This document outlines renovation requirements for Building 52110 at an Army facility. Work includes removing security vault and mail room walls; repairing, cleaning, and sealing concrete floors; upgrading voice and data systems; installing air conditioning, electrical drops, and cubicles; enlarging restrooms; and painting walls and ceilings. The related federal contract opportunity is solicitation number W9124A23R0016 to remodel the specified training facility building. Offerors are to submit a more detailed statement of objectives and work describing the scope of the renovation project.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work required in Bldg: 52110
Simulators:
• Security Vault walls needs to be removed
• Concrete floors will be repaired, cleaned, polished, and sealed
• Old 1959 roll-a-deck comms closet system will be remove
• Voice and Data will be upgraded to current standards
• Walls will be painted semi-gloss eggshell white
• Ceiling will be painted flat black
• 20 electrical drops will be installed to support UMS Simulators
• 4ea 12ton AC units will be installed to support cooling of UMS
• Install cubicles in rear offices
• Install electrical for cubicles
Admin & Classrooms:
• Mail room walls needs to be removed
• Old carpet needs to be removed
• Concrete floors will be repaired, cleaned, polished, and sealed
• Old 1959 roll-a-deck comms closet system will be remove
• Voice and Data will be upgraded to current standards
• Walls will be painted semi-gloss eggshell white
• Restrooms will be enlarged to accommodate population in facility
• Install cubicles in front offices
• Install electrical for cubicles
• Install voice & data for cubicles
Contractor will be required to submit a more detailed SOO/SOW to reflect work required.
Bldg. 52110 Current Layout
Loading Dock
SV
LT
JAN
SV
LT
JAN
SV
LT
JAN
SV
LT
AUX
Bath BathBathBath
TCC
TC
C
M ail R o o m
M ail R o o m
M ail R o o m
M ail R o o m
OfficeOffice Office Office Office Office Office OfficeLobby Lobby Lobby Lobby
STO STO STO STO
SV
LT
JAN
SV
LT
JAN
SV
LT
JAN
SV
LT
AUX
Bath BathBathBath
TCC
TC
C
Bldg. 52110
Remove Walls
Remove Walls
Remove Walls
Remove Walls
Remove Walls
Remove Walls
Remove Comms Closet
Remove Walls
Remove Walls Remove Comms Closet
SV
LT
JAN
SV
LT
JAN
SV
LT
JAN
SV
LT
AUX
Bath BathBathBath
TCC
TC
C
Bldg. 52110
Remove Walls Remove Walls Remove WallsRemove Walls
SDISDI
C O
M M
S
NEC
BR
BR
BR
BR
BR
Student Breakroom
Micro Market
Storage
Cadre/Admin
Cadre/Admin
Sim Room x5
Sim Room x6
Sim Room x6
Classroom 1 Classroom 2 Classroom 3
BR
BR
BR
BR
BR
Gray Eagle Sims Concept Design by Mr. Ortiz
Cadre Breakroom
Double Door Double DoorSingle Door
Sag LCD
Sag LCD
Sag LCD (Optional Sim Room x3)