This document is a Solicitation for a Railroad Maintenance and Repair contract issued by the Department of the Army Materiel Command Mission and Installation Contracting Command.

The contract is for railroad maintenance and repair services at Fort Stewart and Hunter Army Airfield in Georgia. The contract has a base period of 1 year and four 1-year option periods. The work includes on-call maintenance and repair, emergency repairs, and other miscellaneous services to maintain the railroad system to FRA Class 2 standards. The contractor must provide all labor, materials, equipment, and supervision required. The contract is a firm-fixed-price type and is set aside for 100% 8(a) small businesses. The solicitation due date is November 4, 2024. The government estimates the contract value to be greater than $10 million. No site visit will be held.

View the file

Other files for this federal contract opportunity

Other files attached to Railroad Maintenance and Repair, newest first.
File Type Posted
Abstract of ALL offers - W9124M24B0005 (correction).xlsx XLSX spreadsheet
Abstract of ALL offers - W9124M24B0005.xlsx XLSX spreadsheet
Amendment W9124M24B0005-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0012106396

Title: Railroad and Maintenance Repair

Project location: Fort Stew art and Hunter Army Airf ield, GA

Set aside: 100% 8(a)

Guarantee minimun: $25,000

NAICS: 237990 Other Heavy and Civil Engineering Construction

Size Standard: $45M

Magnitude of construction project betw een: more than $10,000,000 quantities set f or th in the Bid Price Schedule are estimated. All w ork shall be completed per Scope of Work , Terms, Conditions, Provisions, Clauses, and Specifications.

No site visit w ill be held.

Due dates f or all questions: 9 October 2024 BONDS: Bid Bond, Payment Bond, and Performance Bond shall be required.

X

CHRISTINA A. WEBB 9127675467

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Sep-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. ( Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442- 101 STANDARD FORM 1442 (REV. 4-85)

Presc ribed by GSA

FAR (48 CFR) 53.236-1( e)

11. The Contractor shall begin perf ormance w ithin _______30 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This per formance per iod is X mandatory, negotiable. (See _________________________task orders

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to per form the w ork required are due at the place specified in Item 8 by ___________ local time ______________04 Nov 2024 (date). If this is a sealed bid solicitation, of fers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in f ull text or by reference.

D. Off ers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MIC C - FORT STEWART

976 WILLI AM H. WI LSON AVE SUITE 100

FORT STEW ART GA 31314

W9124M

PAGE OF PAGES

1 OF

CODE

(Ti tle, identi fying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (912)767-8420 TEL: FAX:

W9124M24B0005 73

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to per form the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this off er is accepted by the Government in w riting w ithin ________ calendar days after the date off ers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required perf ormance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The of feror acknowledges receipt of amendments to the solicit ation -- give number and dat e of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or pr int)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherw ise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. ( Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Cont ractor is not required to sign this document. ) document and return _______ copies t o issuing office.) Cont ractor agrees Y our of f er on t his solicit ation, is hereby accept ed as t o t he items listed. This award con-t o f urnish and deliv er all item s or perf orm all work, requisitions identif ied sum mates the contract , which consists of (a) the Gov ernm ent solicit ation and on this f orm and any continuation sheet s f or t he consideration st ated in this y our of f er , and (b) this cont ract award. No f urther contractual document is cont ract. The rights and obligat ions of t he parties to this cont ract shall be necessary.

gov erned by (a) t his contract award, (b) t he solicitat ion, and (c) the clauses, representat ions, cer tif icat ions, and specif ications or incorporated by ref er-ence in or at tached to t his contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section B - Supplies or Services and Prices

BID PRICE SCHEDULE

Base Option Period-Price Schedule

Item Description Quantity Unit of Issue/

Measure

Unit/ Price

Total Price

0001 F Ballast 600 Nton

0002 R&I Grade existing ballast and stockpile excess for future use

4,000 TF

0003 M& R

Tamping the track to line surface Complete

2,000 TF

0004 M& R

Clean RR Crossing flanges 3,300 TF

0005 F,R &I

Composite track cross tie, Bulk quanty order, 180 ties per Unit (=1,620 Lf) min.

20 Bulk

0006 F,R &I

Composite track cross tie 60 EA

0007 F,R &I

Composite track switch ties, Bulk quantity order, 1,620 Lf per Unit min.

6 Bulk

0008 F,R &I

Wood Headblock Tie, 14' 20 EA

0009 F,R &I

Crossing Flanges Complete 600 LF

0010 F,R &I

Rail (115#) Complete 50 LF

0011 F,R &I

Double Clamp Gage Rod 3 EA

0012 F,R &I

Frog (#8 or #10) Manganese Complete 1 EA

0013 F,R &I

Insulated Joint Complete 2 EA

0014 F,R &I

Joint bars 4 EA

0015 F,R &I

Rail Anchors Complete 300 EA

0016 F,R &I

Rail Braces with Plate Complete 6 EA

0017 F Railroad track material, spikes 1,000 EA

0018 F Railroad track material, tie plates 20 EA

0019 F Railroad track material, track bolts 150 EA

0020 F,R &I

Ramp Bumpers Spring Type Complete 1 EA

0021 F,R &I

Switch point 1 EA

0022 F,R &I

Switch point Clips 2 EA

0023 F,R &I

Swich Point Guards Complete 1 EA

0024 F,R &I

Switch Rods (48.0 Inches) 1 EA

0025 F,R &I

Switch Rods (80.5 Inches) 1 EA

0026 F,R &I

Switch Stand Levers, latches 1 EA

0027 F,R &I

Switch Stand Model 51A Complete 1 EA

0028 F,R &I

Target Flag Post Model 51A Complete 1 EA

0029 F,R &I

Target Flags (Pair) Model 51A Complete 1 Pair

0030 M& R

Drill rail for repair 2 EA

0031 M& R

Perform rail welding Complete 2 EA

0032 M& R

Rail Cropping Complete 2 EA

0033 F,R &I

Rebond Joints /Furnish and install rail bond wire Complete

15 EA

0034 M& R

Regage Railroad Tracks /Keeping curves true and with their proper super elevation Complete

1,000 TF

0035 F,R &I

Remove & reinstall track Section Complete

400 TF

0036 F,R &I

Remove and Reinstall Wheel Stops at the end of tracks Complete

2 SET

0037 M& R

Resurface and realign existing track/ Complete with ballast

16,000 TF

0038 F,R &I

Tightening and Respiking Complete 3,000 TF

0039 M& R

Adjust Rail gaps 20 EA

0040 M& R

Switch & Misc Turnout Adjustment /Lubricating, adjusting

10 EA

and repairing Complete

0041 M& R

Tighten Joint Bolts 1,000 TF

0042 Rerail Derailed Locomotive/No apparent damage to track or Locomotive

2 EA

0043 Rerail Derailed Railcar/No apparent damage to track or railcar

2 EA

0044 Emergency Callout for other than Derailments, Turnout adj (etc.)

4 EA

0045 Other unforeseen Miscellaneous Repairs and/or Inspections required to maintain FRA compliance and safe rail operations.

1 EA

Total Price for bid items 0001-0045

Option Year 1-Price Schedule

Item Description Quantity Unit of Issue/

Measure

Unit/ Price

Total Price

1001 F Ballast 600 Nton

1002 R&I Grade existing ballast and stockpile excess for future use

4,000 TF

1003 M& R

Tamping the track to line surface Complete

2,000 TF

1004 M& R

Clean RR Crossing flanges 3,300 TF

1005 F,R &I

Composite track cross tie, Bulk quanty order, 180 ties per Unit (=1,620 Lf) min.

20 Bulk

1006 F,R &I

Composite track cross tie 60 EA

1007 F,R &I

Composite track switch ties, Bulk quantity order, 1,620 Lf per Unit min.

6 Bulk

1008 F,R &I

Wood Headblock Tie, 14' 20 EA

1009 F,R &I

Crossing Flanges Complete 600 LF

1010 F,R &I

Rail (115#) Complete 50 LF

1011 F,R &I

Double Clamp Gage Rod 3 EA

1012 F,R

Frog (#8 or #10) Manganese Complete 1 EA

1013 F,R &I

Insulated Joint Complete 2 EA

1014 F,R &I

Joint bars 4 EA

1015 F,R &I

Rail Anchors Complete 300 EA

1016 F,R &I

Rail Braces with Plate Complete 6 EA

1017 F Railroad track material, spikes 1,000 EA

1018 F Railroad track material, tie plates 20 EA

1019 F Railroad track material, track bolts 150 EA

1020 F,R &I

Ramp Bumpers Spring Type Complete 1 EA

1021 F,R &I

Switch point 1 EA

1022 F,R &I

Switch point Clips 2 EA

1023 F,R &I

Swich Point Guards Complete 1 EA

1024 F,R &I

Switch Rods (48.0 Inches) 1 EA

1025 F,R &I

Switch Rods (80.5 Inches) 1 EA

1026 F,R &I

Switch Stand Levers, latches 1 EA

1027 F,R &I

Switch Stand Model 51A Complete 1 EA

1028 F,R &I

Target Flag Post Model 51A Complete 1 EA

1029 F,R &I

Target Flags (Pair) Model 51A Complete 1 Pair

1030 M& R

Drill rail for repair 2 EA

1031 M& R

Perform rail welding Complete 2 EA

1032 M& R

Rail Cropping Complete 2 EA

1033 F,R &I

Rebond Joints /Furnish and install rail bond wire Complete

15 EA

1034 M& R

Regage Railroad Tracks /Keeping curves true and with their proper super elevation Complete

