TE_4_Inspection_Report_Form.pdf
PDF 15 KB Posted
- Attached to
- Hangar Door Maintenance, HAAF Federal contract opportunity
- Solicitation number
- W9124M-16-T-0003
About this file
Technical Exhibit 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_0001_16-T-0003_Hangar_Doors.pdf | ||
| Solicitation_16-T-0003_Hangar_Doors.pdf | ||
| PWS-HAAF_-_Hangar_Doors_20150804.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 4 - Maintenance & Repair Inspection Report
Building No:___________ Door No:_____ OF _____ Type of Door: __________________________
Type (Check): Routine________ Emergency________
Part A - Quarterly Routine Inspection & Maintenance Date Completed/Initials
Can Be Performed In Conjuction With Emergency Repairs, Section B
Contact Bldg Personnel & Obtain Door Status/Known Problems
Verify Proper Operation Of Door Limits Switches Repair/Adjust Limit Switches/Inspect Contacts Actuating Rods Perform Visual Inspection, Operate Door In Both Directions Verifying Smooth Operation
Replace Missing/Tighten Loose Nuts, Bolts, Etc.
Visually Inspect Wiring, Buss Bars, Electrical Cable, Conduit & Mounting Hardware Inspect and Lubricate Wheel Drive Axles, Chains, Sprockets & Shafts Inspect Bumpers& Stop Blocks For Wear Lubricate Wheel Fittings, Guides, Stops & Rollers With Grease Gun Oil Levers, Links & Springs With Squirt Can Remove Debris From Door Track, Clean Drains, Remove Grates & Clean Trench Complete Parts C, D & E Below As Required
Part B - Emergency Repairs completed _____/______/__________
Notification Received From:_____________________@_____________(Date/Time)
Nature of Problem:
Remedial Action Taken (List Parts Replaced in Section C):
Part C - Parts Replaced COR Approval Required For All Parts Exceeding $50.00 In Cost (Part D)
Part Name Qty Cost (If Over $50.00)___
Part D - COR Approval Attach Copy of Written Quote for Parts Exceeding $50.00 I Hereby Approve Installation The Parts Listed Above Exceeding $50.00 In Cost
Signature/Date:_____________________________________________________
Part E - Return To Service Signature
Door Returned to To Service (Date/Time):_______________/_______________
COR Notified (Date/Time):____________________/_______________