This document provides details for a solicitation seeking concrete installation, repair, and maintenance construction services for the National Capital Region. The solicitation is issued as a 100% competitive 8(a) small business set-aside by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Sam Houston. Interested offerors must submit bids in accordance with the instructions provided, including responding to any questions by 3:00pm CST on March 19, 2020. Bids for the indefinite delivery indefinite quantity contract are due by 1:00pm CST on April 7, 2020. The awardee will receive task orders for requirements including concrete work at Fort Belvoir, Virginia. Pricing is to be provided for contract line items in the bid schedule attachment.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide revisions to have solicitation correspond w ith answ ers to Industry submitted questions and address changes to the solicitation to address the impacts of the declared national emergency resulting from the COVID-19 virus.
As a result of these changes, the deadline for bid submission w ill be extended to 1:00pm, 14 April 2020, w ith the actual bid opening being rescheduled for 1:30pm, also 14 April 2020.
Please see summary of changes for full details.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124J20B0002
X 9B. DATED (SEE ITEM 11)
06-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2020
CODE
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2145
FORT SAM HOUSTON TX 78234-1361
W9124J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124J20B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
Summary of Changes—Solicitation W9124J-20-B-0002, Amendment 0001
The purpose of this amendment is to provide revisions to the solicitation to address impacts caused by the public health emergency resulting from the COVID-19 virus pandemic, as well as providing responses to Industry submitted questions.
The immediate impact to this solicitation is to the deadline for bid submission, and the time and manner in which the bid opening will be conducted. As previously indicated in the Instructions to Bidders document included with the solicitation, interested parties are required to submit their bids electronically via email to the KO and KS, Regina M.
Espinoza and Israel Gutierrez, respectively. This has not changed.
To allow enough time prepare for the bid opening and for bidders to submit their bids, the due date for bid is extended to 1:00pm CDT, 14 April 2020; while the bid opening will no longer be held via video teleconference, but rather in adherence with prescribed directives designed to curb the effects of COVID-19 will now be conducted through a teleconference where attendees will be allowed to call-in. The bid opening will commence at 1:30pm CDT, 14 April 2020.
The Instructions to Bidders document has been updated to conform to the information provided here and elaborate on the processes that will be followed at the bid opening.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Apr-2020 01:00 PM to 14-Apr-2020 01:00 PM.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS
1- Point of Contact (POC) –
a. Contract Specialist (KS) – Israel Gutierrez, israel.gutierrez1.civ@mail.mil Telephone: 210-466-2196
b. Contracting Officer (KO) – Regina M. Espinoza, regina.m.espinoza.civ@mail.mil Telephone: 210-466-2191
2- Competition Requirements – this procurement is a 100% 8(a) competitive set-aside acquisition for 8(a) contractors whose firms are located in Virginia, Maryland, or the District of Columbia. With that it has been determined that competition will be limited to only 8(a) firms whose business plans are being services by the
Small Business Administration (SBA) Richmond, Virginia District Office; SBA Baltimore, Maryland District Office; or SBA Washington Metropolitan Area District Office.
3- Type of Contract –
The Government will award an Indefinite Delivery Indefinite Quantity Contract (IDIQ). Estimated quantities and/or the work to be performed are described herein as Contract Line Items (CLINS). These quantities are approximate and are provided only for the contractor's information to assist in preparation of bids. They are not guaranteed and the actual quantities may be less or more than shown. Variations in these estimated quantities shall not be justification for or request for additional payment.
Additionally, all work under this contract will be ordered by issuance of Task Orders (TO). A TO (written notification) utilizing SF 1155 will be provided to the contractor prior to the initial date of service for the work.
The TO shall list those items and quantities from the bid schedule that are to be performed. The quantities are not to exceed each line item per TO. Any changes to either the TO line item quantity or schedule will be made by issuance of a written modification to the order. The contractor is authorized to only perform the line items provided for and funded by the individual TO.
