IB08 Questions and Answers - FMCOM Shelving Removal - Final.pdf
PDF 123 KB Posted
- Attached to
- Shelving Unit Removal - Indianapolis Indiana Federal contract opportunity
- Solicitation number
- W9124D25QA141
About this file
This document is a Questions and Answers (Q&A) file for a USAFMCOM Shelving Removal project. The Q&A provides clarification on various aspects of the shelving removal contract, including details about the systems to be removed, site conditions, and project requirements. Key points include no site visits being permitted, dumpsters not allowed on site, and references to the Performance Work Statement (PWS) Section 5 and Technical Exhibit C for specific details about the shelving units, their location, and removal process. Respondents are directed to consult the PWS sections 5.1 and 5.2 for information about the track system and plywood removal, and to review attached site pictures for additional context. The Q&A document serves to provide potential contractors with standardized information about the scope and requirements of the shelving removal project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IA03 PWS - SRO A30 Shelving Unit Removal - Final Amended -5May25.pdf | ||
| IB08 Solicitation Amendment - W9124D25QA1410002 - SF 30 - Shelving with Q and A - Released.pdf | ||
| IB08 Solicitation Conformed - W9124D25QA1410002 - Shelving Extension.pdf | ||
| USAFMCOM Shelving Removal Site Pictures.pdf | ||
| IB08 Solicitation Amendment - W9124D25QA1410001 SF 30 - Shelving Extension.pdf | ||
| IB08 Solicitation Conformed - W9124D25QA1410001 - Shelving Extension.pdf | ||
| IB08 Solicitation - W9124D25QA140 - Released-.pdf | ||
| IA02 PWS - SRO A3O Shelving Unit Removal - Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A
USAFMCOM SHELVING REMOVAL
Q. Do you have more details about the systems that need to be removed?
A. Please refer to the PWS Section 5 and Technical Exhibit C.
Q. Pictures. Are you able to send pictures of the track system/shelving units?
A. Please see attached document titled USAFMCOM Shelving Removal Site Pictures.
Q. Size?
A. Please refer to the PWS Section 5 and Technical Exhibit C.
Q. Drawings?
A. Please refer to Technical Exhibit C of PWS and attached Pictures.
Q. Location in building…1st floor, loading dock, elevators?
A. Please refer to Section 5 of the PWS.
Q. Disposal, can we drop a dumpster at the location?
A. Dumpsters are not permissible on site. See Updated PWS Section 4.4.
Q. Would it be possible to make a site visit? If a site visit is permitted, what is the requirement?
A. A site visit for this solicitation is not possible at this time.
Q. Do you know how many levels of shelving are in each shelving unit?
A. Please refer to the PWS Section 5 and Technical Exhibit C and pictures provided.
Q. Does the track system sit on the plywood or does the plywood sit on the track system? (are we removing the track system as well as the plywood?)
A. Please refer to the updated PWS Sections 5.1 and 5.2.
File details come from the government source that posted it. Updated .