B08 Questions with answers for solicitation W9124A22R0013 Repair Roof Building 51301-11JULY2022.pdf
PDF 124 KB Posted
- Solicitation number
- W9124A22R0013
About this file
This document contains questions and answers related to a solicitation for roof repair services at Building 51301 on Fort Huachuca in Arizona. Key details include that the solicitation is for a firm fixed-price contract to repair 23 skylights measuring approximately 4 feet by 4 feet at the ceiling, with the roof opening size unspecified. Questions from potential offerors are due by July 6th and proposals are due by July 25th. The work is a 100% small business set-aside under NAICS code 238160. The applicable Davis-Bacon wage determination is also provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions for solicitation W9124A22R0013- Repair Roof Building 51301 11 JULY 2022
1. Are there any As-Built drawings for the BUR roof section?
Answer: The BUR roof repair was removed from the Statement of Objectives.
2. Is the BUR roof section a structural slope or is this a tapered insulation section?
Answer: See answer to Question 1.
3. Please confirm that the desired quantity of skylights is to remain (23) 5'x5' skylights?
Answer: The number of skylights shall remain 23. The size at the suspended ceiling is 4’ by 4’. The size of opening at the roof is not defined. The skylight roof opening shall be of a square size that will provide uniform lighting at the 4’ by 4’ ceiling opening.
Photos are provided to show the particular ceiling around some of the skylight openings.
4. What are the required design submittal phases? Will this be one single final submission with limited stamped drawings and full specifications, or will we have an initial design narrative with concept drawings, specification list to then be followed by the final submission?
Answer: We expect a design analysis with calculations with initial set of design, and full text of specifications that has all the elements, as the final design and specifications. The Government will review the initial and final design submissions.
5. Will a design charrette be required?
Answer: See answer to Question 4.
6. What are the expectations for each design drawing package?
Answer: See answer to Question 4.
7. Can the designers stamp be from any U.S. State?
Answer: Yes.
8. Can the design review meetings be virtual?
Answer: No.
9. Please confirm that a single qualified site supervisor (triple-hat) can fill the role of Superintendent, QCM and SSHO.
Answer: The QCM shall not have duties other than QC. The Superintendent can also be the SSHO.
The shape of the skylight cover is similar to a hip roof shape. There are two of this style in the lobby. The bottom left corner of the photo shows the location of the second skylight with a temporary repair using lighting fixture diffuser.
The skylight cover is about 4 foot by 4 foot. The frame covers the edge of the 1 foot by 1 foot ceiling tiles.
The skylight cover fits into the ceiling grid.