1,000 TF

1035 F,R &I

Remove & reinstall track Section Complete

400 TF

1036 F,R &I

Remove and Reinstall Wheel Stops at the end of tracks Complete

2 SET

1037 M& R

Resurface and realign existing track/ Complete with ballast

16,000 TF

1038 F,R &I

Tightening and Respiking Complete 3,000 TF

1039 M& R

Adjust Rail gaps 20 EA

1040 M& R

Switch & Misc Turnout Adjustment /Lubricating, adjusting and repairing Complete

10 EA

1014 M& R

Tighten Joint Bolts 1,000 TF

1042 Rerail Derailed Locomotive/No apparent damage to track or Locomotive

2 EA

1043 Rerail Derailed Railcar/No apparent damage to track or railcar

2 EA

1044 Emergency Callout for other than Derailments, Turnout adj (etc.)

4 EA

1045 Other unforeseen Miscellaneous Repairs and/or Inspections required to maintain FRA compliance and safe rail operations.

Total Price for bid items 1001-1045

Option Year 2-Price Schedule

Issue/

Measure

Unit/ Price

Total Price

2001 F Ballast 600 Nton

2002 R&I Grade existing ballast and stockpile excess for future use

4,000 TF

2003 M& R

Tamping the track to line surface Complete

2,000 TF

2004 M&

Clean RR Crossing flanges 3,300 TF

2005 F,R

Composite track cross tie, Bulk quanty order, 180 ties per Unit (=1,620 Lf) min.

20 Bulk

2006 F,R &I

Composite track cross tie 60 EA

2007 F,R &I

Composite track switch ties, Bulk quantity order, 1,620 Lf per Unit min.

6 Bulk

2008 F,R &I

Wood Headblock Tie, 14' 20 EA

2009 F,R &I

Crossing Flanges Complete 600 LF

2010 F,R &I

Rail (115#) Complete 50 LF

2011 F,R &I

Double Clamp Gage Rod 3 EA

2012 F,R &I

Frog (#8 or #10) Manganese Complete 1 EA

2013 F,R &I

Insulated Joint Complete 2 EA

2014 F,R &I

Joint bars 4 EA

2015 F,R &I

Rail Anchors Complete 300 EA

2016 F,R &I

Rail Braces with Plate Complete 6 EA

2017 F Railroad track material, spikes 1,000 EA

2018 F Railroad track material, tie plates 20 EA

2019 F Railroad track material, track bolts 150 EA

2020 F,R &I

Ramp Bumpers Spring Type Complete 1 EA

2021 F,R &I

Switch point 1 EA

2022 F,R &I

Switch point Clips 2 EA

2023 F,R &I

Swich Point Guards Complete 1 EA

2024 F,R &I

Switch Rods (48.0 Inches) 1 EA

2025 F,R &I

Switch Rods (80.5 Inches) 1 EA

2026 F,R

Switch Stand Levers, latches 1 EA

2027 F,R

Switch Stand Model 51A Complete 1 EA

2028 F,R &I

Target Flag Post Model 51A Complete 1 EA

2029 F,R &I

Target Flags (Pair) Model 51A Complete 1 Pair

2030 M& R

Drill rail for repair 2 EA

2031 M& R

Perform rail welding Complete 2 EA

2032 M& R

Rail Cropping Complete 2 EA

2033 F,R &I

Rebond Joints /Furnish and install rail bond wire Complete

15 EA

2034 M& R

Regage Railroad Tracks /Keeping curves true and with their proper super elevation Complete

1,000 TF

2035 F,R &I

Remove & reinstall track Section Complete

400 TF

2036 F,R &I

Remove and Reinstall Wheel Stops at the end of tracks Complete

2 SET

2037 M& R

Resurface and realign existing track/ Complete with ballast

16,000 TF

2038 F,R &I

Tightening and Respiking Complete 3,000 TF

2039 M& R

Adjust Rail gaps 20 EA

2040 M& R

Switch & Misc Turnout Adjustment /Lubricating, adjusting and repairing Complete

10 EA

2041 M& R

Tighten Joint Bolts 1,000 TF

2042 Rerail Derailed Locomotive/No apparent damage to track or Locomotive

2 EA

2043 Rerail Derailed Railcar/No apparent damage to track or railcar

2 EA

2044 Emergency Callout for other than Derailments, Turnout adj (etc.)

4 EA

2045 Other unforeseen Miscellaneous Repairs and/or Inspections required to maintain FRA compliance and safe rail operations.

Total Price for bid items 2001-2045

Option Year 3-Price Schedule

Issue/

Measure

Unit/ Price

Total Price

3001 F Ballast 600 Nton

3002 R&I Grade existing ballast and stockpile excess for future use

4,000 TF

3003 M& R

Tamping the track to line surface Complete

2,000 TF

3004 M& R

Clean RR Crossing flanges 3,300 TF

3004 F,R &I

Composite track cross tie, Bulk quanty order, 180 ties per Unit (=1,620 Lf) min.

20 Bulk

3006 F,R &I

Composite track cross tie 60 EA

3007 F,R &I

Composite track switch ties, Bulk quantity order, 1,620 Lf per Unit min.

6 Bulk

3008 F,R &I

Wood Headblock Tie, 14' 20 EA

3009 F,R &I

Crossing Flanges Complete 600 LF

3010 F,R &I

Rail (115#) Complete 50 LF

3011 F,R &I

Double Clamp Gage Rod 3 EA

3012 F,R &I

Frog (#8 or #10) Manganese Complete 1 EA

3013 F,R &I

Insulated Joint Complete 2 EA

3014 F,R &I

Joint bars 4 EA

3015 F,R &I

Rail Anchors Complete 300 EA

3016 F,R &I

Rail Braces with Plate Complete 6 EA

3017 F Railroad track material, spikes 1,000 EA

3018 F Railroad track material, tie plates 20 EA

3019 F Railroad track material, track bolts 150 EA

3020 F,R

Ramp Bumpers Spring Type Complete 1 EA

3021 F,R &I

Switch point 1 EA

3022 F,R &I

Switch point Clips 2 EA

3023 F,R &I

Swich Point Guards Complete 1 EA

3024 F,R &I

Switch Rods (48.0 Inches) 1 EA

3025 F,R &I

Switch Rods (80.5 Inches) 1 EA

3026 F,R &I

Switch Stand Levers, latches 1 EA

3027 F,R &I

Switch Stand Model 51A Complete 1 EA

3028 F,R &I

Target Flag Post Model 51A Complete 1 EA

3029 F,R &I

Target Flags (Pair) Model 51A Complete 1 Pair

3030 M& R

Drill rail for repair 2 EA

3031 M& R

Perform rail welding Complete 2 EA

3032 M& R

Rail Cropping Complete 2 EA

3033 F,R &I

Rebond Joints /Furnish and install rail bond wire Complete

15 EA

3034 M& R

Regage Railroad Tracks /Keeping curves true and with their proper super elevation Complete

1,000 TF

3035 F,R &I

Remove & reinstall track Section Complete

400 TF

3036 F,R &I

Remove and Reinstall Wheel Stops at the end of tracks Complete

2 SET

3037 M& R

Resurface and realign existing track/ Complete with ballast

16,000 TF

3038 F,R &I

Tightening and Respiking Complete 3,000 TF

3039 M& R

Adjust Rail gaps 20 EA

3040 M& R

Switch & Misc Turnout Adjustment /Lubricating, adjusting and repairing Complete

10 EA

3041 M&

Tighten Joint Bolts 1,000 TF

3042 Rerail Derailed Locomotive/No apparent damage to track or Locomotive

2 EA

3043 Rerail Derailed Railcar/No apparent

3044 Emergency Callout for other than Derailments, Turnout adj (etc.)

4 EA

3045 Other unforeseen Miscellaneous Repairs and/or Inspections required to maintain FRA compliance and safe rail operations.

Total Price for bid items 3001-3045

Option Year 4-Price Schedule

Issue/

Measure

Unit/ Price

Total Price

4001 F Ballast 600 Nton

4002 R&I Grade existing ballast and stockpile excess for future use

4,000 TF

4003 M& R

Tamping the track to line surface Complete

2,000 TF

4005 M& R

Clean RR Crossing flanges 3,300 TF

4005 F,R &I

Composite track cross tie, Bulk quanty order, 180 ties per Unit (=1,620 Lf) min.

20 Bulk

4006 F,R &I

Composite track cross tie 60 EA

4007 F,R &I

Composite track switch ties, Bulk quantity order, 1,620 Lf per Unit min.

6 Bulk

4008 F,R &I

Wood Headblock Tie, 14' 20 EA

4009 F,R &I

Crossing Flanges Complete 600 LF

4010 F,R &I

Rail (115#) Complete 50 LF

4011 F,R

Double Clamp Gage Rod 3 EA

4012 F,R

Frog (#8 or #10) Manganese Complete 1 EA

4013 F,R &I

Insulated Joint Complete 2 EA

4014 F,R &I

Joint bars 4 EA

4015 F,R &I

Rail Anchors Complete 300 EA

4016 F,R &I

Rail Braces with Plate Complete 6 EA

4017 F Railroad track material, spikes 1,000 EA

4018 F Railroad track material, tie plates 20 EA

4019 F Railroad track material, track bolts 150 EA

4020 F,R &I

Ramp Bumpers Spring Type Complete 1 EA

4021 F,R &I

Switch point 1 EA

4022 F,R &I

Switch point Clips 2 EA

4023 F,R &I

Swich Point Guards Complete 1 EA

4024 F,R &I

Switch Rods (48.0 Inches) 1 EA

4025 F,R &I

Switch Rods (80.5 Inches) 1 EA

4026 F,R &I

Switch Stand Levers, latches 1 EA

4027 F,R &I

Switch Stand Model 51A Complete 1 EA

4028 F,R &I

Target Flag Post Model 51A Complete 1 EA

4029 F,R &I

Target Flags (Pair) Model 51A Complete 1 Pair

4030 M& R

Drill rail for repair 2 EA

4031 M&

Perform rail welding Complete 2 EA

4032 M&

Rail Cropping Complete 2 EA

4033 F,R &I

Rebond Joints /Furnish and install rail bond wire Complete

15 EA

4034 M& R

Regage Railroad Tracks /Keeping curves true and with their proper super elevation Complete

1,000 TF

4035 F,R &I

Remove & reinstall track Section Complete

400 TF

4036 F,R &I

Remove and Reinstall Wheel Stops at the end of tracks Complete

2 SET

4037 M& R

Resurface and realign existing track/ Complete with ballast

16,000 TF

4038 F,R &I

Tightening and Respiking Complete 3,000 TF

4039 M& R

Adjust Rail gaps 20 EA

4040 M& R

Switch & Misc Turnout Adjustment /Lubricating, adjusting and repairing Complete

10 EA

4041 M& R

Tighten Joint Bolts 1,000 TF

4042 Rerail Derailed Locomotive/No apparent damage to track or Locomotive

2 EA

4043 Rerail Derailed Railcar/No apparent

4044 Emergency Callout for other than Derailments, Turnout adj (etc)

4 EA

4045 Other unforeseen Miscellaneous Repairs and/or Inspections required to maintain FRA compliance and safe rail operations.

Total Price for bid items 4001-4045

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job CLIN 0001 Railroad M&R Base Year

FFP

CLIN 0001 Railroad M&R Estimated value of the contract for the base period.

Perform maintenance and repair in accordance with Statement of Work, Terms and Conditions of the contract, and individual task orders. Work and Items ordered to be performed shall be annotated on line items 0001- 0045 on the bid proce schedule FOB: Destination

PURCHASE REQUEST NUMBER: 0012106396

PSC CD: Z1LB

NET AMT

1001 Job CLIN 1001 Railroad M&R OY1

FFP

CLIN 1001 Railroad M&R Estimated value of the contract for option year 1.

Perform maintenance and repair in accordance with Statement of Work, Terms and Conditions of the contract, and individual task orders. Work and items ordered to be performed shall be annotated on lIne items 1001 -1045 on the bid price schedule.

FOB: Destination

2001 Job CLIN 2001 Railroad M&R OY 2

FFP

CLIN 2001 Railroad M&R Estimated value of the contract for option year 2.

Perform maintenance and repair in accordance with Statement of Work, Terms and Conditions of the contract, and individual task orders. Owrk and items ordered tobe performed shall be annotated on line items 2001 - 20024 on the bid price schedule.

FOB: Destination

3001 Job CLIN 3001 Railroad M&R OY3

FFP

CLIN 3001 Railroad M&R Estimated value of the contract for option year 3.

Perform maintenance and repair in accordance with Statement of Work, Terms and Conditions of the contract, and individual task orders. Work and items ordered tobe performed shall be annotated on line items 3001 -3045 of the bid price schedule.

FOB: Destination

4001 Job CLIN 4001 Railroad M&R OY4

FFP

CLIN 4001 Railroad M&R Estimated value of the contract for option year 4.

Perform maintenance and repair in accordance with Statement of Work, Terms and Conditions of the contract, and individual task orders. Work and items ordered to be performed shall be annotated on line items 4001 - 4045 on the bid price schedule.

FOB: Destination

Section C - Descriptions and Specifications

STATEMENT OF WORK

PERFORMANCE WORK STATEMENT (PWS)

PART 1 GENERAL INFORMATION

1. GENERAL: This is a non-personal services contract to provide Railroad Track Maintenance, and Repa ir.

The Government sha ll not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor sha ll provide a ll personnel, equipment, supplies, facilities, transportation, tools, materia ls, supervision, and other items and non-personal services necessary to perform railroad maintenance, and repair as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background:

1.2.1. U.S. Army Ft. Stewa rt and Hunter Army Airfield operates approximately 22 miles of tra ck. Services provided under this contract shall be performed in portions of Liberty and Chatham Counties. Ft. Stewart tracks are approximately 19 miles located within the boundaries of Fort Stewart, and traverses through Hinesville, and joins the main CSX line at Allenhurst, Georgia. Hunter Army Airfield has approximately 3 miles located within the boundaries of Hunter Army Airfield Savannah, Ga.

1.2.2. Site maps applicable to the Fort Stewart and Hunter Army Airfield Railroad Track System may be reviewed at Fort Stewart, Georgia , Directora te of Public Works, Service Branch, Building 1178. One copy of all drawings will be furnished to the successful Contractor at the time of award.

1.3. Objectives: The objective of this requirement is to provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Railroad Maintenance and Repair as defined in this Performance Work Statement (PWS).

