AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Contract for Phase 2 - Samuels Ave North/South Valley Storage Sites, Fort Worth Central City, Upper Trinity River

The purpose of this Amendment is to replace the existing Sections 01 45 01 and 31 23 00.00 20 w ith the attached revised Sections 01 45 01 and 31 23 00.00 20. Section 01 45 01 contains changes in paragraph 3.4.2. Section 31 23 00.00 20 contains changes in paragraph 3.8.2.1.

The bid opening date and time, and all other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Dec-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-10-B-0004

X 9B. DATED (SEE ITEM 11)

23-Nov-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Dec-2009

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A19

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-10-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

Ft Worth, TX Central City Ph2 Samuels Av (N/S) Valley Strge Sites FWCCP2

SECTION 01 45 01

CONTRACTOR QUALITY CONTROL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 3740 (2008) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM E 329 (2007a) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction

1.2 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control program, and all associated costs will be included in the applicable Bid Schedule unit or lump-sum prices.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Establish and maintain an effective quality control (QC) system in compliance with the Contract Clause titled "Inspection of Construction."

QC consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent must maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.

3.2 QUALITY CONTROL PLAN

Submit no later than 15 days after receipt of notice to proceed, the

SECTION 01 45 01 Page 1

Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction."

The Government will consider an interim plan for the first 30 days of operation. Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional work.

3.2.1 Content of the CQC Plan

Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager who reports to the project superintendent.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.

d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer must be used.)

F. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

h. Reporting procedures, including proposed reporting formats.

i. A list of the definable features of work. A definable feature of

SECTION 01 45 01 Page 2 work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.

3.2.2 Acceptance of Plan

Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.2.3 Notification of Changes

After acceptance of the CQC Plan, notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

3.3 COORDINATION MEETING

After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. Submit the CQC Plan a minimum of 7 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operationscontrol activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government, signed by both the Contractor and the Contracting Officer and will become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Safety and Health Manager must receive direction and authority from the CQC System Manager and serve as a member of the CQC staff. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and

SECTION 01 45 01 Page 3 furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.

3.4.2 CQC System Manager

Identify as CQC System Manager an individual within the onsite work organization who is responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must be a construction person with a minimum of 15 years in related work. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager must be assigned as System Manager but may have duties as project superintendent in addition to quality control. [AM 2]In the event that the CQC System Manager assumes the duties of the project superintendent, an alternate CQC System Manager shall be appointed.[AM 2] The requirements for the alternate are the same as the CQC System Manager.

3.4.3 CQC Personnel

In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil and structural. These individuals may be employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein.

These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.

SECTION 01 45 01 Page 4

Experience Matrix

Area Qualifications

a. Civil Graduate Civil Engineer or Construction Manager with 2 years experience in the type of work being performed on this project or technician with 5 yrs related experience

b. Structural Graduate Structural Engineer or Construction Manager with 2 yrs experience or person with 5 yrs related experience

3.4.4 Additional Requirement

In addition to the above experience and/or education requirements the CQC System Manager must have completed the course entitled "Construction Quality Management For Contractors".

3.4.5 Organizational Changes

Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.

3.5 SUBMITTALS AND DELIVERABLES

Submittals, if needed, must comply with the requirements in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization is responsible for certifying that all submittals and deliverables are in compliance with the contract requirements.

3.6 CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control must be conducted by the CQC System Manager for each definable feature of the construction work as follows:

3.6.1 Preparatory Phase

This phase is performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

a. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of

SECTION 01 45 01 Page 5 the work.

b. Review of the contract drawings.

c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.

f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. Review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

j. Discussion of the initial control phase.

k. The Government must be notified at least 72 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel as applicable, and the foreman responsible for the definable feature. Document the results of the preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

3.6.2 Initial Phase

This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:

a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance.

Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity

SECTION 01 45 01 Page 6 analysis with each worker.

f. The Government must be notified at least 24 hours in advance of beginning the initial phase. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report. Indicate the exact location of initial phase for future reference and comparison with follow-up phases.

g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.6.3 Follow-up Phase

Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.

3.6.4 Additional Preparatory and Initial Phases

Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.7 TESTS

3.7.1 Testing Procedure

Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements.

Upon request, furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. Procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Record results of all tests taken, both passing and failing on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the

SECTION 01 45 01 Page 7 test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.

3.7.2 Testing Laboratories

3.7.2.1 Capability Check

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel must meet criteria detailed in ASTM D 3740 and

ASTM E 329.

3.7.3 Furnishing or Transportation of Samples for Testing

Costs incidental to the transportation of samples or materials will be borne by the Contractor.

