QA.docx

DOCX document 14 KB Posted

Attached to
Locate Underground Utilities
Solicitation number
W9124818Q0025
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Conformed_Amd_1.pdf PDF
Technical_Exhibit_1_–_Performance_Requirements_Summary_.pdf PDF
Atch_003.pdf PDF
Atch_006.pdf PDF
Atch_005.pdf PDF
TN_-_Wage_Determination.pdf PDF
Atch_004.pdf PDF
KY_-_Wage_Determination.pdf PDF
W9124818Q0025.pdf PDF
Technical_Exhibit_2_–_Deliverables_Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emergency locate cost is shown for the option 1 year only and is not in the base year or option years 2 through 4, Q1. Should the RFP have this option for each year of the contract?

A. No see revised pricing worksheet

1.6.19 Security training required for Contractor Personnel:

Q2. What is the duration of this training and is it a reimbursable expense?

A. No this is not a reimbursable expense

1.6.20.7.2 DAMAGES RESULTING FROM MISSED OR MIS MARKED FACILITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SUFFICIENT INSURANCE IS REQUIRED TO REPAIR THE DAMAGE CAUSED BY THOSE ACTIONS.

Q3. What are the minimum requirements for insurance coverage to comply with this requirement?

A. SCHEDULE OF INSURANCE

SCHEDULE OF INSURANCE:

a. The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the kinds and minimum amounts of insurance required below:

Workmen's Compensation and Employer's Liability Insurance $100,000.00 General Liability Insurance for Bodily Injury Liability:

Minimum Per Occurrence $500,000.00 Automobile Liability Insurance:

Minimum Per Person$200,000.00
Minimum Per Occurrence for Bodily Injury$500,000.00
Minimum Per Occurrence for Property Damage$ 20,000.00

Section B does not have a rate for 0003 as described in 5.2.17.

Q4. Will this be a required rate and is this the rate Contractor will be paid to update marks?

Section G and I incorporate all the government regulations for contractors including Prevailing Wage Rates.

A. Revised to read item 0001

Q5. The RFP contains Kentucky and Tennessee Prevailing wage rates. Which Wage rate will be required for a Utility Locate Technician for this RFP? Does the KY or TN apply or does it depend if the work on the Fort located in KY or in TN?

A. The Wage Determination will be for both KY and TN…but predominantly in KY.

Q6. Will Contractor be provided electronic prints, not just maps, drawings, or pages?

A. You will be provided with maps of Fort Campbell.

File details come from the government source that posted it.