Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53 243

The Solicitation for Design-Build Request for Proposal for Sixteen (16) Barracks and Four (4) Central Energy Plants, Fort Polk, Louisiana, is amended as follows:

See Continuation Sheet(s)

NOTE: The date and time for the Receipt of Proposals have changed to 22 August 2008, 2:00 PM, local time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-08-R-0192

X 9B. DATED (SEE ITEM 11)

25-June-2008

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-July-2008

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-08-R-0192

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO DOCUMENTS 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

1. Standard Form 1442 – Change the date and time for the Receipt of Proposals from “12 August 2008, 3:00 PM, local time” to “22 August 2008, 2:00 PM, local time”.

2. Replacement Sections – Replace the following sections, with the attached new sections, of the same number and title bearing the notation "ACCOMPANYING AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-08- R-0192."

SECTION 00 11 00.02 CONTRACT LINE ITEM SCHEDULE/PRICING SCHEDULE

SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

SECTION 00 22 11 PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS

OF AWARD ONE STEP - -BEST VALUE, DESIGN BUILD

CHANGES TO DIVISION 01 - GENERAL REQUIREMENTS

3. Replacement Sections – Replace the following sections, with the attached new sections, of the same number and title bearing the notation "ACCOMPANYING AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-08- R-0192."

SECTION 01 10 00 SUMMARY OF WORK

End of Summary of Changes

ACCOMPANYING AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-08-R-0192

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

0001 All design, base bid and options, including barracks, CEP's, structural wall repairs, except for design and analysis to meet progressive collapse requirements. 1 LS *** $

0002 TASK A for Drainage 1 LS *** $

0003 TASK B for Drainage: *** *** *** *** 0003A TASK B work for Bldg 1348 1 LS *** $ 0003B All work in Task B except Bldg 1348 1 LS *** $

0004 TASK C for Drainage 1 LS *** $

0005 TASK D for Drainage 1 LS *** $

0006 TASK E for Drainage 1 LS *** $

0007 TASK F for Drainage 1 LS *** $

0008 Renovate Bldg. 1348 1 LS *** $

0009 Renovate Bldg. 1150 1 LS *** $

0010 Renovate Bldg. 1154 1 LS *** $

0011 Renovate Bldg. 1156 1 LS *** $

0012 Renovate Bldg. 1346 1 LS *** $

0013 Renovate CEP 1172, demo existing piped water lines, install Chilled and Hot Water Lines to supply existing buildings serviced by this plant. Convert Mech. rm to 4 pipe in all bldgs. 1 LS *** $

0014 Operation and Maintenance Manuals 1 LS *** $ 75,000.00

0015 Final Record Drawings 1 LS *** $ 50,000.00

0016 Project Completion Time * Completion Time for Item of Work (1) (NOT to exceed the maximum time stated in Item of Work (1), Section 00 10 00.44) ______ calendar days *See Section 01 00 00.44, Design and Construction Schedule, paragraph 1.1a

PRICING SCHEDULE

TOTAL BASE PROPOSAL

BASE PROPOSAL(PHASE 1): All work required by the plans and specifications exclusive of work required by the Option Items.

SECTION 00 11 00.02

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

PRICING SCHEDULE

SECTION 00 11 00.02

OPTIONS

FOR PHASE 1

0017 OPT 1 : AT/FP Progressive Collapse/Demo park, all Phase 1 except Bldg 1348 1 LS *** $

0018 OPT 2: Structural Wall Repairs, all Phase 1 except Bldg

1348 1 LS *** $

0019 OPT 3: Replace Cooling Towers 1 LS *** $ 0020 OPT 4: Install Solar For Domestic Hot Water 1 LS *** $ 0021 OPT 5: Install Gray Water Heat Recovery 1 LS *** $ 0022 OPT 6 : Decentralize Heating Plant 1 LS *** $ 0023 OPT 7: Mill/Overlay Parking (14 AC), Striping 18000 LF 1 LS *** $ 0024 OPT 8 : BLDG 1348 AT/FP Progressive Collapse/Demo park 1 LS *** $ 0025 OPT 9 : BLDG 1348: Structural Wall Repairs 1 LS *** $

FOR PHASE 2

0026 OPT 10: Renovate CEP 1941, demo existing piped water lines, install Chilled and Hot Water Lines to supply existing buildings serviced by this plant. Convert Mech rm to 4 pipe in all bldgs. 1 LS *** $

