T1_Performance_Requirements_Summary.doc
DOC document 44 KB Posted
- Attached to
- WSMR Mission Support Services
- Solicitation number
- W9124Q-16-R-0104
About this file
PRS
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 1
Performance Requirements Summary
Mission Support Services
| Service |
| PWS Para |
| Standard |
| AQL |
| Method |
| Program Management |
| C.5.1 |
| In accordance with proposal, appropriate level of effort is maintained. |
Surge requirements are supported.
Security regulations are followed.
Satisfactory safety record.
Environmental regulations are followed.
Property is managed IAW FAR Part 45.
Required Reports are accurate and timely
| 15% |
| 100 % Inspection |
Mission Support
Day of Test
| C.5.2 |
| In accordance with the test plan: |
Appropriately participated in all planning phases.
Appropriate number of trained/qualified personnel assigned.
Complied with Test Plan and applicable Operational SOPs.
Personnel and equipment available on time.
Provide accurate and timely data.
| 2.5% of missions supported during the month |
| 100% Inspection |
Mission Support Non Day of Test
| C.5.2 |
| In accordance with the test plan: |
Appropriately participated in all planning phases.
Appropriate number of trained/qualified personnel assigned.
Complied with Test Plan and applicable Operational SOPs.
Personnel and equipment available on time.
2.5% of missions supported during the month
Random Sampling
| Service |
| PWS Para |
| Standard |
| AQL |
| Method |
| Maintenance Services |
| C.5.2 |
| Equipment, systems, facilities, etc. are 95% available. |
Equipment, systems, facilities, etc are 97% reliable.
Maintenance is performed IAW with applicable SOPs/OEM Manuals.
Cost controls are maintained.
Compliant with Environmental laws and regulations.
| 4% of sampled areas |
| Random Sampling |
| Open WAOs |
| C.5.2 |
| In accordance with the metrics in the WAO |
Proper progress is being made.
WAO is within budget.
Appropriate number of and trained personnel assigned.
Compliant with Environmental laws and regulations.
| 6.5% of all open WAOs |
| Random Sampling |
| Completed WAOs |
| C.5.2 |
| In accordance with the metrics in the WAO |
Completed on time.
Completed within budget.
Achieved desired outcome.
| 4% of all WAO’s completed within the month |
| 100% Inspection |
| Reports |
| C.5.1.3 |
| Based on the requirement in the PWS for each report: |
Submitted on time.
Accurate, Concise and complete.
| 10% of all submitted reports |
| 100% Inspection |
File details come from the government source that posted it. Updated .