IDIQ JOB ORDER CONTRACT, FORT STEWART AND HUNTER ARMY AIRFIELD, GA
Solicitation number
WG-54-0J
Issued by

About this file

This is a solicitation for an indefinite delivery/indefinite quantity job order contract to provide construction services at Fort Stewart and Hunter Army Airfield in Georgia. The contractor will complete job orders for minor construction, sustainment, renovation and modernization projects encompassing trades like carpentry, plumbing, HVAC, electrical work, site work and demolition. The contract term is for one base year with four one-year options and has a maximum value of $49.9 million. The government will use Gordian's proprietary job order contracting system and construction task catalog, which the contractor must provide. Job orders will be priced by multiplying construction task catalog line items by the contractor's coefficients for normal and off-hours work. The solicitation response deadline is August 20, 2020.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011458261-0001

PROJECT NO: WG-54-0J

PROJECT TITLE: Job Order Contract (JOC) PROJECT LOCATION: Fort Stew art and Hunter Army Airf ield, Georgia SET ASIDE: 100% HUBZone Set-Aside.

NAICS CODE: 236220

SIZE STANDARD: $39.5M

MAGNITUDE OF CONSTRUCTION PROJECT: More than $10,000,000.00 All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specifications.

SITE VISIT: To be Announced DUE DATE FOR ALL QUESTIONS: 6 August, 2020 by 2:00PM EST.

BONDS: Bid Bond, Payment Bond, and Performance Bonds shall be required.

SHEUNG C. LI 9127679537

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Jul-2020

(RFP)

(IFB)

X

CALL:

IDIQ Job Order Contract (JOC) Fort Stew art and HAAF

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________Job Order

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________20 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MICC - FORT STEWART

976 WILLIAM H. WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

WG-54-0J

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (912)767-8420 TEL: FAX:

W9124M20R0009 119

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9124M20R0009

Section A - Solicitation/Contract Form

TABLE OF CONTENTS

PART I – THE SCHEDULE

SECTION A – Solicitation/Contract Form SECTION B – Supplies or Services and Prices/Costs SECTION C – Descriptions/Specifications/Statement of Work SECTION D – Packaging and Marking SECTION E – Inspection and Acceptance SECTION F – Deliveries and Performance SECTION G – Contract Administration Data SECTION H – Special Contract Requirements

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses

PART III – LIST OF DOCUMENTS, EXIBITS AND OTHER ATTACHMENTS

SECTION J – List of Exhibits, Attachments, and Appendices

Attachment 3 Performance Assessment Questionaire

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors or

Respondents SECTION L – Instructions, Conditions, and Notice to Offerors SECTION M – Evaluation Factors for Award

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 9,980,000 Job Base Ordering Period JOC

FFP

The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each job order placed against this Indefinite Delivery/Indefinite Quantity Contract at Fort Stewart and HAAF, Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $9,980,000.00. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $500,000.00 for the base year.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011458261-0001

PSC CD: Y1JZ

NET AMT

1001 9,980,000 Job OPTION 1st Option Ordering Period JOC

FFP

The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each job order placed against this Indefinite Delivery/Indefinite Quantity Contract at Fort Stewart and HAAF, Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $9,980,000.00. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $500,000.00 for the 1st option year.

FOB: Destination

2001 9,980,000 Job OPTION 2nd Option Ordering Period JOC

FFP

The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each job order placed against this Indefinite Delivery/Indefinite Quantity Contract at Fort Stewart and HAAF, Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $9,980,000.00. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $500,000.00 for the 2nd option year.

3001 9,980,000 Job OPTION 3rd Option Ordering Period JOC

FFP

The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each job order placed against this Indefinite Delivery/Indefinite Quantity Contract at Fort Stewart and HAAF, Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $9,980,000.00. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $500,000.00 for the 3rd option year.

4001 9,980,000 Job OPTION 4th Option Ordering Period JOC

FFP

The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each job order placed against this Indefinite Delivery/Indefinite Quantity Contract at Fort Stewart and HAAF, Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $9,980,000.00. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $500,000.00 for the 4th option year.

COEFFICIENT SCHEDULE

The Offerors shall submit a coefficient for the base year SubCLINs 0001AA through 0001AE and each option ordering period. Coefficients shall be limited to numbers that do not exceed 2 decimal places. All pricing calculations in the schedule shall be based upon a maximum of the 2 decimal places. For price evaluation and contract award, the Government will drop any decimal beyond the 2 places and compute the coefficient and amount without regard to the additional decimal places.