Provide for the safe, reliable, and cost-effective operation of the Ft. Stewart and Hunter Army Airfield ra ilroa d tra ck systems. The contractor sha ll operate IAW 49 CFR 200 through 49 CFR 299, UFC 4-860-03, TM 5-628, Occupational Safety and Health Administration (OSHA) regulations and state and local regulations, in addition to being responsible for all materials purchased, inventoried, stored, and maintain safe and clean work areas at all times.

1.4. Scope:

1.4.1. The general scope of work of this requirement is a Firm-Fixed Priced work for maintenance and repa ir services of 22 miles of ra ilroa d. The Contractor sha ll perform requirements of this contract on an “as needed, as funded” ba sis. This tra ck which is owned and operated by the U.S. Army Ft. Stewa rt and Hunter Army Airfield shall be maintained to Federal Railway Administration (FRA) Class 2 standards in accordance with the current version of Code of Federal Regulations (CFR) Title 49, Part 213, US Department of Transportation (DOT), Federal Railway Administration, UFC 4-860-03, Office of Safety, Publication Track Safety Standards; CFR Title 49, Part 214, Railroad Workplace Safety; and with the current version of CFR Title 48, Part 237, Bridge Safety Standards. All services performed by the Contractor shall be in strict accordance with the conditions and specifications of this contract. All operations in connection with this section shall be closely coordinated with the Contracting Officers Representative (COR).

1.4.2. The Government reserves the right to perform any repa ir/ta sk when the cost of repa ir is less than $50.00.

1.4.3. Maintenance and repa ir items include, but not limited to the following:

1.4.3.1. On-call Maintenance and Repair Non-emergency. Examples include, but not limited to the furnishing, repla cing, repa iring and insta lling the following: ma inta ining and repla cing mile posts, whistle posts, culvert markers and other signs; tightening and replacing bolts and fastenings; raising low joints; clean and lubricate switch/frogs; clean railroad (RR) crossing flanges; furnish and install (F&I) bolts, double clamp gage rod, frog (#8 or #10) manganese, insulated joint, joint bar bolt w/ nut & washer, joint bar w/ bolts, rail anchors, rail braces with plate, rail cropping, ramp bumpers spring type, switch point guards, switch point clips, switch rods (48.0 inches) switch rods (80.5 inches), switch stand lever latches, switch stand, target fla g post, target fla gs (pa ir), tie pla te; gage ra ilroa d tra cks; bond joints; insula ted joint;

spike tightening and spiking; surface and align railroad tracks; switch & misc. turnout adjustment; switch point maintenance; tighten joint bolts, remove and/or reinsta ll wheel stop at the end of tra cks; tamping the track to line and surface; keeping curves true and with their proper super elevation.

1.4.3.1.1. Bid schedule item is a ll inclusive for replacement of worn or damaged ra il and/or ra il sections. Everything required for the complete removal and reinstallation of rail and or rail sections.

Including disposal and restoring to full FRA compliance standards. (Note any ties removed shall be replaced with composite ties.)

1.4.3.1.2. Bid schedule item is all inclusive to complete ballast work (including changing, removal, reloca ting and/or disposalof old ba lla st, insta lling and dressing new ba lla st and/or clea ning and dressing of current ballast, grade and stockpile ballast for current and future use).

1.4.3.1.3. Bid schedule item is a ll inclusive changing and/or repla cing of ties with new composite ties.

(All-inclusive removal, everything required for complete removal and disposal of old ties, a ll-inclusive installation, everything required for complete installation of new composite ties including redressing of ba lla st.)

1.4.3.1.4. Bid schedule item is all inclusive changing and/or replacing of switch ties with new composite switch ties. (All-inclusive removal, everything required for complete removal and disposal of old ties, a ll-inclusive insta lla tion, everything required for complete insta lla tion of new switch ties including redressing of ba lla st.)

1.4.3.1.5. Bid schedule item is all inclusive for complete replacement and repair of Crossing Flanges.

Complete a ll-inclusive replacement and/or repa ir. (All-inclusive removal, everything required for complete removal and disposal of old ties, flanges and other associated materials, a ll-inclusive insta lla tion, everything required for complete installation of new composite ties, Flanges and includes redressing of ba lla st.)

1.4.3.2. Emergency Repa irs. Rera il Dera iled Locomotive/No apparent damage to tra ck or Locomotive. Rerail Derailed Railcar/No apparent damage to track or Railcar.

1.4.3.3. Emergency repa ir Ca ll out for other than Dera ilments. Emergency Ca ll out for other than Derailments. This could include regular repair items that unexpectedly become mission critical.

1.4.3.4. Other Miscellaneous Compliance Items. Miscella neous unforeseen Repa irs and/or Inspections required to maintain FRA compliance and safe rail operations.

1.5. Period of Performance: The period of performance sha ll be for one (1) Ba se Yea r of 12 months and two (4) 12-month option years. The Period of Performance reads as follows:

Ba se Yea r: 1 Ja n 25 - 31 Dec 25 Option Yea r 1: 1 Ja n 26 - 31 Dec 26 Option Yea r 2: 1 Ja n 27 - 31 Dec 27 Option Yea r 3: 1 Ja n 28 - 31 Dec 28 Option Yea r 4: 1 Ja n 29 - 31 Dec 29

1.6. General Information:

1.6.1. Quality Control. The contractor shall develop and maintain an effective quality control program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which s/he assures that the work complies with the requirements of the contract. The contractor shall submit his/her QCP to the Contracting Officer within 10 days of contract award. Any changes to the QCP during the life of the contract shall be documented within 5 working days and submitted to the Contracting Officer for review and acceptance. After acceptance of the QCP the contractor sha ll receive the contractingofficer’s acceptance in writing of any proposed change to the QCP.

1.6.2. Qua lity Assurance. The government sha ll evaluate the contra ctor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveilla nce, and the minimum acceptable defect rate(s).

1.6.2.1. Inspection & test of services. The government will have the right to or cause to have inspected and/or tested all services performed under this contract.

Recognized Holidays:

New Yea rs Da y Martin Luther King Jr.’s Birthday Columbus Day President’s Day Vetera n’s Da y Memoria l Day Thanksgiving Day Juneteenth Day Christma s Day Independence Day Labor Day Labor Day

1.6.3. Hours of Operation. The contractor is responsible for conducting business, between the hours of 0700 – 1630 Monday thru Friday except Federal holidays or when the Government facility is closed due to loca l or national emergencies, administra tive closings, or simila r Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3.1. Service may be required to be performed during non-business hours. Normal hours of operation are 0700 to 1630 Monday through Friday. Due to the nature of the work and the limited down time ava ila ble for this type of maintenance/repair it may be necessary to accomplish these ta sks after normal duty hours such as evenings, weekends or holidays when traffic flow is light.

1.6.4. Place of Performance. The work to be performed under this contract will be performed within Ft.

Stewart and federally owned right of way passing through the surrounding communities leading to CSX main line connection and tracks contained on Hunter Army Airfield, in Savannah, GA.

1.6.5. Type of Contract. The government will award a Firm Fixed Price.

1.6.6. Security Requirements:

1.6.6.1. All contractor employees, to include subcontractor employees, requiring access to government insta lla tions, facilities and controlled access areas sha ll complete AT Level I awareness tra ining within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR within 30 calendar days after completion of tra ining by a ll employees and subcontractor personnel. AT level I awareness tra ining is ava ila ble at the following website: https://jko.jten.mil.

1.6.6.2. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH progra m. This tra ining sha ll be completed within 30 calendar days of contract award andwithin 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award. iWatch training is available at the following website:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx

1.6.6.3. The Contractor and all associated sub-contractor employees shall comply with applicable Installation local access and security policies and procedures. If required by this contract, the contractor shall also provide all information for background checks to meet Installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce must comply with a ll personal identity verifica tion requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the Government may require changes in contractor security matters or processes.

1.6.6.4. All persons employed by the Contractor in the performance of this contract or any representative of the Contractor entering the Government reserva tion sha ll conform to a ll security regulations which may be in effect during the contract period and shall be subject to such checks as may be deemed necessary to a ssure that no viola tion exists. No employee sha ll be permitted on the reserva tion when such checks reveal that his/her presence would be detrimental to the security of the installation or the accomplishment of the work. The Contracting Officer may require the Contractor to remove any employee for security or misconduct reasons.

1.6.6.5. Insta llation Access. Installation access requires valid government issued photo ID for each individua l (i.e. driver’s license), vehicle registration, and proof of insurance to obtain a day pass and will require going through a back ground check and vehicle inspection. Commercial vehicles will only have access through Ga te 7 (commercialgate) during the normalduty day. After hours and holidays Ga te 1 will be used.

1.6.6.6. Physical Security. The contractor sha ll be responsible for safeguarding a ll government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.6.7. Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key ca rds. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.6.7.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.6.7.2. The Contractor sha ll prohibit the use of Government issued keys/key ca rds by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7. Special Qua lifications:

1.6.7.1. The Contractor sha ll provide documentation of tra ining and experience which uniquely qua lifies them for the type of work to be performed under this contract to ensure the safe and relia ble operation of the Ra il System IAW 49 CFR 200 through 49 CFR 299, Unified Facilities Criteria (UFC) UfC-4-860- 03 FRA Railroad Track Maintenance & Safety standards.

§214.343 Tra ining and qua lifica tion, general.

(a) No employer shall assign an employee to perform the duties of a roadway worker, and no employee sha ll accept such a ssignment, unless that employee has received tra ining in the on-tra ck safety procedures associated with the assignment to be performed, and that employee has demonstrated the ability to fulfill the responsibilities for on-track safety that are required of an individual roadway worker performing that assignment.

(b) Each employer sha ll provide to a ll roadway workers in its employ initia l or recurrent tra ining once every calendar year on the on-track safety rules and procedures that they are required to follow.

