Exhibit_A_PRS.pdf
PDF 33 KB Posted
- Attached to
- Systems Integration into Global Combat Support System Army (GCSS-Army) Federal contract opportunity
- Solicitation number
- W9124J-17-R-GCSS
About this file
Performance Requirements Summary
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources_Sought_Questions_with_Reponses.docx | DOCX document | |
| Attachment_2_DOD_Requirements_Validation_Instructions_and_Template.pdf | ||
| PWS_GCSS-Army_Integration_V1.13.pdf | ||
| Attachment_1_Health_Readiness_Center_of_Excellence_(HRCoE)_Problem_Statement_v2_(11_J....pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS)
Performance Objective Performance Standard Acceptable Quality Level
(AQL)
Method of Inspection
Incentive/Disincentive
Para 3.5 – 3.5.13
Complete Training Requirements and Submit Completion Certificates
Certificates of training shall be provided within 30 days of performance start date.
Certificates of training shall be provided within 30 days of performance start date no less than 100% of the time.
100% review of training requirements
Performance below the standard will be documented in the Contractor Performance Assessment Reporting System
(CPARS).
Para 5.2.1
CONTRACTOR
MANPOWER
REPORTING. The contractor shall report ALL contractor labor hours
The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/.
Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30.
Labor Hours submitted prior to 31 October after contract award no less than 100% of the time.
100% review
Performance above or below the standard will be documented in the
CPARS.
Para 5.2.2
The contractor shall develop a requirements document based on the Enterprise Architecture for developing interfaces and changing business processes and policy for MEDLOG integration with GCSS-Army.
Milestone 1: Complete within 90 days of the award.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% inspection standard will be documented in
CPARS.
Para 5.2.3.
The contractor shall develop Business Process Models to Support Business Process Re-engineering (BPR) Assertions for MEDLOG integration into GCSS-Army.
Milestone 2: Complete 120 days after award and capture each type of operating force medical organization.
Business Process Models are created to capture 100% each type of orgainzation supported within the operating force.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of of document standard will be documented in
CPARS.
Para 5.2.4.
The contractor shall develop a DOTMLPF- P Implementation Plan, to Include Anticipated Return-on- Investment (RoI) for MEDLOG integration with GCSS-Army.
120 days after award.
Implementation Plan the addresses 100% of DOTMLPF-P sections.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of of document standard will be
Para 5.2.5.
develop a Rough Order of Magnitude Estimate (ROM estimate) to determine the project’s level of effort and cost to complete.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be
Para 5.2.6.
analyze a Link to Out-of-Cycle (OOC) Requests or Other Investment(s). If the MEDLOG integration with GCSS-Army requirement is aligned to an Out-of-Cycle (OOC) request, all relevant details should be outlined in this section to ensure continuity between the efforts, allowing for faster evaluation and
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be approval timelines.
Para 5.2.7.
The contractor shall provide the MEDCOM
G-46, USAMMA BSO,
USAMMA NMP and AMLE with meeting minutes after key engagements with
HQDA G4, CASCOM,
GCSS-A PM and
AESIP PM.
Submit meeting minutes within seven days of the engagement.
Submit minutes for 97% of the engagements the contractors attend with
AMLE
government representative and corrections made within two days of meeting.
100% review of document
Performance above or below the standard will be
Para 5.2.8.
provide the MEDCOM G-46, AMLE and CASCOM with power point briefings for decisions and informational depicting Medical Logistics processes, master data, LCMC equipment total package fieldings, catalog / NIR processes, assembly management, war reserve and MEDLOG SSA processes.
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be
5.2.9.
provide the MEDCOM G-46, AMLE and CASCOM information papers on Medical Logistics processes, master data, LCMC equipment total package fieldings, catalog / NIR processes, assembly management, war
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be reserve and MEDLOG SSA processes.
Para 5.2.10.
The contractor shall provide the
USAMMA BSO,
AMLE and CASCOM with power point briefings for decisions and informational depicting Class VIII supply processes, master data, LCMC equipment total package fieldings, catalog / NIR processes, assembly management, war reserve and
MEDLOG SSA
processes.
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be
Para 5.2.11.
provide the
USAMMA BSO,
AMLE and
CASCOM
information papers on Class VIII supply processes, master data, LCMC equipment total package fieldings, catalog / NIR processes, assembly management, war reserve and
MEDLOG SSA
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be processes.
Para 5.2.12.
The contractor shall provide the
USAMMA NMP,
AMLE and CASCOM with power point briefings for decisions and informational depicting Class VIII maintenance processes, master data and catalog / NIR processes.
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be
Para 5.2.13.
provide the USAMMA NMP, AMLE and CASCOM information papers on Class VIII maintenance processes, master data and catalog / NIR processes.
Submit project within the assigned suspense using template provided by the government.
Requires no more than a 30% revision of the document.
Revisions made within 7 days of government notification of errors/change requests.
100% review of document
Performance above or below the standard will be
File details come from the government source that posted it. Updated .