0027 OPT 11: Replace Cooling Towers 1 LS *** $

'0028 BLDG 1945 *** *** *** ***

0028AA OPT 12: Renovate BLDG 1945 1 LS *** $ 0028AB OPT 13: Strutural wall repair 1 LS *** $ 0028AC OPT 14 : AT/FP Progressive Collapse/Dem park 1 LS *** $ 0028AD OPT 15: Install Solar For Domestic Hot Water 1 LS *** $ 0028AE OPT 16: Install Gray Water Heat Recovery 1 LS *** $

'0029 BLDG 1948 *** *** *** ***

'0029AA OPT 17: Renovate BLDG 1948 1 LS *** $ '0029AB OPT 18: Structural Wall Repairs 1 LS *** $ '0029AC OPT 19 : AT/FP Progressive Collapse/Demo park 1 LS *** $ '0029AD OPT 20: Install Solar For Domestic Hot Water 1 LS *** $ '0029AE OPT 21: Install Gray Water Heat Recovery 1 LS *** $

'0030 BLDG 1950 *** *** *** ***

'0030AA OPT 22: Renovate Bldg. 1950 1 LS *** $ '0030AB OPT 23: Structural Wall Repairs 1 LS *** $ '0030AC OPT 24: AT/FP Progressive Collapse/Demo park 1 LS *** $ '0030AD OPT 25: Install Solar For Domestic Hot Water 1 LS *** $ '0030AE OPT 26: Install Gray Water Heat Recovery 1 LS *** $

'0031 BLDG 2043 *** *** *** ***

'0031AA OPT 27: Renovate Bldg. 2043 1 LS *** $ '0031AB OPT 28: Structural Wall Repairs 1 LS *** $ '0031AC OPT 29 : AT/FP Progressive Collapse/Demo park 1 LS *** $ '0031AD OPT 30: Install Solar For Domestic Hot Water 1 LS *** $ '0031AE OPT 31: Install Gray Water Heat Recovery 1 LS *** $

0032 OPT 32 : Decentralize Heating Plant 1 LS *** $ 0033 OPT 33: Mill/Overlay Parking (14 AC),Striping 18000 LF 1 LS *** $

TOTAL BLDG 1950

TOTAL BLDG 2043

TOTAL BLDG 1945

TOTAL BLDG 1948

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

PRICING SCHEDULE

SECTION 00 11 00.02

FOR PHASE 3

0034 OPT 34 : Renovate CEP 2271, demo existing piped water lines, install Chilled and Hot Water Lines to supply existing buildings serviced by this plant. Convert Mech rm to 4 pipe in all bldgs. 1 LS *** $

0035 OPT 35: Replace Cooling Towers 1 LS *** $

0036 BLDG 2274 *** *** *** ***

0036AA OPT 36 : Renovate Bldg. 2274 1 LS *** $ 0036AB OPT 37: Structural Wall Repairs 1 LS *** $ 0036AC OPT 38 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0036AD OPT 39: Install Solar For Domestic Hot Water 1 LS *** $ 0036AE OPT 40: Install Gray Water Heat Recovery 1 LS *** $

0037 BLDG 2278 *** *** *** ***

0037AA OPT 41 : Renovate Bldg. 2278 1 LS *** $ 0037AB OPT 42: Structural Wall Repairs 1 LS *** $ 0037AC OPT 43 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0037AD OPT 44: Install Solar For Domestic Hot Water 1 LS *** $ 0037AE OPT 45: Install Gray Water Heat Recovery 1 LS *** $

0038 BLDG 2279 *** *** *** ***

0038AA OPT 46 : Renovate Bldg. 2279 1 LS *** $ 0038AB OPT 47: Structural Wall Repairs 1 LS *** $ 0038AC OPT 48 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0038AD OPT 49: Install Solar For Domestic Hot Water 1 LS *** $ 0038AE OPT 50: Install Gray Water Heat Recovery 1 LS *** $

0039 BLDG 2386 *** *** *** ***

0039AA OPT 51 : Renovate Bldg. 2386 1 LS *** $ 0039AB OPT 52: Structural Wall Repairs 1 LS *** $ 0039AC OPT 53 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0039AD OPT 54: Install Solar For Domestic Hot Water 1 LS *** $ 0039AE OPT 55: Install Gray Water Heat Recovery 1 LS *** $

