SEAL AND REPAIR RUNWAY 33R/15L, Wright Army Airfield, GA.
Solicitation number
W9124M-15-B-0005
Issued by

About this file

AMENDMENT

View the file

Other files

File Type Posted
ABSTRACT0005.xls XLS spreadsheet
W9124M15B0005AMENDMENT0003.pdf PDF
RevisedDRAWINGS.pdf PDF
DRAWING3677Rev1Combined.pdf PDF
STATEMENTOFWORK.pdf PDF
DRAWINGS.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC, FORT STEWART F10156

ATTN SEBRENA BUTLER

EMAIL: SEBRENA.M.BUTLER.CIV@MAIL.MIL

912-767-9033

FORT STEWART GA 31314

0010543187-0002 2U-4-7J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to add Revised Draw ing, Questions and Answ ers from the Site Visit. The cut off date for submitting questions is 19 June 2015.

b. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jun-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M-15-B-0005

X 9B. DATED (SEE ITEM 11)

27-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jun-2015

CODE

MICC, FORT STEWART

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W9124M

FACILITY CODECODE

EMAIL:TEL:

W9124M-15-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

DRAWINGS FS - 3677 REV 1

Amendment to Drawings Drawings: FS - 3677 REVISION 1 Dated: 06-09-2015 Drawings: For Constuction Date: 04-13-2015 Revision shown on Pages 2 & 3 of the Drawings.

Sebrena M. Butler Contract Specialist 912-767-9033

QUESTIONS FROM SITE VISIT

1. Drawing C‐2: The painting of runway closure markings seems to be a very inefficient method for this type of project. Will the government consider the use of fabric runway closure markings or lighted runway closure markings for this project?

**Drawings have been amended to require lighted runway closure markings.

2. Drawing C‐1: Will the contractor be required to close Runways 33L/15R and 24L/6R?

**Yes, see amended drawing C‐1.

3. Will the government consider providing the bidders with an AutoCAD file of the Existing/Proposed Topography and/or Cross Sections for use in estimating quantities since this is a lump sum project?

**Due to issues with file conversion and possible loss of integrity, we cannot provide the drawing files for bidding purposes. For our policy on this matter, see the Technical Provisions, General para. 5.3.

4. Due to the lack of erosion control plans, can we assume that this project will not require any local or state environmental permits?

**Yes, no permits are required.

5. Is the intent of the contract to mill all of the existing runway mainline, without consideration of existing fills required on the existing runway, (50 ft left and right for a depth of 4 quote mark , and then 2 quote mark on the adjcent shoulders for 25' width prior to placement of structural asphalt?

**No. The intent is to mill only where indicated on the runway cross sections in order to achieve the final grades.

Some places on the runway will require the entire 4"/2" for the runway/shoulders, some places will require very little milling, plus a leveling course.

W9124M-15-B-0005

6. Is the intent of the contract mill only the cut sections of the mainline runway to a variable depth as needed as indicated by the provided cross sections and then apply only leveling and no milling in the fill sections of the mainline runway prior to placement of structural asphalt?

**This project requires variable depth milling in order to provide the correct profile of the runway and shoulders after the 4"/2" of new asphalt are installed. In places where leveling is required, it will be necessary to mill and square out the existing pavement in order to avoid feathering out the asphalt. In these cases, the leveling course needs to be a minimum of 1‐1/2" thick.

SECTION A - SOLICITATION/CONTRACT FORM

The standard size code $36,500,000 has been added.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been deleted:

STATEMENT OF WORK

(End of Summary of Changes)