W9124L-19-R-0013_Amendment_0001.pdf
PDF 214 KB Posted
- Attached to
- Pumping Services
- Solicitation number
- W9124L-19-R-0013
About this file
Amendment W9124L-19-R-0013
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011333909
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO CHANGE THE DATE OF THE SITE VISIT FROM 04 JUNE 2019 AT 09:00 A.M. CST TO 06 JUNE
2019 AT 09:00A.M.CST. SEE SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124L19R0013
X 9B. DATED (SEE ITEM 11)
22-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2019
CODE
MICC - FORT SILL
1803 NW MACOMB ROAD
FORT SILL OK 73503
W9124L 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124L19R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ADDENDUM TO 52.212-4 Contract Terms and Conditions -- Commercial Items
APACHE GATE DELIVERY INFORMATION
All delivery trucks, transportation trucks, vehicles pulling trailers, every type of cargo or construction vehicle must enter through Apache Gate.
Location of Apache Gate: Take the Medicine Park exit 45 off of Interstate 44, proceed west on highway 49 (approximately 0.5 mile). Entrance to Apache Gate is on the left (south).
Hours for Apache Gate are: Mon- Fri/5 a.m.-9 p.m., Sat/6 a.m. – 2 p.m., closed on Sunday.
CONTRACTUAL AUTHORITY
No written or oral statements of any person whosoever other than the Contracting Officer will, in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.
CHANGES
Changes in terms and conditions of this contract may be made only by written agreement of the parties with the exception of administrative changes such as changes in paying office, appropriation data, etc., which may be made unilaterally by the Government.
PERMITS, TAXES, LICENSES, ORDINANCES, AND REGULATIONS
Contractor shall obtain all necessary permits, give all notices, pay all license fees and taxes, comply with all Federal, state, municipal, county, and local Board of Health ordinances, rules and regulations applicable to the business carried on under this contract, and are responsible for all applicable state sales and use taxes.
CONTRACT PERIOD
Any contract awarded as a result of offers submitted under this RFQ shall extend from 1 October 2019, or date of contract award, whichever is later, through 30 September 2020, unless sooner terminated under the terms of the contract.
NOTE: Exercise of the Government's option(s) to extend this contract may extend the above 1 October 2020 to as late as 30 September 2024.
OPTION TO EXTEND SERVICES
a. Services described herein may be extended as described at FAR 52.217-8 by the Contracting Officer’s written notice to the Contractor any time before contract expiration. This option is intended to protect the Government from disruption of mission essential services in the event of unusual administrative problems or other extenuating circumstances.
b. No legal liability on the part of the Government for payment of any money for performance under any option beyond 30 September of the contract year shall arise unless and until funds are made available to the Contracting
Officer for such performance and notice of such availability, to the be confirmed in writing by the Contracting Officer, is given to the Contractor
AWARD FOR BASE PERIOD ONLY
Any award made as a result of this solicitation will be for the Base period only and will not include any Option period
INSURANCE REQUIREMENTS
In addition to any Insurance which may be legally required, the Contractor and any subcontractors shall procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
(See FAR 28.307-2)
a. COMPREHENSIVE GENERAL LIABILITY INSURANCE: Bodily injury liability insurance in the minimum limits of $500,000 per occurrence and property damage liability insurance in the minimum limits of $100,000 per occurrence shall be required on the comprehensive form of policy.
b. AUTOMOBILE LIABILITY INSURANCE: This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
c. WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE: As required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workman's Compensation Insurance shall extend to cover employer's liability for accidental bodily insurance or death and for occupational disease with a minimum liability limit of $100,000.
PROOF OF INSURANCE
1. At all times during performance, the Contractor shall maintain with the Contracting Officer either:
(a) A current Certificate of Insurance (COI) showing at least the insurance required above and providing for a firm 30 day written notice to the Contracting Officer by the Insurance Company prior to cancellation or any material change in policy coverage. The statement that "failure to provide such notice relieves the insurance company of any liability" shall not be written into the COI.
(b) A Certificate of Compliance, executed by an officer of the Contractor's firm, certifying that the firm will comply with the insurance requirements stated in this contract at all times during performance of this contract.
2. A Certificate of Insurance from the Contractor's insurance company or a Certificate of Compliance shall be furnished to the Contracting Officer 10 calendar days prior to contract performance.
3. Failure to maintain the required coverage may result in termination of the contract.
APPLICABLE WAGE DETERMINATION (S)
The following U.S. Department of Labor Wage Determination (s) is (are) applicable to this procurement: (a copy of each Determination is incorporated herein and made a part hereof at Wage Determination attachment.
Wage Determination No Date 15-5313 Revision 7 12/26/2018
STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES
In accordance with FAR Clause 52.222-42 “Statement of Equivalent Rates for Federal Hires” incorporated into this contract by reference by FAR Clause 52.212-5 “Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items,” the following information is furnished:
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
EMPLOYEE CLASS MONETARY WAGE-FRINGE BENEFITS*
Truck Driver, Heavy $21.34 – 45.3% Laborer $14.12 – 45.3%
ADDENDUM TO 52.212-1-Instructions to Offerors---Commercial Items
COMMERCIAL ITEM ACQUISITION PROCEDURES
This acquisition is solicited under Commercial item Simplified Acquisition procedures specified in FAR Part 13.5, Test Program For Certain Commercial Items
CLARIFICATION OF THIS SOLICITATION
Prospective bidders/offerors are cautioned against soliciting views, clarification, interpretations, etc., of this solicitation from agencies or individuals of the Government other than the office issuing this solicitation. Any desired explanation of this solicitation should be made in writing to points of contact (POCs) below. Clarifications and/or questions are due 10 June 2019 at 4:00 P.M. CST. Sufficient time should be allowed for a reply to reach bidders/offerors before submission of their quote/proposal. No phone calls, email only. Oral explanations will not be binding.
Contracting Officer (KO): Brien.M.Glenn. brien.m.glenn.civ@mail.mil
Contract Specialist (CS): Michael.S.Mitchell, : michael.s.mitchell.civ@mail.mil
SITE VISIT: Offerors/bidders are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Fort Sill has implemented an Access Control procedure that requires registration by any visitor to Fort Sill prior to gaining access. Any visitor to the installation who does not possess a Common Access Card (CAC), a valid Military ID, or a current long term unescorted pass shall report to the Visitor Control Center (VCC) to secure a pass prior to entry onto the installation. Instruction to secure a pass can be found at http://sill-www.army.mil . The site contains the required forms as well as direction to the VCC.
Although wait times can vary based on foot traffic, the average wait time to secure a pass is approximately 45 minutes-90 minutes. A temporary pass will only be issued to an individual when a NCIC interstate Identification check is passed and a valid current federal or state issued ID with a picture is produced for identification.
SITE VISIT ARRANGEMENTS
The Government will hold an organized site visit to inspect the site where these services are to be performed. The site visit will be on 6 June 2019 at 0900 A.M. CST. Persons attending the site visit should be at Mission and Installation Contracting Command (MICC), Building 1803 Macomb Road, Fort Sill, OK no later than 6 June 2019 at 08:45 A.M. CST. Due to the limited space available, each concern should limit the number of their representatives attending to two (2) persons. Written notification of attendance shall be received by the Government not later than 31 May 2019 at 4:00 P.M. CST. to the POCs (KO and CS) identified above.
INTERRUPTION OF GOVERNMENT PROCESSES
If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. If no time is specified in the solicitation, the time for receipt is 4:00 p.m., CST for the designed Government office.
(End of Summary of Changes)
File details come from the government source that posted it.