DRAFT_PRS.pdf
PDF 260 KB Posted
- Attached to
- EXTENSION OF BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES CONTRACT Federal contract opportunity
- Solicitation number
- W91249-16-C-0006
About this file
Performance Requirements Summary
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY
Directorate of Public Works Base Operations and Maintenance Support Services
Fort Gordon, Georgia
FUNCTIONAL AREA 5.1
MOBILIZATION RELATED MISSIONS, DEPLOYMENT AND CONTINGENCY PLANNING
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract clauses.
Performance Objective SOW
Paragraphs Performance Threshold
TASK 1
Provide engineer support for the Government’s mobilization related missions, deployments, contingencies and special events in compliance with Department of Army and installation security procedures.
5.1. and 5.1.1. 100% of the time.
TASK 2 5.1.2. 100% of the time.
Establish approved classified storage facilities in through compliance with DoD 5220.22-M and 5220.22-R, with 5.1.2.2.
Supplements, Department of the Army and installation security procedures.
TASK 3
Maintain and provide current rosters of personnel cleared for access to classified materials IAW technical exhibits.
5.1.2.3. 100% of the time.
TASK 4
Develop, review, and deliver supplemental support plans and procedures IAW the Department of Army and installation security procedures.
5.1.2.4. 100% of the time.
TASK 5 5.1.3. 100% of the time.
Provides immediate response in support of mobilization through related mission(s), contingency efforts 5.1.3.2.10 TASK 6 5.1.4. 100% of the time.
Identify and provide a single point of contact in support of through Plans and Operations coordinator and Unit movement 5.1.4.1.
Coordinators IAW installation security plan.
TASK 7
Establish and furnish, in writing, names and positions of contractor personnel designated to participate in activities.
5.1.4.3. 100% of the time.
TASK 8
Prepare and provide reports, briefs, after actions reports, and other documentation and provide representation in accordance with the terms of the contract.
5.1.4.4. 100% of the time.
TASK 9
Establish and implement a Quality Control Program within the contractor’s organization IAW approved Contractor’s Quality Control Plan.
5.1. through 5.1.4.4.
100% of the time.
FUNCTIONAL AREA 5.2
RESOURCE MANAGEMENT
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract clauses.
Performance Threshold
TASK 1
The Contractor shall provide financial data to assist in the formulation of the IMCOM Garrison Operating Budget and for other budget reporting and financial management purposes.
5.2.1 100% of the time.
TASK 2
No over-obligation of funds. Maintain commitment ledgers and obligation files by AMS as outlined DFAS-IN Manual 37-100-XX. The reports shall be reconciled with GFEBS to verify recording of all transactions.
5.2.2, 5.2.3 and 5.2.4
100% of the time.
TASK 3
Preparation/receipt of all deliverables and operate within established obligation/expense ceilings furnished by the Contracting Officer for each funding level.
5.2.4 100% of the time.
TASK 4
Prepare and process Cost Transfer Voucher. Prepare documents and maintain budget schedules for cost transfers and shall not provide services for amounts in excess of funded amounts. Reconcile and close out reimbursable customer documents.
5.2.5.2 No more than two deficiencies per month.
TASK 5
Ensure proper accounting classification AMS and WBS’ are cost on all financial or accounting documents. Documents will be submitted in accordance with IMCOM Common Level of Support (CLS), DOD-FMR, DFAS 37-1, and DFAS 37-100-
XX.
5.2.6 No more than two deficiencies per month.
TASK 6
Notify COR prior to responding to requests for financial information or costing data by anyone other than KO.
5.2.10 100% of the time.
TASK 7
Provide a Quality Control Program and effective Problem Resolution/Customer Satisfaction by tracking incremental funding, tracking obligations by funding lines on the contract, identify incremental funding to the COR to reflect schedule changes, additions projects and de-obligations IAW IMCOM guidance and financial regulations. Prepare accounting data and schedule changes for all contract modifications;
maintain cost statements each month-end through 31 Aug and as of 15 and 30 Sep for key accounts.
Monitor contract disbursements and identify errors to the COR.
