J-03 GE Sims Bldg 52110 Remodel.pdf

PDF 476 KB Posted

Attached to
W9124A23R0016 - Remodel Training Facility BLDG. 52110
Solicitation number
W9124A23R0016
Issued by

About this file

This document outlines renovation requirements for Building 52110 at an Army facility. Work includes removing security vault and mail room walls; repairing, cleaning, and sealing concrete floors; upgrading voice and data systems; installing air conditioning, electrical drops, and cubicles; enlarging restrooms; and painting walls and ceilings. The related federal contract opportunity is solicitation number W9124A23R0016 to remodel the specified training facility building. Offerors are to submit a more detailed statement of objectives and work describing the scope of the renovation project.

View the file

Other files

File Type Posted
W9124A23R0016 Amendment 1 Conform.pdf PDF
J-09 Concept Design.PNG PNG image
W9124A23R0016 Amendment 1.pdf PDF
J-27 Picture Files Location.pdf PDF
J-23 Right Side Elevation.pdf PDF
J-18 Mech Room.pdf PDF
J-22 Rear Elevation.pdf PDF
J-17 Service Entrance.pdf PDF
J-19 RTU.pdf PDF
J-21 Front Elevation.pdf PDF
J-28 Fire Sprinkler System.pdf PDF
J-26_Labeled Photos.pdf PDF
J-25_Photo Locations.pdf PDF
J-32 Site-Visit - 52110 7.24.23 Attendance List.pdf PDF
J-09A Concept Design.pdf PDF
J-24 Left Side Elevation.pdf PDF
J-01_SOO-Rev2_UAS00024-1J_Remodel Training Facility-Bldg-52110.pdf PDF
J-20 Condenser location.pdf PDF
J-30 Room.pdf PDF
J-31 QA remodel training facility-52110-8-04-2023.pdf PDF
J-29_fh-az52110-01s.pdf PDF
Solicitation W9124A23R0016.pdf PDF
J-01 - SOO-Rev1_UAS00024-1J_Remodel Training Facility-Bldg-52110-4.pdf PDF
J-07 52.204-9 Personnel Log.xlsx XLSX spreadsheet
J-12 Demolish Walls Lower level.PNG PNG image
J-04c-asbestos-lead report3.pdf PDF
J-05 Questions Template.xlsx XLSX spreadsheet
J-04b-asbestos-lead-report2.pdf PDF
J-13 Drawings 1958.pdf PDF
J-06 Past Performance Evaluation Questionnaire Form.pdf PDF
J-14 Ladders.pdf PDF
J-15 Comparison of SOO BLDG 52110.pdf PDF
J-08 Map Ft Huachuca AZ.pptx PPTX presentation
J-11 Exterior Bay doors.pdf PDF
J-10 Demolish WallsANDCeilings.PNG PNG image
J-09 Concept Design.PNG PNG image
J-02 Floorplan 52110.pdf PDF
J-04a-asbestos-lead-report1.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work required in Bldg: 52110

Simulators:

• Security Vault walls needs to be removed

• Concrete floors will be repaired, cleaned, polished, and sealed

• Old 1959 roll-a-deck comms closet system will be remove

• Voice and Data will be upgraded to current standards

• Walls will be painted semi-gloss eggshell white

• Ceiling will be painted flat black

• 20 electrical drops will be installed to support UMS Simulators

• 4ea 12ton AC units will be installed to support cooling of UMS

• Install cubicles in rear offices

• Install electrical for cubicles

Admin & Classrooms:

• Mail room walls needs to be removed

• Old carpet needs to be removed

• Concrete floors will be repaired, cleaned, polished, and sealed

• Old 1959 roll-a-deck comms closet system will be remove

• Voice and Data will be upgraded to current standards

• Walls will be painted semi-gloss eggshell white

• Restrooms will be enlarged to accommodate population in facility

• Install cubicles in front offices

• Install electrical for cubicles

• Install voice & data for cubicles

Contractor will be required to submit a more detailed SOO/SOW to reflect work required.

Bldg. 52110 Current Layout

Loading Dock

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

M ail R o o m

M ail R o o m

M ail R o o m

M ail R o o m

OfficeOffice Office Office Office Office Office OfficeLobby Lobby Lobby Lobby

STO STO STO STO

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

Bldg. 52110

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Comms Closet

Remove Walls

Remove Walls Remove Comms Closet

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

Bldg. 52110

Remove Walls Remove Walls Remove WallsRemove Walls

SDISDI

C O

M M

S

NEC

BR

BR

BR

BR

BR

Student Breakroom

Micro Market

Storage

Cadre/Admin

Cadre/Admin

Sim Room x5

Sim Room x6

Sim Room x6

Classroom 1 Classroom 2 Classroom 3

BR

BR

BR

BR

BR

Gray Eagle Sims Concept Design by Mr. Ortiz

Cadre Breakroom

Double Door Double DoorSingle Door

Sag LCD

Sag LCD

Sag LCD (Optional Sim Room x3)

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5

File details come from the government source that posted it. Updated .