PWS_Yellow_Ribbon_Event.docx
DOCX document 26 KB Posted
- Solicitation number
- W9124X19Q0009
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_W9124X-19-Q-0009.pdf | ||
| WDOL_Wage_Determination_2015-5593_Rev_10_Clark_County_NV.pdf | ||
| Pricing_Sheet_-_Yellow_Ribbon_Event_13_July_Las_Vegas.docx | DOCX document | |
| SOR_Yellow_Ribbon_Event.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS) FOR
Yellow Ribbon Event, Las Vegas
PART I: GENERAL INFORMATION
1. Introduction The Nevada National Guard has a requirement for a conference room facility at which to hold a Yellow Ribbon Event, on Saturday, 13 July 2019. The facility will accommodate a dining and training space for approximately 90 Nevada National Guard Service Members, Spouse/Significant Other, and their dependent children and youth, ages 0-18.
1.1 Scope
The contractor shall provide space, breakfast buffet, lunch buffet, tables and chairs, A/V support equipment, restrooms, and parking necessary to meet criteria defined in this Performance Work Statement (PWS) to hold a Yellow Ribbon Event.
1.2 Background
Authorized by the National Defense Authorization Act of 2008, the Department of Defense (DoD) Yellow Ribbon Reintegration Program (YRRP) will provide National Guard and Reserve Members and their Families with information, services, referral and proactive outreach opportunities throughout the entire deployment cycle: Pre-Deployment, Deployment, Demobilization and Post-Deployment-Reconstitution. It is the intent of the National Guard Bureau to establish a DoD YRRP that provides a continuum of support and high standard of care for the Army and Air National Guard members and their Families.
1.3 Period of Performance (PoP)
The Yellow Ribbon Event shall take place on the day of Saturday, 13 July 2019.
1.4 Place of Performance
Performance shall be at a conference room facility in the greater Las Vegas area within 6 miles of McCarran International Airport.
1.5 Hours of Operation
The contractor shall provide a ballroom/training space from approximately 7:00 am to 6:00 pm Pacific Standard Time on Saturday, 13 July 2019.
PART II: GENERAL REQUIREMENTS
2. This section describes general requirements for the 2019 Yellow Ribbon Pre-30 Day Event, Las Vegas.
2.1 The Contractor shall ensure compliance of the following during the event:
2.1.1 Contractor employees shall either carry proper identification or wear clothing with venue logo which identifies them as staff for the venue at all times during Event.
2.1.2 All contractor food service employees must have the required training and food handler’s permits in accordance with location regulations, on file and available for review during the event.
2.1.3 Contractor shall have clear standard emergency evacuation notices posted in all conference rooms.
2.1.4 Contractor shall provide a facility site map/layout that includes floor plans of conference room(s).
2.1.5 Contractor shall provide access to facility for support staff during the week prior to the event for a walk through. This will be to plan/coordinate outside resources (pop-up tables, extension cords, etc.) that the support staff plans to bring.
PART III: PERFORMANCE REQUIREMENTS
3. Specific Tasks and Work Requirements The contractor shall perform the following tasks to deliver the required services. The contractor shall meet these specifications to demonstrate its technical, operational, and administrative expertise in support of the Nevada National Guard Yellow Ribbon Reintegration Program objectives.
3.1 Event Setting
3.1.1 Contractor shall provide conference space that is conducive to safety and learning.
3.1.2 Location shall be in the greater Las Vegas area within 6 miles of McCarran International Airport.
3.1.3 Onsite parking for all Event attendees and support staff, shall be provided.
3.1.4 Location shall be in close proximity of a hospital or emergency room.
3.1.5 The contractor shall provide all conference/training area locations. All costs or fees required to access conference/training locations shall be included in the offered pricing.
3.1.6 A deposit for the conference room and meals cannot be required.
3.2 Conference/Meeting Services
These requirements are for the duration of the Event.
3.2.1 One (1) main conference room to accommodate 90 guests.
3.2.2 Two (2) conference (breakout) rooms to accommodate 25 guests.
3.2.3 One (1) conference room to accommodate child care services for 25 children/ staff.
3.2.4 Each conference room space large enough for personnel to move around freely from the tables and chairs.
3.2.5 Set-up rounds or rectangle tables with chairs of 8-10 per table for each conference room.
3.2.6 A/V Equipment
3.2.6.1 Three (3) conference rooms equipped with podium, mic, projector and screen
3.2.6.2 Speakers for main conference room
3.2.6.3 One (1) 25 ft extension cord
3.2.6.4 One (1) grounded power strip
3.2.7 The contractor shall provide beverage service to the conference space, to include ice water, throughout the event.
3.3 Meals
The Contractor with NVARNG cannot charge an explicit or implicit Food and Beverage Minimum charge for the event.
3.3.1 A breakfast buffet and lunch buffet shall be provided by the contractor.
3.3.2 Breakfast buffet to include: Full breakfast offering eggs; multiple meat selections; pancakes, waffles or biscuits; fruit selections; cereal; selection of beverages to include coffee, tea, hot and iced water, juice, milk, etc.
3.3.2 Lunch buffet to include: choice of 3 main entrée selections; 2 side dishes (potato or rice and vegetable), choice of salads with selection of dressings and condiments; breads; selection of beverages to include coffee, tea, hot and iced water, juice, etc.
3.3.3 Meal options must be available for vegan, gluten and dairy-free.
3.3.4 Contractor shall ensure that there is enough food for 90 guests, which includes adults, children, and youth
3.3.5 All standard serving dishes, plates/glasses, utensils and linens provided.
3.3.6 Beverages. Beverage service will be available during the use of the Event.
3.4 Room Block
3.4.1 15 rooms will be made available for guests to reserve lodging at a special rate for the event.
3.4.2 Night of stay will be Friday, 12 July 2019.
PART IV: SPECIAL REQUIREMENTS
4. This section describes general requirements for the 2019 Yellow Ribbon Pre-30 Day Event, Las Vegas.
4.1. Food Handlers Permit. At a minimum, all food servers and kitchen staff must possess and maintain a current food handler’s permit, in accordance with their local regulations. Copies of these permits must be onsite and available for review during the duration of the Event.
4.2 Food Service License. At a minimum, the contractor will hold and maintain a valid food service license, in accordance with their local regulations. Copies of these licenses must be onsite and available for review during the duration of the Event.
4.3 Business license. At a minimum, the contractor will hold and maintain a valid business and operator’s license, in accordance with their local regulations. A copy of this license/s must be onsite and available for review during the duration of the Event.
4.4 Compliance. The contractor shall comply with all federal, state and local laws, codes and regulations applicable to his/her performance under this contract and shall be solely responsible for all costs associated with said compliance. Any and all licenses associated with the Contractor and the location must be available for the duration of the event and provided upon request of the SFPD/COR.
4.5 Location shall be in close proximity of a hospital or emergency room.
4.6 Meal Rates. The rate shall be tax exempt.
PART V: SAFETY AND SECURITY
5. This section describes the security and safety for the Yellow Ribbon Event. The following sub-section provide details of various considerations for this event.
5.1 Safety
Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the contractor’s safety and health program. The Department of Defense (DOD) participates in the OSHA Voluntary Protection Program (VPP).
PART VI: QUALITY
6. Quality Assurance Surveillance Plan (QASP) The Government shall monitor the Contractor’s performance under this Purchase Order in accordance with the Government’s QASP
PART VI: DELIVERABLES
| Identifier |
| Name |
| Description |
| 1.3 |
| Period of Performance |
| Provide performance dates to coincide with the required date of 13 July 2019 and time of 7:00am-6:00pm. |
| 1.4 |
| Place of Performance |
| Provide google map or similar to show that location is within the greater Las Vegas area. |
| 2.1.1 |
| Staff identification plan |
| Provide information on how contractor’s staff will be readily identified at the Event. |
| 2.1.2 |
| Employee permits |
| All food servers to have a food handler’s permit on file and available for review during Event. |
| 2.1.3 |
| Emergency Evacuation |
procedures All rooms to have Emergency Evacuation Procedures posted.
| 2.1.4 |
| Facility site map |
| Provide a facility site map. |
| 2.1.5 |
| Facility Walkthrough |
| Provide support staff an opportunity to walkthrough and identify the areas to be used. |
| 3.1.2 |
| Location |
| Provide a google map identifying location. |
| 3.1.3 |
| Parking |
| Provide parking for all Event attendees and support staff. |
| 3.2 |
| Meeting room description |
| Provide a site map/floor plan of the proposed conference room, set-up, and dimensions. |
| 3.2.5 |
| A/V Equipment |
| Provide a list of A/V equipment available during the Event. |
| 3.3 |
| Meals |
| Provide a breakfast and lunch buffet menu which indicates substitutions for food allergies and food limitations. |
| 3.4 |
| Room Block |
| Provide availability of rooms for guests to book lodging for the night prior to the event. |
4.1 4.2 4.3 4.4
| Permits and licenses |
| Copies of permits and licenses must be onsite and available for review during the Event. |
| 4.5 |
| Hospital/emergency room |
location Provide a google map of the hotel proximity to a hospital and/or emergency room.
PWS
SUBJECT: Yellow Ribbon Event, Las Vegas 13 July 2019
Appendix 1 Performance Requirements Summary This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Statements |
| Standards / |
Acceptable Quality Levels (AQLs)
| Inspections |
| Ratings |
| 1.3 |
| Period of Performance 13 July 2019 |
AQL: 100%
How: Provided in proposal
Who: COR
| 1.4 |
| Location of venue |
within greater Las Vegas area How: Provided in proposal
| AQL: 100% |
| Who: COR |
| 2.1.1 |
| Staff Identification Plan |
AQL: 100%
How: Provided in proposal
| 2.1.3 |
| Emergency Evacuation Plan |
AQL: 100%
How: Provided in proposal
| 2.1.4 |
| Facility Site Map |
How: Provided in proposal
| 3.1.3 |
| Parking |
How: Inspected by YRRP
Who: CYPC
| 3.2.3 |
| Meeting room site map |
How: Inspected by YRRP
| 3.2.5 |
| A/V Equipment |
How: Inspected by YRRP
| 3.3 |
| Meal Plan with allergy |
and food limitations How: Provided in proposal substitutions
| AQL: 100% |
| Who: COR |
4.1 4.2
| Permits & Licenses |
| How: Inspected by YRRP |
4.3 4.4
| 4.5 |
| Proximity to Hospital or Emergency Room |
AQL: 100%
How: Provided in proposal
File details come from the government source that posted it.