(c) Railroad employees other than roadway workers, who are associated with on-track safety procedures, and whose prima ry duties a re concerned with the movement and protection of tra ins, shall be trained to perform their functions related to on-track safety through the training and qualification procedures prescribed by the operating railroad for the primary position of the employee, including maintenance of records and frequency of training.

(d) Each employer of roadway workers shall maintain written or electronic records of each roadway worker qua lifica tion in effect. Each record sha ll include the name of the employee, the type of qua lifica tion made, and the most recent date of qua lifica tion. These records sha ll be kept available for inspection and photocopying by the Federal Railroad Administrator during regular business hours.

§214.345 Tra ining for a ll roadway workers.

The tra ining of a ll roadway workers sha ll include, as a minimum, the following:

(a) Recognition of ra ilroa d tra cks and understandingof the spa ce around them within which on-track safety is required.

(b) The functions and responsibilities of various persons involved with on-tra ck sa fety procedures.

(c) Proper compliance with on-tra ck sa fety instructions given by persons performing or responsible for on-track safety functions.

(d) Signa ls given by watchmen/lookouts, and the proper procedures upon receiving a tra in approach warning from a lookout.

(e) The hazards a ssocia ted with working on or near ra ilroa d tra cks, including review of on-tra ck safety rules and procedures.

1.6.7.2. The Foreman/superintendent shall be required to have a minimum of five (5) yea rs’ experience with the maintenance and repair of Army railroad track systems.

1.6.7.3. Employees. The contractor is responsible for ensuring all employees possess valid identifica tion and ma inta in current Information Assura nce Technician (IAT) Level I certifica tion and have completed the required FRA Rail safety courses.

1.6.8. Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regula tion Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the government.

1.6.9. Contracting Officer Representative (COR). The (COR) will be identified by separate letter.

The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

ma inta in written and ora lcommunications with the Contractor concerningtechnicalaspects of the contract:

issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.10. Key Personnel: The follow personnel are considered key personnel by the government: contract manager/Alternate and/or Foreman/ superintendent. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate Foreman/superintendent who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate sha ll be ava ila ble between 8:00 a .m. to 4:30 p.m. Monday thru Frida y or when the crew is on site.

1.6.10.1. The Contractor shall provide an on-site Foreman/superintendent with authority to act for the Contractor. This individual sha ll be responsible for overall managementand coordination of this contract and shall act as the point of contact with the Government.

1.6.11. Identification of Contractor Employees. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties a re required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.11.1. The Contractor shall provide a means to identify all employees working under this contract. The Contractor shall provide a typewritten list of employees’ names with personal identification information to the KO/COR. The Contractor sha ll notify a ll parties of any changes to the employee list within two (2) days after change occurs. Each employee shall keep this card/badge on their person at all times while within the boundaries of this installation and shall produce this identification upon request of Military Police, Contracting Officer or the COR.

1.6.12. Contractor Travel. Contractor tra vel at Government expense is not authorized.

• Data Rights. The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government sha ll be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

• Organizational Conflict of Interest. Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actualor potential OCI and sha ll promptly submit a plan to the Contracting Officer to avoid or mitiga te any such OCI. The Contra ctor’s mitiga tion pla n will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. Defective Service. A service output that does not meet the standard of performance a ssocia ted with the Performance Work Statement.

2.1.5. Delivera ble. Anything that can be physica lly delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel a re used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.8. Qua lity Assura nce. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. Qua lity Assura nce Surveilla nce Pla n (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. Qua lity Control. All necessary measures taken by the Contractor to a ssure that the qua lity of an end product or service shall meet contract requirements.

2.1.11. Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. Work Da y. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. Work Week. Monday through Friday, unless specified otherwise.

2.2. Acronyms:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regula tion Supplement AR Army Regula tion CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Ala ska and Hawa ii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regula tion Supplement DMDC Defense Manpower Da ta Center DOD Department of Defense FAR Federal Acquisition Regula tion HIPAA Hea lth Insurance Portability and Accountability Act of 1996 KO Contracting Officer MADR Maximum Allowa ble Defect Rate OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Ala ska and Hawa ii) ODC Other Direct Costs PIPO Pha se In/Phase Out POC Point of Contact PRS Performa nce Requirements Summary PWS Performa nce Work Statement QA Qua lity Assura nce QAP Qua lity Assura nce Progra m QASP Qua lity Assura nce Surveilla nce Pla n QC Qua lity Control

QCP Qua lity Control Progra m TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services. The Government will provide no services.

3.2. Facilities. The Government will provide no facilities. The Government will not provide any administra tive areas or storage areas for the contra ctor’s employees, vehicles, equipment or supplies.

3.3 Utilities. The Government will a llow the use of existing utilities when ava ila ble. The Contractor sha ll instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General. The Contractor sha ll furnish a ll supplies, equipment, facilities, supervision, and services required to…