3.8 COMPLETION INSPECTION

3.8.1 Punch-Out Inspection

Conduct an inspection of the work by the CQC Manager near the end of the work, or any increment of the work established by a time stated in the SPECIAL CONTRACT REQUIREMENTS Clause, "Commencement, Prosecution, and Completion of Work", or by the specifications. Prepare and include in the CQC documentation a punch list of items which do not conform to the approved drawings and specifications, as required by paragraph DOCUMENTATION. Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. Make a second inspection the CQC System Manager or staff to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the Government Pre-Final inspection.

3.8.2 Pre-Final Inspection

The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. Ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Correct any items noted on the Pre-Final inspection in a timely manner. These inspections and any deficiency corrections required by this paragraph must be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.

3.8.3 Final Acceptance Inspection

The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative must be in attendance at the final acceptance inspection. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection.

Notify the Contracting Officer at least 14 days prior to the final

SECTION 01 45 01 Page 8 acceptance inspection and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance with the contract clause titled "Inspection of Construction".

3.9 DOCUMENTATION

Maintain current records providing factual evidence that required quality control activities and/or tests have been performed. Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:

a. Contractor/subcontractor and their area of responsibility.

b. Operating plant/equipment with hours worked, idle, or down for repair.

c. Work performed each day, giving location, description, and by whom. When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.

d. Test and/or control activities performed with results and references to specifications/drawings requirements. Identify the control phase (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.

e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.

f. Submittals and deliverables reviewed, with contract reference, by whom, and action taken.

g. Offsite surveillance activities, including actions taken.

h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

i. Instructions given/received and conflicts in plans and/or specifications.

j. Contractor's verification statement.

Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. Furnish the original and one copy of these records in report form to the Government daily within 72 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, prepare and submit one report for every 7 days of no work and on the last day of a no work period. All calendar days must be accounted for throughout the life of the contract. The first report following a day of no work will be for that day

SECTION 01 45 01 Page 9 only. Reports must be signed and dated by the CQC System Manager. Include copies of test reports and copies of reports prepared by all subordinate quality control personnel within the CQC System Manager Report.

3.10 NOTIFICATION OF NONCOMPLIANCE

The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, will be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

3.11 SAMPLE FORMS

a. Minimum construction quality control report and the required preparatory and initial inspection documentation.

b. All tests of piping systems or portions thereof shall be recorded on the "Piping System Test Report".

c. Compaction equipment data along with the manufacturer's information and the Contractor's certification of compliance shall be submitted for approval for each different type of equipment on the

"COMPACTION EQUIPMENT RECORD."

Sample forms enclosed at the end of this section.

SAMPLE FORMS

Sample QC forms follow this page.

SECTION 01 45 01 Page 10

(Sample of typical Contractor Quality Control Report)

CONTRACTOR'S NAME

(Address)

DAILY CONSTRUCTION QUALITY CONTROL REPORT

Date: __________________ Report No. ____________

Contract No.:____________________________________________________________________

Description and Location of work:

WEATHER: (Clear) (P. Cloudy) (Cloudy);

Temperature:_________ Min. _________ Max;

Rainfall _________ inches.

Contractor/Subcontractors and Area of Responsibility with Labor Count for Each a.______________________________________________________________________ b.______________________________________________________________________ c.______________________________________________________________________ d.______________________________________________________________________

Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)

1. Work Performed Today: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above. If no work is performed, report the reason.)

2. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)

a. Preparatory Inspection:

b. Initial Inspection:

c. Follow-up Inspections:

3. Test Required by Plans and/or Specifications performed and Results of Tests:

SECTION 01 45 01 Page 11

4. Verbal Instructions Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover any conflicts in plans, specifications, or instructions or any delay to the job.)

6. Results of Safety Inspection: (Include safety violations and corrective actions taken.)

Contractor's Inspector

SECTION 01 45 01 Page 12

CONTRACTOR'S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

Contractor's Chief of Quality Control

NOTE:

DO NOT LEAVE REPORT ITEMS BLANK

Items 1. through 6. must be reported every day. If there is no other report on an item, enter the work "none" in the reporting space. Reports with items left blank will be returned as incomplete.

