Text version
1. Who is the incumbent consultant?
A. The incumbent is J.L. Rogers & Callcott Engineers, Inc.
2. Can we get access to the current TMDL Plans?
A. TMDL Plans will be provided as an attachment to the solicitation
3. Specifically how does the modeling activity under this contract fit into the work that is currently taking place on the Semmes Lake Dam (under that contract)?
A. Modeling is not a task in the PWS.
4. Several documents were referenced in the PWS. Please provide the latest versions of the following:
* 5.1.2 - TMDL Monitoring Plan
* 5.2.3 - TMDL Implementation Plan
* 5.2.7 - BMP Inspection Report
* 5.3.1 - Sampling Report
* 5.3.3 – TMDL Assessment Plan
* 5.3.5 – IDDE Priority Map
* 5.3.6 – Land Disturbance Handbook
* 5.3.7 – Annual Report
* 5.3.8 – Storm Water Monitoring Plan A. All the documents stated above will be provided as an attachment to the solicitation.
5. How do we show a PE code for wage when one is not listed in the Solicitation, but is required per the solicitation.
A. The Area Wage Determination Code in the direct labor table you can either leave it blank or provide the code for a similar position at the same performance level. However, table must be completed for your organizations staffing.
6. Under section 1.5.11 in the solicitation, Key Personnel, the Project Director must be a professional engineer in SC or have CEPSCI and CSPR certifications. However, under the WD 15-4429 (Wage Determination) Rev. 9 (page 69/104), there are no titles or occupation codes associated with a Professional Engineers.
A. See answer to question 5 above.
7. Part of Volume II, Tab B, i, A detailed list of the labor categories, number of personnel proposed for each labor category and associated labor hours deemed necessary to perform the requirement for each performance period are requested. How are we to provide labor categories and wages if they do not exist in the table.
A. You are required to complete this table with the proposed labor categories your company deem necessary to fulfill all the requirements outlined in the PWS.
8. Can copies of the TMDL Monitoring and Assessment Plans be provided?
A. Yes, they are going to be provided as an attachment to the solicitation
9. Is this a renewal of an existing contract? If so, could you provide that contract number?
A. Yes, the contract number is W9124C-17-C-0051.