Round_Two_Questions_and_Answers.pdf
PDF 113 KB Posted
- Attached to
- HVAC system replacement Federal contract opportunity
- Solicitation number
- W9124A-17-T-0010
About this file
Round two questions answered after the Site Visit on 04/27/2017.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Round_Two_Additional_Questions_and_Answers_CORRECTION.docx | DOCX document | |
| Round_Two_Additional_Questions_and_Answers.docx | DOCX document | |
| Round_One_Questions_and_Answers.docx | DOCX document | |
| A07-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Round two questions from site visit. Metzger, Craig A Mr CIV USA IMCOM | UNITED STATES ARMY
HVAC system Questions and Answers for W9124A-17-T-0010
1.) Will contractor be responsible for removal of the old HVAC unit from property or will it be left onsite?
A: Contractor to provide removal
2.) SOV item 3.2.1.1 Recover refrigerant in current system. Will recovery cylinders be provided or should contractor include in bid proposal?
A: Contractor to provide and dispose of old refrigerant
3.) I heard the heater is broken, but the A/C still works. Can we replace the heater or do we have to replace the whole HVAC?
A: Replace entire unit with new.
4.) When specifically is the requirement due?
A: The requirement, as stated in the solicitation, shall be received electronically via e-mail no later than
10:00 AM local Arizona time.
5.) Does new system need to be tied into the existing building automation?
A: The system is not tied into any other system. It is a stand-alone system, which only provides cooling/heating for room 122. The unit does need to be controlled by a thermostat, to be located in a convenient location within the room.
The following questions follow the site visit, which encompassed visiting room 122 (the electronics shop), the outside fenced area (the heat exchanger/electrical area) & room 121 (the breaker room, labelled ‘mechanical room#2’), as well as, two rooms that adjoin the HVAC areas.