SECTION 01 45 01 Page 13

PREPARATORY PHASE CHECKLIST

Contract No._________________ Date:_______________

Definable Feature:_______________ Spec Section:_______________

Gov't Rep Notified ________ Hours in Advance Yes________ No_______

I. Personnel Present:

Name Position Company/Government 1.__________________________________________________________________

2.__________________________________________________________________

3.__________________________________________________________________

4.__________________________________________________________________

5.__________________________________________________________________

6.__________________________________________________________________

7.__________________________________________________________________

8.__________________________________________________________________

9.__________________________________________________________________

10._________________________________________________________________

(List additional personnel on reverse side)

II. Submittals

1. Review submittals and/or submittal log 4288.

Have all submittals been approved? Yes_________ No_________

If no, what items have not been submitted?

a.__________________________________________________________________ b.__________________________________________________________________ c.__________________________________________________________________

PPC Page 1

SECTION 01 45 01 Page 14

2. Are all materials on hand? Yes_________ No__________

If no, what items are missing?

a.__________________________________________________________________ b.__________________________________________________________________ c.__________________________________________________________________

3. Check approved submittals against delivered materials. (This should be done as material arrives.)

Comments____________________________________________________________

III. Material storage

Are materials stored properly? Yes___________ No ____________

If No, what action is taken?_______________________________________

IV. Specifications

1. Review each paragraph of specifications.

2. Discuss procedure for accomplishing the work.

3. Clarify any differences.

V. Preliminary Work and Permits

Ensure preliminary work is correct and permits are on file.

If not, what action is taken? ___________________________________

PPC Page 2

SECTION 01 45 01 Page 15

VI. Testing

1. Identify test to be performed, frequency, and by whom.

2. When required?

3. Where required?

4. Reviewing Testing Plan.

5. Have test facilities been approved?

VII. Safety

1. Review applicable portion of EM 385-1-1.

2. Activity Hazard Analysis approved? Yes ________ No ________

VIII. Corps of Engineers comments during meeting.

CQC REP

PPC Page 3

SECTION 01 45 01 Page 16

INITIAL PHASE CHECKLIST

Contract No._________________ Date:___________________

Definable Feature:_______________

Gov't Rep Notified ________ Hours in Advance Yes________ No_______

I. Personnel Present:

Name Position Company/Government

1.__________________________________________________________________

2.__________________________________________________________________

3.__________________________________________________________________

4.__________________________________________________________________

5.__________________________________________________________________

6.__________________________________________________________________

7.__________________________________________________________________

8.__________________________________________________________________

9.__________________________________________________________________

10._________________________________________________________________

(List additional personnel on reverse side)

IC Page 1

SECTION 01 45 01 Page 17

II.

Identify full compliance with procedures identified at preparatory.

Coordinate plans, specifications, and submittals.

Comments

III. Preliminary Work. Ensure preliminary work is complete and correct. If not, what action is taken?

IV. Establish Level of Workmanship.

1. Where is work located?______________________________________

2. Is a sample panel required? Yes ______ No ______

3. Will the initial work be considered as a sample?

Yes _________ No _____________

(If yes, maintain in present condition as long as possible.)

V. Resolve any differences.

Comments

IC Page 2

SECTION 01 45 01 Page 18

VI. Check Safety

Review job conditions using EM 385-1-1 and job hazard analysis.

Comments________________________________________________________

CQC REP

IC Page 3

SECTION 01 45 01 Page 19

PIPING SYSTEM TEST REPORT

STRUCTURE OR BUILDING__________________________

CONTRACT NO._________________________

DESCRIPTION OF SYSTEM OR PART OF SYSTEM TESTED:___________________________

DESCRIPTION OF TEST:______________________________________________________

NAME AND TITLE OF PERSON IN CHARGE OF PERFORMING TESTS FOR CONTRACTOR:

NAME___________________________________

TITLE__________________________________

SIGNATURE______________________________

I HEREBY CERTIFY THAT THE ABOVE DESCRIBED SYSTEM HAS BEEN TESTED AS

INDICATED ABOVE AND FOUND TO BE ENTIRELY SATISFACTORY AS REQUIRED IN

THE CONTRACT SPECIFICATIONS.

SIGNATURE OF INSPECTOR_________________________

DATE___________________________________________

REMARKS:__________________________________________________________________

Piping Systems Test Page 1

SECTION 01 45 01 Page 20

COMPACTION EQUIPMENT RECORD

Project: ___________________________________________

Contract No.: ______________________________________

*Rubber-tired roller

a. Make and model:

b. Type:

c. Tires:

(1) Number:

(2) Spacing:

(3) Size:

(4) Ply rating:

(5) Tire air pressure:

(6) Load per tire:

d. Roller width:

(1) Rolling width:

(2) Overall width:

e. Weight:

(1) Empty:

(2) Loaded:

(3) Ballast:

f. Speed during compaction:

(1) Specified:

(2) Actual:

*Tamping roller

a. Make and model:

b. Type:

c. Drums:

(1)

(2) Diameter:

SECTION 01 45 01 Page 21

(3) Length:

d. Tamping Feet:

(1) Base area:

(2) Shape:

(3) Length:

(4) Number per drum:

(5) Number per row:

(6) Number per rows:

e. Weight and ballast:

(1) Empty:

(2) Ballast:

(3) Ballast weight:

f. Foot pressure:

g. Type of cleaners and frame:

(1) Cleaners:

(2) Frame:

h. Speed during compaction:

(1) Specified:

(2) Actual:

Submitted by: _______________________

*Note: This form shall be completed in typewritten form for each different type of equipment and submitted along with the manufacturer's information and the Contractor's certification of compliance with the specifications.

