T1_Performance_Requirements_Summary.doc

DOC document 44 KB Posted

Attached to
WSMR Mission Support Services
Solicitation number
W9124Q-16-R-0104
Issued by

About this file

PRS

View the file

Other files

File Type Posted
TE_1_WORKFLOW_DIAGRAM.pdf PDF
TECHNICAL_EXHIBIT_7_Reference_for_Contract_Management_and_Compliance.pdf PDF
TECHNICAL_EXHIBIT_10_CHEMICAL_NAME_AND_SUMMARY_FACT_SHEET.pdf PDF
Draft_Solicitation_W9124Q-16-R-0104_6_January_2017.pdf PDF
TECHNICAL_EXHIBIT_14_TESTFACs.pdf PDF
TE_9B_Courier_Schedule_Stallion.pdf PDF
TECHNICAL_EXHIBIT_2_POTENTIAL_LOCATIONS.pdf PDF
TE_9A_Courier_Schedule_WSMR.pdf PDF
TECHNICAL_EXHIBIT_11_TRAINING_REQUIREMENTS.pdf PDF
TECHNICAL_EXHIBIT_8_GOVERNMENT_FURNISHED_FACILITIES.pdf PDF
WSMR_MSS_Draft_RFP.pdf PDF
T3_GF_Facilities.xlsx XLSX spreadsheet
T12_Projected_Technology_Development_and_Acquisition_Plans.pdf PDF
T7-DD254_MSCC_Continuation_Sheet_(Feb_2014).docx DOCX document
T13_Technical_Exhibit_13_Reference_Documents.docx DOCX document
T11_List_of_Required_Reports.doc DOC document
T2_GFP_1_(NONTDA).xlsx XLSX spreadsheet
T6_Theater_Support.doc DOC document
DRAFT_PWS.doc DOC document
T10_Sample_Reports_and_Documents.doc DOC document
T14_RO_Technical_Exhibits_20150615.pdf PDF
T5_WAO_PROCESS.pdf PDF
T4_GFE(GSA)_VEHICLES.xlsx XLSX spreadsheet
T2_GFE_3_(TDA6A).xlsx XLSX spreadsheet
T2_GFE_2_PROPERTY-TOOLS-EQUIP.xlsx XLSX spreadsheet
T7-DD254_Mission_Support_Services_Contract_Feb_2014.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 1

Performance Requirements Summary

Mission Support Services

Service
PWS Para
Standard
AQL
Method
Program Management
C.5.1
In accordance with proposal, appropriate level of effort is maintained.

Surge requirements are supported.

Security regulations are followed.

Satisfactory safety record.

Environmental regulations are followed.

Property is managed IAW FAR Part 45.

Required Reports are accurate and timely

15%
100 % Inspection

Mission Support

Day of Test

C.5.2
In accordance with the test plan:

Appropriately participated in all planning phases.

Appropriate number of trained/qualified personnel assigned.

Complied with Test Plan and applicable Operational SOPs.

Personnel and equipment available on time.

Provide accurate and timely data.

2.5% of missions supported during the month
100% Inspection

Mission Support Non Day of Test

C.5.2
In accordance with the test plan:

Appropriately participated in all planning phases.

Appropriate number of trained/qualified personnel assigned.

Complied with Test Plan and applicable Operational SOPs.

Personnel and equipment available on time.

2.5% of missions supported during the month

Random Sampling

Service
PWS Para
Standard
AQL
Method
Maintenance Services
C.5.2
Equipment, systems, facilities, etc. are 95% available.

Equipment, systems, facilities, etc are 97% reliable.

Maintenance is performed IAW with applicable SOPs/OEM Manuals.

Cost controls are maintained.

Compliant with Environmental laws and regulations.

4% of sampled areas
Random Sampling
Open WAOs
C.5.2
In accordance with the metrics in the WAO

Proper progress is being made.

WAO is within budget.

Appropriate number of and trained personnel assigned.

Compliant with Environmental laws and regulations.

6.5% of all open WAOs
Random Sampling
Completed WAOs
C.5.2
In accordance with the metrics in the WAO

Completed on time.

Completed within budget.

Achieved desired outcome.

4% of all WAO’s completed within the month
100% Inspection
Reports
C.5.1.3
Based on the requirement in the PWS for each report:

Submitted on time.

Accurate, Concise and complete.

10% of all submitted reports
100% Inspection

File details come from the government source that posted it. Updated .