TOTAL BLDG 2274

TOTAL BLDG 2278

TOTAL BLDG 2279

TOTAL BLDG 2386

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

PRICING SCHEDULE

SECTION 00 11 00.02

PHASE 3 (cont) 0040 OPT 56 : Renovate CEP 1628, demo existing piped water lines, install Chilled and Hot Water Lines to supply existing buildings serviced by this plant. Convert Mech rm to 4 pipe in all bldgs. 1 LS *** $

0041 OPT 57: Replace Cooling Towers 1 LS *** $

0042 BLDG 293 *** *** *** ***

0042AA OPT 58 : Renovate Bldg. 293 1 LS *** $ 0042AB OPT 59: Structural Wall Repairs 1 LS *** $ 0042AC OPT 60 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0042AD OPT 61: Install Solar For Domestic Hot Water 1 LS *** $ 0042AE OPT 62: Install Gray Water Heat Recovery 1 LS *** $

0043 BLDG 1631 *** *** *** ***

0043AA OPT 63 : Renovate Bldg. 1631 1 LS *** $ 0043AB OPT 64: Structural Wall Repairs 1 LS *** $ 0043AC OPT 65 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0043AD OPT 66: Install Solar For Domestic Hot Water 1 LS *** $ 0043AE OPT 67: Install Gray Water Heat Recovery 1 LS *** $

0044 BLDG 1635 *** *** *** ***

0044AA OPT 68 : Renovate Bldg. 1635 1 LS *** $ 0044AB OPT 69: Structural Wall Repairs 1 LS *** $ 0044AC OPT 70 : AT/FP Progressive Collapse/Demo park 1 LS *** $ 0044AD OPT 71: Install Solar For Domestic Hot Water 1 LS *** $ 0044AE OPT 72: Install Gray Water Heat Recovery 1 LS *** $

0045 OPT 73 : Decentralize Heating Plant (all bldg in phase 3) 1 LS *** $ 0046 OPT 74: Mill/Overlay Parking (28 AC)striping 36000 LF 1 LS *** $

$TOTAL (BASE PROPOSAL + ALL OPTIONS)

TOTAL (BASE PROPOSAL)

TOTAL BLDG 293

TOTAL BLDG 1635

TOTAL BLDG 1631

NOTES:

1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)

(a) For the purpose of initial evaluation of proposals, the following will be utilized in resolving arithmetic discrepancies found on the face of the clin schedule as submitted by offerors:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected; and

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of proposal evaluation, the Government will proceed on the assumption that the offeror intends his proposal to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the offer will be so reflected on the abstract of proposals.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which proposal is low.

2. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the clin schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the clin schedule.

3. Offerors must bid on all items.

4. Costs attributable to Division 01 - General Requirements are assumed to be prorated among price items listed.

5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

6. The Army will procure this structure through a design and cost competition in accordance with the provisions set forth in this Request for Proposal (RFP). When a contract is awarded, it will be a Firm Fixed Price Contract.

7. Any proposal that is materially unbalanced as to prices for the Price Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

8. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))

The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Proposal without an increase in the Offeror's Proposal Price. Completion of added items shall continue at the same schedule as the Base Proposal unless otherwise noted in Section 01 00 00.00 44 DESIGN AND CONSTRUCTION SCHEDULE, paragraph 1 entitled SCHEDULE.

9. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. LS (lump sum)

END OF PRICING SCHEDULE

Section 00 21 00

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONTRUCTION COSTS

1.3 GOVERNMENT SECURITY REQUIREMENTS

1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.5 OFFEROR'S QUESTIONS AND COMMENTS

1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 PRE-PROPOSAL CONFERENCE

1.9 ACCURACY IN PROPOSALS

1.10 PROPOSAL SUBMITTALS

1.11 PROPOSAL FORMAT

1.12 JOINT VENTURE PROPOSAL REQUIREMENTS

1.13 SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF

SMALL BUSINESS CONCERNS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

The scope of project includes all work required to Design and Construct the renovation of Barracks and Central Energy Plants at Fort Polk, LA. The work shall be in accordance with Request for Proposal documents.

1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION COSTS

The design and construction costs will be subject to the funds available for this project. The estimated project total contract award shall be between $100 and $150 Million for this contract. Offerors are notified that they are under no obligation to approach this ceiling. However the Government will not be able to make an award, if the dollar amount set for this project is exceeded.

1.3. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Fort Worth District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at PO Box 17300, Fort Worth, TX 76102-0300 if it does not contain a return mailing address. There will be no exceptions.

1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities Website website at:

http://www.fbo.gov

It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov/ via Quick Search (Solicitation No. W9126G-08- R -0192).

1.5. OFFEROR'S QUESTIONS AND COMMENTS

1.5.1 Bidder Inquiry

1.5.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

1.5.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

1.5.1.1.2 From this page you may view all bidder inquiries or add inquiry.

1.5.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.5.1.1.4 The Solicitation Number is : W9126G-08-R-0192.

1.5.1.1.5 The Bidder Inquiry Key is: D31TA3-D495JS

1.5.1.2 The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

1.5.1.3 Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

1.5.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.5.1.5 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.219-1 for the small business size standard/NAICS Code.

1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.8. PRE-PROPOSAL CONFERENCE / SITE VISIT

The Government intends to hold a pre-proposal conference / site visit as follows:

July 8, 2008 at 9 AM (Central Standard Time).

Location address: 2315 Service Command Loop, Bldg 4740, Conference room, Fort Polk, LA.

POC Steve Sherrill, Resident Engineer.

RSVP to Ann Michalk at ann.m.michalk@usace.army.mil or 337-531-2933, by COB on Monday, July 7, 2008.

All interested offerors are urged to attend. During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.

1.9. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.10. PROPOSAL SUBMITTALS

Due to heightened security at Government installations, those offerors who have their proposals hand-delivered shall contact the following Contract Specialist Point of Contact for this solicitation:

Ms. Ali Marshall at Alisa.Marshall@usace.army.mil

Ms. Marshall’s telephone number is 817-886-1068. Email is the preferred method of communication for record.

If Ms. Marshall is not available please call The Contracting Office Main Desk number at 817-886-1043.

Deliver to the address shown below on the date and time specified on Standard Form SF 1442, Page 1, Item 9, a Contracting representative will be in the lobby to accept proposals. At the time specified on Standard Form SF 1442, Page 1, Item 9, it will be announced that receipt of proposals is closed. Official time will be established by the clock located in the area where the proposals are received. Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.

As stated on Standard Form SF 1442: Proposals will be received until 2:00 PM CST on August 22, 2008 at:

U.S. Army Corps of Engineers, Fort Worth District

ATTN: Ms. Ali Marshall

819 Taylor Street, Room 2A19

Fort Worth, TX 76102-0300

The Packaging that contains the Proposals shall be marked:

”Proposals for Solicitation Number: W9126G-08-R-0192”

1.11. PROPOSAL FORMAT

a Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein

(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

(a) Drawing sheets: Up to 22” x 34” is acceptable for full size drawings. Half-size sheets are also acceptable.

(b) Electronic Format: Provide two CDs in read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format with formuls and totals on each line and column appropriate.

(c) Number of copies: Submit one original and Five (5) copies of drawings and printed matter (Bound Volumes), as well as Two (2) CDs.

1.12. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively

1.13. SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF

SMALL BUSINESS CONCERNS

(a) Application. This clause applies to all offerors submitting proposals.

(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:

52.219-8, Utilization of Small Business Concerns (Alternate I)

52.219-9, Small Business Sub Contracting Plan (Alternate I) (applies only to Large Business)

52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)

252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

(i) 70 % of subcontracted amount contract amount with small business concerns.

(ii) 6.2 % of subcontracted amount contract amount with those small business concerns owned and controlled by socially and economically disadvantaged individuals.

(iii) 7.0 % of subcontracted amount contract amount with those small business concerns owned and controlled by women.

(iv) .9 % of subcontracted amount contract amount with those small business concerns owned and controlled by Service-Disabled Veterans.

(v) 9.8 % of subcontracted amount contract amount with those small business concerns owned and controlled by HUBZones.

(vi) 13.0 % of subcontracted amount contract amount with those minority institutions and historically black colleges and universities

(End of Section 00 21 00)

SECTION 00 22 11

W9126G-08-R-0192 Fort Polk Barracks and Central Energy Plant

REV 5.4 - 30APR 2008

PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS OF AWARD ONE STEP - -

BEST VALUE, DESIGN BUILD

(SINGLE AWARD)

