Round_Two_Additional_Questions_and_Answers_CORRECTION.docx
DOCX document 33 KB Posted
- Attached to
- HVAC system replacement Federal contract opportunity
- Solicitation number
- W9124A-17-T-0010
About this file
CORRECTION to Round Two Additional Questions and Answers at request of customer after reviewing the answers they provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Round_Two_Additional_Questions_and_Answers.docx | DOCX document | |
| Round_Two_Questions_and_Answers.pdf | ||
| Round_One_Questions_and_Answers.docx | DOCX document | |
| A07-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC system Questions and Answers for W9124A-17-T-0010 The following questions follow the site visit, which encompassed visiting room 122 (the electronics shop), the outside fenced area (the heat exchanger/electrical area) & room 121 (the breaker room, labelled ‘mechanical room#2’), as well as, two rooms that adjoin the HVAC areas.
6) Is humidity control required? Is a humidifier required?
A: Yes, humidity control required. Humidifier is not required. Would like control included within the unit
7) Is there a current emcs system in this building? Is it connected to this unit? Will it be required to be connected/ reconnected?
A: Unit is a standalone system, only for room 122.
8) Is fire alarm shut down required?
A: No shut down required.
9) Does new duct need to be painted?
A: No
10) If the new unit is larger than the concrete pad, will we have to pour a larger base or can we make something out of steel to add on?
A: Any base that meets the manufacturer's requirements will be fine.
Round two questions from site visit.Metzger, Craig A Mr CIV USA IMCOM | UNITED STATES ARMY
File details come from the government source that posted it. Updated .