5.2.1.1 No more than two deficiencies per month.
TASK 8
Provide Monthly Briefings to show status of un-liquidated contract obligations. Un-liquidated obligations will be justified. Financial data will be provided to COR to assist in formulation of the IMA Garrison Operating Budget. Provide Phased Obligation Plan (POP) and assure costs are accurate and charged to the appropriate WBS as costs are incurred. Track funding by each funding line and functional line of the contract.
5.2.1 AND
5.2.8
FUNCTIONAL AREA 5.3
ENGINEER WORK ORDER RECEPTION, TRACKING, AND DESIGN SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1 C.5.3.1 Not more than 10 deficiencies noted per Provide project work order, demand maintenance order through 100 tasks accomplished.
and operations work order reception and data reporting C.5.5.3.5.1.
capability. Work orders are properly prioritized, C.5.3.7 & classified and scheduled. C.5.3.7.1 TASK 2 C.5.3.5.2 Not more than 10 deficiencies noted per Provide a detailed estimate and design capability. through 100 tasks accomplished.
Detailed estimates are provided within the established C.5.3.5.5 time requirements.
TASK 3
Process and issue digging permits within the 3-day response requirement.
C.5.3.6. Not more the 10 deficiencies noted per 100 tasks accomplished.
TASK 4 C.5.3.8 Not more the 4 deficiencies noted per 100 Provide RPMA supply capability IAWE the assigned through tasks accomplished.
priorities. C.5.3.8.4 TASK 5 C.5.3.5.3, Not more than 10 deficiencies noted per Provide reports and deliverables as required in the C.5.3.3.1, reports submitted Technical exhibit. C.5.3.4, C.5.3.8.1, C.5.3.8.2, C.5.3.8.3
TASK 6 C.1.11.1 Not more the 4 deficiencies noted per 100 Provide a Quality Control Program and effective through tasks accomplished.
Problem Resolution/Customer Satisfaction capability C.1.11.1.2 IAW sound facilities maintenance and repair service procedures.
FUNCTIONAL AREA 5.4
ENVIRONMENTAL EFFECTS
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1 C.5.4.2.1 – 100% of the time Contractor shall comply with all applicable C.5.4.2.2, environmental, natural and cultural resource federal, C.5.4.9.6 state, and local law, regulation policy, standard, and US Army Garrison, Fort Gordon Compliance Media Specific Management Plans
TASK 2
Operate all landfills to comply with all federal, State, and local regulatory solid waste requirements and permits.
C.5.4.2.1. 100% of the time.
TASK 3
Compliance and permit required reports are submitted within proper time frame to allow submission to regulatory agencies, through appropriate government in nature staff.
C.5.4.2.1. 100% of the time.
TASK 4
Operators have required licenses/certifications.
Minimum manning levels are met.
C.5.4.2.1. 100% of the time.
TASK 5
Contractor shall comply with all provisions and requirements of the Installation Pest Management Plan
C.5.4.2.1.1. 100% of the time.
TASK 6
Facilities are operated to comply with Storm water NPDES Permit (Industrial, Construction, and Municipal)/Storm water Plan requirements.
C.5.4.2.1.3. 100% of the time.
TASK 7 C.5.4.2.1.3 100% of the time.
Activity coordinator is appointed in writing for each facility covered under industrial, construction, and municipal Storm water NPDES Permits.
TASK 8
Conduct and Document facility inspections IAW permit/plan.
C.5.4.2.1.3. 100% of the time
TASK 9
Train personnel IAW with permits/plans
C.5.4.2.1.3. 100% of the time.
TASK 10
Inform COR of facility changes required IAW permits/plans and coordinate plan update
C.5.4.2.1.3. 100% of the time.
TASK 11
Implement facility/plan/project Best Management Practices IAW permits/plan requirements.
C.5.4.2.1.3. 100% of the time.
TASK 12
Inspect and repair storm water control structures IAW Permits/Plans.
C.5.4.2.1.3. 100% of the time.
TASK 13
Prepare and Submit all erosion and sediment control plans to COR for review and approval IAW permits/plans. All designs will be prepared IAW Georgia Requirements for Erosion and Sediment Control.
C.5.4.2.1.3. 100% of the time.
TASK 14
Recycle waste/excess IAW Installation Sustainability Management System (SMS) goals and Solid Waste Management Plan
C.5.4.2.1.3. 100% of the time.
TASK 15 C.5.4.2.4. – 100% of the time.
Hazardous material and waste will be managed, stored, C.5.4.2.4.6.
handled, and disposed of in accordance with 40 CFR, Part 262: 49CFR, State law and regulation and US Army Garrison, Fort Gordon policy and requirement.
TASK 16 C.5.4.3.1. 100% of the time.
Asbestos related activities shall comply with all through Federal, state, local laws, and regulations C.5.4.3.10.
TASK 17
Manage all asbestos containing materials (ACM) in accordance with requirements of the Toxic Substance Control Act (TSCA).
C.5.4.3.1. 100% of the time.
TASK 18
Establish and maintain operations and maintenance (O&M) plan with specific procedures for workers handling ACM. Certified Industrial Hygienist (CIH) shall update and certify this plan annually.
C.5.4.3.2. 100% of the time
TASK 19
Maintain database by building number, which identified ACM in all buildings. Verify building is free of asbestos or certify that appropriate precautions have been taken to in health, welfare, and safety of building occupants.
C.5.4.3.3. 100% of the time.
TASK 20
Perform asbestos sampling as directed; provide verbal analysis results within six hours of an individual emergency or within three working days in a non-emergency situation. Written results shall be provided within several working days in all cases.
C.5.4.3.4. 100% of the time.
TASK 21
Perform surveys, at one-year intervals, of all facilities with ACM. The survey shall be certified by
C.5.4.3.5. As directed
TASK 22
Perform asbestos survey within the preceding 30 days on any building scheduled for demolition
C.5.4.3.6. 100% of the time.
TASK 23 C.5.4.3.7 100% of the time Maintain an equipped and trained asbestos abatement C.5.4.3.8 team IAW Asbestos Management Plan. C.5.4.3.9
TASK 24
All ACM shall be disposed of in proper containers that
C.5.4.3.10. 100% of the time.
TASK 25
RESERVED
TASK 26
TASK 27
TASK 28
TASK 29
Perform all requirements for sewage spills and pump out
C.5.4.6. 100% of the time.
TASK 30
Telephonically notify COR of sewage spills and provide spill report within 30 minutes of discovery.
C.5.4.6. 100% of the time.
TASK 31
Implement requirements of Underground Storage Tank (UST) Regulations 40 CFR 280-281 and
C.5.4.7 100% of the time.
TASK 32
Lead-based paint activities shall comply with all Federal, state, local laws, and regulations.
C.5.4.8.1. 100% of the time.
TASK 33
C.5.4.8.2 100% of the time.
Establish operations and maintenance plan for workers C.5.4.8.3 100% of the time.
with specific procedures for handling lead-based paint C.5.4.8.4 IAW regulatory requirements and policies. Analysis of C.5.4.8.5 materials for lead content shall be performed by an C.5.4.8.5 C.5.4.9.1 approved and accredited laboratory.
TASK 34
Comply with all Conditions of the Part 70 Operating Permit—Title V Permit.
TASK 35
Emergency Generator G 028 Central Power Plant – Recordkeeping Requirements, Testing and Monitoring, and 40% Opacity compliance IAW Title V.
C.5.4.9.2.1. 100% of the time.
TASK 36
Peaking Generator G002 Hospital – Recordkeeping Requirements, Testing and Monitoring, and 40% Opacity compliance IAW Title V.
C.5.4.9.2.2. 100% of the time.
TASK 37
Submit all copies of logs to the Air Quality Program by the 10th of each month.
C.5.4.9.2.4. 100% of the time.
TASK 38
TASK 39
Boilers B014, B015, B016 (Boilers #1-3), Building 310 – Recordkeeping Requirements, and Testing and Monitoring. Opacity shall not exceed 20% (6-minute average) except for on-six minute period per hour of 27% Opacity IAW Title V.
C.5.4.9.3.2. 100% of the time.
TASK 40
Boilers B003, B004, B005 (Boilers #3, 4, & 5), Building 25910 – Recordkeeping Requirements, and Testing and Monitoring. Opacity shall not exceed 20% (6-minute average) except for one-six minute period per hour of 27% opacity IAW Title V.
C.5.4.9.3.3. 100% of the time.
TASK 41
Submit all copies of logs to the Air Quality Program by the 10th of each month.
C.5.4.9.3.4. 100% of the time.
TASK 42
Vehicle Paint and Body Spray Paint Booths – Recordkeeping Requirements, and Testing and Monitoring IAW Title V Permit.
C.5.4.9.4.1. 100% of the time.
TASK 43
Paint Spray Booths (Miscellaneous Coating and Operations – Recordkeeping Requirements IAW Title V Permit.
C.5.4.9.4.2. 100% of the time.
TASK 44
Maintain MSDS for all paint/material used in the operation. Submit all copies of logs to the Air Quality Program by the 10th of each month.
C.5.4.9.4.3. 100% of the time.
TASK 45
Manage Ozone Depleting Chemicals (ODC’s) – Condition 7.11 IAW Title V Permit.
C.5.4.9.5. 100% of the time.
TASK 46
Recordkeeping Requirements, Certification/License Requirements IAW EPA Regulatory guidance.
C5.4.9.5.2.
through C.5.4.9.5.3.
100% of the time.
TASK 47
ODC uses will be reported to the Air Quality Program IAW regulatory requirement.
C.5.4.9.5.4. 100% of the time.
TASK 48
TASK 49
Special Emphasis – State and Federal Regulators inspect for compliance, closely monitor these Part 70 Operating Permit – Title V conditions.
C.5.4.9.7 100% of the time.
TASK 50
Comply with the Asbestos NESHAP in accordance with the Clean Air Act Section 112, 40 CFR 61.145, CFR 61.140, 150, 153, and 154.
C.5.4.9.7.1.1 100% of the time.
TASK 51 C.5.4.9.7.1.2 100% of the time.
Comply with the Toxic Substance control Act, 40 CFR C.5.4.9.7.1.3
763.160 to 763. Bans “new uses” of asbestos materials.
TASK 52
Identify Asbestos-Containing material (ACM) that has become friable IAW Georgia Rules – Chapter 391-3-1, 391-3-4 and 391-3-14 Regulated Asbestos Containing material (RACM) to include Category I non-friable
ACM.
C.5.4.9.7.2. 100% of the time.
TASK 53
Maintain accessible records of the dimensions and an analysis showing the capacity of Storage Tanks T001 through T007 IAW regulatory requirements. These records shall be kept for the life of the sources.
C.5.4.9.7.3.1. 100% of the time.
TASK 54
Comply with requirements – 40 CFR 60, Subpart K, 110-117b, “Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels)”.
C.5.4.9.7.3.2 100% of the time.
TASK 55
Comply with Fugitive Dust – conditions 8.22 IAW Title V Permit.
C.5.4.9.7.4. 100% of the time.
TASK 56
Comply with Visible Emissions – Conditions 8.18 IAW Title V Permit
C.5.4.9.7.5. 100% of the time.
TASK 57
Comply with Particulate Emissions – condition 8.21 or Title V Permit
C.5.4.9.7.6. 100% of the time.
TASK 58
Comply with Visible Emissions Monitoring IAW Title V Permit.
C.5.4.9.7.7. 100% of the time.
TASK 59 C.5.4.10 100% of the time.
Potable wells and associated components are operated to comply with all Federal, State Regulations 391-3-5, 391-3-6 and 290-5-26, and availability of potable water is maintained.
TASK 60
Compliance and permit required reports are submitted within proper time frame to allow submission to regulatory agencies.
C.5.4.10
TASK 61
Operators, lab technician, contract manager and alternate’s have required licenses/certifications and they are valid IAW EPA and State of Georgia regulatory requirements. Minimum manning levels are met.
C.5.4.10
TASK 62
TASK 63 C.5.4.10 All necessary tests are performed and are Provides accurate sampling and laboratory analysis accurate 100 % of the time.
IAW 391-3-5.
TASK 64
Participate in US Army Garrison, Fort Gordon Environmental Management System (EMS)/Sustainability Management System (SMS) conforming to ISO 1400 1 standards.
C.5.4.12 100% of the time.
TASK 65
Facilities are operated IAW 40 CFR 112 and in compliance with Fort Gordon Spill Contingency and Countermeasures Plan, Installation Spill Contingency Plan requirements.
C.5.4.12.1 100% of the time.
TASK 66
Maintain Spill Response Equipment and Response Trailer 40 CFR 112.
C.5.4.12.1 100% of the time.
TASK 67 C.5.4.2.1.3, 100% of the time.
Respond to oil/hazardous/general release and spills (to C.5.4.6, include non-permitted discharges) IAW 40 CFR 112. C.5.4.12.1
TASK 68
Train Personnel IAW 40 CFR 112.
C.5.4.12.1 100% of the time.
TASK 69
Coordinate facility changes and plan updates with
COR IAW 40 CFR 112.
C.5.4.12.1 100% of the time.
TASK 70
Infectious/Toxic waste incident site cleanup and waste disposal IAW 391-3-4, DOT 49CFR173 and HHS 42CFR72 and RCRA requirements.
C.5.4.12.1 100% of the time.
FUNCTIONAL AREA 5.5
U-DO-IT SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1 C.5.5.1. Not more than 10 deficiencies noted per Operate the U-DO-IT facility during established time through 100 tasks accomplished.
periods. C.5.5.1.2 &
C.5.5.4.6 TASK 2 C.5.5.2 Not more than 10 deficiencies noted per Provide U-DO-IT Training Programs IAW technical through 100 tasks accomplished.
exhibits. C.5.5.4.6 TASK 3 C.5.5.4.1 Not more than 4 deficiencies noted per Issue of authorized U-DO-IT items IAQ technical through 100 tasks accomplished.
exhibits and approved work orders. C.5.5.4.5 TASK 4 C.5.5.4.4 Not more than 10 deficiencies noted per Inspect completed U-DO-IT tasks IAW AR 420-70. through 100 tasks accomplished.
C.5.5.4.8 TASK 5 C.5.5.1.1, Not more than 10 deficiencies noted per Provide reports and deliverables IAW technical C.5.5.2.1, 100 tasks accomplished.
exhibits. C.5.5.2.2, C.5.5.2.3, C.5.5.4.2, C.5.5.4.4, C.5.5.4.5
TASK 6
Provide a Quality Control Program and Problem Resolution/Customer Satisfaction capability IAW sound facilities maintenance and repair service procedures.
C.1.9 through C.1.9.6
Not more than 4 deficiencies noted per 100 tasks accomplished.
FUNCTIONAL AREA 5.6
FACILITIES MAINTENANCE AND REPAIR SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1
PM conducted IAW the contractor’s approved PM Plan.
C.5.6.1.1 through C.5.6.1.2.2.2
Not more than 10 deficiencies noted per 100 tasks accomplished.
TASK 2
RESERVED
TASK 3 C.5.6.1.4 Not more than 6 deficiencies noted per Pr “1” DMO repairs service provided by qualified through 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.6.1.11.3 TASK 4 C.5.6.1.4 Not more than 10 deficiencies noted per Pri “2” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.6.1.11.3 TASK 5 C.5.6.1.4 Not more than 15 deficiencies noted per Pri “3” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.6.1.11.3 TASK 6 C.5.6.1.4 Not more than 4 deficiencies noted per Operations Work Order (OWO) repair service through 100 tasks accomplished.
provided by qualified personnel IAW industry C.5.6.1.11.3 standards and reported IAW associated deliverables.
TASK 7 C.5.6.1.5.4.7 Not more than 10 deficiencies noted per Provide reports and deliverables as required in the C.5.6.1.2.2 100 tasks accomplished.
technical exhibit. C.5.6.1.5.4.8.3 TASK 8 C.1.11.1 Not more than 4 deficiencies noted per Provide a Quality Control Program and an effective through 100 tasks accomplished.
Problem Resolution/Customer Satisfaction capability C.1.11.1.2
FUNCTIONAL AREA 5.7
GROUNDS AND SURFACED AREA SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1
Perform grounds maintenance IAW approved plans and technical exhibits.
C.5.7.1.1 through C.5.7.4.20
Not more than 4 deficiencies noted per 100 tasks accomplished.
TASK 2
TASK 3 C.5.7.1.1 Not more than 6 deficiencies noted per Pr “1-Z” DMO repairs service provided by qualified through 100 tasks accomplished.
personnel IAWQ industry standards and C.5.3.3. C.5.7.4.20 TASK 4 C.5.7.1.1 Not more than 10 deficiencies noted per Pri “2” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAQ industry standards and C.5.3.3. C.5.7.4.20 TASK 5 C.5.7.1.1 Not more than 15 deficiencies noted per Pri “3” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAQ industry standards and C.5.3.3. C.5.7.4.20 TASK 6 C.5.7.5 Not more than 10 deficiencies noted per Operations Work Order (OWO) repair service through 100 tasks accomplished.
provided by qualified personnel IAW industry C.5.7.10 & standards and reported IAW associated deliverables. C.5.7.11
C.5.7.12 through C.5.7.12 C.5.7.14.3
TASK 7 C.5.7.8 No deficiencies noted for the tasks Provide bridge and class 1 dam maintenance IAW C.5.7.10 accomplished industry standards.
TASK 8
Provide lake and pond maintenance IAW technical exhibit.
C.5.7.9 Not more than 5 deficiencies noted per 100 tasks accomplished.
TASK 9 C.5.7.4.8 Not more than 4 deficiencies noted per Provide reports and deliverables as required in the C.5.7.4.16 100 tasks accomplished.
technical exhibit. C.5.7.6.6 TASK 10 C.1.11.1 Not more than 4 deficiencies noted per Provide a Quality Control Program IAW sound through 100 tasks accomplished.
facilities maintenance and repair service procedures. C.1.11.1.2
FUNCTIONAL AREA 5.8
PEST CONTROL SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1 C.5.8.1 Not more than 10 deficiencies noted per Pest management operations conducted in accordance through 100 tasks accomplished.
with the approved Pest Management Plan. C.5.8.4.3
C.5.5.5 through C.5.8.10.15 C.5.8.11.1 through C.5.8.13
TASK 2 C.5.8.5 Not more than 4 deficiencies noted per Supply/material management IAW the DoD through 100 tasks accomplished.
management Board and EPA./ C.5.8.6.7
TASK 3
Permits, licenses and certificates IAW DoD and/or State of Georgia requirements.
C.5.8.7 No deficiencies accepted during the performance periods.
TASK 4 C.5.8.14 Not more than 10 deficiencies noted per Equipment maintenance and calibration IAW through 100 tasks accomplished.
manufacturer’s recommendations. C.5.8.14.17 TASK 5 C.5.8.14 Not more than 10 deficiencies noted per Provide reports and deliverables as required in the through 100 tasks accomplished.
technical exhibits. C.5.8.14.17
TASK 6
Provide a Quality Control Program an effective
C.1.11.1 through
Not more than 3 deficiencies noted per 100 tasks accomplished.
Problem Resolution/Customer Satisfaction capability and IAW sound facilities maintenance and repair service procedures.
C.1.11.1.2
FUNCTIONAL AREA 5.9
PLANT OPERATIONS
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1
Provide operations IAW the Rules for Safe Drinking Water – Chapter 391-3-5, Georgia DNR, and State Permit to Operate well systems.
C.5.9.1.3 No deficiencies accepted during the performance period.
TASK 2
Provide operation and maintenance of emergency standby equipment IAW technical exhibits.
C.5.9.3 No deficiencies accepted during the performance period.
TASK 3
Provide operation and maintenance of swimming pool equipment IAW TB Med 575 and current State of Georgia Regulations.
C.5.9.1.4 No deficiencies accepted during the performance period.
TASK 4 C.5.9.1 Not more than 4 deficiencies noted per Provide reports and deliverables as required in the C.5.9.3 100 tasks accomplished.
technical exhibit C.5.9.4
C.5.9.5
TASK 5
TASK 6
TASK 7 C.5.9.1 Not more than 6 deficiencies noted per Pri “1/Z” DMOs repair service provided by qualified C.5.9.3 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.9.4
C.5.9.5 Performance Objective SOW
Paragraphs Performance Threshold
TASK 8 C.5.9.2.4 Not more than 10 deficiencies noted per Pri “2” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.9.4.6 and
C.5.9.2.6 & C.5.9.2.7
TASK 9 C.5.9.2.4 Not more than 15 deficiencies noted per Pri “3” DMO repair service provided by qualified through 100 tasks accomplished.
personnel IAW industry standards and C.5.3.3. C.5.9.4.6 and
C.5.9.2.6 & C.5.9.2.7
TASK 10 C.5.9.2.2.1, Not more than 4 deficiencies noted per Provide reports and deliverables as required in the C.5.9.2.3, reports submitted.
technical exhibits. C.5.9.2.2.3, C.5.9.2.4.5, C.5.9.2.2.3.6.1
& C.5.9.2.5 TASK 11 C.5.9.3.1 Not more than 4 deficiencies noted per Provide heating and cooling plant operations IAW C.5.9.3.2 100 tasks accomplished.
technical exhibits. through
C.5.9.3.5.5 TASK 12 C.5.9.3.3.4.14, Not more than 4 deficiencies noted per Provide reports and deliverables as required in the C.5.9.3.3.4.15, reports submitted.
technical exhibits. C.5.9.3.6 TASK 13 C.5.9.4 Not more than 4 deficiencies noted per Provide an Energy Conservation and Utilities Program through 100 tasks accomplished.
IAW AR 11-27. C.5.9.4.3
TASK 14 C.5.9.1 Not more than 4 deficiencies noted per Provide Landfill operations and dumpster sanitation through 100 tasks accomplished.
requirements IAW the Georgia Solid Waste C.5.9.5.2.2.
Management Act Regulations, applicable Federal C.5.9.5.4 Regulations, and technical exhibits. through
C.5.9.5.5 C.5.9.5.2.1 C.5.9.5.3 through C.5.9.5.3.3.
TASK 15 C.5.9.5.2.2., Not more than 4 deficiencies noted per Provide reports and deliverables as required in the C.5.9.5.5 reports submitted technical exhibits. C.5.9.5.3.3 TASK 16 C.1.11.1 Not more than 4 deficiencies noted per Provide a Quality Control Program and an effective through 100 tasks accomplished.
Problem Resolution/Customer Satisfaction capability C.1.11.1.2
FUNCTIONAL AREA 5.10
PROJECT ACCOMPLISHMENT SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1
Provide a project tasking and accomplishment capability IAW C.5.3.5.
C.5.10.1 through C.5.10.2.2 C.5.10.3 through C.5.10.3.2
Not more than 4 deficiencies noted per 100 tasks accomplished.
TASK 2
TASK 3 C.1.11.1 Not more than 3 deficiencies noted per Provide a Quality Control Program and an effective through 100 tasks accomplished.
Problem Resolution/Customer Satisfaction capability C.1.11.1.2
FUNCTIONAL AREA 5.14
INSTALLATION SUPPLY SERVICES
General. The performance requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. All aspects of the contractor’s performance are subject to Government surveillance and the absence of a contract requirement from the PRS shall not detract from its enforceability nor limit the rights or remedies of the Government under contract
Performance Threshold
TASK 1 – TASK 17
TASK 18
Provide management, requisitioning, issuing and disposition of furnishings IAW applicable regulations.
5.14.14 through 5.14.14.1
No more than 4 days from receipt to perform all functions.
TASK 19 – TASK 29
| FUNCTIONAL AREA 5.1 |
| FUNCTIONAL AREA 5.2 RESOURCE MANAGEMENT |
| FUNCTIONAL AREA 5.3 |
| FUNCTIONAL AREA 5.7 |
| FUNCTIONAL AREA 5.9 PLANT OPERATIONS |
| FUNCTIONAL AREA 5.10 |
| FUNCTIONAL AREA 5.14 INSTALLATION SUPPLY SERVICES |
File details come from the government source that posted it. Updated .