CER Page 1

-- End of Section --

SECTION 01 45 01 Page 22

SECTION 31 23 00.00 20

EXCAVATION AND FILL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 698 (2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort

ASTM D 2922 (2005) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)

U.S. ARMY CORPS OF ENGINEERS (USACE)

ASTM D 3017 (2005) Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)

ASTM D 4643 (2008) Standard Test Method for Determination of Water Content of Soil by the Microwave

1.2 DEFINITIONS

1.2.1 Degree of Compaction

Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 698, for general soil types, abbreviated as percent laboratory maximum density.

1.2.2 Hard Materials

Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.

1.2.3 Rock

Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1 cubic yard in volume.

Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.

SECTION 31 23 00.00 20 Page 1

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-06 Test Reports

Survey Reports

Density tests

Copies of all laboratory and field test reports within 24 hours of the completion of the test.

1.4 CRITERIA FOR BIDDING

Base bids on the following criteria:

a. Surface elevations are as indicated.

b. Pipes or other artificial obstructions, except those indicated, will not be encountered.

c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.

d. Material character is indicated by the boring logs.

e. River stage elevation data is attached indicating water surface elevations for various storm events.

1.5 MEASUREMENT AND PAYMENT

Preparatory site work, clearing, grubbing, removal of trails, stripping/stockpiling of topsoil, protection of utilities, and verification surveys will be paid as a lump sum item.

Demolition of asphalt roads, storm structure and pipe, monitoring wells, cut/plug 36" RCP, metal beam guard, remove and replace overhead electric poles and line, metal gate, concrete flumes, drop inlets, cable fence, debris from impound lot, irrigation lines, and other miscellaneous items to be removed from the site will be paid as lump sum items.

Excavation hauling, spreading, and disposal will be paid for by the unit price per cubic yard based upon in-place (bank) quantities. The work covered by this item consists of furnishing all equipment, excavation, hauling, compaction, testing, and performing all labor for the required excavation and disposal. Quantities shall be determined by volumetric calculation of DTM's of pre and post excavation surfaces as determined by certified survey and approved by the Contracting Officer.

SECTION 31 23 00.00 20 Page 2

PART 2 PRODUCTS

2.1 SOIL MATERIALS

2.1.1 Topsoil

Provide as specified in Section 32 92 19 SEEDING.

2.2 UTILITY BEDDING MATERIAL

Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with ACPA Class "B", Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 698 maximum density. Provide ASTM D 2321 materials as follows:

a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells.

PART 3 EXECUTION

3.1 CONTRACTOR VERIFICATION OF CONTRACT SURVEY DATA

During initial site layout and before existing conditions are disturbed the Contractor shall verify, in writing by an independent registered surveyor, the basic survey data provided on the contract drawings. Verification shall be initiated from the points shown on the contract drawings or from the contract drawing reference points designated by the Contracting Officer's Authorized Representative and shall include, as a minimum, benchmark elevations, horizontal control points, and sufficient spot checks of critical elevations to ensure that the survey data adequately reflects existing conditions. The Contractor shall not proceed with construction until survey verification is provided to the Contracting Officer's Authorized Representative. Before an existing benchmark referenced on the contract drawings is disturbed the Contractor shall establish a new benchmark which has been approved by the Contracting Officer's Authorized Representative. Benchmarks which are destroyed without authorization from the Contracting Officer's Authorized Representative must be replaced at the Contractor's expense as prescribed in Section 00700 Contract Clause, "Layout of Work." The Contractor shall refer to Contract Clauses, "Differing Site Conditions" and "Site Investigation and Conditions Affecting the Work," for additional requirements. Upon completion of the work the Contractor shall provide an independent certified verification survey by a registered professional surveyor to confirm all cut areas and provide locations and elevations to be used in establishing final quantities and incorporated in the Contractor's As Built Drawings.

3.2 DEMOLITION

3.2.1 Well Removal Capping and Plugging

All monitoring wells which are required to be removed, plugged or capped under Texas Occupations Code Chapters 1901 and 1902 or this Chapter shall be plugged and capped in accordance with the following specifications and in compliance with the local groundwater conservation district rules or incorporated city ordinances:

a. All removable casing shall be removed from the well.

SECTION 31 23 00.00 20 Page 3

b. Any existing surface completion shall be removed.

c. The entire well pressure filled via a tremie pipe with cement from bottom up to the land surface.

d. In lieu of the procedure in paragraph (3) of this section, the well shall be pressure filled via a tremie tube with clean bentonite grout of a minimum 9.1 pounds per gallon weight followed by a cement plug extending from land surface to a depth of not less than two (2) feet, or if the well to be plugged has one hundred 100 feet or less of standing water the entire well may be filled with a solid column of 3/8 inch or larger granular sodium bentonite hydrated at frequent intervals while strictly adhering to the manufacturers' recommended rate and method of application.

If a bentonite grout is used, the entire well from not less than two (2) feet below land surface may be filled with the bentonite grout. The top two (2) feet above any bentonite grout or granular sodium bentonite shall be filled with cement as an atmospheric barrier. Bentonite grout may not be used if a water zone contains chlorides above 1500 ppm or if hydrocarbons are present.

3.2.2 Removal and Abandonment of Existing Sewer (Samuels Avenue North Site)

a. Backfill and compaction of sewer removal area shall comply with sub-section 3 of this section.

b. Remove sewer piping where shown on plans and at least five feet beyond the grading extents shown on plans.

c. Plug pipe a minimum of 5 feet with concrete.

d. Show on As-Built Construction Plans plugs and masters used in abandonment.

e. The upstream end of the existing pipe is capped and plugged.

3.3 PROTECTION

3.3.1 Drainage and Dewatering

Provide for the collection and disposal of surface and subsurface water encountered during construction. Contractor shall coordinate in advance with the Tarrant Regional Water District (TRWD) to lower the river level for the Samuels North, and Samuels South Excavation. Water levels will not be lowered for up to fourteen (14) calendar days from the TRWD's receipt and approval of Contractor's written request. Normal river stage (pool) elevation can only be lowered during dry weather conditions. This elevation cannot be maintained during wet weather conditions. The Project is located between river stations 241026.78 and 238695.56 for Samuels North and South sites. Cross-section of the river with elevations at these stations is presented at the end of this specification and is available electronically from the C.O. upon request. A tabular listing of river stage elevations and flows for various storm events is presented at the end of this section for use by the Contractor in establishing the site flood protection during the construction period.

SECTION 31 23 00.00 20 Page 4

3.3.1.1 Drainage

So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, dikes, swales, and other drainage features and equipment as required to maintain dry soils and prevent erosion. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing.

Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained.

3.3.2 Underground Utilities

The existence and location of underground utilities indicated on the plans are taken from available records. Contractor prior to the commencement of work shall verify the location and existence of utilities within the work zone. Any underground utilities not shown on the plans if encountered during construction will be treated as differing/changed conditions. Upon encountering any underground utilities the Contractor shall immediately notify the government and wait for further written instructions from the Contracting Officer.

3.3.3 Machinery and Equipment

Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged.

3.4 SURFACE PREPARATION

3.4.1 Clearing and Grubbing

Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface.

3.4.2 Stripping

Strip suitable soil from the site within the limits where excavation is indicated to a depth of 9 inches and stockpile separately from other excavated material. Any material unsuitable for use as topsoil shall be hauled to the designated disposal area. Protect topsoil and keep in segregated piles until needed. Stripping of top soil from disposal areas is not required.

3.4.3 Unsuitable Material

Remove vegetation from site cleared, debris and rubbish. Removed site vegetation shall be mulched and stockpiled north of the Contractor lay down

SECTION 31 23 00.00 20 Page 5 area for use in erosion control and seeding.

3.5 EXCAVATION

Excavate to contours, elevation, and dimensions indicated with allowance for topsoil replacement. Keep excavations free from water. Excavations below indicated depths will not be permitted except to remove unsatisfactory material and to allow for replacement of top soil.

Unsatisfactory material encountered below the grades shown shall be removed as directed and disposed of in the designated disposal area. Unless specified otherwise, refill excavations cut below indicated depth and compact to 95 percent of ASTM D 698 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer.

3.5.1 Excavated Materials

Excavated material shall be placed in the designated disposal area.

3.6 FILLING AND BACK FILLING

Excavated areas above natural river stage elevation of 500 shall be backfilled with topsoil to contours, elevations, and dimensions as shown on the plans for final elevations.