This document is an amendment to a solicitation for the remodel of a training facility building at Fort Huachuca, Arizona. The Army Contracting Command at Aberdeen Proving Ground is soliciting proposals to renovate Building 52110, including fire sprinklers, mechanical systems, and interior renovations. Proposals are due by August 28, 2023 at 12:00 PM MST. The amendment provides revised statements of objectives, instructions to proposers, and lists of attachments. Offerors must acknowledge all amendments. The solicitation seeks firm fixed prices for construction line items and provides a price proposal template for offerors to complete. Past performance evaluations are also required from recent, relevant efforts.

View the file

Other files

File Type Posted
W9124A23R0016 Amendment 1 Conform.pdf PDF
J-09 Concept Design.PNG PNG image
J-27 Picture Files Location.pdf PDF
J-23 Right Side Elevation.pdf PDF
J-18 Mech Room.pdf PDF
J-22 Rear Elevation.pdf PDF
J-17 Service Entrance.pdf PDF
J-19 RTU.pdf PDF
J-21 Front Elevation.pdf PDF
J-28 Fire Sprinkler System.pdf PDF
J-26_Labeled Photos.pdf PDF
J-25_Photo Locations.pdf PDF
J-32 Site-Visit - 52110 7.24.23 Attendance List.pdf PDF
J-09A Concept Design.pdf PDF
J-24 Left Side Elevation.pdf PDF
J-01_SOO-Rev2_UAS00024-1J_Remodel Training Facility-Bldg-52110.pdf PDF
J-20 Condenser location.pdf PDF
J-30 Room.pdf PDF
J-31 QA remodel training facility-52110-8-04-2023.pdf PDF
J-29_fh-az52110-01s.pdf PDF
Solicitation W9124A23R0016.pdf PDF
J-01 - SOO-Rev1_UAS00024-1J_Remodel Training Facility-Bldg-52110-4.pdf PDF
J-07 52.204-9 Personnel Log.xlsx XLSX spreadsheet
J-12 Demolish Walls Lower level.PNG PNG image
J-04c-asbestos-lead report3.pdf PDF
J-05 Questions Template.xlsx XLSX spreadsheet
J-04b-asbestos-lead-report2.pdf PDF
J-13 Drawings 1958.pdf PDF
J-03 GE Sims Bldg 52110 Remodel.pdf PDF
J-06 Past Performance Evaluation Questionnaire Form.pdf PDF
J-14 Ladders.pdf PDF
J-15 Comparison of SOO BLDG 52110.pdf PDF
J-08 Map Ft Huachuca AZ.pptx PPTX presentation
J-11 Exterior Bay doors.pdf PDF
J-10 Demolish WallsANDCeilings.PNG PNG image
J-09 Concept Design.PNG PNG image
J-02 Floorplan 52110.pdf PDF
J-04a-asbestos-lead-report1.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACC-APG

MAVERICK SIRAGUSA BLDG 22208

FT HUACHUCA AZ 85613

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment 0001 is as follow s:

14.1 Provide Questions and Answ ers for solicitation.

14.2 Provide Revised Statement of Objectives dated 4 August 2023.

14.3 Updated Section 00 21 16 Instructions to Proposers.

14.4 Updated Section 01 00 00 List of Attachments.

14.5 Proposal due date extended until 28 August 2023, 12:00 P.M. MST time.

14.6 The SF 1442, Solicitation, Offer, and Aw ard is to be completed by all Offerors and duly executed w ith an electronic or PDF scanned signature by an official authorized to bind the company in accordance w ith FAR 4.102. All amendments must be acknow ledged by all Offerors in accordance w ith the instructions on the Standard Form 30 or 1442, Amendment of Solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124A23R0016

X 9B. DATED (SEE ITEM 11)

20-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2023

CODE

ACC-APG

CONSTRUCTION 600AUGER ST BLDG 22208

FT HUACHUCA AZ 85613

W9124A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W9124A

FACILITY CODECODE

EMAIL:TEL:

W9124A23R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

PROPOSAL INSTRUCTIONS

F. PROPOSAL SUBMISSION:

PROPOSAL PREPARATION

Technical Factor (Volume I):

1. Technical Proposals shall address all the elements required in the attached Statement of Objectives (SOO).

2. The contractor’s proposed schedule shall be submitted with the technical proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the percentage of work scheduled for completion at any given date during the period.

3. Technical Proposal with schedule submission is limited to 15 pages.

4. Provide a List of Materials with quantities and a total price for all materials. Materials will not be evaluated for price on an individual basis.

5. Provide a List of Equipment with quantities and a total price for all equipment. Equipment will not be evaluated for price on an individual basis.

6. Proposals shall be single spaced. Each paragraph shall be separated by at least one blank line.

A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required.

Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

Price Factor (Volume II):

1. A price for each CLIN/SLIN shall be provided in your proposal. Pricing must be totaled in the proposal to show the total overall price as indicated in the price summary below.

2. An example price summary is provided below.

PRICE FACTOR SUMMARY:

CLIN Description Unit Price Total Price 0001AA Renovate Bldg.

52110

0001AB Fire Sprinkler System

Total

3. No price information shall be presented in any part of the proposal except the Price Proposal.

Proposals shall be clear and concise, logically assembled (with all pages appropriately numbered) and referenced to applicable parts of the Statement of Objectives or Request for Proposal, as appropriate. To reduce proposal size, the Offeror will confine submission to essential matters sufficient to define the proposal and provide an adequate basis for evaluation.

File shall not contain classified data.

4. The contractor shall provide a labor break-out of all labor rates and loadings (all indirect rates, inclusive of labor indirect rates, G&A, and profit) that lead to the establishment of the firm fixed price. The contractor will provide a price breakout for all major components and equipment.

Past Performance Factor (Volume III):

1. Past Performance related to Remodel Training Facility occurring in the past 5 years must be provided using the Past Performance Evaluation Questionnaire Form provided as attachment J- 06 of this solicitation. The Questionnaire should be sent to the PCO/ACO of the recent/relevant effort to be completed. The completed forms must be e-mailed to:

Nadia I. Firestone Contract Specialist nadia.i.firestone.civ@army.mil Maverick C. Siragusa Contract Specialist maverick.c.siragusa.civ@army.mil

Jonathan W. Jones Contract Specialist jonathan.w.jones56.civ@army.mil

Glenn E. Hohman Contracting Officer glenn.e.hohman.civ@army.mil

No later than 21 August 2023, 12:00PM Arizona Time.

2. Late submissions may not be considered.

3. See Attachment for instructions for completing Past Performance Questionnaires

4. Additional Sources of Past Performance Information for Evaluation which may be used by the contracting office to determine acceptability of past performance. Sources such as the following maybe used:

• Past performance information may be provided by the offeror, as solicited.

• Past performance information may be obtained from established systems such as the Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; and may be obtained from other sources available to the Government, such as the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, Fee Determining Officials. Although the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

G. PROPOSALS/SPECIFICATIONS SUBMISSIONS

Proposals are to be submitted via e-mail to the Points of Contact listed below by 28 August 2023, 12:00PM Arizona Time.

H. POINT OF CONTACTS (POC):

Nadia I. Firestone Contract Specialist nadia.i.firestone.civ@army.mil

Maverick C. Siragusa Contract Specialist maverick.c.siragusa.civ@army.mil

Jonathan W. Jones Contract Specialist jonathan.w.jones56.civ@army.mil

Glenn E. Hohman Contracting Officer glenn.e.hohman.civ@army.mil

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

LIST OF ATTACHMENTS

LIST OF ATTACHMENTS:

J-01 SOO-Rev2_UAS00024-1J_Remodel Training Facility-Bldg-52110-4 J-02 Floorplan 52110 J-03 GE Sims Bldg 52110 Remodel J-04a asbestos-lead-report1 J-04b asbestos-lead-report2 J-04c asbestos-lead report3 J-05 Questions Template J-06 Past Performance Evaluation Questionnaire Form J-07 52.204-9 Personnel Log J-08 Map Ft Huachuca AZ J-09 Concept Design J-09a Concept Design J-10 Demolish WallsANDCeilings J-11 Exterior Bay doors J-12 Demolish Walls Lower level J-13 Drawings 1958 J-14 Ladders J-15 Comparison of SOO BLDG 52110 J-16 Site-Visit - 52110 7.24.23 Attendance List J-17 Service Entrance J-18 Mech Room

J-19 RTU

J-20 Condenser Location J-21 Front Elevation J-22 Rear Elevation J-23 Right Side Elevation J-24 Left Side Elevation J-25 Photo Location J-26 Labeled Photos J-27 Picture Files Location J-28 Fire Sprinkler System J-29 fh-az52110-01s J-30 Rooms J-31 QA Remodel Training Facility

(End of Summary of Changes)

File details come from the government source that posted it. Updated .