1.0 OVERVIEW

2.0 BASIS OF AWARD

3.0 GENERAL INSTRUCTIONS

4.0 PROPOSALINFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS AND ELEMENTS

4.1 VOLUME 1 – DESIGN-TECHNICAL

4.2 VOLUME 2 – PERFORMANCE CAPABILITY/UTILIZATION OF SMALL BUSINESS

4.3 VOLUME 3 – PROPOSED CONTRACT DURATION AND SUMMARY SCHEDULE

4.4 VOLUME 4 - PRICE AND PRO-FORMA INFORMATION

5.0 VOLUME 1 – FACTOR 1 - DESIGN TECHNICAL

5.1 GENERAL

5.2 PRESENTATION EXTERIOR ELEVATION(S) OF THE PRIMARY ELEVATION(S) OF EACH BARRACK

TYPE CLEARLY NOTING PROPOSED MATERIALS AND COLORS

5.3 MECHANICAL EQUIPMENT AND PRODUCTS

5.4 CMU REPAIR

5.5. SITE DESIGN

5.6. SUSTAINABILITY REQUIREMENT

5.7 EVALUATION CRITERIA

6.0 VOLUME 2 –FACTOR 2 - PERFORMANCE CAPABILITY

6.1 TAB A –SUBFACTOR 1 – SPECIALIZED EXPERIENCE

6.2 TAB B –SUBFACTOR 2 – PAST PERFORMANCE

6.3 TAB D –SUBFACTOR 4 – ORGANIZATION/TECHNICAL APPROACH

6.4 TAB E - SUBFACTOR 5 – UTILIZATION OF SMALL BUSINESS CONCERNS

7.0 VOLUME 3 - PROPOSED CONTRACT DURATION AND SUMMARY SCHEDULE

7.1 GENERAL

8.0 VOLUME 4 – PRICE AND PRO FORMA INFORMATION

8.1 GENERAL

8.2 TAB A – FACTOR 3 – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND CONTRACT LINE

ITEM SCHEDULE)

8.3 TAB B – N/A

8.4 TAB C– REQUIRED PRE-AWARD INFORMATION

8.5 TAB D – SUBCONTRACTING PLAN

9.0 EVALUATION PROCEDURES

9.1 SOURCE SELECTION EVALUATION BOARD (SSEB)

9.2 EVALUATION

9.3 DEFINITIONS

9.4 EVALUATION RATING SYSTEM

9.5 PAST PERFORMANCE RISK RATINGS

ATTACHMENTS

1 - FORMAT FOR TABLE OF FACILITIES

2 - FORMAT FOR TABLE OF SPACES

3 - COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR

4 - COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY

5 - COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR (OR PRIME IF WORK NOT TO BE

SUBCONTRACTED)

6 - PAST PERFORMANCE EVALUATION TELEPHONE INTERVIEW QUESTIONNAIRE

9 - LETTER OF COMMITMENT FOR (DESIGN FIRM OR KEY SUBCONTRACTOR)

10 - PROPOSAL DATA SHEETS

1.0 OVERVIEW

1.1. The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing task orders to meet the Army’s Transformation program goals of faster project execution at lower cost, while taking advantage of industry standards, means and methods.

1.2. This is a “Best Value” solicitation for the Design and Construction of a Barracks and Central Energy Plants located at

Fort Polk. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

2.0 BASIS OF AWARD

2.1. The Contracting Officer will award a firm fixed-price contract to that responsible Offeror whose proposal the Source

Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered significantly more important than the price, however the Contract award shall not exceed the cost limitation described in Section 00 21 00 for this project. The intent of this solicitation is to obtain the best proposal within the cost limitation. There is no obligation to approach or match the cost limitation in the offer. After the

Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the Contracting

Officer/Source Selection Official must determine that the added value of a more expensive proposal (within the cost limitation) would justify award to that offeror.

2.2. As part of the evaluation, the Government will evaluate betterments in proposals relative to the minimum standards in the RFP to determine if they offer additional value to the Government. In addition, innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria.

3.0 GENERAL INSTRUCTIONS

3.1. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

3.2. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal, provided that the

Offeror or Offeror’s subcontractor has or will have professional architects and engineers, registered in the appropriate technical disciplines and provided that the requirements specified in Contract clause, “Requirements for Registration of

Designers”, are met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

3.3. Submit proposals in tabbed, three-ring binders. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS AND ELEMENTS

4.1. VOLUME 1 – TAB A – DESIGN TECHNICAL FOR SOLICITATION NO. W9126G-08-R-0192

Factor/Sub Factor

Location

Description

Relative Importance

FACTOR 1

DESIGN TECHNICAL

Equal To Factor 3

4.2. VOLUME 2, TAB B – PERFORMANCE CAPABILITY AND SMALL BUSINESS UTILIZATION

FACTOR 2

Vol. 2 PERFORMANCE CAPABILITY

Least Important Factor

Vol. 2 Tab A

Specialized Experience

Most Important Subfactor

Vol. 2 Tab B

Past Performance

2nd Most Important subfactor ( less important than Subfactor 1)

Vol. 2 Tab C

Organization/Technical Approach

3rd Most Important Subfactor ( less important than Subfactor 2. Equal to

Subfactors 3 and 4).

