Technical_Exhibit_1_–_Performance_Requirements_Summary_.pdf

PDF 105 KB Posted

Attached to
Locate Underground Utilities
Solicitation number
W9124818Q0025
Issued by

About this file

PRS

View the file

Other files

File Type Posted
QA.docx DOCX document
Conformed_Amd_1.pdf PDF
Atch_003.pdf PDF
Atch_006.pdf PDF
Atch_005.pdf PDF
TN_-_Wage_Determination.pdf PDF
Atch_004.pdf PDF
KY_-_Wage_Determination.pdf PDF
W9124818Q0025.pdf PDF
Technical_Exhibit_2_–_Deliverables_Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Required Services (Tasks)

Performance Standard

Acceptable Quality Level (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

# 1.

The contractor shall provide Normal Locates:

The contractor shall receive, process, coordinate and complete all locate requests/digging permits submitted. PWS paragraph 5.2.2

The contractor provided98% within 3 days 100%

Within 5 days.

2% Periodic Sampling and/ or 100% Inspection

# 2 Normal Locates: The contractor shall telephonically/electronicall y notify the point of contact (POC) listed on the locate request/digging permit whether buried/underground cable/utility was found. .

PWS paragraph 5.2.3

98% within 3 days 100% within 5 days

2% Periodic sampling or 100% inspection

# 3 Emergency Locates: The contractor shall receive, process, coordinate all locate requests/digging permits submitted. PWS paragraph 5.2.4

98% within 2 hours 100% within 3 hours

2% Periodic Sampling and/or Customer Feedback

# 4 Emergency Locates: The contractor shall complete all locate requests/digging permits submitted. PWS paragraph 5.2.5

98% within 3 hours 100% within 6 hours

2% Periodic Sampling and/or Customer Feedback

# 5 Emergency Locates: The contractor shall telephonically/electronicall y notify the point of contact (POC) listed on the locate request/digging permit whether buried/underground cable/utility was found.

PWS paragraph 5.2.6

98% within 4 hours 100% within 7 hours

2% Periodic Sampling and/or Customer Feedback

# 6 CMRA Data Input

NLT October

0% Verification of database entry