W9124M15B0005AMENDMENT0003.pdf

PDF 103 KB Posted

Attached to
SEAL AND REPAIR RUNWAY 33R/15L, Wright Army Airfield, GA.
Solicitation number
W9124M-15-B-0005
Issued by

About this file

Amendment0003

View the file

Other files

File Type Posted
ABSTRACT0005.xls XLS spreadsheet
RevisedDRAWINGS.pdf PDF
AMENDMENT.pdf PDF
DRAWING3677Rev1Combined.pdf PDF
STATEMENTOFWORK.pdf PDF
DRAWINGS.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010543187-0002 2U-4-7J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to add additional questions and answ ers from the Site Visit - The cut off date for asking questions w as 19 June 2015.

b. Section H is added w ith Special Notes.

c. Please disregard the w ording "The follow ing have been modified" on Page 7 of this Amendment. The questions and answ ers from Amendment 0002 are listed again on page 7 and 8. No changes w ere made to the previous questions and answ ers issued in Amendment 0002.

d. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M-15-B-0005

X 9B. DATED (SEE ITEM 11)

27-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2015

CODE

MICC, FORT STEWART

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124M-15-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS/SECTION H

QUESTIONS FROM SITE VISIT – 23 June 2015

1. The specification for crack sealing airfield pavement at Ft. Stewart is calling for placement of foam backer rod in cracks in asphalt pavement. Would application of a stiffer D6690 II sealant, which will be more effective, be acceptable for use in these cracks?

***Crack repair will be performed in accordance with Specification Section 32 01 17.16.

2. Section 32 12 15.13, Paragraph 2.3 states that, “The JMF shall have been developed and aggregates tested no earlier than 6 months before contract award.” There is not enough time between now and contract award to meet this requirement if the plant doesn’t already have this specific mix. Will it be waived?

***The Job Mix formula (JMF) shall have been developed and aggregates tested NO LATER than 6 months before contract award.

3. Are there any restrictions on work hours or days work can be performed?

***Please see Section H of this Amendment

4. The project specifications and the plan detail for crack sealing are different. The method in the plans is more typical for this type of project. We need clarification as to which will be required. Also the plans do not show what is required for cracks greater than 2" in width.

***The specifications take precedence over the drawings. Crack repair will be performed in accordance with Specification Section 32 01 17.16.

5. Will Fort Stewart provide an existing/proposed centerline profile of the runway and allow the contractor to bid the project based on a consistent proposed slope? They are currently requesting a schedule of construction that is going to require multiple survey crews on site at all times to achieve the desired finished grade. They aren’t providing cad files so a GPS model cannot be built to perform the work they are requesting.

*** Existing/proposed centerline profile is shown on Sheet 12, "Runway Longitudinal Profile.

SECTION H – SPECIAL NOTES

ALTERNATE DISPUTES RESOLUTION (4 DEC 02)

In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable in accordance with the authority and requirements of the ADR Act.

EMERGENCY MEDICAL TREATMENT

Emergency medical treatment will be provided by the Winn Army Community Hospital in order to prevent undue suffering or loss of life. Emergencies will be treated only during the period of emergency and appropriate action will be taken to discharge or transfer such patients as soon as the emergency period ends.

Charges for medical care will be at the prevailing rate and at the Contractor's expense.

HOURS OF OPERATION

Normal working hours are 7:30 a.m. through 4:00 p.m. Monday through Friday excluding Federal Holidays.

Notwithstanding the provisions of the Contract Work Hours and Safety Standards Act – Overtime Compensation clause herein, work will not be permitted outside normal work hours, nor on Saturdays, Sundays or legal holidays unless approved by the Contracting Officer. Requests to work other than normal work hours for all work, except within Family Housing, must be submitted in writing a minimum of 2 work days in advance of date on which such work is anticipated. Work within Family Housing shall be performed during normal work hours except in the event of emergencies as determined by the Contracting Officer. The exclusion of work on Saturdays, Sundays, and holidays has been considered in computing the performance time of this contract. The following legal holidays are observed:

January 1st

1st Monday of September 3rd Monday of January 2nd Monday of October 3rd Monday of February November 11th

Last Monday of May 4th Thursday of November July 4th

December 25th

Any other Congressional or Presidential imposed Federal Holiday.

When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies.

MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by FAR clause 52.236-5 entitled, “Materials and Workmanship”, and listed at Technical Exhibit 1 or any requested deviations from the Technical Provisions shall be submitted on ENG Form 4025-R, “Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certifications”.

Required certificates, manufacturing brochures, etc., shall be submitted in five (5) copies unless otherwise specified.

Submittals requiring manufacturer’s certifications must be executed by an officer of the manufacturing company and notarized. Approval of materials or equipment not noted as a deviation shall not relieve the Contractor from complying with the applicable Technical Provisions.

REMOVAL OF CONTRACTOR PERSONNEL

The Government reserves the right to require removal of any Contractor personnel from the job site who endanger persons or property, or whose continued employment is inconsistent with the interest of military security. The Government also reserves the right to require the Contractor to remove from the job site, any employee found to be under the influence of alcohol, drugs or any other incapacitating agent or any employee involved in the theft of Government property. The removal from the job site of such personnel shall not relieve the Contractor of the requirement to provide personnel to perform services.

REQUIRED INSURANCE

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation As required by Federal and State laws

Employer’s Liability Insurance $100,000

General Liability Insurance:

Bodily Injury Liability $500,000 per occurrence

Auto Liability Insurance $200,000 per person Bodily Injury $500,000 per occurrence Property Damage $20,000 per occurrence

UTILITIES

Utility services required at the work site will be furnished at no cost to the Contractor if in place. Any alterations or connections to the existing utility facilities for accomplishment of this work shall be at no additional cost to the Government. The Contractor is responsible for coordinating with Canoochee Electric Membership Corporation (CEMC) prior to making any alterations to the electrical infrastructure. The Contractor shall remove all alterations before final acceptance of work at no expense to the Government. The Contractor shall carefully conserve any utilities furnished without charge. If utilities are not available at the job site and are required for performance, the Contractor shall provide his own generators or other necessary equipment to provide the utilities. Utilities for the operation of any work/office trailor located on the military installation for the convenience of the Contractor shall be at the Contractor’s expense. CEMC will be the point of contact (POC) for electrical concerns.

WAGE DETERMINATION

U.S. Department of Labor Wage Determination(s)/Decision(s) for Davis Bacon Act is/are incorporated into this solicitation and shall be applicable to any resultant contract.

Current Decisions and Counties are:

Liberty -GA150010 Dated: 01/02/2015 (Highway)

Bryan - GA150010 Dated: 01/02/2015 (Highway)

Chatham – GA150010 Dated: 01/02/2015 (Highway)

Evans – GA150010 Dated: 01/02/2015 (Highway)

Long - GA150010 Dated: 01/02/2015 (Highway)

ASBESTOS PROHIBITION

“Asbestos”, including chrysotile, ammosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any of these materials that have been chemically treated and/or altered is prohibited from incorporation into the work under this contract. This prohibition does not apply to nor prevent the removal and disposal of asbestos materials.

CONTRACT PROGRESS REPORTS

The contractor shall submit FORSCOM Form 59-1-R, Contract Progress Report, accompanied by a brief narrative report of work accomplished, to the Contracting Officer weekly. Each report submitted must be complete, signed and dated by the Contractor.

FIRE PREVENTION

The Contractor shall comply with fire prevention practices as set forth by the National Fire Protection Association in the National Fire Code and other recognized fire prevention agencies and post regulations.

PROGRESS SCHEDULES

The reports contemplated by the clause, FAR 52.236.15, herein entitled, “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to FORSCOM Form 59-R when periods of performance exceed 60 calendar days.

SALVAGE AND DISPOSAL OF MATERIALS

a. Salvage materials, unless otherwise specified, become the property of the contractor upon removal from the job site and should be taken into consideration in formulating bids.

b. Salvage materials to remain as Government property are None.

c. Material not salvageable shall be removed from the job site and disposed of off the installation.

d. All tree debis shall be delivered by the contractor to a central depository location on post as directed by the

COR.

IDENTIFICATION BADGES

The Contractor shall provide each employee an Identification (ID) Badge, which includes the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title.

ID Badges are to be worn at all times the employee is performing work under this contract. Each Contractor employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. Contractor is responsible for collection of ID Badges upon completion of contract or termination of employee.

DOD ANTI-TERRORISM (AT) STANDARDS

(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a US Army installation or a Federally-controlled installation, facility and/or Federally-controlled information systems shall complete Level I AT Awareness Training and receive a certificate of completion. The training is accessible from any computer and is available at https://atlevel1.dtic.mil/at/. The contractor shall certify that their workforce has completed the training and submit the completed certificate(s) to the contracting officer or designee (i.e., the Contracting Officer’s Representative). If an automated system is not available, the contractor may complete the training under the instruction of a qualified Level I AT Awareness Instructor. Level I AT Awareness Instructor qualification must be coordinated with the Installation Security Office and the name(s) of approved instructors shall be provided the contracting officer or designee.

(b) Anti-terrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

(2) Installation ATO

(a) Provide online access to AT Level I web based training for all contract personnel who have computer access.

(b) Provide AT briefings for all contract personnel who do not have access to the online website.

(c) Assist organization ATOs in developing and presenting Country Antiterrorism briefs to contract personnel prior to deployments.

(d) Assist organizations who use contract personnel to implement site specific AT measures where required.

(e) At least quarterly, review at random locally generated contracts to ensure that AT requirements are fully documented.

(f) As required, assist contracting officers in identifying AT contract requirements.

RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS

FORT STEWARTAND HUNTER ARMY AIRFIELD

Disposal: All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR) showing the in, out, and tare weights of each load taken from the installation. The COR will provide copies of these tickets to the DPW Environmental Division, Solid Waste Management Section for tracking and regulatory reporting requirements.

Recycling/Salvage: Fort Stewart and Hunter Army Air Field has a mandatory recycling program. The Installation Command Recycling Policy Memorandum #8 can be accessed at http://www.stewart.army.mil/dpw/recycle.asp. All recyclable materials (listed in the recycling policy) generated during the entire term of any construction, demolition, or renovation contract will be turned over to the Fort Stewart or HAAF Recycling Program. Contractors must contact the COR who will coordinate with the DPW Environmental Waste Management Section (912-767-2010) to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap metal or cardboard will be generated, it is possible that a collection bin/container could be provided by the Contractor at no cost to deposit these materials. Salvage materials, unless otherwise specified, become the property of the contractor upon removal from the job site and should be taken into consideration in formulating bids.

Hauling/Transport Requirements: All vehicles and containers used to transport waste or recyclables on or off the Installations will meet all Federal and State DOT requirements. All waste or recyclable materials being transported will be loaded, tied, and covered in such a manner that will prevent any of the materials from leaking, spilling, falling or blowing from/off the vehicle or container. It is the contractor’s responsibility to ensure immediate pickup/ clean-up of any material that is accidentally dropped, spilled or blown from a vehicle or container while in transit on and off the Installation.

Custodial Contract: If this contract is for custodial services or will include a custodial service requirement, the Contractor shall empty or otherwise transfer the contents from the blue recycling containers located inside buildings/facilities to the nearest blue recycling dumpster located outside. The contactor will ensure that all recycled paper products are first placed inside a clear plastic bag and the top is tied closed before it too is placed inside the nearest blue recycle dumpster.

Payment/Funding: If any of the conditions listed under the Recycling, Salvage, and Disposal section are not met, it will be considered a failure to comply with the terms of the contract as discussed in the inspection clause herein.

Guidance/Question: Anyone requiring further guidance, recycling training for contractors, or has additional questions on this section should contact the DPW Environmental Division, Solid Waste Management Section at 912-767-2010.

The following have been modified:

QUESTIONS FROM SITE VISIT

1. Drawing C‐2: The painting of runway closure markings seems to be a very inefficient method for this type of project. Will the government consider the use of fabric runway closure markings or lighted runway closure markings for this project?

**Drawings have been amended to require lighted runway closure markings.

2. Drawing C‐1: Will the contractor be required to close Runways 33L/15R and 24L/6R?

**Yes, see amended drawing C‐1.

3. Will the government consider providing the bidders with an AutoCAD file of the Existing/Proposed Topography and/or Cross Sections for use in estimating quantities since this is a lump sum project?

**Due to issues with file conversion and possible loss of integrity, we cannot provide the drawing files for bidding purposes. For our policy on this matter, see the Technical Provisions, General para. 5.3.

4. Due to the lack of erosion control plans, can we assume that this project will not require any local or state environmental permits?

**Yes, no permits are required.

5. Is the intent of the contract to mill all of the existing runway mainline, without consideration of existing fills required on the existing runway, (50 ft left and right for a depth of 4 quote mark , and then 2 quote mark on the adjcent shoulders for 25' width prior to placement of structural asphalt?

**No. The intent is to mill only where indicated on the runway cross sections in order to achieve the final grades.

Some places on the runway will require the entire 4"/2" for the runway/shoulders, some places will require very little milling, plus a leveling course.

6. Is the intent of the contract mill only the cut sections of the mainline runway to a variable depth as needed as indicated by the provided cross sections and then apply only leveling and no milling in the fill sections of the mainline runway prior to placement of structural asphalt?

**This project requires variable depth milling in order to provide the correct profile of the runway and shoulders after the 4"/2" of new asphalt are installed. In places where leveling is required, it will be necessary to mill and square out the existing pavement in order to avoid feathering out the asphalt. In these cases, the leveling course needs to be a minimum of 1‐1/2" thick.

(End of Summary of Changes)