About this file

amendment no. 0002

View the file

Other files for this federal contract opportunity

Other files attached to Construct Recruit Housing and Training Airman Training Complex Dining/Classroom Facility (DCF) #1, newest first.
File Type Posted
am_4.exe EXE file
am_3.exe EXE file
Breakout Section 00 11 01_a1.doc DOC document
g10r0015_a1.exe EXE file
Stand-Alone Price Schedule.doc DOC document
g10r0015.exe EXE file
10r0015 FedBizOpsAnnouncement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53 243

The Solicitation for Design-Bid-Build of the first "Recruit Housing and Training" Dining/Classroom Facility of the Lackland Airmen Training Center, at Lackland AFB, San Antonio, Texas, is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date has been extended. See page 2, SF Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-10-R-0015

X 9B. DATED (SEE ITEM 11)

19-Nov-2009

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer x is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Dec-2009

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-10-R-0015-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO PROPOSAL RECEIPT DATE

1. Proposal Receipt Date: Change the proposal receipt date from "21 Dec 2009, 2:00 p.m., local time" to "5 January 2010, 12:00 p.m. Noon, local time (CST) ".

CHANGES TO CLIN SCHEDULE

2. 00 11 00 CLIN Schedule: Replace the CLIN and Breakout Schedules, pages 1 through 9, with the accompanying new CLIN and Breakout Schedules bearing the notation "W9126G-10-R-0015-0002."

CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

3 Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS: Replace this Section with the accompanying new Section 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS bearing the notation "W9126G-10-R-0015-0002."

4. 00 45 00 REPRESENTATIONS AND CERTIFICATIONS: The accompanying 00 45 00 REPRESENTATIONS AND CERTIFICATIONS bearing the notation “W9126G-10-R-0015-0002” is added to Division 00. A Word copy is included in the amendment files for your proposal preparation.

5. 00 72 00 Contract Clauses, Pages 56 and 57 of 197: Replace clauses 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) and 52.211-12 LIQUIDATED DAMAGES-- CONSTRUCTION (SEP 2000) with the following new clauses:

“52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (see Section 01 00 00.00 44 Construction Schedule) calendar days.

The time stated for completion shall include final cleanup of the premises.

“52.211-12 Liquidated Damages—Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (see Section 01 00 00.00 44 Construction Schedule) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. “

5. Section 00 73 46 WAGE DETERMINATION SCHEDULE: Replace this Section with the accompanying new Section 00 73 46 WAGE DETERMINATION SCHEDULE bearing the notation "W9126G-10-R-0015-0002."

6. New Sections: Add the accompanying new Section 00 73 00 Special Contract Requirements, bearing the notation "W9126G-10-R-0015-0002.", to Division 0, and add the section number and title to the Table of Contents..

CHANGES TO THE SPECIFICATIONS

7. General: Change all occurrences of the word “Airman” in the solicitation document to “Airmen,” including those at the following locations:

00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, PDF Page 22, first sentence of the Small Business Goals.

01 00 00.00 44 - CONSTRUCTION SCHEDULE, Page 3, Paragraph 1.3.1 Work Restrictions, second subparagraph.

01 33 29 - LEEDTM DOCUMENTATION, LEED-NC Version 2.2 Registered Project Checklist attachment, at the top of the pages.

8. 01 00 00.00 44 Construction Schedule: Replace this section with the accompanying new Section 01 00 00.00 44 Construction Schedule bearing the notation “W9126G-10-R-0015-0002”.

9. Comprehensive Interior Design (CID) Package: The accompanying CID package bearing the notation “W9126G-10-R-0015-0002” is added to the solicitation as an Appendix.

End of Summary of Changes

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

EXPANDED BLOCK 10 FROM PAGE 1

Instructions for PROJNET: Throughout the solicitation process, all questions and answers will be handled through the PROJNET system: https://www.

Agency: USACE

KEY: 8ZDLJS-6T62YY

Email: Offeror’s email address

The last day to post questions to PROJNET is 17 December 2009.

The Government will not allow the contractor to work on the project unless the bond documents and insurance certificates have been accepted by the Contracting Officer and a signed Notice to Proceed has been issued to the contractor. Be further advised that the contract completion date established in Section 01 10 00, Clause 52.211-10 Alternate I will remain unchanged if issuance of the Notice to Proceed is delayed due to the contractor's failure to provide these documents within the required 10 days.

Any BRAND NAME indicated in any part of this solicitation and technical specifications should be construed as BRAND NAME OR EQUAL.

Email: Clements.C.Schram@usace.army.mil, Nathan.j.fry@usace.army.mil, and julianne.l.bowersock@usace.army.mil

(AM#2)

ITEM

NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 All work for Construction of the Lackland AFB FY10 Dining/ Classroom Facility (DCF) #1, complete

1 Lump Sum

Funded Amt:

All work complete for Construction of Dining/Classroom Facility #1, including all options. See Breakout Schedule for details.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

(/AM#2)

This form is provided as a Word document on the Federal Business Opportunity website, for use in proposal preparation.

00 11 01

Breakout Price Schedule

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___

BASE OFFER: All work required by the Contract documents for the construction of the Lackland Air Force Base FY10 Dining/Classroom Facility (DCF) #1 excluding Option Items.

0001 All work for Construction 1 LS $__________ of the DCF #1, complete, except for all work listed (AM#2) separately separated.. (/AM#2)

0002 Drilled Piers Pier Type I 2898 LF $______ $__________ 0003 Drilled Piers Pier Type II 761 LF $______ $__________ 0004 Drilled Piers Pier Type III 1025 LF $_______$__________ 0005 Drilled Piers Pier Type IV 704 LF $_______$__________

0006 Operation and Maintenance Manuals 1 LS *** $ 50,000.00

0007 Final Record Drawings 1 LS *** $ 83,000.00

TOTAL BASE OFFER $_________________

OPTIONS

0008 OPTION NO. 1A: All work required by the contract documents to provide loading dock screen wall except for all work listed (AM#2) separately separated.. (/AM#2) 1 LS *** $_________

0009 OPTION 1B: Type I Drilled Piers for the loading dock screen wall. 637 LF $_______ $_______

0010 OPTION NO. 2: All work required by the contract documents to provide parking and Connally Street Extension. 1 LS *** $_________

No. Description Quantity Unit Price Amount___

0011 OPTION NO. 3: All work required by the contract documents to provide Anti Terrorism/Force Protection (AT/FP)

Knee Wall. (AM#2) See drawing sheet D-C502, Detail 4. (/AM#2) 1 LS *** $_________

0012 OPTION NO. 4A: All work required by the contract documents to provide Side Canopies except for all work listed (AM#2) separately separated.. (/AM#2) .. 1 LS *** $_________

0013 OPTION NO. 4B: Type I Drilled Piers for the Side Canopies. 402 LF $_____ $_________

0014 OPTION NO. 5: DELETED. *** *** *** $*********

0015 OPTION NO. 6: All work required by the contract documents to provide

Built-in Furniture ((AM#2) Fixed Training Tables and Seating.

See drawing sheet D-I102, Note 1 (/AM#2)) at Classrooms. 1 LS *** $________

(AM#2)

0016 OPTION NO. 7: All work required by the contract documents to provide and install Dispensary and Loose Classroom Furniture as described in the Comprehensive Interior Design (CID) Package. 1 LS *** $________

0017 OPTION NO. 8: All work required by the contract documents to provide and install Furniture at Dining Area and Kitchen Offices as described in the Comprehensive Interior Design (CID) Package. 1 LS *** $________

No. Description Quantity Unit Price Amount___

0018 OPTION NO. 9: All work required by the contract documents to provide Movable Kitchen Equipment 1 LS *** $________

/AM#2)

TOTAL BASE PROPOSAL PLUS ALL OPTIONS $______________

NOTES:

1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)

(a) For the purpose of initial evaluation of proposals, the following will be utilized in resolving arithmetic discrepancies found on the face of the price schedule as submitted by offerors:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected; and

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of proposal evaluation, the Government will proceed on the assumption that the offeror intends his proposal to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the proposal will be so reflected on the abstract of proposals.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which proposal is low.

2. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the price schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the price schedule.

3. Offerors must submit a proposal on all items.

4. Costs attributable to Division 01 - General Requirements is assumed to be prorated among proposal items listed.

5. Responders are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the

Government to exercise the option(s).

NOTES: (cont)

(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))

The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Proposal without an increase in the Offeror's Proposal Price. Completion of added items shall continue at the same schedule as the Base Proposal unless otherwise noted in Section 0010 00.00 44 CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULE.

8. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. LS (lump sum)

b. LF (linear feet)

END OF BREAKOUT PRICE SCHEDULE

Section: 00 22 11 W9126G-10-R-0015-0002

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, and Basis of Award One Step - Best Value, Design-Build (Single Award)

BASIS FOR AWARD

Section 00 22 11

PROPOSAL SUBMISSION INSTRUCTIONS, CONDITIONS,

NOTICE TO OFFERORS, AND BASIS OF AWARD

1. PROPOSAL OVERVIEW. This Request for Proposal (RFP) solicits construction of the Airmen Training Complex (ATC) Dining/Classroom Facility, No. 1 (DCF #1), Lackland AFB, Texas. The Government will make a contract award based on the lowest priced, technically acceptable proposal. In as much, the proposal shall describe the capability of the Offeror to perform any resulting contract. The proposal should be specific and complete in every detail. The proposal should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract. The proposal should be practical, legible, clear, and coherent. Local Instructions, including Federal Acquisition Regulation (FAR) Provisions are annotated at the end of this section.

1.1 Proposal Submissions and the LPTA Process. An evaluation for acceptability will be performed on each proposal in accordance with FAR 15.101-2(b)(3). The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award.

Technical acceptability will be determined based on the Offeror’s past performance and experience on similar type work to this solicitation and the Offeror’s ability to successfully perform the work by satisfying all solicitation requirements. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the factors will result in a technically unacceptable rating and preclude award.

2. PROPOSAL SUBMISSION INSTRUCTIONS

2.1 Who May Submit. Any legally organized Offeror may submit a proposal.

2.2 Where to Submit. Offerors shall submit their proposals to the Fort Worth District at the address shown in Block 7 of the Standard Form 1442, Attn: Clem Schram

2.3 Submission Deadline. Proposals shall be received by the Fort Worth District no later than the time and date specified in Block 13 of Standard Form 1442.

2. PROPOSAL SUBMISSION INSTRUCTIONS

2.4 General Requirements.

2.4.1 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation.

Offerors should provide sufficient detail and clearly define all items required in this section. The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP for purposes of efficiency pursuant to FAR 15.306(c)(2).

2.4.2 Tabs. Proposal shall be organized and tabbed as shown in paragraph 2.5 Submission Format.

2.4.3 Size of Printed Matter Submissions.

2.4.3.1 Written proposal materials shall be submitted in standard three ring loose-leaf binders.

Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal;

however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. 11 x 17 inch sheets will be counted as 2 8-1/2 inch x 11 inch sheets. Volume II, Technical Proposal, shall not exceed (AM#1) 90 pages (single-sided), XXX pages (XX single-sided), (/AM#1) excluding the cover sheet and Table of Contents. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror must comply with the page limitations. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

2.4.3.2 The proposals shall contain a cover sheet and a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each.

a. The cover sheet shall identify the Offeror (name, address, point of contact with phone number and email address), project title, and solicitation number. The point of contact shall be available to answer questions telephonically during normal business hours; if necessary, an alternate may be identified.

b. The second sheet shall be the Table of Contents.

Any mistake or omission in this procedure may constitute the Contracting Officer’s determination of a Non-Responsive proposal and cause unnecessary delay to the evaluation process. The Offer or’s proposal may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted above.

2.4.3.3 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision.

Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).

2.4.4 Number of Copies. Offerors shall submit an original and one (1) hard copy of Volume I and an original and seven (7) hard copies of Volumes II of their Proposal, and one (1) CD with all files in an electronic format. Within three (3) days of contract award, the awardee shall submit two (2) copies of Volumes I and II, updated to include all revisions, in electronic format on CD-ROM.

2.5 Submission Format.

2.5.1 The Proposal will be tabbed and submitted in a three ring binders in the following format:

VOLUME I – Price/Cost Proposal

TAB A – SF 1442, completed and signed by an authorized person from the company or team.

TAB B – Section 00 11 00 – Contract Line Item (CLIN) Schedule.

TAB C – Section 00 45 00 – Representations and Certifications

TAB D – PROPOSAL DATA SHEET – See the format provided in this Section. Ensure to include Offeror’s telephone number, FAX number, e-mail address and DUNS number. Duns number will be used to access CCASS data. The Offeror shall list all DUNS numbers that the Offeror or the Joint Venture has used. NOTE: Any mistake or omission in this procedure may constitute a determination the proposal is not responsive by the contracting officer.

TAB E – Bid Bond (Standard Form 24)

TAB F – Pre Award Information (e.g. Bank and Supplier References)

In accordance with FAR 9.103(a) “… contracts shall be awarded to responsible prospective contractors only.” To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform the contract or the ability to obtain them. As an aid in assessing responsibility, the offeror shall notify their bank/suppliers that the Corps of Engineers may contact them, and shall authorize the bank/suppliers to release the following information regarding the Offeror’s account. If a written authorization is required by their bank, Offerors shall provide that authorization with their proposal.

Name and telephone number of bank’s point of contact Number of year’s business has been conducted with each bank Types of open accounts (checking, loans, etc.)

Balance of current accounts (the banks will provide a "range of figures" for this information, such as, medium five-figures range) Means by which loans are secured and if paid as agreed Point of contact and telephone number of three (3) different suppliers CAGE Code

NOTE: All offerors must submit one (1) CAGE code. For a Joint Venture, as for all Offerors, there must be a CAGE Code. This issue may be addressed one of two ways: (1) One company of the Joint Venture could use its CAGE Code; in this situation, this company will have the sole legal responsibility for performance under the contract. Or, (2) The Joint Venture could establish its own CAGE code. This will require its own address, its own bank account, its own taxpayer identification and so on. The US Government has no preference of how the Joint Venture decides to address this issue, other than to say – there must be a CAGE Code - and that CAGE Code will be used to generate the award documents for names and addresses. It will also be used for payment during the contract duration.

For the purpose of evaluating the preaward survey information submitted hereunder:

The Pre-Award Survey information must be completed by all offerors and submitted as as part of their price proposal. This document may be used by the Contracting Officer for the Contracting Officer’s Determination of Responsibility done prior to contract award.

The Government will use pre-award survey data provided by the offeror and data obtained from other sources to perform this assessment.

TAB G – Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9.

VOLUME II – Technical Proposal

THE TECHNICAL PROPOSAL SHALL NOT INCLUDE ANY COST

INFORMATION AND SHALL NOT EXCEED THE PAGE LIMIT ANNOTATED

ABOVE. ALL INFORMATION SHALL BE PROVIDED WITHIN THESE TABBED

SECTIONS AND SHALL NOT BE INCLUDED AS AN APPENDIX OR

ATTACHMENT).

TAB 1 – FACTOR 1: CONSTRUCTION EXPERIENCE ON SIMILAR TYPE WORK

(VOLUME II, TAB 1).

TAB 2 – FACTOR 2: MANAGEMENT EFFECTIVENESS (VOLUME II, TAB 2)

TAB 3 – FACTOR 3: CONSTRUCTION SCHEDULE (VOLUME II, TAB 3).

TAB 4 – ACCAS/CCASS Printouts: The Offeror shall printout all ACCAS/CCASS reports for all previously performed Federal contract projects; this will include printouts for all Joint Venture partners, if the proposal is for a Joint Venture. These pages do not count toward the maximum page count.

3. VOLUME II: TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

3.1 FACTOR 1: CONSTRUCTION PAST PERFORMANCE ON SIMILAR TYPE

WORK (VOLUME II, TAB 1). Offerors shall be evaluated for acceptability on construction projects completed or in progress in the last five years that are same/similar in size (square footage), scope and complexity to the project requirements solicited under this RFP such as multi-story construction of commercial kitchens with dining facilities and training classroom buildings. Submitted projects (AM#2) should shall (/AM#2) be similar in construction type methods required by this solicitation’s technical specifications consisting of the following significant features: a drilled pier foundation, concrete floor slabs, structural frame, precast concrete cladding, masonry walls, standing seam metal roof, anti-terrorism force protection construction, (AM#2) loading dock, refrigerated enclosures, kitchen utilities, kitchen equipment, stadium raised classroom floors, polished concrete floor finish, service yards with precast concrete screen walls, back-up generator, HVAC system, fire protection system, cooling tower, lightning protection system and an elevator. Provides all necessary support and restores all areas disturbed by construction. Complies with DoD Minimum Antiterrorism/Force Protection Standards per UFC. (/AM#2) In addition the offeror must demonstrate successful experience in the certification process for Leadership in Energy and Environmental Design (LEED) through U.

S. Green Building Council (USGBC).

The Offeror’s past performance will be evaluated to determine technical capability to perform the proposed contract and how well it satisfied its customers. The information presented in the Offeror’s submittal, together with that from other sources available to the Government will comprise the input for evaluation of acceptability for this factor. The following elements will be evaluated:

• Quality of Construction

• Timeliness of Performance

• Customer Satisfaction

• Subcontractor Management

• Documentation

• Safety Record

3.1.1 Offeror’s Submission Requirements.

3.1.1.1 Project Information Worksheets. Offerors shall provide project information on no more than five completed (or substantially complete) construction projects that reflect prior past performance and experience on similar type projects and construction elements referenced in Paragraph 3.1 above. The examples should be similar to this solicitation in project type, size, complexity and scope. Submitted commercial kitchen with dining facility type projects must be valued at over (AM#2) $10,000,000; classroom $10,000,000 and classroom building type projects with including kitchen and dining (i.e.; high schools or universities) must have with a combined value at over $20,000,000. ((/AM#2) (A construction project is considered substantially complete when the facility is sufficient for occupancy for the use of which it is intended at the time of this solicitation submission). As a minimum, the contractor shall provide the data specified in the attached “Project Information” Worksheet. If the offeror represents the combining of two or more companies for the purpose of this RFP, each company shall list project examples. For each of the projects submitted, on the Project Information Worksheets, provide a narrative discussing the relevancy of the submitted project to this solicitation. In addition, Offerors are encouraged to submit a matrix chart or table identifying each project submitted and depicting the various types of similar construction methods as required for this project. The information provided on the Project Information Worksheets and additional project information provided will be used in the evaluations of Factor 1.

3.1.1.2 Performance Documentation. For each similar type project submitted, offerors shall submit available performance documentation. If no performance documentation is available, state so on the project information worksheet. Experience given with no past performance information associated with it leads the Government to believe that the Offeror may have performed poorly on those projects.

3.1.1.2.2 For non-DOD contracts, provide a copy of the performance rating issued by the contracting agent.

3.1.1.2.3 Offerors may submit awards, letters or other forms of recognition relevant to the submitted projects that demonstrate the offeror’s performance capabilities and customer satisfaction.

3.1.1.3 Past Performance Questionnaires. For each project that does not have a final CCASS evaluation, offerors shall provide a questionnaire to the point of contact, clearly identifying the project to be evaluated. A sample Past Performance Evaluation Questionnaire is included at the end of this section. When completed, these forms shall be mailed, faxed or e-mailed to the Fort Worth District Contract Specialist identified in the sample transmittal letter provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have final CCASS evaluations.

3.1.1.4 Other Sources. The Government may contact sources other than those provided by the Offeror for information with respect to past performance on projects completed within the past 5 years and on projects that are currently under construction. These other sources may include, but are not limited to, CCASS, telephone interviews with organizations familiar with the Offeror’s performance, and Government personnel with personal knowledge of the Offeror’s performance capability.

3.1.1.5 New Companies and Joint Ventures. New companies and joint ventures entering the marketplace (without relevant company experience) should each submit past performance information on similar projects to this solicitation. If Offeror represents the combining of two or more companies for the purpose of this RFP, the proposal shall clearly identify the contractual responsibilities of each firm and the work to be performed by each; describe the nature of the association; indicate whether the firms have experience working together in construction ventures, including how long and how many projects. If no such past performance information is available then the new company or joint venture shall be given a neutral rating.

Provide a copy of the commitment letter of the firms or the joint venture agreement. Prior to award of any contract, a copy of the Joint Venture Agreement will be required. If approval of the Joint Venture Agreement is required by the Small Business Administration, failure to timely provide an approved SBA Joint Venture Agreement may prevent award of a contract.

3.1.2 Evaluation. The Government will evaluate the Offeror's responsiveness to the solicitation regarding past performance on similar projects using the sources identified above. New Companies and Joint Ventures shall be evaluated on their own past performance to determine the company’s ability to perform satisfactorily under the elements of evaluation. If any of the information required to be submitted is not included in the Project Information Worksheet then the contractor will be considered non-responsive and evaluated as unacceptable

Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond. The Government treats an Offeror's lack of past performance as having no positive or negative evaluation significance. The Government will evaluate past performance based on the elements listed below:

• Quality of Construction. Based on all information available, the Government will assess the quality of the actual construction undertaken and the standards of workmanship exhibited by the Offeror.

• Timeliness of Performance. The Government will evaluate all information available with respect to the Offeror completing past projects within the scheduled completion times.

• Customer Satisfaction. The Government will evaluate all information available with respect to the Offeror’s past customer satisfaction, cooperation with customers, and interaction on past projects.

• Subcontractor Management. The Government will evaluate all information available with respect to the Offeror’s management of subcontractors, including mitigation of conflicts and resolution of disputes at the lowest level. For large businesses, the Government will also evaluate compliance with subcontracting plans.

• Documentation. The Government will evaluate all information available with respect to the Offeror’s level of meeting customer satisfaction on timeliness and quality of the documentation, reports, and other written materials completed by the Offeror on past projects.

• Safety Record. All information available with respect to the Offeror’s safety record, to include CCASS rating for safety, safety awards, and other indications of improvements in safety will be taken into consideration in evaluating the Offeror’s overall safety record.

STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror has demonstrated satisfactory performance or better in the areas noted above on relevant similar type projects as described under this Factor 1. Failure to demonstrate the minimally acceptability standards under this factor will result in a “NO GO” rating and possible elimination from further consideration for contract award.

3.2 FACTOR 2: MANAGEMENT EFFECTIVENESS (VOLUME II, TAB 2). The Government will evaluate the Offeror’s management effectiveness by considering the Offeror’s understanding and capability of successfully managing the project to completion. The following elements will be evaluated:

• Organizational Chart or Structure

• Preliminary Contractor Quality Control Plan (CQC Plan).

• Contract Closeout Plan.

3.2.1 Offeror’s Submission Requirements.

3.2.1.1 Organizational Chart or Structure Information. Provide an organizational chart that clearly shows lines of authority and the communication chain of the organization, including but not limited to, Project Manager, Project Scheduler, Construction Quality Control System Manager, and Superintendent (ref: Sections (AM#1) 01 32 01.00 10 01 32 01.11 Project Schedule and 01 45 01 01 45 04 (/AM#1) USACE Quality Control for minimum qualifications and responsibilities). Subsequent to contract award, the successful Offer will be required to submit, for Government approval, verification that all specified contractor staffing provided meet or exceed the minimum qualification requirements of the contract.

3.2.1.2 Preliminary Contractor Quality Control Plan (CQC Plan). Provide preliminary plan for quality control of all work in accordance with Section 01 45 01 USACE Quality Control.

After award, the successful Offeror will be required to expand this preliminary plan to comply with contract requirements for Quality Control. The preliminary plan must address the following as a minimum:

3.2.1.2.1. CQC organizational chart identifying the chain of command of the CQC organization, number of individuals and specialized disciplines of qualified CQC staff.

3.2.1.2.2 Authority and functions of the CQC Manager and each key CQC position.

3.2.1.2.3 Maintenance of Record Drawings: Describe procedures for maintaining up-to-date plans and specifications on the job site and for preparation and submittal of record drawings Include narrative describing document control and production of electronic “as-built” record drawings and their transfer to the Government. Assisting Government with updated information on completed contract modifications for the DD1354 Transfer Document (Section 01 78 02.00 44 Closeout Submittals for DD1354).

3.2.1.2.4 Contractor’s plan to use Government QCS-RMS electronic system for overall contract management. (reference 01 45 01.10 Quality Control System (QCS))

3.2.1.2.5 Deficiency or discrepancy tracking system and correction procedures.

3.2.1.2.6 System for tracking Requests for Information submitted to the Government.

3.2.1.2.7 Procedures for tracking and maintenance of submittals

3.2.1.2.8 The plan and procedures for the Contractor's completion inspection, prior to the joint inspection with the Government Quality Assurance personnel.

3.2.1.3 Contract Closeout Plan. A Closeout Plan shall be provided in a brief structured time scale schedule reflecting the planned activities during the final 90 days of the contract activity.

Minimum items to be included:

3.2.1.3.1 Testing of equipment and systems.

3.2.1.3.2 Equipment instruction and training schedules.

3.2.1.3.3 O&M Manuals completion schedule and transfer.

3.2.1.3.3 Red Zone Meeting

3.2.1.3.4 Record as-built drawings completion schedule and transfer.

3.2.1.3.5 Pre-final inspection procedures and correction of deficiencies.

3.2.1.3.6 Warranty data submission and planned implementation.

3.2.1.3.7 Closeout of administrative deficiencies.

3.2.2 Evaluation.

3.2.2.1 Organizational Chart or Structure

3.2.2.1.1 The organizational chart will be evaluated for required contractor staffing, chain of command, lines of communication and logical management structure.

3.2.2.2 Contractor Quality Control Plan. The Contractor Quality Control (CQC) Plan will be evaluated for staffing and practices that ensure all services required by this solicitation are performed and provided in a manner that meets the project requirements.

3.2.2.3 Closeout Plan. The Offeror’s closeout plan will be reviewed and evaluated to determine the Offeror’s understanding of the solicitation close out requirements.

STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror demonstrates the ability to accomplish the work in a manner that meets or exceeds the requirements of the solicitation. This standard is met when the Offeror demonstrates a clear understanding of the solicitation requirements, a plan to provide good customer service, capability of successfully managing the project to completion and a preliminary Quality Control Plan that will ensure the successful completion of the work. Failure to demonstrate the minimally acceptability standards under this factor will result in a “NO GO” rating and possible elimination from further consideration for contract award.

3.3 FACTOR 3: CONSTRUCTION SCHEDULE (VOLUME II, TAB 3).

3.3.1 Submission Requirements: The Offeror shall provide a narrative and a times scaled [Gantt Chart] summary network. The proposed total contract duration in calendar days shall be reflected on the chart. The Schedule shall fully demonstrate how the Offeror plans to complete all work, no later than the completion date from the receipt of contract Notice-to Proceed (NTP) as specified in the Construction Schedule, Section 01 00 00.00 44. The Schedule is to include sequencing of work for construction activities, specified time for Government review and approval periods of required work plans, submittals, long lead procurement items, phasing of work, all option work, and closeout submittals specified in Section (AM#1) 01 78 02.00 44 Contract Closeout Submittals. (/AM#1)

(AM#1)

It is the Government’s requirement that all work is to be completed is to complete within the duration specified in the Construction Schedule. The Offeror may propose a completion period of lesser duration; however, any such proposals must include the same time periods for Government reviews, Option Work and phasing as specified in the solicitation. If the Government accepts a proposal for a completion period of a lesser duration, and such proposal alters the time periods for reviews, option work and phasing, the contract shall be read to include the original periods for these activities. If the Government accepts a proposal for a completion period of a lesser duration, the accepted completion period will replace the original construction schedule specified under Section 01 00 00.00 44. In addition, if a completion period of a lesser duration is proposed, the CLIN (Bid) Schedule must reflect pricing information for the lesser proposed completion period. Offers who propose completion of work beyond the completion period specified will be evaluated as unacceptable. Offerors are warned that the Military Construction Codification Act prohibits the expenditure of appropriations to expedite the completion date of a military construction contract at additional cost to the government.

Offerors may not expedite the completion date of the construction contract through the use of overtime, double shifts, larger crews, and similar efforts unless such measures are either required for normal construction efficiencies or offset by lowered overhead costs, more economical equipment rental costs, and other similar measures. (/AM#1)

The Narrative should include any construction challenges that the Offeror foresees that may jeopardize the successful completion of all contract work and plans for overcoming these challenges. (Any deviations from the solicitation requirements will be considered non-responsive and evaluated as unacceptable).

3.2.2 Evaluation. The narrative and time scaled schedule will be evaluated by the Government based on the Offer or’s demonstrated understanding of the solicitation scope of work, logical sequencing/scheduling of work activities, to include time periods for Government reviews, all option work and construction phasing as specified.

STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror demonstrates a clear understanding of the solicitation requirements and a schedule to complete the project within the specified or proposed construction duration. Failure to demonstrate the minimally acceptability standards under this factor will result in a “NO GO” rating and possible elimination from further consideration for contract award.

4. EVALUATION OF TECHNICAL PROPOSAL

The offeror’s conformance with the specified format and submission requirements will be considered during the technical evaluation. Failure to comply with the format and/or the submission requirements may be seen as indicative of the type of problems that could be expected during contract performance. Material omission(s) may cause the technical proposal to be rejected as non-acceptable. The Offeror’s adherence to prescribed page and formatting limitations prescribed will be strictly adhered to and enforced. Information submitted which exceeds the specified limit will NOT be evaluated.

Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being found deficient if inadequate detail is provided.

The Government cannot make award based on a deficient offer. Therefore, receipt of a “NO GO” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.

5.0 EVALUATION OF PRICE PROPOSAL

The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it is realistic for the scope of work to be performed; reflects a clear understanding of the requirements; and is consistent with the offeror’s technical proposal. All offers with separately priced line items or sub line items will be analyzed for unbalanced pricing.

6.0 INTENT TO AWARD WITHOUT DISCUSSIONS.

The Government intends to evaluate proposals and award a contract without discussions.

Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

7.0 PROPOSAL EXPENSE AND PREAWARD COSTS.

The Request for Proposal does not commit the Government to pay any costs incurred in the preparation and submission of the initial and/or any subsequent proposals.

(AM#1) This Page was intentionally left blank (/AM#1)

VOLUME II – TAB 1

PROJECT INFORMATION WORKSHEET

The information provided on this worksheet will be utilized in the evaluation of Factor 1, Construction Past Performance on Similar Work.

1. Project Title/Description:

(For task order contracts, attach a list of task orders to this sheet, to include description, cost, dates of construction start/completion or percent complete if not completed, for each task order)

2. Location:

3. Contract number:

4. Procuring activity:

5. Procurement Point of Contact and Telephone Number:

6. Address and telephone number of owner/customer:

7. Type of Project (private sector, Government, planned unit development, etc.):

8. General Nature of the Contract:

9. Nature of Involvement in this project (i.e., General Contractor, subcontractor, designer)

10. Award Date:

11. Original Contract Amount:

12. Final Contract Amount:

13. Original Completion Date:

14. Final Completion Date:

15. Explanation for any differences between original and final contract costs and completion dates:

16. Total number of Manhours including all subcontractors:

17. Total number of Lost Time Accidents including all Subcontractors:

18. Is performance documentation provided? If not, state reason.

VOLUME I – TAB D

PROPOSAL DATA SHEET

1. Name of Firm:

2. Address:

3. Phone:

4. Fax:

5. E-mail:

6. ALL Duns # (used for accessing CCASS) (List all DUNS numbers used by a Joint Venture, if applicable)

7. If a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

8. AUTHORIZED NEGOTIATORS. FAR 52.215-11

The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).

9. Name of Person Authorized to Negotiate:

10. Negotiator's Address:

11. Negotiator's Telephone:

12. Negotiator’s E-mail:

SAMPLE TRANSMITTAL LETTER

AND

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Date: _________________

To: ______________________________________

We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the U.S. Army Corps of Engineers, Fort Worth District. In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm's past performance will be completed by the Corps of Engineers. Your candid response to the attached questionnaire will assist the evaluation team in this process.

We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Understand that while the responses to this questionnaire may be released to the offeror, FAR

15.306 (e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Furthermore, a questionnaire has also been sent to ____________________ of your organization. Only one response from each office is required. If at all possible, we request that you individually answer this questionnaire and then coordinate your responses with that of ________________________, to develop a consensus on one overall response from your organization.

Please send your completed questionnaire to the following address to arrive NOT LATER THAN (3 days prior to due date of the solicitation):

U.S. Army Engineer District, Fort Worth ATTN: CESWF-CT-A (Clem Schram) Room 2A19 819 Taylor Street Fort Worth, TX 76102

The questionnaires can also be faxed to Mr. Clem Schram, Fort Worth District, Contract Specialist at FAX 817-886-6403 or emailed to Clements.C.Schram@usace.army.mil. If you have questions regarding the attached questionnaire, please email Clem Schram. Thank you for your assistance.

Lackland Airmen Training Center, Lackland AFB, Texas

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Upon completion of this form, please send directly to the U.S. Army Corps of Engineers in the enclosed addressed envelope, or fax to (817) 886-6403 ATTN: Mr. Clem Schram or e-mail Clements.C.Schram@usace.army.mil. Do not return this form to our offices.

Thank you.

1. Contractor/Name & Address (City and State):

2. Type of Contract: Fixed Price ________ Cost Reimbursement ________

Other (Specify) ________________________________

3. Title of Project/Contract Number:

4. Description of Work: (Attach additional pages as necessary)

5. Complexity of Work: High ________ Mid _________ Routine __________

6. Location of Work:______________________________________________