4- Bid Preparation Instructions and Contents – These instructions are designed to ensure the submission of necessary information to provide clear understanding and the comprehensive evaluation of bids. In the Sealed Bidding procedures, price will determine the “Apparent Low Bid;” however, the submission of a low bid does not in and of itself determine responsibility of a bidder or a fair and reasonable price. Therefore, it is necessary to require additional information in order for the KO to make an award to the lowest, overall priced, responsible bidder. See Basis for Award
5- Bid Submission
The Solicitation (up to and including this and any future solicitation amendments, if any) will constitute the Offeror’s complete “bid” for the subject requirement. Bids shall be submitted prior to the bid opening time identified in Block 13 of the SF1442, which is 1:00pm CDT 14 April 2020.
Only electronic bids will be accepted. Electronic submission of bids, to include e-mail, are authorized. All bids shall be submitted electronically via email to the attention of
a. Contract Specialist (KS) – Israel Gutierrez, israel.gutierrez1.civ@mail.mil
b. Contracting Officer (KO) – Regina M. Espinoza, regina.m.espinoza.civ@mail.mil
Please ensure you include the solicitation number with subject line reference: Bid Submission.
All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the cover sheet should indicate the following:
Invitation for Bid (IFB) No: W9124J-20-B-0002 Due Date of Bids: 14 April 2020 Time by which Bids are due: 1:30pm CDT Title of Project: Concrete Installation & Maintenance – Fort Belvoir
The bid opening date and due date for bids will be 14 April 2020, however bid are due no later than 1:00pm CDT, while the bid opening will begin via teleconference at 1:30pm CDT. The delay will allow Contracting Personnel to organize the details from submitted bids to streamline the bid opening process.
Call-in details for the bid opening will be posted on the beta.SAM government point of entry website.
Bidders must allow sufficient time to complete security screening to gain admittance to Fort Sam Houston, Texas or Fort Belvoir, Virginia. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.
6- Bid Content and Documents – Contract shall be awarded to the responsive/responsible prospective contractor.
The IFB contains provisions and other items required to be completed by the bidder and returned with its bid.
Before award, to be determined responsive, a prospective contractor must furnish the following information with their bid:
a. Cover Sheet – Coversheet shall be on company letterhead and must contain your DUNS number, CAGE code, Tax ID, and authorized representative(s) who can obligate your company contractually, sign the bid, and sign, other contract actions; include telephone number with area code and complete email address for each authorized representative.
If a joint venture, the vendor must provide:
The primary member of the joint venture shall sign the SF 1442 and Corporate Certificate unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, the Offeror shall submit a copy of the joint venture agreement with the proposal. Failure to comply with the foregoing requirements may eliminate the IFB from further consideration.
The SBA must receive the joint venture agreement prior to the bid due time/date for approval before award of any resulting contract. If an Offeror is contemplating a joint venture on this project, it must advise its assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when its BOS has adequate time for a thorough review before the proposal due time/date.
b. Signed and completed SF 1442 along with any amendments –The Contractor shall acknowledge any amendments to the IFB in accordance with the instructions on the SF1442. All bidders are cautioned to complete blocks 20a-20c with an authorized signature in block 20b.
This solicitation contains provisions and other items required to be completed electronically by the bidder (see System for Award Management). Some provisions and other items required are not available online and must be completed by the bidder and returned with its bid in electronic format.
Failure to provide this information may render the bidder non-responsive.
c. Bid Schedule, Concrete IDIQ Section B (Attachment 01) –
Bidders shall incorporate a total price for each CLIN.
Bidders shall submit a completed Bid Schedule spreadsheet. A unit price shall be inserted for each line item for each location for each ordering period.
All extensions of the unit prices in the spreadsheets will be subject to verification by the
Government. In case of a discrepancy between the unit price and the totals, the unit price will govern.
Failure to submit a price for each CLIN or sub-CLIN could render your bid as non-responsive.
Notice to Bidders: When a component, work element, or system does not exist within the Bid Schedule, it shall be considered as a Non-Pre Priced Item (NPI). Line items not covered in the Bid Schedule but within the scope and general intent of this requirement and are necessary to complete the requirements of a specific TO may be negotiated and incorporated into a TO by the KO. These non-pre-priced line items will only be allowed if the Government deems that an appropriate line item is not provided within the Bid Schedule. NPIs WILL NOT BE EVALUATED FOR CONTRACT AWARD PURPOSES. NPIs WILL ONLY BE EVALUATED FOR INDIVIDUAL TASK
ORDERS AS APPLICABLE. THE USE OF NPIs IS EXPLICITLY RESERVED FOR
GOVERNMENT USE ONLY.
d. Letter from Bonding Company – Letter must indicate the bidder’s ability to obtain performance and payment bonds in the amounts, as limited by the ordering limits, up to the value of the contract’s ceiling maximum. Failure to provide this letter could render your bid as nonresponsive.
e. Bid Bond Guarantee – Per FAR Part 52.228-1, failure to provide a bid guarantee per FAR Part 52.228-1 could render your bid nonresponsive.
f. Work Experience – The prime contractor shall demonstrate that it possesses general construction contract management by providing at least two examples of recent, relevant work experience with a value of at least $250,000.00 in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, and the period of time allocated for completion of the work. Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.
g. Representations & Certifications – Bidders shall ensure their business has completed an online
Representations and Certifications at the System and Awards Management (SAM) website, which may be found at https://www.sam.gov/SAM/. It is the bidder’s responsibility to ensure that the information provided in each representation and certification is completed truthfully and completely. A bidder’s failure to complete the online representations and certifications prior to the close of the Solicitation (to include listing of the applicable NAICS code and applicable size standards) will result in their bid being deemed non-responsive and eliminated from further consideration.. Bidder must be registered in the database per FAR Part 52.204-7 in order awarded a contract and have the applicable NAICS code listed in FAR Part 52.219-1(c), Small Business Program Representations (Alternate I), Representations.
7- Site Visit – The Government has scheduled a one (01) day site visit meeting at Fort Belvoir, Virginia at 7:00am
CDT on 17 March 2020.
a. Meeting place will be the MICC – Fort Belvoir at 9410 Jackson Loop, Bldg. 1425, Fort Belvoir, Virginia 22032. Directions will be provided separately. Please arrive early enough to facilitate going through the visitor’s center at the main gate to receive a visitor’s pass.
b. Any firms who wish to attend the site visit shall submit their request electronically and directed to the attention of the KS via email at israel.gutierrez1.civ@mail.mil no later than 1:00pm CDT on 13 March 2020. All requests shall include the name(s), company name, position title, telephone number, email address and mailing address of all attendees.
c. The site visit is limited to a maximum of five (05) attendees per company. Contractor representatives should be prepared to furnish identification if requested.
d. Individual or group questions will not be answered during the site visit.
NOTE: Remarks and explanations made by the Government representatives during the course of the site visit, whether orally or in writing, shall not change or qualify any of the terms or conditions of this solicitation. The solicitation can only be changed by a formal written amendment issued by the KO.
8- Submission of Questions – Offerors shall review the solicitation and its amendments (if applicable) and submit only written questions and/or comments electronically with the Subject Line Reference:
Questions/Comments/Exceptions for Sol. W9124J-20-B-0002. All inquiries, questions and/or comments shall be directed to the attention of all of the following and are due no later than 3:00p.m. CENTRAL DAYLIGHT TIME (CDT) 19 March 2020:
(KS) Mr. Israel Gutierrez, e-mail: israel.gutierrez1.civ@mail.mil and cc to (KO) Ms. Regina M. Espinoza, e-mail: regina.m.espinoza.civ@mail.mil
**Questions submitted after the due date will not be answered**
9- Amendments – No bidders’ mailing list will be maintained. It is the responsibility of all interested parties wishing to bid on this requirement to monitor the Contracting Opportunities web page at https://beta.sam.gov/search?index=opp for any/all amendments to this Solicitation. Failure to respond to an amendment may render the bid to be considered nonresponsive and thereby rejected.
10- Public Bid Opening – Please refer to Block 13A of the SF1442. Anyone wishing to attend the bid opening
MUST notify the KO and the KS by no later than five (05) calendar days prior to the bid opening date with a firm commitment to attend.
At the bid opening all attendees will be required to provide their name and title; the name of the company they represent and contact information, to have an accounting all present for the file.
If a Bidder believes that the requirements in this IFB contain an error, omission, or are otherwise unsound;
immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.
11- Bidder Acceptance Period – See Standard Form 1442 BLOCK 13 D and BLOCK 17. Bidders providing less than 180 calendar days for Government acceptance after the date bids are due will not be considered for award and will be rejected. If the bidder would like to provide more than ninety (90) calendar days to be considered, the number of days needs to be inserted in BLOCK 17. Failure to insert any number in BLOCK 17 means the bidder accepts the minimum in Item 13D.
12- Performance and Payment Bonds Bidders are reminded of the requirement for performance and payment bonds (see FAR Part 52.228-15 -- Performance and Payment Bonds -- Construction).
EVALUATION & BASIS FOR AWARD
The KO will make a single contract award by written or electronic notice, within the time for acceptance specified in the bid or an extension, and to the responsible bidder whose bid, conforming to the invitation, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation.
Award will not be made until all required approvals have been obtained and the award otherwise conforms to FAR Part 14.103-2.
1- Determination of Responsibility
a. Per FAR Part 14.408-2, Responsible Bidder – Reasonableness of Price, the Contracting Officer will determine that a prospective contractor is responsible in accordance with FAR Subpart 9.1.
b. To be determined responsible, a prospective Contractor must – Have adequate financial resources to perform the contract, or the ability to obtain them;
Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
Have a satisfactory performance record;
Have a satisfactory record of integrity and business ethics;
Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors);
Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
2- Price and Price-Related Factors
a. Price, FAR Part 14.408-2 – the KO will determine that the prices offered are fair and reasonable before awarding the contract.
b. Price-Related Factors, FAR 14.201-8 – the following Price-Related Factors shall be evaluated prior to award as applicable: Changes made, or requested by the bidder, in any of the provisions of the IFB, if the change does not constitute a ground for rejection under FAR Part 14.404.
As part of price evaluation, the Government will evaluate its option to extend services (see FAR Clause 52.217-8) by adding six (06) months of the Offeror's last year price to the Offeror's total price. Offeror shall not submit a price for the potential six month extension of services period. The Government may choose to exercise the Extension of Services at the end of the performance period (Ordering Periods), utilizing the rates of that performance period.
3- Evaluation of Bids
a. For award purposes, the Government will evaluate bids by adding the total price for all five (05) ordering periods to determine the lowest priced bid. This includes the amount on FAR Part 52.217-8 Extension which is calculated as ½ the final ordering period total cost.
b. A written notice of award or acceptance of bid mailed or otherwise furnished to the successful bidder within the time for acceptance specified in the solicitation shall result in a binding contract without further action by either party.
RELATIONSHIP BETWEEN GOVERNMENT, CONTRACTOR AND CONTRACTOR PERSONNEL
The Government and the Contractor understand and agree that the services to be delivered under this contract are non-personal services and that no employer-employee or master-servant relationship exists or will exist under the contract between the Government and the Contractor or between the Government and the Contractor's personnel.
Further, the Contractor is not the Government's agent.
The Government will not exercise any supervision or control over Contractor personnel performing services under this contract. Contractor personnel shall not become an integrated part of the Government organization in connection with performance under this contract.
The work required under this contract does not require or authorize the Contractor or his employees to exercise personal judgment and discretion on behalf of the Government, but rather, the Contractor's employees shall act and exercise personal judgment and discretion on behalf of the Contractor.
Contractor personnel shall not be eligible, by virtue of performance under this contract, for payment by the Government of entitlements and benefits accorded federal employees. The entire consideration to the Contractor for performance of this contract is contained in the provisions for payment set forth in this contract.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .