This document contains questions and answers related to a federal solicitation for roof repair services at multiple buildings located at Fort Huachuca, Arizona. The solicitation seeks a firm fixed-price contract for roof repairs at Buildings 51005, 51450, 51451, and 63845. Services include re-flashing vent hoods, replacing entire roof decks, and recycling unbroken roof tiles. Additional files provide supplementary drawings and details. The North American Industry Classification System code is 238160 for roof contractors. The solicitation is set aside 100% for small businesses and incorporates the applicable construction wage determination. Proposals are due by August 11, 2022 at 4:00pm Arizona time. The contract will be awarded to the lowest priced technically acceptable offeror.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Repair Roofs
Buildings 51005, 51450, 51451, and 63845
12 August 2022
1. Riley Barracks SOO# 4.02.01 Do we need to replace the large vent hoods or can we re-flash the existing ones?
Answer: The large vent hoods shall not be replaced. The contractor shall include re-flashing the large vent hoods.
2. Riley Barracks SOO #4.02.01 Do you have a core sample of the roof to see if the roof is originally pitch or has a taper system on it?
Answer: The two as-built roof drawings provided on SAM.gov show the pitch of the roof for Area CE and DE. See 21-06 13 Building 51005 Area CE roof plans and details.pdf and 23-2-412-7 (A3) Building 51005 Area DE ROOF PLAN.pdf. No core sample has been taken. The as-built drawings show a taper was present when first constructed.
3. Rowe Hall SOO# 4.01.01 What is the expectation of the government for the recycled tile? Location of the relocation tile and distances to relocation? Packaging of the recycled tile?
Answer: Stacks of unbroken tiles shall be strapped on pallets and left at the staging area.
4. Rowe Hall SOO#4.01.01 Do we need to replace the parapet caps that are associated with the tile areas?
Answer: No. The parapet caps are not being replaced.
5. 11th Signal Brigade Motor Pool Bldgs 51450 SOO# 4.01.01 and 51451 SOO# 4.03.02 There is no mention of deck repairs. We assume that we will replace the b-deck as needed. If metal panels can't be matched? What will be the method of installation of new panels? weld or screw?
Answer: The entire decks of Building 51450 and Building 51451 shall be replaced. Welds or screws are each an acceptable method of installation.
6. Are there any additional files related to the roof repair efforts?
Answer: The following two files are provided.
1. 223-25-421 pages 19, 20, 21, 22, 34, 41, 44, and 45 for building 63845.
2. 223-25-1637 pages 9, 10, 13 and 14 for building 51450 and 51451.