ITEM DESCRIPTION

ESTIMATED

PERCENTAGE

OF WORK

COEFFICIENT

0001 BASE YEAR ORDERING PERIOD

0001AA FORT STEWART – NORMAL WORKING HOURS 90%

0001AB FORT STEWART – OTHER THAN NORMAL

WORKING HOURS

10%

0001AC HUNTER ARMY AIRFIELD – NORMAL WORKING

HOURS

90%

0001AD HUNTER ARMY AIRFIELD – OTHER THAN

NORMAL WORKING HOURS

0001AE NON PRE-PRICED COEFFICIENT 10%

PERCENTAGE

OF WORK

COEFFICIENT

1001 1ST OPTION YEAR ORDERING PERIOD

1001AA FORT STEWART – NORMAL WORKING HOURS 90%

1001AB FORT STEWART – OTHER THAN NORMAL

1001AC HUNTER ARMY AIRFIELD – NORMAL WORKING

1001AD HUNTER ARMY AIRFIELD – OTHER THAN

1001AE NON PRE-PRICED COEFFICIENT 10%

PERCENTAGE

OF WORK

COEFFICIENT

2001 2nd OPTION YEAR ORDERING PERIOD

2001AA FORT STEWART – NORMAL WORKING HOURS 90%

2001AB FORT STEWART – OTHER THAN NORMAL

2001AC HUNTER ARMY AIRFIELD – NORMAL WORKING

2001AD HUNTER ARMY AIRFIELD – OTHER THAN

2001AE NON PRE-PRICED COEFFICIENT 10%

PERCENTAGE

OF WORK

COEFFICIENT

3001 3rd OPTION YEAR ORDERING PERIOD

3001AA FORT STEWART – NORMAL WORKING HOURS 90%

3001AB FORT STEWART – OTHER THAN NORMAL

3001AC HUNTER ARMY AIRFIELD – NORMAL WORKING

3001AD HUNTER ARMY AIRFIELD – OTHER THAN

3001AE NON PRE-PRICED COEFFICIENT 10%

PERCENTAGE

OF WORK

COEFFICIENT

4001 4th OPTION YEAR ORDERING PERIOD

4001AA FORT STEWART – NORMAL WORKING HOURS 90%

4001AB FORT STEWART – OTHER THAN NORMAL

4001AC HUNTER ARMY AIRFIELD – NORMAL WORKING

4001AD HUNTER ARMY AIRFIELD – OTHER THAN

4001AE NON PRE-PRICED COEFFICIENT 10%

MINIMUM GUARANTEED AMOUNT: There is a guaranteed Minimum of $500,000.00 for the base ordering period and each option ordering period. A new minimum guarantee will be obligated upon exercise of each ordering period.

a. ANNUAL MINIMUM: The total annual minimum is $500,000.00 per year.

b. ANNUAL MAXIMUM: The total annual maximum is $9,980,000.00 per year.

TOTAL JOB ORDER CONTRACT (JOC) MAXIMUM: The total JOC Maximum Value is $49,900,000.00.

This is an IDIQ contract with fixed price (FP) job orders and the level of work is only an estimate.

Section C - Descriptions and Specifications

STATEMENT OF WORK

GENERAL STATEMENT OF WORK STATEMENT (SOW)

JOB ORDER CONTRACT (JOC)

INDEFINITE DELIVERY/INDEFINITE QUANTITY

U. S ARMY STEWART, HUNTER ARMY AIRFIELD (HAAF)

Part 1: INTRODUCTION AND SCOPE

C.1. Introduction. This is a Firm Fixed Price IDIQ (Indefinite Delivery-Indefinite Quantity) JOB ORDER CONTRACT (JOC) to provide construction services for a broad range of military sustainment, renovation, modernization, and construction projects, in support of U. S. Army Fort Stewart and Hunter Army Air Field (HAAF), Georgia. This contract is intended to provide the Fort Stewart Garrison Commander and the Directorate of Public Works (DPW) the capability to provide timely and quality minor construction, sustainment, renovation and modernization projects for the facilities and components which support the Soldiers, family members and civilians of the 3rd Infantry Division. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). The Contractor shall be accountable to the Government for Contractor, Subcontractor personnel and for the quality and timeliness of work.

C.1.1. Scope. The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each Job Order placed against this IDIQ Contract at Fort Stewart and Hunter Army Air Field Georgia in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. Individual Job Orders will vary in size and scope. Orders will encompass tasks in a variety of construction and trade areas; such as general carpentry, general plumbing, heating, ventilating and air condition (HVAC) systems, fire suppression systems, general electrical systems, utility distribution systems, concrete construction, road paving systems, storm water systems, concrete masonry unit (CMU) construction, painting, roofing, demolition, and steel construction.

All general construction related trade disciplines and managerial positions will be included along with some specialty technicians.

C.1.1.2. The Ft. Stewart-Mission Installation Contracting Command (MICC) selected Gordian’s Job Order Contracting (JOC) System for the JOC program at Ft. Stewart and Hunter Army Air Field. The Gordian JOC Solution includes proprietary JOC Applications and Construction Task Catalog®, which shall be provided by the Contractor and used by Government personnel to prepare and submit Task Order Proposals, subcontractor lists, and other requirements specified by the contract. The contractor shall obtain at its own expense and provide the government with the following for the base plus each option:

five (5) printed copies of Gordian’s Construction Task Catalog® (CTC®), one (1) printed copy of Gordian’s Technical Specifications, one (1) electronic copy of the CTC® and specifications in pdf format, and any updates for the life of the contract. The Government shall have online access. These publications shall be furnished to the KO within 30 days of contract award and within 30 days of each exercised option year. These publications shall remain the property of the Government.

C.1.2. Work by the Government. The Government reserves the right to undertake performance by Government personnel or other Contractors, for the same type or similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract, in accordance with Job Order Contracting Guide.

C.1.3. General Contract Requirements

C.1.3.1 The Contractor shall complete the Sustainability Management System Awareness Training available on the internet at http://www.stewart.army.mil/dpw/PC_Sustainability_Training.asp and provide proof of completion to the COR within 10 calendar days of contract award. This requirement shall include:

C.1.3.2 Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

C.1.3.3 Contractor personnel performing work under this contract shall be U.S.

citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non- U.S. citizen to perform the required support.

C.1.3.4 Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative.

Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

C.1.3.5 Emergency Medical Treatment: Emergency medical treatment will be provided by the Winn Army Community Hospital in order to prevent undue suffering or loss of life. Emergencies will be treated only during the period of emergency and appropriate action will be taken to discharge or transfer such patients as soon as the emergency period ends. Charges for medical care will be at the prevailing rate and at the Contractor's expense.

C.1.3.6 The Contractor and Contractor employees shall comply with all applicable existing post regulations on Government controlled property. The Contractor shall comply with all applicable O.S.H.A. Regulations and with the safety provisions as outlined in "Safety and Health Requirements Manual,” EM 385-1-1 and installation policies. These regulations can be obtained from the MICC at Fort Stewart.

C.1.3.7 The Government reserves the right to require removal of any Contractor personnel from the job site who endanger persons or property, or whose continued employment is inconsistent with the interest of military security. The Government also reserves the right to require the Contractor to remove from the job site, any employee found to be under the influence of alcohol, drugs or any other incapacitating agent or any employee involved in the theft of Government property. The removal from the job site of such personnel shall not relieve the Contractor of the requirement to provide personnel to perform services.

C.1.4 Installation Access Control Requirement

C.1.4.1. Contractor and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The Government will not be responsible for damages due to delay/stoppages caused by failure to comply. At times, depending on the level of access control, it might take individuals longer than normal to get on or off the installation. Such time periods are not to be considered the basis of a claim against the Government.

C.1.4.2. Contractors shall provide personnel roster with personal information and recovery status for individual employees to the Adjutant General (AG), Fort Stewart prior the start of work and within 15 days after each required update. This shall include:

employee last name, first name, middle initial; social security number, date of birth, weight, height, color hair, color eyes, and sex.

C.1.4.3. Government issued access cards are government property and must be relinquished to the AG’s office upon request of the Government, termination of an employee or expiration of the contract.

C.1.4.4. All personnel employed by the Contractor or any representative of the Contractor entering the Government installation shall conform to all security regulations which may be in effect during the contract period and shall be subject to such checks as may be deemed necessary to assure that no violations occur. No employee or representative will be permitted on the installation when such check reveals that their presence would be detrimental to the physical or operational security of the installation.

C.1.5. Contractor Employee Conduct. Contractor and Contractor's employees, to include subcontractor personnel, shall be subject to the same general rules of conduct while on the installation that apply to Government civilian employees. The Government reserves the right to refuse installation access to any Contractor employee if the Contracting Officer determines it to be in the best interests of the Government. The Contractor will be required to respond within two (2) working days from the time contacted by the Contracting Officer or his designated representative regarding conduct of Contractor employees.

C.1.5.1. The Contractor shall take appropriate personnel action, as required, in event employees become involved with civilian or military authorities as a result of misconduct.

C.1.5.2 The Contractor shall comply with the Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13.

C.1.5.3. When passing troops in formation or jogging, Fort Stewart and Hunter Army Airfield speed limit is 10 mph.

C.1.6 Environmental Compliance. The Contractor shall comply with all Federal, State, and Local environmental laws and regulations. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. If as a result of Contractor noncompliance with any applicable environmental law or requirement, the Government incurs any cost (e.g., the cost of cleaning up a hazardous waste spill); the Contractor shall indemnify the Government and provide reimbursement for these costs. If a Federal, State, or Regulatory Agency assesses any fine, penalty, or fee against the Government that is attributable to Contractor noncompliance with any environmental law or requirement, the Contractor shall indemnify the Government for the amount of the fine and other Government costs attributable to the violation. This provision is not intended in any way to waive the Government's rights under any other provision of the contract.

C.1.6.1. Contractor shall support all Executive Order 13514 goals to include the mandates to divert 50% of Municipal Solid Waste from the waste stream (via recycling) and to reduce our water consumption by 2% each year. The Installation Command

Recycling Policy Memorandum is available at http://www.stewart.army.mil/info.asp?e=DPW

C.1.7 Environmental Protection Solid, liquid, and gaseous wastes. The Contractor shall be responsible for the proper disposal of all solid, liquid, and gaseous waste to include asbestos in accordance with all Federal, State, and Local codes and regulations, together with the following requirements:

C.1.7.1. Discharge of any waste into the environment, storm or sanitary sewers is prohibited.

C.1.7.2. The storage of any liquids except those for human consumption shall have secondary containment. The use of earthen berms as secondary containment is prohibited.

C.1.8. Disposal of debris, scrap and recyclables. All debris, scrap, and trash caused by the operations under this contract shall be removed at the end of each working day. All of this debris/trash material shall be properly disposed of at the appropriate locations, i.e.

State regulated landfill located off of the installation. All recyclables and/or salvage materials/equipment shall be transported to the appropriate Recycle Center, or Defense Reutilization and Marketing Office (DRMO), or as directed by the COR. When the recyclable material is appropriate for a recycle bin, the Government will provide the recycle bins to the Contractor.

C.1.8.1 Burning of materials and debris. No materials or debris shall be burned on Fort Stewart and Hunter Army Airfield.

C.1.8.2. Covered Chutes. All chutes for refuse, and the like, shall be covered or of such a design to fully confine the material to prevent the dissemination of dust.

C.1.8.3. The Contractor shall coordinate all activities, which may require environmental documentation, or State environmental permits with the DPW Contract Inspections Branch, as applicable.

C.1.8.4. Preserving Historical and Archeological Finds. The Contractor shall obtain clearance from the DPW Environmental Division prior to conducting any activities that have the potential to disturb significant cultural resources. Cultural resources are historic and prehistoric archeological sites, as well as buildings, structures, cemeteries, and in some cases, objects that are older than 50 years. Actions taken without coordination with the DPW Environmental Division that cause damage to significant resources may result in claims assessed against the Contractor for costs of mitigating the damage, AR 200-1, National Historical Preservation Act.

C.1.8.5. Removal of lighting and ballasts. All fluorescent light bulbs, high density discharge lamps (HD), or lighting ballasts are considered unsalvageable material and shall be recycled by a recycling center approved by the DPW Construction Inspections Branch.

C.1.8.6. Shipping documents (e.g. manifests, bills of lading, land ban forms, waste profiles) for transportation of hazardous material/wastes off site shall be submitted for approval and signature to the Hazardous Waste Manager, Environmental Division, DPW at least three (3) days prior to shipment of the material/wastes. These documents shall be completed in accordance with Local, State and Federal laws and regulations. In case of conflict among these laws and regulations, the most stringent law or regulation shall apply. Coordination for the documents shall be made through the DPW Construction Inspections Branch.

C.1.8.7. Borrow Material. The Contractor shall normally be required to procure all borrow material and top soil used on Job Orders issued under this contract from off Installation sources. The COR may approve the Contractor to use an on Installation borrow area. In these cases, the Contractor shall open, operate, and close the borrow area in strict compliance with all guidelines and regulations set forth by the Fort Stewart Environmental and Natural Resources Division and by the Georgia State Soil and Water Conservation Commission. If local fill material is needed, a Borrow Pit Excavation Application must be completed and approved by the Environmental Office prior to receiving a Borrow Pit Permit. Any borrow pit requests shall be coordinated through the DPW Construction Inspections Branch.

C.1.8.8. If a building upgrade/renovation project or new construction will require installation of a sanitary lift station, an alarm and fence surrounding the perimeter of the lift station is required, as is permitting for the lift station with the State of Georgia.

Permitting shall be accomplished through the DPW Environmental Office; coordination for all permits shall be through the DPW Construction Inspections Branch. For building upgrades/renovations or new construction, a Supervisory Control and Data Acquisition (SCADA) System must be installed that is compatible with the current system used on the Installation, along with an emergency electric generator.

C.1.8.9. All potable water lines on Fort Stewart HAAF must include a water meter and backflow preventer. These should be clearly identified as a requirement for all Contractors working on the Installation and must be clearly identified on all design submittals, such as specifications, design analysis, and drawings. IAW the Georgia Water Stewardship Act, all construction must conserve water by installing the following:

1.) Toilets that do not exceed 1.28 gallons per flush.

2.) Showerheads that allow a flow of no more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure.

3.) Urinals that use no more than 0.5 gallons per flush.

4.) Lavatory faucets that use no more than 1.5 gallons per minute.

5.) Kitchen faucets that allow a flow of no more than 2.0 gallons per minute.

Construction is defined as ‘the erection of a new building or the alteration of an existing building in connection with its repair or renovation or in connection with making an addition to an existing building and shall include the replacement of a malfunctioning, unserviceable, or obsolete faucet, showerhead, toilet, or urinal in an existing building.

C.1.8.10. All major renovation, repair or alteration of Federal buildings must comply with the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings. The Installation should make annual progress toward 100% conformance with the Guiding Principles for its existing building inventory by ensuring that all projects: 1. Employ integrated design principles; 2. Optimize Energy Performance; 3. Protect and Conserve Water; 4. Enhance Indoor Environmental Quality; 5. Reducing Environmental Impacts of Materials.

C.1.8.11. The Contractor shall obtain concurrence from the Directorate of Public Works, Environmental Management Division, and U.S. Army Garrison Fort Stewart/HAAF for all standing operating procedures, plans, and operations involving disposal, handling, storage, and use of any materials which could possibly impact the environment in any media (air, water, ground, noise).” This concurrence shall be coordinated through the DPW Construction Inspections Branch.

C.1.8.12. The Contractor shall execute applicable Federal Acquisition Regulation part 23 contract clauses required under EO 13423 and EO 13514.

C.1.8.13. Noise Control

C.1.8.13.1 The Contractor shall comply with all applicable state and local laws, ordinances, and regulations relative to noise control.

C.1.8.14. Trucking

C.1.8.14.1 The Contractor shall load all trucks leaving the site with loose debris in a manner that will prevent dropping of materials on streets. All vehicles transporting hot-mix mixtures, sand, base course material, surfacing aggregates or dirt for work performance under this contract and traveling in excess of 35 mph over post area streets or main access roads of Fort Stewart/HAAF shall have the materials covered with a tarpaulin, canvas, or shall be loaded a minimum of 6 inches below the top of the sideboards to avoid spillage of materials. The Contractor shall be responsible for cleaning up any materials that fall from trucks.

C.1.8.15. Elevators

C.1.8.15.1. Any temporary use of an existing elevator shall be arranged with the COR and subject to Government controls. Such use will be of an intermittent nature. The Contractor shall provide and maintain suitable and adequate protection covering for the elevator machinery, the hatchway entrance, and the interior of elevator during the period of temporary use. Loads in excess of the rated capacity of the elevator will not be permitted.

C.1.8.15.2. The Government will bear the cost of electrical current for the operation of the elevator. On completion of the work, the Contractor shall remove the protective coverings together with any resultant dirt and debris, and leave the equipment in a condition equal to that which he found it. The Contractor shall be responsible for bearing the cost of repair for all damages that occurred as a result of his use and/or construction operation.

C.1.8.16. Safety and Health

(a) Applicable Publications. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

(b) Code of Federal Regulations (CFR). OSHA General Industry Safety and

Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926, as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S.

Government Printing Office, Washington, D.C. 20402.

National Emission Standards for Hazardous Pollutants (40 CFR, Part 61)

Federal Standard (Fed STD): 313A Material Safety Data Sheets, Preparation and the Submission of: Safety and Health Requirements Manual, EM 385-1-1.

Use of Asbestos Containing Material, ETL 110-1-118.

Policy and Guidelines for Asbestos Management, DA Circular 40-834.

C.1.8.17. Safety, Health, and Accident Prevention Plan. The Contractor shall submit, as a part of its proposal the Safety, Health, and Accident Prevention Plan for this contract.

The Government will review this submitted plan as a part of the award process. Post award the Government will approve/comment/disapprove the submitted plan. The Contractor shall employ means necessary to furnish an acceptable plan. This approved plan shall then become a part of the contract. Development of this Safety, Health, and accident Prevention Plan shall be the responsibility of the Contractor. This plan shall be fully developed and submitted at no additional cost to the Government. The plan shall be considered as a requirement of the contract to be included in the Contractor’s coefficient.

C.1.8.18. Definition of Hazardous Materials. Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910. Those most commonly encountered include asbestos, polychlorinated biphenyls (PCBs), explosives, and radioactive material, but may include others not listed. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging, pipe covering, shingles, siding, roofing felt, mastic floor tiles and other common sources of asbestos.

C.1.8.19. Asbestos

(a) The Contractor is warned that exposure to airborne asbestos has been associated with four diseases: lung cancer, certain gastrointestinal cancers, pleural or peritoneal mesothelioma and asbestosis. Studies indicate there are significantly increased health dangers to persons exposed to asbestos who smoke, and further, to family members and other persons who become indirectly exposed as a result of the exposed worker bringing asbestos- laden work clothing home to be laundered.

(b) The Contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in area(s) where contract work is to be performed. Asbestos-containing material (ACM) is any material that contains more than one percent asbestos by weight. Friable ACM is material that with hand pressure can crumble, pulverize or reduce to power when dry. Nonfriable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturant, impregnant or coating. Non-friable ACM does not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition or other similar activities.

(c) Care must be taken to avoid releasing, or causing to be released, asbestos fibers into the atmosphere where they may be inhaled or ingested. The Occupational Safety and Health Administration (OSHA) has set standards at 29 CFR 1910.1001 for exposure to airborne concentrations of asbestos fibers, methods of compliance, medical surveillance, housekeeping procedures, and other measures that must be taken when working with or around asbestos-containing materials. 29 CFR 1910.1001 has been identified as applicable to construction (29 CFR 1926.55 gases, vapors, fumes, dusts and mists). The Environmental Protection Agency (EPA) has established standards at 40 CFR 61.140-156 for the control of asbestos emissions to the environment and handling and disposal of asbestos wastes.

(d) Friable ACM is not permitted by current criteria and shall not be used in new construction or modification projects (ETL 110-1-118, 27 May 1983).

(e) Maintenance, modification, or demolition activities where exposure to asbestos dust may occur from previously installed friable or non-friable ACM will be identified by the Contractor. All precautions, to include proper work practices, medical surveillance, respiratory protection, industrial hygiene, and environmental protection requirements of OSHA (29 CFR 19210.1002), EPA (40 CFR 61.140-156) and DA Circular 40-83-4, as applicable, shall be strictly adhered to.

(f) The Government will identify the known existence of asbestos in areas where work is to be performed under individual Job Orders prior to the issuance of the order. However, the Contractor shall identify and report any unforeseen findings of asbestos to the COR prior to initiating any actions under a Job Order.

(g) “Asbestos”, including chrysotile, ammosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any of these materials that have been chemically treated and/or altered is prohibited from incorporation into the work under this contract. This prohibition does not apply to nor prevent the removal and disposal of asbestos materials.

C.1.8.20. Safety Assurance

C.1.8.20.1. Preconstruction Safety Meeting. Representatives of the Contractor shall meet with the COR prior to the start of repair, alteration or construction activities for the purposes of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The Contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the preconstruction conference, if so directed by the Contracting Officer. The conduct of this meeting is not contingent upon a general preconstruction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The Contractor's principal on-site representative(s), the general superintendent and his/her safety representative(s) shall attend this meeting.

C.1.8.20.2. Compliance with Regulations. All work, including the handling of hazardous materials or the disturbance of dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1926/1910. Work involving the disturbance or dismantling of asbestos or asbestos-containing material; the demolition of structures containing asbestos; and/or the disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subparts A and B, ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable Federal, State and municipal safety and requirements and regulations. Where there is a conflict between applicable regulations, the most stringent shall apply.

C.1.8.20.3. Contractor Responsibility. The Contractor shall assume full responsibility pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death.

Contractors are required to report all accidents and injuries to the Safety Office, Fort Stewart, and COR within four (4) hours. AR 385-40 requires that accidents and injuries be reported within seven (7) calendar days to the U.S. Army Safety Center. A copy of Workmen's Compensation Reports or information provided telephonically to the Public Safety Business Center, Telephone 912-767-8132/7880 will suffice with notification to the COR Members from the installation Safety Office may visit work site to monitor for compliance with safety regulations.

C.1.8.20.4. Accident Prevention Plan (Indefinite Delivery Type A Hazard Analysis/Safety Plan may be required for individual Job Orders. The requirement for the Contractor to submit a Hazard analysis/Safety Plan for individual Job Orders shall be contingent on the type and/or complexity of work to be performed on that Job Order. The COR shall make the determination for the requirement of a Hazard analysis/Safety Plan for individual Job Orders. The Contractor shall furnish this plan at no additional cost to the Government, it shall be considered as a requirement included in the Contractor’s coefficient. The Contractor shall prepare a Government-Furnished Department of the Army (DA) Form 285, Report of Army Accident, and submit it to the COR within seven (7) days from an accident involving personnel injuries or property damages. A copy of the completed DA Form 285 shall be furnished to the Contracting Officer as well.

C.1.8.21. Fire Prevention and Protection

a. The Contractor shall comply with fire prevention practices as set forth by the National Fire Protection Association in the National Fire Code and other recognized fire prevention agencies and post regulations. The Contractor shall obtain a written fire permit from the installation Fire Marshal for use of open flame devices, such as blow-torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment in, on, or within fifteen (15) feet of buildings. The Contractor shall be liable for any fire loss to Government property proximately caused by negligence or willful misconduct on the part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract.

b. Emergency Reporting Procedures. In the event of an emergency on Fort Stewart/HAAF dial 911, or the Installation Emergency Hotline at 866- 586-3116.

c. The Contractor shall be responsible for securing a valid excavation permit prior to commencing any excavation on Fort Stewart/Hunter Army Airfield. Excavation permits may be obtained through 1(811) 282-7411. The Contractor shall be responsible to maintain the location markings throughout the life of the Job Order.

C.1.8.22. Hazardous Materials. The Contractor shall bring to the attention of the COR any material suspected of being hazardous which he encounters during the execution of the work. A determination will be made by the COR as to whether the Contractor shall perform tests to determine if the material is hazardous. If the COR or the Contracting Officer approves the Contractor to perform tests and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.

C.1.8.23. Materials and Equipment. Special facilities, devices, equipment, clothing, and similar items used by the Contractor in the execution of work shall comply with the applicable regulations.

C.1.8.24. Asbestos Removal for Disposal

C.1.8.25. Permits. The Contractor shall obtain any necessary permits from the State of Georgia and coordinate all asbestos removal projects with the Environmental Branch twenty (20) days prior to any asbestos removal operations.

C.1.8.26. Permits and Notifications. Obtain and submit necessary permits in conjunction with asbestos removal, hauling, and disposition, and provide notification of such actions at least ten (10) working days prior to starting work. Fort Stewart/HAAF asbestos projects must comply with requirements of the National Emissions Standards for Hazardous Air Pollutants (NESHAPS), EPA notification forms shall be provided to PW, Environmental Branch. The Contractor shall send written notification to:

Georgia Department of Natural Resource Environmental Protection Division Lead Paint/Asbestos Program 4244 International Parkway Suite 104 Atlanta, GA 30354 Phone Number: (404) 363-7026

C.1.8.27. Salvageable and Repairable Materials

C.1.8.27.1. All existing materials shall remain the property of the U.S. Government unless otherwise indicated.

C.1.8.27.2. Materials classified as salvageable, serviceable, repairable, or recyclable in the contract technical provisions/plans or by the Contracting Officer shall remain the property of the U.S. Government and shall be coordinated with the Contracting Officer or the COR as to disposition within Fort Stewart/Hunter Army Airfield. Components and materials so classified shall be dismantled, thoroughly cleaned, and prepared for storage or recycle. All other materials demolished or otherwise removed in the prosecution of a Job Order shall become the property of the Contractor and the Contractor shall be responsible for proper disposal of said materials.

C.1.8.27.3. Prior to commencing work a joint inventory will be conducted by the Contractor, the COR, and the quality assurance/inspection agency. During the inventory, salvageable, serviceable, repairable, and recyclable materials will be identified. The Contractor will be given a copy of this record and will be accountable for property as indicated above. This joint inventory will in no way limit or preclude the COR from designating additional items in the above categories during the life of this contract.

C.1.8.28. Excavation Permit (4 Dec 13). The Contractor shall be responsible for securing a necessary excavation permits. Excavation permits shall be secured in accordance with the Georgia Utility Facility Protection Act (GUFPA). It shall be the contractor’s responsibility to positively locate or define the area of excavation prior to scheduled date of excavation permit request. The Contractor’s superintendent shall be present at the site at the time of issuance of the excavation permit. The contractor will not proceed with excavation of any kind until the following are in its possession:

a. Contract drawing(s) showing utilities within the proposed work area(s).

b. A completed and signed excavation permit(s). The excavation permit shall be valid for a period of 30 days from date of issuance or as otherwise directed by issuing authority.

Contractor shall repair any damages to utilities that were staked or positively located at no cost to the Government. Utilities not located that are damaged by the Contractor will be repaired by the Government.

GUFPA mandates that, before starting any mechanized digging or excavation work, you must contact Georgia 811 at least 48 hours but no more than 10 working days in advance to have utility lines marked. This law covers activities such as excavation, tunneling, grading, boring, demolition or any similar work. Georgia 811 accepts calls Monday thru Friday, excluding holidays, for normal locate requests. Damage and Emergency locate requests may be called in 24 hours a day, seven days a week.

C.1.8.29. Recycling, Salvage, and Disposal Of Materials Fort Stewart and Hunter Army Airfield

C.1.8.29.1. Disposal. All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR) showing the in, out, and tare weights of each load taken from the installation. The COR will provide copies of these tickets to the DPW Environmental Division, Solid Waste Management Section for tracking and regulatory reporting requirements.

C.1.8.29.2. Recycling/Salvage. Fort Stewart and Hunter Army Air Field has a mandatory recycling program. The Installation Command Recycling Policy Memorandum #8 can be accessed at http://www.stewart.army.mil/dpw/recycle.asp. All recyclable materials (listed in the recycling policy) generated during the entire term of any construction, demolition, or renovation contract will be turned over to the Fort Stewart or HAAF Recycling Program. Contractors must contact the COR who will coordinate with the DPW Environmental Waste Management Section (912-767-2010) to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap metal or cardboard will be generated, it is possible that a collection bin/container could be provided by the Contractor at no cost to deposit these materials. Salvage materials, unless otherwise specified, become the property of the contractor upon removal from the job site and should be taken into consideration in formulating bids.

C.1.8.29.3. Hauling/Transport Requirements. All vehicles and containers used to transport waste or recyclables on or off the Installations will meet all Federal and State DOT requirements. All waste or recyclable materials being transported will be loaded, tied, and covered in such a manner that will prevent any of the materials from leaking, spilling, falling or blowing from/off the vehicle or container. It is the contractor’s responsibility to ensure immediate pickup/clean-up of any material that is accidentally dropped, spilled or blown from a vehicle or container while in transit on and off the Installation.

C.1.8.29.4. Custodial Contract. If this contract is for custodial services or will include a custodial service requirement, the Contractor shall empty or otherwise transfer the contents from the blue recycling containers located inside buildings/facilities to the nearest blue recycling dumpster located outside.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .