AMENDMENT_01_-_Conformed.pdf
PDF 378 KB Posted
- Attached to
- Upgrade Electrical Systems Federal contract opportunity
- Solicitation number
- W9124M-17-B-0008
About this file
Amendment 01 - To add Revised Solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Statement_of_Work_02.pdf | ||
| REVISED_DRAWINGS_03_BLDG_850.pdf | ||
| REVISED_DRAWING_03__BLDG_860_-_ELECTRICAL_.pdf | ||
| AMENDMENT_03.pdf | ||
| REVISED_DRAWINGS_03_-_HANGAR_REPAIRS_860.pdf | ||
| REVISED_DRAWINGS_-_BLDG_860.pdf | ||
| AMENDMENT_02.pdf | ||
| ASBESTOS_SURVERY_Bldg_860_HAAF.pdf | ||
| ASBESTOS_SURVEY_BLDG_850_HAAF.pdf | ||
| DRAWINGS_850.pdf | ||
| DRAWINGS_BUSBARS_860.pdf | ||
| AMENDMENT.pdf | ||
| DRAWINGS_-_860.pdf | ||
| DRAWINGS_BUSBARS_850_.pdf | ||
| W9124M-17-B-0008_Solicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124M-17-B-0008
W9124M-17-B-0008-0001
0011044841-0001
PROJECT NO: Q58-9-2J;Q5B-8-2J;ED-19-7J;ED-18-7J
PROJECT TITLE: Upgrade Electrical Sys & Replace Rolling Door Electrical BusBars Bldg 850 & 860.
PROJECT LOCATION: Hunter Army Airfield Georgia.
SET ASIDE: 100% HUBZone.
NAICS CODE: 238210 - SIZE STANDARD: $15 Million
MAGNITUDE OF CONSTRUCTION PROJECT: The estimated value of the proposed w ork is betw een $1,000,000.00 and $5,000,000.00
All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specif ications.
BONDS: Bid Bond, Payment Bond, and Performance Bonds shall all be required.
SITE VISIT: Wednesday, 23 August 2017 @ 0900 See Section L DUE DATE FOR ALL QUESTIONS: Monday, 28 August 2017 @ 4:30 p.m..
BID OPENING: Monday, 11 September 2017 @ 2:00 p.m.
X
SEBRENA M. BUTLER 917-767-9033
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
04-Aug-2017
(RFP)
(IFB)
CALL:
Upgrade Electrical Systems (HAAF)
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________270 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Sep 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FORT STEWART
976 WILLIAM H. WILSON AVE SUITE 100
FORT STEWART GA 31314
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
Q5B-8-21
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (912)767-8420 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section A - Solicitation/Contract Form
SPECIAL INSTRUCTIONS
1. Bidders must complete and return the SF 1442 Front and Back (2 pages) & Section B (Bid Price Schedule), by date/time specified in Block 13A of the SF 1442. FAX will not be accepted.
2. Bidders must acknowledge receipt of all amendments by giving number and date as required in block 19.
3. Bids and Bid Amendments shall be submitted in sealed envelopes or packages and show Solicitation Number, Date, and Time of closing on the OUTSIDE OF THE ENVELOPE.
4. Please enter your CAGE code, Tax ID (TIN) & DUNS in Block 14 of Page 2.
5. Hard Copy of the Bid and Electronic copy on CD shall be hand delivered or mailed to the address in Block 7. The envelope shall be marked IAW FAR Clause 52.214-5 and ATTN Sebrena M. Butler/Mary L. Hightower.
6. MICC-Fort Stewart only receives CERTIFIED mail through the US Postal Service on Mondays and Wednesdays at 10:00 a.m EST. Regular Mail sent through the US Postal Service is received daily. Please plan accordingly when submitting your Bid/Offer Packages through the US Postal Service.
7. Drawings: H -1943 Bldg 850
8. Drawings: H -1944 Bldg 860 – Revision 1 – Sheets 1 - 15.
9. Drawings: For Construction Date: 6/27/2017
10. Contractors must be registered in the System for Award Management (SAM.gov) under NAICS Code 238210. See FAR 52.204-7 and FAR 52.204-8.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Upgrade Elec Sys, Bldg 850
FFP
Upgrade Elec Sys, Bldg 850 IAW Statement of Work & Drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011044841-0001
NET AMT
0002 1 Job Repl Rolling Door Elec Busbars, Bldg 850
FFP
Repl Rolling Door Elec Busbars, Bldg 850 IAW Statement of Work & Drawings.
0003 1 Job Upgrade Elec Sys, Bldg 860
FFP
Upgrade Elec Sys, Bldg 860 IAW Statement of Work & Drawings.
0004 1 Job Repl Rolling Door Elec Busbars, Bldg 860
FFP
Repl Rolling Door Elec Busbars, Bldg 860 IAW Statement of Work & Drawings.
0005 1 Job Contract Manpower Reporting (CMR)
FFP
The contractor will report All contractor labor hours (Including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site - See Section H.
BID PRICE
* Please see Section H for information reference Clin 0005
BID AMOUNT
0001 - Upgrade Elec Sys. Bldg 850 $
0002 - Repl Rolling Door Busbars 850 $
0003 - Upgrade Elec Sys. Bldg 860 $
0004 - Repl Rolling Door Busbars 860 $
0005 - CMR $
TOTAL ALL CLINS $
Section C - Descriptions and Specifications
STATEMENT OF WORK
TECHNICAL PROVISIONS
GENERAL
Upgrade Electrical System Building 850
IJO No. Q5B-8-2J
1. DESCRIPTION OF WORK:
1.1 Work to be Done: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with the project Upgrade Electrical System Building 850. Complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items.
1.1.1 Abate asbestos in the existing boiler room. Reference included field reports dated 8
October 1999 and 22 January 2009 for applicable areas. Also reference Paragraph 4.3.2 of the Technical Provisions – General. Main power to the entire hangar will be de-energized during this process by Canoochee EMC.
1.1.2 Field survey the existing electrical distribution system. Deliver survey results to the Contracting Officer as part of the submittal process.
1.1.3 Demolish existing interior electrical distribution system, switchgear, and electrical panels per the electrical drawings. Rework exterior electrical service. Install new interior transformers, panelboards and feeders to existing loads.
1.2 Government Furnished – Government Installed (GF-GI) Furniture and Equipment: None.
1.3 Government Furnished – Contractor Installed (GF-CI) Furniture and Equipment: None.
1.4 Contractor Furnished – Contractor Installed (CF-CI) Furniture and Equipment: None.
1.5 WORK BY OTHERS: The Contractor shall afford the Government and separate
Contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.
1.6 DRAWINGS AND SITE VISITS
1.6.1 The drawings indicate the extent of the general location and arrangement of existing conditions. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the amount of material required to perform this project. Field measurements may be necessary to determine the size and quantity of materials.
Conditions which are obvious and/or visible, or which should be reasonably anticipated by the Contractor on inspection, will not be considered under the Differing Site Conditions provision of this contract.
2. CONSTRUCTION CONSTRAINTS
2.1. Time of Performance
2.1.1 Access to Buildings – All work requiring access to building interiors excluding attics, crawl spaces, etc. and all other work shall be performed between 7:30 a.m. and 4:00 p.m.
excluding official holidays, unless otherwise indicated or approved by the Contracting
Officer. Requests to work during other than these normal hours shall be made in writing at least 36 hours in advance. For example, a request to work on a Saturday should be made no later than noon on Thursday.
2.1.2 Work Requiring Outages – Work requiring outages of utilities or building systems shall comply with prior-approved schedules.
2.2. Outages – The Contractor’s work requiring outages of utility or building systems will require a fifteen (15) day advance notice and shall be subject to approval of the Contracting Officer. The notice shall include the type of outage, date and time outage will commence and estimated duration.
2.3. Continuity – All tools, labor, and materials required to complete any item of work within a given work area or requiring an outage of any building utility or system, shall be available at the site prior to commencement thereof. Once work has commenced on an item of work, this work shall be continuously and diligently performed to completion and acceptance.
2.4. Entry – Entry to all areas, except the cantonment area, shall be coordinated with Airfield
Operations, Hunter Army Airfield and the Provost Marshal’s Office.
2.5. Fire Zone – The Contractor is required to provide 72-hour notice to the Contracting
Officer prior to any work which will impact the status of the existing fire alarm system.
2.6. Foreign Object Debris (FOD) – The Contractor shall take special precautions to contain
Foreign Object Debris (FOD) in and around any runways, taxi ways and aprons.
2.7 Operational Safety on the Airfield During Construction – The Contractor shall comply with airfield safety regulations. Coordinate with the Contracting Officer.
2.7.1 The Contractor shall be responsible for devising and implementing a detailed construction phasing plan. This plan shall be submitted to the Contracting Officer for review and approval.
3. CONSTRUCTION ACTIVITIES:
3.1 The Contractor shall submit a Safety Plan and Construction Schedule to the Contracting
Officer’s Representative (COR) ten (10) days in advance of any construction activities to arrange specific schedule for performing work as required by this Contract.
4. FACTORS AFFECTING PERFORMANCE UNDER THIS CONTRACT:
4.1 The Contractor shall coordinate use of the site for access, staging, and parking with the
Contracting Officer.
4.2 The Contractor shall be responsible for limiting access of his employees and subcontractors to the area of work defined in the Contract. The Contractor shall not have access to restrooms and amenities, such as vending machines, unless granted prior permission by the Contracting Officer.
4.3 RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS FORT STEWART AND
HUNTER ARMY AIRFIELD
4.3.1.1 Disposal: All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the Contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR), showing the in, out, and tare weights of each load taken from the installation. The COR shall provide copies of these tickets to the DPW Environmental Division, Solid Waste Management Section, for tracking and regulatory reporting requirements.
4.3.1.2 Recycling/Salvage: Fort Stewart and Hunter Army Air Field has an in-place mandatory recycling program. Reference the “Installation Command Policy Letter No. 30 and Command Recycling Standard Operating Procedure (SOP)”, which can be accessed at http://www.stewart.army.mil/info/?id=443&p=1.
All recyclable materials (listed in the recycling SOP) generated during the entire term of any construction, demolition, or renovation contract, will be turned over to the Fort Stewart or HAAF Recycling Program. Contractors must contact the COR, who will coordinate with the DPW Environmental Waste Management Section (912-767-2010), in order to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap metal or cardboard will be generated, a collection bin/container may be provided to the Contractor at no cost to deposit these materials. Salvage materials, unless otherwise specified, become the property of the Contractor upon removal from the job site and shall be taken into consideration in formulating the project bid.
4.3.1.3 Hauling/Transport Requirements: All vehicles and containers used for transport of waste or recyclables on or off the Installations shall meet all Federal and State DOT requirements. All waste or recyclable materials requiring transport shall be loaded, tied, and covered in such a manner that prevents any of the materials from leaking, spilling, falling, or blowing from or off the vehicle or container. The Contractor shall be responsible for the immediate pick-up and clean-up of any material that is accidentally dropped, spilled, or blown from a vehicle or container while in transit on and off the Installation.
4.3.1.4 Payment/Funding: If any of the conditions listed under the Recycling, Salvage, and
Disposal section are not met, the Contracting Officer shall consider this a failure to comply with the terms of the contract as discussed in the inspection clause herein.
4.3.1.5 Guidance/Question: Anyone requiring further guidance, recycling training for contractors, or has additional questions on this section should contact the DPW Environmental Division, Solid Waste Management Section, telephone 912-767-2010.
4.3.2 Toxic Substances Control Act (TSCA) Requirements
4.3.2.1 Asbestos Containing Materials (ACM)
4.3.2.2 Asbestos Containing Material (ACM) abatement is part of the work of this contract. The
Contractor must perform asbestos abatement, containment, and disposal as well as provide a 10-day notification to the Georgia Environmental Protection Division (GA EPD), as required by the Georgia Asbestos Safety Act and Official Code of Georgia (OCG), Annotated Section 12-12-1. The disposal of ACM must be in accordance with both the Georgia Environmental Protection Division (EPD) and federal Occupational Safety and Health Administration (OSHA) regulations.
4.3.2.3 REQUIRED SUBMITTAL ITEM: The Installation TSCA POC, is Craig W. Christopher, telephone
(912)-767-1234, email address craig.w.christopher.civ@mail.mil.
The TSCA POC shall be provided a copy of the 10-day notification at the time the Contractor informs GA EPD of their intent to properly abate the ACM. A copy of the Georgia asbestos shipment record must also be provided to the TSCA POC.
5. AS-BUILT RECORD DRAWINGS:
5.1 The Contractor shall be responsible for maintaining one set of master/record construction drawing prints on the job site on which he shall keep a neat and accurate record of all deviations from the original contract documents as the work progresses. The Contractor is responsible for noting all changes and corrections on the master/record construction drawing prints promptly as the changes occur in red ink (redline prints) and note the dates when these changes occurred; in no case less often than on a weekly basis. The master/record construction drawing prints shall indicate all the changes and modifications incorporated into the work as well as the following:
5.1.1 Actual locations of all subsurface and concealed utility lines after completion of any performed subsurface surveys. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered or obscured, the master/record construction drawings shall show the actual locations by offset dimensions via two permanently fixed surface features.
Appurtenances shall be located by dimensions along the utility run from a reference point. The average depth below the surface of each run shall also be recorded as applicable.
5.1.2 Shop drawings that constitute part of the design shall be included with the record drawings.
5.2 The master/record (redline construction drawings) prints with corrections, such as field changes and contract modifications, shall be certified by the Contractor as to their correctness and shall be submitted to the Contracting Officer’s Representative for approval. After the provisional master/record (redline construction drawing) prints are approved by the COR, the COR will obtain a compact disc (CD) of computer-generated construction drawings from the DPW Engineering Service Division, Building 1021 at Hunter AAF. The Contractor shall then transfer all corrections from the redline construction drawing prints to the compact disc (CD) of computer generated construction drawings. Corrections done shall be executed in MicroStation “.dgn” format. The Contractor shall note on the computer generated construction drawings the words “AS- BUILT” in the revision block with the next revision number to identify any changes made.
The revision number identification will be placed to annotate the respective changes on the drawings. The Contractor shall then submit the AS-BUILT compact disc (CD) of computer generated drawings and one (1) AS-BUILT hard copy with the Contractor’s redline corrections to the COR to insure accuracy and that all corrections were transferred from the redline construction drawing prints to the AS-BUILT hardcopy prints.
After COR approval of the AS-BUILT hardcopy prints, the COR will deliver the package to the DPW/ESD/Drafting section for final approval of the AS-BUILT compact disc (CD) of computer generated drawings. At this time, the Contractor will receive final payment contingent on approval by the COR.
6. SECURITY REQUIREMENTS.
6.1 All Contractor and subcontractor employees who require access to government installations, facilities, and controlled-access areas, shall complete Anti-Terrorism Level I Awareness Training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of successful completion for each affected Contractor employee and sub-contractor employee to the COR or the Contracting Officer (if a COR has not been designated) within 30 calendar days after completion of training by all employees and subcontractor personnel. Anti-Terrorism Level I Awareness Training is available at the following website:
https://jkodirect.jten.mil/.
6.2 The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This training shall be completed within thirty (30) calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR not later than 30 calendar days after contract award.
6.3 The Contractor and all associated sub-contractor employees shall comply with all applicable installation, facility and area Commander’s local access, security policies, and procedures. If required by this contract, the Contractor shall provide all information for background checks to meet Installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or the Security Office, as applicable. The Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the Government may require changes in Contractor security matters or processes.
END OF SECTION
SECTION 16020
ELECTRICAL RACEWAYS
PART 1 - GENERAL
1.01 SUMMARY
A. Provide electrical raceways, consisting of conduit, boxes, and cabinets for electrical power distribution, or as otherwise indicated by the contract documents.
1.02 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, connections, and relationship with adjacent construction.
1.03 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide UL listed products from manufacturers. Deliver, handle, and store materials in accordance with manufacturer's instructions and applicable codes and regulations.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Wiring Methods:
1. Exposed Indoor Wiring: Electrical Metallic Tubing (EMT) or Intermediate Metallic Conduit (IMC), installed 6 feet or higher above finished floor; Rigid Galvanized Steel or Intermediate Metal Conduit (IMC) installed lower than 6 feet above finished floor or less or where raceways are subject to physical damage.
2. Concealed Indoor Wiring: Electrical Metallic Tubing (EMT).
2. Exposed Outdoor Wiring: Rigid Galvanized Steel (RGS).
3. Concealed Outdoor Wiring: Intermediate Metallic Conduit (IMC) or Electrical
Metallic Tubing (EMT), as appropriate for the particular installation.
4. Underground Service laterals and feeders: Rigid Nonmetallic Conduit, (RNC).
Conduit penetrations in concrete slabs shall be executed via the use of corrosion-protected Rigid Galvanized Steel (RGS).
6. Connections to Vibrating Equipment: Provide flexible metallic conduit for indoor equipment. Provide liquid-tight flexible metallic conduit for equipment located outdoors or in non-conditioned spaces that are exposed to outside air.
B. Metal Conduit and Tubing:
1. Rigid Galvanized Steel Conduit: ANSI C80.1.
2. Intermediate Steel Conduit: UL 1242.
3. PVC Externally Coated Rigid Steel Conduit and Fittings: ANSI C80.1 and
NEMA RN 1.
4. Electrical Metallic Tubing (EMT) and Fittings: ANSI C80.3.
5. PVC Externally-Coated Electrical Metallic Tubing and Fittings: ANSI
C80.3 and NEMA RN 1.
6. Flexible Metal Conduit: UL 1 zinc-coated steel.
7. Liquid-tight Flexible Metal Conduit and Fittings: UL 360.
C. Nonmetallic Conduit and Ducts:
1. Electrical Non-Metallic Tubing (ENT): The use of Electrical Non-Metallic Tubing is not permissible.
2. Rigid Nonmetallic Conduit (RNC): NEMA TC 2 and UL 651, Schedule 40 or 80 PVC as applicable or as specified.
3. PVC and ABS Plastic Utilities Duct Fittings: NEMA TC 9.
4. Liquid-tight Flexible Nonmetallic Conduit and Fittings: The use of Liquid-Tight
Flexible Non-Metallic Conduit is not permissible.
D. Raceway Accessory Materials:
1. Conduit Bodies: Provide the same materials as the corresponding conduit system.
2. Wireways: Wireways, wiring troughs, etc., shall be galvanized steel construction, with screw-on galvanized covers, with minimal cross-sectional area as required by NFPA 70.
3. Provide a 200 pound tensile strength nylon pull cord in all empty telecommunications conduits, whether inside or outside the building envelope.
4. Provide metallic tracer tapes in all empty rigid nonmetallic conduits installed below grade outside of the building envelope.
E. Boxes and Fittings:
1. Cabinet Boxes: UL 50, sheet steel, NEMA 1.
2. Pull and Junction Boxes: UL 50, steel boxes.
3. Metal Outlet, Device and Small Wiring Boxes: UL 514A and OS 1.
4. Nonmetallic Outlet, Device and Small Wiring Boxes: NOT permissible.
5.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install materials and systems in accordance with manufacturer's instructions and approved submittals. Install materials in proper relation with adjacent construction and with uniform appearance for exposed work. Coordinate with work of other sections.
Comply with applicable regulations and code requirements. Provide proper clearances for servicing.
B. Maintain indicated fire ratings of walls, partitions, ceilings and floors at penetrations. Seal with fire-stopping compound or materials in order to maintain fire rating of the penetration per the applicable assembly detail in the UL Fire Resistance Directory.
SECTION 16010
CONDUCTORS AND CABLES
A. Provide wires, cables, and connectors for power, lighting, signal, control, and related systems rated 600 volts and less.
C. Operation and Maintenance Data: Submit manufacturer's operation and maintenance data, including operating instructions, list of spare parts and maintenance schedule.
1.03 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Compliance: Current editions of NFPA 70 National Electric Code and NFPA 101 Life
Safety Code; UL 4, 83, 486A, 486B, 854; NEMA/ICEA WC-5, WC- 7, WC-8; IEEE 82;
UFC 3-520-01, “Interior Electrical Systems”.
PART 2 – PRODUCTS
1.01 MATERIALS
1.02
A. Wire Components:
1. Branch circuit and feeder conductors: Solid conductors for No. 10 AWG and smaller; stranded conductors for No. 8 AWG and larger. Minimum size shall be No. 12 AWG.
2. Insulation: All insulation systems shall be THHN/THWN, minimum 75 degrees C.
3. Jackets: Factory-applied nylon or PVC.
4. Conductor Material: Copper. Do not provide aluminum conductors.
B. Cables:
1. Metal-Clad Cable: MC cabling is NOT permissible.
2. Nonmetallic-Sheathed Cable for Lighting Wiring: Residential style non-metallic sheathed cabling (NM) cabling is not allowed.
3. Underground Service Entrance Cable: THHN/THWN 75 degrees C copper, routed in Schedule 40 polyvinyl chloride conduit. Conductors above grade, or otherwise subject to physical damage, shall be routed via RGS (rigid galvanized steel) conduit.
4. Control/Signal Transmission Media: Type as specified by equipment manufacturer, UL listed for the application, with plenum rated insulation system. Provide non-power limited or power-limited as applicable for the particular system installation or as otherwise specified.
C. Connectors: Provide UL listed solder-less metal connectors with appropriate temperature ratings.
PART 3 – EXECUTION
with uniform appearance for exposed work. Coordinate with the work of other specification sections. Comply with applicable regulations and code requirements.
Provide proper clearances for servicing.
B. Maintain the integrity of fire rated partitions. Refer to the architectural contract documents for locations of fire rated partitions. Seal electrical and related penetrations in fire rated partitions via UL approved fire-stopping methods and materials to maintain fire ratings.
Refer to the UL Fire Resistance Directory for information pertaining to penetration methods for the particular application.
C. Clearly label and tag all components as required per applicable codes.
PART 1 – GENERAL
A. Comply with governing codes and regulations. Provide UL listed products from
1. Exposed Indoor Wiring: Electrical Metallic Tubing (EMT) or Intermediate Metallic Conduit (IMC), installed 6 feet or higher above finished floor; Rigid Galvanized Steel or Intermediate Metal Conduit (IMC) installed lower than 6 feet above finished floor or less or where raceways are subject to physical damage.
3. Exposed Outdoor Wiring: Rigid Galvanized Steel (RGS).
4. Concealed Outdoor Wiring: Intermediate Metallic Conduit (IMC) or Electrical
5. Underground Service laterals and feeders: Rigid Nonmetallic Conduit, (RNC).
6. Connections to Vibrating Equipment: Provide flexible metallic conduit for indoor equipment. Provide liquid-tight flexible metallic conduit for equipment located outdoors or in non-conditioned spaces that are exposed to outside air.
B. Metal Conduit and Tubing:
5. PVC Externally-Coated Electrical Metallic Tubing and Fittings: ANSI
C80.3 and NEMA RN 1.
6. Flexible Metal Conduit: UL 1 zinc-coated steel.
7. Liquid-tight Flexible Metal Conduit and Fittings: UL 360.
C. Nonmetallic Conduit and Ducts:
1. Electrical Non-Metallic Tubing (ENT): The use of Electrical Non-Metallic
Tubing is not permissible.
2. Rigid Nonmetallic Conduit (RNC): NEMA TC 2 and UL 651, Schedule 40 or
80 PVC as applicable or as specified.
C. Raceway Accessory Materials:
D. Boxes and Fittings:
approved submittals. Install materials in proper relation with adjacent construction and with uniform appearance for exposed work. Coordinate with work of other sections. Comply with applicable regulations and code requirements. Provide proper clearances for servicing.
SECTION 16200
ELECTRICAL DISTRIBUTION
A. Provide electrical service and distribution; including service entrance, grounding, panelboards, transient voltage surge suppressors (TVSS), dry-type transformers, enclosed circuit breakers, and enclosed safety switches.
material and product used. List project specific information; including incoming service characteristics, connection types, and distribution system characteristics, as applicable.
B. Shop Drawings: Submit shop drawings, indicating material characteristics, details of
C. Operation and Maintenance Data: Submit manufacturer's operation and maintenance data, including operating instructions, list of spare parts and maintenance schedule.
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in satisfactory use in similar service for three years. Use
A. Service Entrance:
1. Meter Socket and Current Transformer (CT) Enclosures: Provided by the power utility and installed by the Contractor, unless noted otherwise.
B. Grounding:
1. Grounding Equipment: UL 467; copper conductors; NEC Table 8 wire and cable conductors; connectors.
2. Grounding Electrodes: Copper clad steel ground rods, 0.75” thick by 10’ long.
Connections to grounding rods shall be made via exothermic.
C. Panelboards:
1. Panelboards: NEMA PB 1, UL 50, 61, with overcurrent protection devices, NEMA 1 enclosure suitable for use, copper bussing, compression type main and neutral lugs.
2. Panelboard Type: Lighting panelboards, minimum dimensions 20” wide by 6” deep. Distribution panelboards shall be minimum 32” wide by 9” deep.
Loadcenter style construction is not acceptable. 42 poles maximum each section. Both sections of two section panelboards shall be the same size.
See the panelboard schedules on the project drawings.
3. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA 70, Article 110-16.
4. Amperes Interrupting Current (AIC): Panelboard AIC ratings shall comply with the project drawings.
5. Doors: Doors shall have integral locking latch.
6. Directories: Panelboards shall have manufacturer-provided directory holders, cards, and clear plastic cover-inserts.
7. Provide engraved plastic nameplates, black with white core. Nameplates shall be screwed and glued to the device enclosures.
D. Dry-type Transformers:
1. Standards: Dry-type Transformers: NEMA ST-20, NEMA TP1-002, NEMA TP 3-2000, NEMA 2-2005, UL1561, DOE 2016 Energy Efficiency Standard.
2. Voltage: 480V delta primary; 120/208V, 3 phase, 4 wire “wye”, secondary.
3. Primary Bussing: Provide standard copper bussing for primary winding conductor connection; consisting of three phases + ground. Aluminum bussing is not permissible.
4. Secondary Bussing: Provide standard copper bussing for separately-derived secondary; consisting of three phases, neutral, and ground. Supply manufacturer-installed neutral-ground bonding jumper. Aluminum bussing is not
5. Capacity: KVA ratings are indicated on the project drawings.
6. Enclosure: NEMA 1, ventilated.
7. Windings: Copper only. Aluminum windings are NOT permitted.
8. Temperature Rating: 115 degrees C rise.
9. Vibration: Provide vibration isolation devices.
10. Provide a 4” thick concrete housekeeping pad with beveled edges. The pad’s dimensions shall exceed those of the transformers’ width and length by 6”, each side.
11. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA 70, Article 110-16.
12. Provide engraved plastic nameplates, black with white core, identifying the corresponding device the transformer serves. Nameplates shall be screwed and glued to the device enclosures.
E. Transient Voltage Surge Suppressor (TVSS):
Standards: TVSS shall be listed and comply with UL 1283 and UL1449, as well as NEMA
LS-1.
1. TVSS shall be suitable for use on a 277/480 volt, three-phase, four-wire system.
2. TVSS shall be rated a minimum of 150,000 amperes per mode.
3. Fault current rating shall not be less than that indicated for the device under protection. See the panelboard schedules.
4. NEMA 3R enclosure with indicator LEDs. Units with internal potting compound filler are not acceptable. Internal components shall be clearly visible and accessible.
5. TVSS shall have a 10 year manufacturer’s warranty.
6. Residential grade units are not acceptable.
7. Acceptable manufacturers: Liebert, Current Technology, LEA International, and
APC.
8. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA 70, F. Overcurrent Protection Devices:
1. Overcurrent Protection Devices: Integral to panelboards and enclosed circuit breakers. Amperes interrupting current (AIC) ratings shall not be less than that listed for bus bracing to which the breaker/device is installed.
2. Molded Case Circuit Breakers: UL 489, NEMA AB 1, thermomagnetic type, rating suitable for use. AIC ratings shall match that of bus bracing to which the breaker is installed.
3. Provide engraved plastic nameplates, black with white core, identifying the corresponding device the device serves. Nameplates shall be screwed and
4. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA 70, G. Enclosed Safety Switches (Disconnects):
1. Polyphase: Provide 600V, heavy duty type, with the number of poles indicated. Provide NEMA 3R for all disconnects installed outdoors. Provide NEMA 1 at all other locations unless noted otherwise.
2. Single Phase, 30 Amperes or Less: Provide single pole, NEMA 1 enclosure, snap switch style disconnects for all loads 1/6 HP or less, without integral overcurrent protection. Provide similar switches with integral overcurrent protection for all motor driven loads greater than 1/6 HP.
corresponding device the disconnect serves. Nameplates shall be screwed and glued to the device enclosures.
4. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA
H. Motor Starters:
I.
1. All motor starters shall be full voltage, non-reversing type, with integral disconnecting means.
2. All motor starters shall be NEMA standard size. Starters less than NEMA Size 1 are not permitted..
glued to the starter enclosures.
H. Contactors:
1. Contactors shall have 600V, 100 ampere rated contacts (unless noted otherwise), 3 phase, with separate neutral and ground bussing.
2. Contactors shall be electrically-operated, mechanically-held type. Electrically-held contactors are NOT permissible.
3. Contactors shall be provided with a galvanized steel enclosure with cover.
4. Contactors shall have integral HAND-OFF-AUTO (H-O-A) control installed in the enclosure.
5. Contactors shall be capable of external control via intelligent, programmable timer-control. Reference the project drawings.
6. Provide engraved plastic nameplates, black with white core, identifying the corresponding device the device serves. Nameplates shall be screwed and glued to the contactor enclosures.
7. Provide manufacturer-affixed ARC HAZARD labels in accordance with NFPA 70, with uniform appearance for exposed work. Coordinate with work of other sections.
with firestopping to maintain fire rating in accordance with the Underwriter’s Laboratories Fire Resistance Directory.
C. Test all systems for proper operation. Label circuits in electrical panels.
D. Restore damaged finishes. Clean and protect work from damage.
E. Instruct Owner's personnel in proper operation of systems.
TECHNICAL PROVISIONS
GENERAL
Upgrade Electrical System Building 860 IJO No. Q5B-9-2J labor, materials and performing all operations required in connection with the project Upgrade Electrical System Building 860. Complete in strict accordance with
1.1.1 Abate asbestos. Reference Paragraph 4.3.2 of the Technical Provisions – General. Main power to the entire hangar will be de-energized during this process by Canoochee EMC.
1.1.2 Field survey the existing electrical distribution system. Deliver survey results to the Contracting Officer as part of the submittal process.
1.1.3 Demolish existing interior electrical distribution system, switchgear, and electrical panels per the electrical drawings. Rework exterior electrical service. Install new interior transformers, panelboards and feeders to existing loads.
1.2 Government Furnished – Government Installed (GF-GI) Furniture and Equipment:
None.
1.3 Government Furnished – Contractor Installed (GF-CI) Furniture and Equipment: None.
1.4 Contractor Furnished – Contractor Installed (CF-CI) Furniture and Equipment: None.
1.5 WORK BY OTHERS: The Contractor shall afford the Government and separate
Contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.
1.6 DRAWINGS AND SITE VISITS
1.6.1 The drawings indicate the extent of the general location and arrangement of existing conditions. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the amount of material required to perform this project. Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious and/or visible, or which should be reasonably anticipated by the Contractor on inspection, will not be considered under the Differing Site Conditions provision of this contract.
2.1.1 Access to Buildings – All work requiring access to building interiors excluding attics, crawl spaces, etc. and all other work shall be performed between 7:30 a.m. and 4:00 p.m.
excluding official holidays, unless otherwise indicated or approved by the Contracting Officer. Requests to work during other than these normal hours shall be made in writing
2.2. Outages – The Contractor’s work requiring outages of utility or building systems will require a fifteen (15) day advance notice and shall be subject to approval of the
2.3. Continuity – All tools, labor, and materials required to complete any item of work within a given work area or requiring an outage of any building utility or system, shall be available at the site prior to commencement thereof. Once work has commenced on an item of work, this work shall be continuously and diligently performed to completion and acceptance.
2.5. Fire Zone – The Contractor is required to provide 72-hour notice to the Contracting
Officer prior to any work which will impact the status of the existing fire alarm system.
2.6. Foreign Object Debris (FOD) – The Contractor shall take special precautions to contain
Foreign Object Debris (FOD) in and around any runways, taxi ways and aprons.
2.7 Operational Safety on the Airfield during Construction – The Contractor shall comply with airfield safety regulations. Coordinate with the Contracting Officer.
2.7.1 The Contractor shall be responsible for devising and implementing a detailed construction phasing plan. This plan shall be submitted to the Contracting Officer for review and approval.
3. CONSTRUCTION ACTIVITIES:
3.1 The Contractor shall submit a Safety Plan and Construction Schedule to the Contracting
Contracting Officer.
4.2 The Contractor shall be responsible for limiting access of his employees and subcontractors to the area of work defined in the Contract. The Contractor shall not have access to restrooms and amenities, such as vending machines, unless granted prior permission by the Contracting Officer.
4.3.1.1 Disposal: All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the Contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR), showing the in, out, and tare weights of each load taken from the installation. The COR shall provide
Stewart or HAAF Recycling Program. Contractors must contact the COR, who will coordinate with the DPW Environmental Waste Management Section (912-767-2010), in order to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap metal or cardboard will be generated, a collection bin/container may be provided to the Contractor at no cost to deposit these materials. Salvage materials, requirements. All waste or recyclable materials requiring transport shall be loaded, tied, and covered in such a manner that prevents any of the materials from leaking, spilling, falling, or blowing from or off the vehicle or container. The Contractor shall be responsible
Division, Solid Waste Management Section, telephone 912-767-2010.
4.3.2 Toxic Substances Control Act (TSCA) Requirements
4.3.2.1 Asbestos Containing Materials (ACM)
4.3.2.2 Asbestos Containing Material (ACM) abatement is part of the work of this contract. The
Contractor must perform asbestos abatement, containment, and disposal as well as provide a 10-day notification to the Georgia Environmental Protection Division (GA EPD), as required by the Georgia Asbestos Safety Act and Official Code of Georgia (OCG), Annotated Section 12-12-1. The disposal of ACM must be in accordance with both the Georgia Environmental Protection Division (EPD) and federal Occupational Safety and Health Administration (OSHA) regulations.
4.3.2.3 REQUIRED SUBMITTAL ITEM: The Installation TSCA POC, is Craig W. Christopher, telephone
(912)-767-1234, email address craig.w.christopher.civ@mail.mil.
The TSCA POC shall be provided a copy of the 10-day notification at the time the
Contractor informs GA EPD of their intent to properly abate the ACM. A copy of the Georgia asbestos shipment record must also be provided to the TSCA POC.
5. AS-BUILT RECORD DRAWINGS:
5.1 The Contractor shall be responsible for maintaining one set of master/record construction drawing prints on the job site on which he shall keep a neat and accurate record of all deviations from the original contract documents as the work progresses. The Contractor is responsible for noting all changes and corrections on the master/record construction drawing prints promptly as the changes occur in red ink (redline prints) and note the dates when these changes occurred; in no case less often than on a weekly basis. The master/record construction drawing prints shall indicate all the changes and modifications incorporated into the work as well as the following:
5.1.1 Actual locations of all subsurface and concealed utility lines after completion of any performed subsurface surveys. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered or obscured, the master/record construction drawings shall show the actual locations by offset dimensions via two permanently fixed surface features.
Appurtenances shall be located by dimensions along the utility run from a reference point. The average depth below the surface of each run shall also be recorded as
5.1.2 Shop drawings that constitute part of the design shall be included with the record drawings.
5.2 The master/record (redline construction drawings) prints with corrections, such as field changes and contract modifications, shall be certified by the Contractor as to their correctness and shall be submitted to the Contracting Officer’s Representative for approval. After the provisional master/record (redline construction drawing) prints are approved by the COR, the COR will obtain a compact disc (CD) of computer-generated construction drawings from the DPW Engineering Service Division, Building 1021 at Hunter AAF. The Contractor shall then transfer all corrections from the redline construction drawing prints to the compact disc (CD) of computer generated construction drawings. Corrections done shall be executed in MicroStation “.dgn” format. The Contractor shall note on the computer generated construction drawings the words “AS- BUILT” in the revision block with the next revision number to identify any changes made.
The revision number identification will be placed to annotate the respective changes on the drawings. The Contractor shall then submit the AS-BUILT compact disc (CD) of computer generated drawings and one (1) AS-BUILT hard copy with the Contractor’s redline corrections to the COR to insure accuracy and that all corrections were transferred from the redline construction drawing prints to the AS-BUILT hardcopy prints.
After COR approval of the AS-BUILT hardcopy prints, the COR will deliver the package to the DPW/ESD/Drafting section for final approval of the AS-BUILT compact disc (CD) of computer generated drawings. At this time, the Contractor will receive final payment contingent on approval by the COR.
6. SECURITY REQUIREMENTS.
6.1 All Contractor and subcontractor employees who require access to government installations, facilities, and controlled-access areas, shall complete Anti-Terrorism Level I Awareness Training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of successful completion for each affected Contractor employee and sub-contractor employee to the COR or the Contracting Officer (if a COR has not been designated) within 30 calendar days after completion of training by all employees and subcontractor personnel. Anti-Terrorism Level I Awareness Training is available at the following website:
https://jkodirect.jten.mil/.
6.2 The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This training shall be completed within thirty (30) calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR not later than 30 calendar days after contract award.
6.3 The Contractor and all associated sub-contractor employees shall comply with all applicable installation, facility and area Commander’s local access, security policies, and procedures. If required by this contract, the Contractor shall provide all information for background checks to meet Installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or the Security Office, as applicable. The Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the
PART 1 - GENERAL
1.01 SUMMARY
A. Provide wires, cables, and connectors for power, lighting, signal, control, and related systems rated 600 volts and less.
D. Operation and Maintenance Data: Submit manufacturer's operation and maintenance data, including operating instructions, list of spare parts and maintenance schedule.
manufacturers which have been in satisfactory use in similar service for three years. Use
B. Compliance: Current editions of NFPA 70…
This is the start of the file's text. The full file is on GovTribe.