Technical_Exhibit_1_Grounds_Maintenance_Quantities.docx

DOCX document 17 KB Posted

Attached to
Fort Buchanan Grounds Maintenance
Solicitation number
W9124J-16-R-0059
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 1 Grounds Maintenance Quantities

Item Description

Quantity (Approximately)

Unit Reference Drawing

Improved Grounds:

1. All other area DPW

1. Family Housing Area Total

Acres (AC) Acres (AC) Acres (AC) GM-1 through GM-7

Unimproved Grounds

a. All other Area DPW

b. Family Hosing Area

GM-1 through GM-7

Coconut Palm Trees:

a. All other area

b. Family Housing Area

Each (EA) Each (EA) Each (EA)

Flower Beds*

a. All other area

b. Family Housing Area

_0_

Acre

Acre

Storm Drainage Systems

a. All other area

b. Family Housing Area

Note: These figures account for major drainage systems where powered equipment may be used by the contractor to scrape sediments and debris. Total amount of open channels (including but not limited to curbs & gutters) is not accounted for in here and is payable under improved grounds mowing and cleaning.

17,700 5,300 23,000

Linear Feet (LF)

Tree Pruning:

1. All other area DPW

1. Family Housing area

15,000 (However, approximately 750 will require pruning)

Security Perimeter Fence

a. All other area DPW

b. Housing area

36,000 LNFT

36,000 LNFT

GM-7

Security Boundary Fence

a. All other area DPW

54,200 LNFT

1,808 LNFT

56,000 LNFT

GM-7

Electrical Aerial Lines Right-of-Way

a. All other area DPW

RU-6, RU-7 & RU-8 (Electrical Distribution)

Solar Panels

* Flower beds include graveled areas and planters. See Technical Exhibit 2.

File details come from the government source that posted it. Updated .