W9124M20R00240004 SOLICITATION.pdf

PDF 213 KB Posted

Attached to
HAAF TEMPORARY BLDG RENTAL Federal contract opportunity
Solicitation number
W9124M20R0024
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

This document is an amendment to a solicitation for the rental of a temporary dining facility building at Hunter Army Airfield in Savannah, Georgia. The amendment provides answers to vendor questions to clarify requirements. The temporary facility must include a dining area to seat 200 people according to social distancing guidelines, a kitchen with preparation and serving areas, and separate restroom facilities for men and women. The site is approximately 8,000 square feet and the government will provide required utilities. Vendors must provide all necessary equipment including hot holding cabinets, refrigeration, sinks, and HVAC systems. The closing date for proposals and period of performance are not specified in this amendment.

View the file

Other files for this federal contract opportunity

Other files attached to HAAF TEMPORARY BLDG RENTAL, newest first.
File Type Posted
W9124M20R00240007 SOLICITATION.pdf PDF
site map.pdf PDF
W9124M20R00240006 SOLICITATION.pdf PDF
IMG_0673.jpg JPG image
IMG_0678.jpg JPG image
IMG_0670.jpg JPG image
IMG_0666.jpg JPG image
IMG_0665.jpg JPG image
IMG_0671.jpg JPG image
IMG_0681.jpg JPG image
IMG_0667.jpg JPG image
IMG_0675.jpg JPG image
IMG_0677.jpg JPG image
W9124M20R00240005 SOLICITATION.pdf PDF
W9124M20R00240003 SOLICITATION.pdf PDF
W9124M20R0024U0002 SOLICITATION.pdf PDF
W9124M20R0024U0001 DRAFT SOLICITATION.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011519457

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to provide answ ers to vendor questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M20R0024

X 9B. DATED (SEE ITEM 11)

22-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2020

CODE

MICC - FORT STEWART

976 WILLIAM H. WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124M20R0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

QUESTION AND ANSWERS FROM CONT

Questions and answers 8/13/2020

Hot Holding Warmers ‐2 EA

Are these hot holding cabinets or holding wells?

A: Cabinets

If the facility is looking for a cabinet how many doors / size are they requesting for each unit.

A: Standard 5‐6 Ft height cabinet warmers two doors to fit line pans. Two per work unit for prep units and serving areas.

If this is a counter with hot holding wells how many wells are needed? This is specifically for the equipment needed in the prep module.

A: We have listed hot holding wells for the serving line, 5 total wells per serving lines, 2 total hot serving lines.

The RFP also requires "Refrigeration Units for Salad Storage and Left Over Storage". ‐ 2EA

Is the facility looking for an upright refrigerator and / or a salad prep station. If looking for a refrigerator how many doors / size would they need for operations. If looking for a salad prep unit how many doors would be needed?

A: Upright refrigerators are for left over storage in the prep unit and cold wells required for the serving area (10 total wells for salad bar).

In the Cook Module it lists ‐ Work Sink ‐ 1EA What size does this work sink need to be? One or Two compartment sink? How many drain boards are needed?

A: Two compartment, drains required for all work sinks for food prep.

Handwashing sinks throughout must be standard size.

Questions and answers 11 Aug 2020 We would like to coordinate a site visit for this coming Monday morning, August 17 if possible. Please let me know what the procedures are to have this arranged.

A: From my foxhole, the visit can be scheduled for 17AUG 2020 any time after 1300hrs, depending to stakeholder's availability. I can tailor my schedule to meet this requirement only in the afternoon. We can meet in the parking lot facing the gym of Bldg. 100 at HAAF, and walk to the proposed site for the portable kitchen. At that point, we can discuss dimensions, utilities requirements, parking, etc. I will request a representative from DPW ENG IOT to clarify any contractor's concerns/questions. Thank you.

Site visit will be conducted on Monday 17 Aug 2020 at 1300hrs at the above referenced parking lot at Hunter Army Airfield. All interested parties are welcome to attend.

Questions and answers 10 Aug 2020

1. For the dining room the RFP states approximately 600 will be served at Each meal, yet it states seating will be for 200. Is this seating being accommodated by rotational meal times or would there be more people served but not seated (i.e. ‐ Grab‐n‐Go) at each meal? 200 seat space requirement is what we need. We rotate 200 soldiers per 30 minutes which is what the 600 capacity translates to the military.

2. Which square footage standard would the facility prefer to use? COVID has prompted most of our clients to establish a 36 sq. ft. per person for dining while the standard is normally 20 sq. ft. per person. 20 sq ft per person.

We will distance diners ourselves.

3. The RFP mentions a customer restroom but does not specify if it can be unisex or needs to be separate facilities for men and women. Please advise as to preference. Answer: Separate is better if possible.

4. What are the dimensions of the site where this complex is to be placed?

The site is 80 x 100 or 8000 sq ft. roughly

5. Are on‐site visits available to determine scope of installation work?

Yes, site visits are available, please coordinate to set one up if needed.

Question 1 ‐ What is the available power at site?

A: DPW will meet the power requirements for the site and do site prep/selection

Question 2 ‐ Do you require HVAC in the dining area?

A: Yes, HVAC should be adequate to provide cooling/heating to all functional working and dining areas.

Question 3 ‐ Do you require HVAC in the wash module?

A: Yes, HVAC should be adequate to provide cooling/heating to all functional working areas.

Question 4 ‐ Do you require HVAC in the prep module?

A: Yes, HVAC should be adequate to provide cooling/heating to all functional working areas.

Question 5 ‐ Based on the dining area request in the solicitation, there is not adequate space for the dining area to accommodate the 200 seated soldiers and the serving equipment. Attached is a drawing illustrating the space. We recommend increasing the minimum dining area to 3300 sq. ft. or 66' x 50'. This configuration based on the Governments requirements is not COVID Compliant. Please advise. (See attached drawing reflecting Non‐COVID Compliant Seating).

Question 5a ‐ The current seating arrangement based on government minimum size for dining area is not compliant with Federal mandates for social distancing. Is it the Governments intent to seat personnel in compliance with socialsistancing mandates? If so, what is the minimum size for the dining area? (Please see the attached a drawing reflecting COVID Compliant seating for your reference and review).

A: the military will make certain tables off limit ISO COVID‐19 mitigations.

We need normal sq footage for seating 200 seats in dining room.

Question 6 ‐ Solicitation incorporates WD 2015‐4492 (Rev 14) dated 12/23/2019 however the appropriate Service Contract Act FAR Clauses have not been incorporated. Is it the Government's intent to have Contractor personnel performing duties such as cooking, serving, janitorial for dining and kitchen facilities as well as latrines? Or will these services be performed by Government Personnel? It appears the intent of the solicitation (based on the NAICS 532490 "Other Commercial and Industrial Machinery and Equipment Rental and Leasing") is for the Lease/Rental of equipment and temporary facilities however the incorporation of the WD leans towards a Service Contract. Please advise.

WD are not required for this Contract and an amendment will be issued deleting that from the Solicitation.

A: Government will provide their own military chefs not a service contractor.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .