Breakout Section 00 11 01_a1.doc

DOC document 299 KB Posted

Attached to
Construct Recruit Housing and Training Airman Training Complex Dining/Classroom Facility (DCF) #1 Federal contract opportunity
Solicitation number
W9126G-10-R-0015
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

This Breakout Bid Schedule in Word is for the bidders' use in preparing proposals.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Recruit Housing and Training Airman Training Complex Dining/Classroom Facility (DCF) #1, newest first.
File Type Posted
am_4.exe EXE file
am_3.exe EXE file
am_2.pdf PDF
g10r0015_a1.exe EXE file
Stand-Alone Price Schedule.doc DOC document
g10r0015.exe EXE file
10r0015 FedBizOpsAnnouncement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9126G-10-R-0015-0001

This form is provided as a Word document on the Federal Business Opportunity website, for use in proposal preparation.

00 11 01

Breakout Price Schedule

Item Estimated Unit Estimated

No.

Description Quantity Unit Price Amount___

BASE OFFER: All work required by the Contract documents for the construction of the Lackland Air Force Base FY10 Dining/Classroom Facility (DCF) #1 excluding Option Items.

All work complete for Construction

LS

of the DCF #1 except for all work listed separated..

Drilled Piers Pier Type I

LF

Drilled Piers Pier Type II

LF

Drilled Piers Pier Type III

LF

Drilled Piers Pier Type IV

LF

Operation and Maintenance

Manuals

LS

$ 50,000.00 Final Record Drawings

LS

$ 83,000.00

TOTAL BASE OFFER $_________________

OPTIONS

OPTION NO. 1A: All work required by the contract documents to provide loading dock screen wall except for all work listed separated..

LS

0009 OPTION 1B: Type I Drilled Piers for the loading dock screen wall. 637

LF

OPTION NO. 2: All work required by parking and Connally Street

Extension. 1

LS

OPTION NO. 3: All work required by

Anti Terrorism/Force Protection (AT/FP)

Knee Wall.

LS

Item Estimated Unit Estimated

No.

Description Quantity Unit Price Amount___

OPTION NO. 4A: All work required by

Side Canopies except for all work listed separated..

LS

0013 OPTION NO. 4B: Type I Drilled Piers for the Side Canopies.

LF

OPTION NO. 5: DELETED. ***

OPTION NO. 6: All work required by

Built-in Furniture at Classrooms. 1

LS

OPTION NO. 7: All work required by

Movable Kitchen Equipment. 1 LS

TOTAL BASE PROPOSAL PLUS ALL OPTIONS $______________

00 11 01

Breakout Price Schedule

NOTES:

1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)

(a) For the purpose of initial evaluation of proposals, the following will be utilized in resolving arithmetic discrepancies found on the face of the price schedule as submitted by offerors:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected; and

(4) Apparent errors in addition of lump‑sum and extended prices will be corrected.

(b) For the purpose of proposal evaluation, the Government will proceed on the assumption that the offeror intends his proposal to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the proposal will be so reflected on the abstract of proposals.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which proposal is low.

2. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the price schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the price schedule.

3. Offerors must submit a proposal on all items.

4. Costs attributable to Division 01 - General Requirements is assumed to be prorated among proposal items listed.

5. Responders are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTES: (cont)

(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))

The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Proposal without an increase in the Offeror's Proposal Price. Completion of added items shall continue at the same schedule as the Base Proposal unless otherwise noted in Section 0010 00.00 44 CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULE.

8. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. LS (lump sum)

b. LF (linear feet)

END OF BREAKOUT PRICE SCHEDULE