Vol. 2 Tab D

Small Business Utilization

4th Most Important Subfactor ( less important than Subfactors 2,and 3)

4.3 VOLUME 3 - PROPOSED CONTRACT DURATION AND SUMMARY SCHEDULE

FACTOR 3

Vol. 3 Tab E

Proposed Contract Duration and Summary

Schedule

Equal to Factor 1

4.4. VOLUME 4 – PRICE AND PRO FORMA INFORMATION

FACTOR 4

Vol. 4

Price (Standard Form 1442, Proposal Data

Sheet And Contract Line Item Schedule)

4th Most Important Factor ( less important than Factor 3)

N/A

Not Rated

Required Pre-Award Information

Not Rated

NOTE: 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from

Offerors SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist

5.0 VOLUME 1– FACTOR 1 – DESIGN TECHNICAL

5.1. GENERAL: The design-technical Factor consists of conceptual level presentation drawings, technical approach narratives and information regarding material and system quality. It must clearly define the proposed scope and quality levels that the design-build team is offering to the Government in enough detail for the Government and the Offeror to mutually understand whether or not the proposal meets or exceeds the minimum Solicitation requirements. Fully developed drawings, details, or specifications are not desired or required. The Offeror shall identify what it considers to be Betterments in its proposal. (See Section 00 73 00, SCR “Proposed Betterments“).

5.2. PRESENTATION EXTERIOR ELEVATION(S) OF THE PRIMARY ELEVATION(S) OF EACH THE

THREE (3) BARRACKS TYPES CLEARLY NOTING PROPOSED MATERIALS

5.2.1.1 Presentation Drawings

(a) At least one (1) Exterior Perspective Rendering (may be CADD rendering) for each barrack type included in the contract with enough detail to aid in the evaluation of the exterior building aesthetics. Rendering should be at least 11" x 17" in order to show a detailed perspective view of the building

(b) Typical building or wall sections with appropriate details for each barracks type to depict full building height.

Show cross section of exterior wall, including new connections at top for EIFS and connections at doors and windows. Provide a detail for addressing the brick and EIFS intersection at the ground level.

(c) Schematic floor plans for the first floor of each barracks type.

(d) Show new three-story stair enclosure and atrium concepts with details for air and vapor barriers.

5.3. MECHANICAL EQUIPMENT AND PRODUCTS

5.3.1.1 Product Data

(a) Provide chiller product data and efficiency for frequency drive chillers capable of variable evaporator/condenser water flow. capacity turndown of 10:1, full load kw/ton of less than 0.50, IPLV kw/ton of less than 0.4. Velocity is 5 fps maximum.

(b) Provide boiler selection and an efficiency rating for the base bid and bid option.

(c) Provide product data for Dedicated Outside Air System(DOAS) with 14.0 SEER DX coil (3.52 COP) with reheat from compressor and condenser heat.

(d) Provide selection of piping material for interior plumbing and HVAC piping.

(e) Provide selection of piping materials for chilled water and heating water underground distribution system.

(f) Provide the proposed concept narrative for decentralized heating, as described in Section 01 10 00.

5.4. CMU REPAIR

5.4.1.1 Repair Methods

The offeror shall be aware of possible CMU damage in the barracks based on the requirements of the statement of work and shall have a planned approach to repairing such possibilities.

(a) Provide narrative describing the methods and details for evaluating the existing CMU walls and describe proposed methods for repairing damaged CMU wall sections.

5.5. SITE DESIGN

5.5.1.1. Technical Approach Narrative:

Provide technical approach narrative, both qualitative and quantitative, defining the elements described below. Preface the narratives with a design concepts narrative where applicable, providing the design rationale and basis of the proposal. It is acceptable to include all the sub-items shown below into a single combined narrative for the entire project. It is the responsibility of the offeror to ensure that all aspects identified in the evaluation criteria below are addressed. Whether individual narratives or a single combined narrative is provided, the maximum total length for narratives shall be eight (8) typewritten pages.

