Round_Two_Additional_Questions_and_Answers_CORRECTION.docx
DOCX document 33 KB Posted
- Attached to
- HVAC system replacement
- Solicitation number
- W9124A-17-T-0010
About this file
CORRECTION to Round Two Additional Questions and Answers at request of customer after reviewing the answers they provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Round_Two_Additional_Questions_and_Answers.docx | DOCX document | |
| Round_Two_Questions_and_Answers.pdf | ||
| Round_One_Questions_and_Answers.docx | DOCX document | |
| A07-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC system Questions and Answers for W9124A-17-T-0010 The following questions follow the site visit, which encompassed visiting room 122 (the electronics shop), the outside fenced area (the heat exchanger/electrical area) & room 121 (the breaker room, labelled ‘mechanical room#2’), as well as, two rooms that adjoin the HVAC areas.
6) Is humidity control required? Is a humidifier required?
A: Yes, humidity control required. Humidifier is not required. Would like control included within the unit
7) Is there a current emcs system in this building? Is it connected to this unit? Will it be required to be connected/ reconnected?
A: Unit is a standalone system, only for room 122.
8) Is fire alarm shut down required?
A: No shut down required.
9) Does new duct need to be painted?
A: No
10) If the new unit is larger than the concrete pad, will we have to pour a larger base or can we make something out of steel to add on?
A: Any base that meets the manufacturer's requirements will be fine.