDPE).
c. Type 3: Vinyl (Polyvinyl Chloride or PVC).
d. Type 4: Low Density Polyethylene (LDPE).
e. Type 5: Polypropylene (PP).
f. Type 6: Polystyrene (PS).
g. Type 7: Other. Use of this code indicates that the package in question is made with a resin other than the six listed above, or is made of more than one resin listed above, and used in a multi-layer combination.
1.8 FIELD MEASUREMENTS
Take field measurements prior to preparation of the drawings and fabrication.
SECTION 08 51 13 Page 5
1.9 PERFORMANCE REQUIREMENTS
1.9.1 Minimum Antiterrorism Performance Criteria
Windows must meet the minimum antiterrorism performance criteria as specified in the paragraphs below.
1.9.1.1 Glazing
Glazing must have laminated glass as specified in Section 08 81 00 GLAZING.
1.9.1.2 Aluminum Window Frames
Restrict aluminum framing members deflections of edges of glazing they support to L/160 under an equivalent 3-second duration loading of 23 pounds per square foot (psf), where L denotes the length of the glazing supported edge. (L is to be based on edge length of glazing in frame and not on the distance between anchors that fasten frame to the structure.)
The glazing frame bite for the window frames must be adequate to accept the width of structural silicone sealant or glazing tape as specified in paragraph "Provisions for Glazing" below.
1.9.1.3 Window Frame Anchors
Fasten window frames to the supporting structure with anchors designed to resist forces generated by a 3-second duration load of 46 pounds per square foot (psf) acting on the entire window unit.
1.9.2 Wind Loading Design Pressure
Design window components, including mullions, hardware, and anchors, to withstand a wind-loading design pressure of at least 46 pounds per square foot (psf).
1.10 DRAWINGS
Submit the Fabrication Drawings for aluminum window units showing complete window assembly including hardware, weatherstripping, and subframe assembly details.
1.11 WINDOW PERFORMANCE
Aluminum windows must meet the following performance requirements. Perform testing requirements by an independent testing laboratory or agency.
1.11.1 Structural Performance
Structural test pressures on window units must be for positive load (inward) and negative load (outward). After testing, there will be no glass breakage, permanent damage to fasteners, hardware parts, support arms or actuating mechanisms or any other damage which could cause window to be inoperable. There must be no permanent deformation of any main frame, sash or ventilator member in excess of the requirements established by AAMA/WDMA/CSA 101/I.S.2/A440 for the window types and classification specified in this section.
SECTION 08 51 13 Page 6
1.11.2 Minimum Antiterrorism Performance
Windows shall meet the minimum antiterrorism performance criteria of UFC 4-010-01, as specified in the paragraphs below. Conformance to the performance requirements shall be validated by one of the following methods.
1.11.2.1 Computational Design Analysis Method
Window frames, mullions, and sashes shall be designed to the criteria listed herein. Computational design analysis shall include calculations verifying the structural performance of each window proposed for use, under the given static equivalent loads.
Aluminum window framing members shall restrict deflections of edges of glazing they support to L/160 under an equivalent 3-second duration loading of 23 pounds per square foot (psf), where L denotes the length of the glazing supported edge. (L is to be based on edge length of glazing in frame and not on the distance between anchors that fasten frame to the structure.)
The glazing frame bite for the window frames shall be adequate to accept the width of structural silicone sealant or glazing tape as specified in paragraph "Provisions for Glazing" below.
Window frames shall be anchored to the supporting structure with anchors designed to resist forces generated by a 3-second duration load of 46 pounds per square foot (psf) acting on the entire window unit.
1.11.2.2 Alternate Dynamic Design Analysis Method
As an alternative to the static equivalent load design approach described above, window framing members, anchors, and glazing may be designed using a dynamic analysis to prove the window system will provide performance equivalent to or better than the hazard rating associated with the applicable level of protection for the project.
1.11.2.3 Standard Airblast Test Method
As an alternative to either of the Computational Design Analysis Methods, each Minimum Antiterrorism window type shall be tested for evaluation of hazards generated from airblast loading in accordance with ASTM F 1642 by an independent testing agency regularly engaged in blast testing. For proposed window systems that are of the same type as the tested system but of different size, the test results may be accepted provided the proposed window size is within the range from 25 percent smaller to 10 percent larger in area, than the tested window. Proposed windows of a size outside this range shall require testing to evaluate their hazard rating. Testing my be by shocktube or arena test. The test shall be performed on the entire proposed window system, which shall include, but not be limited to, the glazing, its framing system, operating devices, and all anchorage devices. Anchorage of the window frame or subframe shall replicate the method of installation to be used for the project. The minimum airblast loading parameters for the test shall be as follows: Peak positive pressure of 5.8 psi and positive phase impulse of 41.1 psi-msec . The hazard rating for the proposed window systems, as determined by the rating criteria of ASTM F 1642, shall not exceed the "Very Low Hazard" rating (i.e. the "No Break", "No Hazard", "Minimal Hazard" and "Very Low Hazard" ratings are acceptable. "Low Hazard" and "High Hazard" ratings are unacceptable). Results of window systems previously tested by test
SECTION 08 51 13 Page 7 protocols other than ASTM F 1642 may be accepted provided the required loading, hazard level rating, and size limitations stated herein are met.
1.11.3 Air Infiltration
Air infiltration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.11.4 Water Penetration
Water penetration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.11.5 Thermal Performance
Thermal transmittance for thermally broken aluminum windows with insulating glass must not exceed a U-factor of 0.40 Btu/hr-ft2-F determined according to NFRC 100, and a solar heat gain coefficient (SHGC) of 0.55 Btu/hr-ft2-F determined according to NFRC 200. Provide window units that comply with the U.S. Department of Energy, Energy Star Window Program for the Central Climate Zone.
1.11.6 Sound Attenuation
The window unit must have a minimum STC of 34 with the window glazed with 1/2 inch air space between two pieces of 1/4 inch thick glass when tested in accordance with AAMA/WDMA/CSA 101/I.S.2/A440 acoustical performance (optional).
1.12 QUALIFICATION
Window manufacturer must specialize in designing and manufacturing the type of aluminum windows specified in this section, and have a minimum of five
(5) years of documented successful experience. Manufacturer must have the facilities capable of meeting contract requirements, single-source responsibility and warranty.
1.13 WARRANTY
Provide Manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period.
PART 2 PRODUCTS
2.1 WINDOWS
Provide prime windows that comply with AAMA/WDMA/CSA 101/I.S.2/A440 and the requirements specified herein. In addition to compliance with AAMA/WDMA/CSA 101/I.S.2/A440, window framing members for each individual light of glass must not deflect to the extent that deflection perpendicular to the glass light exceeds L/175 of the glass edge length when subjected to uniform loads at specified design pressures. Provide Structural calculations for deflection to substantiate compliance with deflection requirements. Provide windows of types, performance classes, performance grades, combinations, and sizes indicated or specified. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements. Window materials may contain post-consumer or post-industrial recycled content. Design windows to accommodate hardware, glass, weatherstripping, screens, and accessories to be furnished. Each
SECTION 08 51 13 Page 8 window must be a complete factory assembled unit with or without glass installed. Dimensions shown are minimum. Provide windows with insulating glass and thermal break necessary to achieve a minimum Condensation Resistance Factor (CRF) of 55 when tested in accordance with AAMA 1503.
Glazed systems (including frames and glass) will be Energy Star labeled products as appropriate to climate zone and as applicable to window type, with a whole-window Solar Heat Gain Coefficient (SHGC) maximum of 0.374 determined according to NFRC 200 procedures. Glazed systems must have a U-factor maximum of 0.314 Btu per square foot times hr times degree F in accordance with NFRC 100.
2.1.1 Awning Windows (AP)
Type AP-HC40. Conceal operating mechanism within the frame members or enclose within a metal casing not less than 0.0625 inch thick sheet aluminum.
2.1.2 AM#3 Horizontal Sliding Windows (HS)
Type HS-HC40 (Optional Performance Grade)./AM#3
2.1.3 Fixed Windows (F)
Type F-HC40.
2.1.4 Glass and Glazing
Materials are specified in Section 08 81 00 GLAZING.
2.1.5 Caulking and Sealing
Are specified in Section 07 92 00 JOINT SEALANTS.
2.1.6 Weatherstripping
AAMA/WDMA/CSA 101/I.S.2/A440.
2.2 FABRICATION
Fabrication of window units must comply with AAMA/WDMA/CSA 101/I.S.2/A440.
2.2.1 Provisions for Glazing
Design windows and rabbets suitable for glass thickness shown or specified.
For minimum antiterrorism windows, attach glazing to its supporting frame using structural silicone sealant or adhesive glazing tape. The width of the structural silicone sealant bead must be at least equal to, but not larger than two times the thickness designation of the glass to which it adheres. The width of the adhesive glazing tape will be at least equal to two times, but not more than four times the thickness designation of the glass to which it adheres.Design sash for double glazing and for securing glass with metal beads, glazing clips, glazing channels, or glazing compound.
2.2.2 Weatherstripping
Provide for ventilating sections of all windows to ensure a weather-tight seal meeting the infiltration requirements specified in AAMA/WDMA/CSA 101/I.S.2/A440. Provide easily replaceable factory-applied
SECTION 08 51 13 Page 9 weatherstripping. Use molded vinyl, molded or molded-expanded neoprene or molded or expanded Ethylene Propylene Diene Terpolymer (EPDM) compression-type weatherstripping for compression contact surfaces. Use treated woven pile or wool, or polypropylene or nylon pile bonded to nylon fabric and metal or plastic backing strip weatherstripping for sliding surfaces. Do no use neoprene or polyvinylchloride weatherstripping where they will be exposed to direct sunlight.
2.2.3 Fasteners
Fabricated from 100 percent re-melted steel. Use fasteners as standard with the window manufacturer for windows, trim, and accessories.
Self-tapping sheet-metal screws are not acceptable for material more than 1/16 inch thick.
2.2.4 Adhesives
Comply with applicable regulations regarding toxic and hazardous materials, GS-36, SCAQMD Rule 1168, and as specified in Section 07 92 00 JOINT
SEALANTS.
2.2.5 Drips and Weep Holes
Provide continuous drips over heads of top ventilators. Where fixed windows adjoin ventilators, drips must be continuous across tops of fixed windows. Provide drips and weep holes as required to return water to the outside.
2.2.6 Combination Windows
Windows used in combination must be the same class and grade and will be factory assembled. Where factory assembly of individual windows into larger units is limited by transportation considerations, prefabricate, match mark, transport, and field assemble.
2.2.7 Mullions and Transom Bars
Provide mullions with a thermal break. Secure mullions and transom bars to adjoining construction and window units in such a manner as to permit expansion and contraction and to form a weathertight joint. Provide mullion covers on the interior and exterior to completely close exposed joints and recesses between window units and to present a neat appearance.
2.2.8 Accessories
Provide windows complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation and proper operation. Furnish extruded aluminum subframe receptors and subsill with each window unit.
2.2.8.1 Hardware
AAMA/WDMA/CSA 101/I.S.2/A440. The item, type, and functional characteristics must be the manufacturer's standard for the particular window type. Provide hardware of suitable design and of sufficient strength to perform the function for which it is used. Equip all operating ventilators with a lock or latching device which can be secured from the inside.
SECTION 08 51 13 Page 10
2.2.8.2 Fasteners
Provide concealed anchors of the type recommended by the window manufacturer for the specific type of construction. Anchors and fasteners must be compatible with the window and the adjoining construction. Provide a minimum of three anchors for each jamb located approximately 6 inches from each end and at midpoint.
2.2.8.3 Window-Cleaner Anchors
Provide double head anchors for windows indicated and specified. Anchors must be stainless steel of size and design required for the window type and application, conforming to ASTM A 276. Provide two anchors for each single window and each adjacent fixed glass window unit. Fasten anchors 44 inches above the window sill utilizing appropriate methods for the window type and application in accordance with industry safety standards.
2.2.8.4 Window Anchors
Anchoring devices for installing windows must be made of aluminum, cadmium-plated steel, stainless steel, or zinc-plated steel conforming to
AAMA/WDMA/CSA 101/I.S.2/A440.
2.2.9 Finishes
Exposed aluminum surfaces must be factory finished with an anodic coating.
Color shall be as indicated. All windows for each building will have the same finish.
2.2.9.1 Anodic Coating
Clean exposed aluminum surfaces and provide an anodized finish conforming to AA DAF-45 and AAMA 611. Finish must be:
b. Architectural Class I ( 0.7 mil or thicker), designation AA-M10-C22- A41, clear (natural) anodized.
2.2.10 Screens
AAMA/WDMA/CSA 101/I.S.2/A440. Provide one insect screen for each operable exterior sash or ventilator. Design screens to be rewirable, easily removable from inside the building, and to permit easy access to operating hardware.
2.3 SPECIAL OPERATORS
For windows having operating hardware or locking or latching devices located more than 6 feet above the floor, provide suitably designed operators or locking or latching devices necessary for convenient and proper window operation.
2.3.1 Pole Operators
Poles must be of proper length to permit window operation from 5 feet above the floor. Provide one pole operator for each room, and one pole hanger for each pole. Locate hangers where directed.
SECTION 08 51 13 Page 11
2.3.2 Extension Crank Operators
Provide removable handles for crank-operated rotary-type operators located more than 6 feet above the floor. Provide one removable handle for each room.
2.4 THERMAL-BARRIER WINDOWS
Provide thermal-barrier windows, complete with accessories and fittings, where indicated.
Specify material and construction except as follows:
a. Aluminum alloy must be 6063-T6.
b. Frame construction, including operable sash, must be factory-assembled and factory-sealed inner and outer aluminum completely separated from metal-to-metal contact. Join assembly by a continuous, concealed, low conductance divider housed in an interlocking extrusion of the inner frame. Metal fasteners, straps, or anchors will not bridge the connection between the inner and outer frame.
c. Operating hardware for each sash must consist of spring-loaded nylon cushion blocks and pin locks designed to lock in predetermined locations.
d. Sash must be completely separated from metal-to-metal contact by means of woven-pile weatherstripping, plastic, or elastomeric separation members.
e. Operating and storm sash will be factory-glazed with the type of glass indicated and of the quality specified in Section 08 81 00 GLAZING.
2.5 MULLIONS
Provide mullions between multiple-window units where indicated.
Mullions and mullion covers must be the profile indicated, reinforced as required for the specified wind loading, and securely anchored to the adjoining construction. Mullion extrusion will include serrations or pockets to receive weatherstripping, sealant, or tape at the point of contact with each window flange.
Mullion assembly must include aluminum window clamps or brackets screwed or bolted to the mullion and the mullion cover.
Mullion cover must be screw-fastened to the mullion unless otherwise indicated.
Mullion reinforcing members shall be fabricated of the materials specified in AAMA/WDMA/CSA 101/I.S.2/A440 and meet the specified design loading.
2.6 WINDOW CLEANERS' BOLTS
Provide window cleaners' bolts for all windows 7 feet or higher above finished grade, except windows located so they may be removed for…