(a) Task A - Grading and Erosion Control Modifications around Buildings 2272, 2277, 1948, 1268, and 2044

(b) Task B - Grading and Erosion Control Modifications around Buildings 1052, 1053, 1054, 1152, 1154, 1156, 1344, 1346, 1348, 1566, 1567, 1568, 1634, 1945, 2274 and 2387.

(c) Task C – Storm Drainage Analysis – 1000-1300, 1500-1600, 1900-2000, and 2200-2300 Blocks.

(d) Task D – Storm Drainage Design – 1000-1300, 1500-1600, 1900-2000, and 2200-2300 Blocks.

(e) Task E – Construction of New Storm Drainage – 1000-1300, 1500-1600, 1900-2000, and 2200-2300 Blocks.

(f) Task F - Grading and Erosion Control Modifications around Buildings 1150, 1172, 1628, 1631, 1635, 1941, 1945, 1950, 2043, 2271, 2274, 2278, 2279, and, 2386.

(g) Task G (Option) – Anti-terrorism / Force Protection Parking Modifications

(h) Task H (Option) – Milling / Overlaying / Asphaltic Surface Treatment of Existing Parking Lots

5.6. SUSTAINABILITY REQUIREMENT

5.6.1. Submission Requirements:

The Offeror shall acknowledge that it understands the contract requirements for sustainable design and construction and that the final project will achieve a LEED Silver rating. The Offeror shall submit LEED-NC v 2.2 Registered Project

Checklist demonstrating how it will achieve the Silver LEED rating. Project Checklist for each non-exempt barracks and

CEPs demonstrating how it will achieve the Silver LEED rating. One checklist may be provided for multiple identical facilities. If the offeror proposes a higher LEED rating than silver, the proposal shall describe whether or not it involves additional costs and clearly indicate if such costs would detract from higher rated factors herein, such as functionality, quality of materials and systems, site work, etc.

5.7 EVALUATION CRITERIA:

5.71. General: It is the Army’s objective with this renovation project that these buildings will have a 20-year useful design life before a additional reuse/repurpose or renovation requirement, to include normal sustainment, restoration, and modernization activities. Within that overriding theme the Government will evaluate the Offeror’s selected systems and components proposed in terms of maintenance considerations (frequency, estimated cost, access, equipment locations), operability (ease of use, placement of control features, simplicity), durability (withstand troop usage, ease of cleaning), sustainability, and energy consumption (HVAC, lighting, power). The minimum acceptable level of quality for exterior finish materials for these buildings are those materials suitable for the expected population and usage. Residential or similar exterior grade finishes and materials are not acceptable for inclusion in these buildings.

5.7.2. The Government will evaluate the drawings submitted to ensure the Offeror has considered all technical requirements, to include whether the type of EFIS system proposed is appropriate for the conditions and environment at

Ft. Polk, that the sealants used are appropriate for maintaining a dry envelope of the building.

5.7.3. The Government will evaluate the Offeror’s proposed mechanical equipment to determine the most efficient system used for the conditions for Ft. Polk. More emphasis will be placed on those Offerors who propose equipment that is easy to maintain and have a history of being durable and reliable equipment.

5.7.4. The Government will evaluate the Offeror’s plan to correct the deteriorated CMU to include how well the Offeror is able to complete the repairs with the least amount of disruption to other trades and the most efficient use of materials.

5.7.5 The site design proposal shall be evaluated based on the overall compliance of the requirements set forth in the

Statement of Work. The Government will ensure that the proposal is complete, realistic and takes into consideration all requirements set forth in the Statement of Work. Failure to comply with the requirements will result in an Unacceptable rating.

5.7.6. All requirements identified as mandatory in Section 01 10 00 or elsewhere in the Solicitation must be included and the proposal must meet the requirements of the LEED-NC v 2.2 requirements for a Silver rating. The Government will provide additional evaluation consideration for proposals which include LEED points identified as preferred. The

Government does not desire to pay more to obtain a higher LEED rating, such as Gold, if the additional cost would detract from the higher rated factors, herein.

6.0 VOLUME 2 –FACTOR 2 – PERFORMANCE CAPABILITY

6.1. TAB A – SPECIALIZED EXPERIENCE

6.1.1. Submission Requirements:

6.1.1.1. The offeror shall select the design firm(s) and key subcontractors for electrical and mechanical installation, (or prime contractor if design and/or electrical and mechanical work is to be self-performed). Also identify general mechanical subcontractors, and describe the extent of their involvement in the project The prime contractor and the design firm(s) (or prime contract if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects, Construction – Specialized Experience Form (Attachment 3), Designer – Specialized Experience Form

(Attachment 4), and Key Subcontractor – Specialized Experience Form (Attachment 5) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. Submit projects selected from those discussed in the experience narrative that are currently well underway

(designed and at least 50% construction progress completed) or completed and turned over no longer that five (5) years preceding the date of this Solicitation. If any firm has multiple functions or divisions, limit the project examples to those preformed by the division or unit submitting the offer or by the team member. Design firms may list prime contractors they have worked for or government, private or commercial customers. The offeror shall select the design firm(s). If projects were design-build, so identify them. The prime contractor and the design firm(s) shall each submit no more than five (5) projects that represent barracks and central energy plant rehabilitation The projects presented shall also state the mechanical designer and mechanical subcontractor.

6.1.1.2. The offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the

Government will benefit. The following information may be considered.

6.1.1.3. The offeror should describe any previous teaming experience between current team members, if not described in the project list. Describe Team members’ experience on LEED projects, if not included on the project list. Offeror may describe design-build experience on other type projects. The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past five years preceding the date of this solicitation.

6.1.2. Evaluation Criteria:

6.1.2.1. The Government will evaluate the extent of recent, related experience of the prime contractor, design firm(s) and key subcontractors in design, construction or design-build, as relevant to their role on this project. If the design will be accomplished in-house, rather than by subcontract, then the design element of specialized experience will still be evaluated, realizing that the work is being done in-house. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-

Federal Government project experience. (Note: After award, the Section 00 73 00 Special Contract Requirement Key

Personnel, Subcontractors and Outside Consultants will apply to the selection, which establishes the minimum quality standard. No substitution will be allowed without adequate reason and possible consideration to the Government.)

6.1.2.2. The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the barrack types (which may include similar state or local government or private counterparts) included in this contract. Recent experience includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP for design or construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.

6.1.2.3. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System

(CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.

6.1.2.4. To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.

6.1.2.5. The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:

(1) Number, size, type work, complexity, location

(2) Dates (well under way or completed no more than 5 years preceding date of Solicitation)

(3) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience)

6.1.2.6. Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous D-B experience a strength, even if the experience is on different type projects than this project. Similarly, the

Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project. The more relevant the experience, the more credit will be given.

6.1.2.7. The firm(s) preparing the design must demonstrate qualifications and experience in sustainable design and development and design, based on project experience on projects that have achieved US Green Building Council’s LEED certification or project experience on completed Corps of engineers design-build projects that were validated as having achieving LEED silver rating or were certifiable at LEED silver or better for an acceptable rating. Additional consideration will be given if both the constructor and the design firm(s) demonstrate qualifications and experience on

LEED.

6.2. TAB B – PAST PERFORMANCE

6.2.1. Submission Requirements:

6.2.1.1. Past performance refers to the quality of recent project experience from the owner's perspective. The Offeror and its design firm(s) (or prime contractor if design is to be self-performed) shall provide customer reference name(s), company affiliation and current phone numbers on the specific project experience sheets in TAB B. The Government will use the specific project experience sheets submitted for specialized experience in Tab B that were completed or well underway (as defined above) within five (5) years preceding the date of the solicitation. (No separate submittal for past performance for those projects, here). Include the performance rating by the owner on the form, if the Offeror was rated.

Additional past performance examples may be submitted for consideration on any member of a Teaming Arrangement that will perform a major or critical aspect of the project. Projects cited shall be currently well underway (fully designed and at least 50% construction progress completed) or construction substantially completed within 5 years preceding the date of this solicitation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government may contact and interview the points of contact and reserves the right to interview other individuals acting for the listed reference, if the listed reference is not available. See the Interview form at the end of this Section (attachment 4). The team members may also briefly provide information on problems encountered on identified contracts and the team member’s corrective action.

6.2.2. Evaluation Criteria:

6.2.2.1. The Government will perform a risk assessment, considering the degree of success of the D-B team's recent (well under way or turned over no longer than five (5) years preceding the date of this solicitation), relevant experience. See explanation of “well underway” and relevancy under the Factor “Specialized Experience”. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance.